1. ESTIMATES
1.1 Submitted 03
1.2 Awarded 05
2. REPORTS SUBMITTED 07
3. RESEARCH PAPERS
3.1 Submitted 07
3.2 Published 07
4. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES 08
5. LECTURES DELIVERED 08
6. PARTICIPATION IN MEETINGS
6.1 Technical Committees 08
6.2 Other Committees 09
7. TRAINING OF PERSONNELS 09
8. IMPORTANT VISITORS 09
9. NEW APPOINTMENTS / PROMOTIONS / RETIREMENTS 10
10. TRAINING PROGRAMMES ORGANIZED 10
11. OTHER INFORMATION 11
Phones : 24103378 Fax : 2438 1004 Email : [email protected] web: http://cwprs.gov.in
August 2017
2
Summary Information For 2009-2017
Years Jobs Awarded
_____________________
Nos. | Amount (Rs.)
Reports Submitted
Papers Published
Participation in Seminars/ Symposia/ Conferences
Lectures Delivered
Technical Committee Meetings
Training of Personnel
Training Programmes/ Conferences Organized
2009-10 118 14,46,68,747 94 57 39 36 30 59 04
2010-11 159 17,06,34,397 95 94 38 52 23 61 11
2011-12 139 18,56,13,568 116 63 26 45 42 88 08
2012-13 150 22,53,10,859 120 67 44 57 24 55 08
2013-14 152 18,24,51,087 112 63 37 68 21 54 11
2014-15 153 25,69,14,032 113 62 58 47 12 62 09
2015-16 85 13,95,89,971 106 65 51 74 17 120 10
2016-17 111 25,90,34,704 95 90 114 97 23 315 17
STUDIES AWARDED FOR CURRENT YEAR 2017-2018
Till July -17 43 9,38,43,719 31 13 02 04 15 494 05
During August -17
14 4,75,72,606 04 05 04 01 02 44 02
Total 5 7 141416325 35 18 06 05 17 538 07
Estimate submitted to Client but yet to be awarded
August 2017 31 4,23,27,754 - - - - - - -
CWPRS Information Bulletin August 2017
3
1. ESTIMATES
1.1 Submitted: (31 Nos. totaling to Rs, 4,23,27,754/-)
Sl. No.
Name of Work Sponsoring Agency Division Amount (Rs.)
1 Measurement of water discharge through Penstocks of Koyna Stage-I and Stage-II generating units for MAHAGENCO, Pophali.
Chief Engineer, Maharashtra State Power Generation Co. Ltd. Koyna Generating Station Complex, Pophali tal-Chiplun, Dist-Ratnagiri (MS) Pin-415601
HMC 7,71,440
2 Measurement of water discharge through penstocks of Koyna Stage-IV generating units for MAHAGENCO, Pophali
Chief Engineer, Maharashtra State Power Generation Co. Ltd. Koyna Generating Station Complex, Pophali tal-Chiplun, Dist-Ratnagiri (MS)Pin 415601
HMC 4,45,860
3 Measurement of water discharge through penstocks of Koyna Stage-III and KDPH generating units for MAHAGENCO Pophali
Chief Engineer, Maharashtra State Power Generation Co. Ltd. Koyna Generating Station Complex, Pophali tal-Chiplun, Dist-Ratnagiri (MS) pin- 415601
HMC 6,10,100
4 Desk studies for the design of Coastal protection works for various sites in Mumbai Saburban, Palghar and Raigad districts, Maharashtra
Coastal Engineer, Office of the Coastal Engineer 3rd floor, Administrative Building, Near Chetana Collage, Bandra (East) Mumbai-400051
CHS-II 30,03,000
5 Desk studies for the design of Coastal protection works for various sites in Sindhudurg district, Maharashtra.
Coastal Engineer, Office of the Coastal Engineer 3rd floor, Administrative Building, Near Chetana Collage, Bandra (East) Mumbai-400051
CHS-II 10,00,710
6 Desk studies for the design of Coastal protection works for various sites in Ratnagiri district, Maharashtra.
Coastal Engineer, Office of the Coastal Engineer 3rd floor, Administrative Building, Near Chetana Collage, Bandra (East) Mumbai-400051
CHS-II 15,02,410
7 Desk & wave flume studies for the design of breakwater for the development of Fishery harbour at Vadarevu in Prakasam district ,Andhra Pradesh.
Sr. General Manager (P & H) WAPCOS LIMITED, 76-C Institutional Area, Sector-18 Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
8 Desk & wave flume studies for the design of breakwater for the development of Fishery harbour at Uppada in East Godavari district, Andhra Pradesh
Sr. General Manager (P & H) WAPCOS LIMITED, 76-C Institutional Area, Sector-18 Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
9 Desk & wave flume studies for the design of breakwater for the Phase-II development of Nizampattanam Fishery harbour in Guntur district, Andhra Pradesh
Sr. General Manager (P & H), WAPCOS LIMITED 76-C, Institutional Area Sector-18, Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
10 Desk & wave flume studies for the design of breakwater for the Phase-II development of Machilipattanam Fishery harbour in Krishna district, Andhra Pradesh.
Sr. General Manager (P & H), WAPCOS LIMITED 76-C, Institutional Area Sector-18, Gurgaon-122015 (Haryana), India.
CHS-II 6,07,140
11 Mathematical model studies to access the flow Conditions in river Tapi due to
City Engineer, Surat Municipal Corporation Surat Mahangar Seva
RH 17,52,680
CWPRS Information Bulletin August 2017
4
proposed river front development and river rejuvenation.
Sadan, Muglisaru, Surat-395003
12 Dam Break Analysis and providing inputs for Emergency Action plan for Baswapur Reservoir (Kaleshwaram Project), Bhongir Mandal, Dist-Yadadri, Bhongir, Telangana
Ex. Engineer, Irrigation & CAD, Construction Division, No-3, Kaleshwaram Project, Dist-Yadadri, Bhongir, Telangana-508116
SWH 16,00,000
13 Dam Break Analysis and providing inputs for Konda Pochamma Sagar Reservoir (Kaleshwaram Project) near Pamulaparthi Village, Dist. Siddipet, Telangana.
Ex. Engineer, Irrigation & CAD Construction Division no.2 Kaleshwaram Telangana-502278
SWH 16,00,000
14 Dam Break Analysis and providing inputs for Emergency Action plan for Gandhmalla Reservoir (Kaleshwaram Project) near Gandhmalla Village, Dist-Yadadri Bhongir, Telangana.
Ex. Engineer, Irrigation & CAD, Construction Division no.5, Kaleshwaram project Grade 2, Jagadevpur, Dist-Siddipet, Telangana-502103
SWH 16,00,000
15 Review of studies on Flood Estimation and Storm Water Drains for Patalganga Industrial Area of Reliance Industries Ltd, Raigad District of Maharashtra, for TRITECH Engineering Projects.
Shri. M. S. Gawande, TRITECH Engineering Projects, A-1, Sai Ganesh Complex, near Sahawas Society, Karvenagar, Pune-411052, Maharashtra.
HMET 9,33,700
16 Review of Hydro geological studies with reference to Pune Metro rail alignment passing through Mutha River of Maharashtra Conducted by MITCON (C& ES. Ltd.)
Dr. Sandeep Jadhav, Vice president, MITCON Consultancy and Engineering Service Ltd. 1st Floor, Kubera Chambers, Shivajinagar Pune-5 Maharashtra.
GP 6,84,760
17 Mathematical model studies for Hydrodynamics and Sedimentation in navigational channel in Khara Creek for Sanghi industries Limited, Gujarat.
Shri Jagdish Dodia Vice President (Exim. Logistic) 10th Floor, Katariya Arcade, aff S. G. Highway, Post-Makaaba, Dist-Ahmedabad Gujarat, Pin-380051
PH-I 19,02,200
18 Site Visit for Preliminary inspection of 10 surface penstocks of Sharavathi Generating station, Gerusoppa, Karnataka.
The Chief Engineer (Electrical Designs), Karnataka Power Corporation Limited, Sudarshan Complex, 3rd Floor, 22/23 Sheshadri Road, Bengaluru, Karnataka 560009
SMA 2,17,280
19 Dam break analysis for Doyang Dam, Doyang Hydro Electric Plant, NEEPCO, Doyang, Nagaland.
DGM(E/M) & 1/C HOP, Doyang Hydro Electric Power, NEEPCO, Doyang, Dist-Wokha, Nagaland-797100
SWH 16,00,000
20 Mathematical model studies for Hydrodynamics and dredge dispersion in the Gulf of Kutch, Gujarat.
The Chief Engineer, Kandla Port Trust Nirman Bhavan Near Kandla Kutchch Gujarat-370210
PH-I 10,36,280
21 Running and maintenance of Vishakhapatnam Port physical model during 2017.
The Chief Engineer (Civil) Vishakhapatnam-500035 Andhra Pradesh
PH-II 19,49,711
22 Hydraulic model studies for proposed Delhi-Ghaziabad-Meerut corridor of RRTS bridge across river Yamuna on the Upstream of NOIDA bridge at New Delhi
Shri R. K. Hustoo Chief Project Manager/DM National Capital Region Transport Corporation 7/6, ADA Building, Siri Fort Institutional Area August Kranti Marg, New Delhi-110049
RH 26,65,010
23 Desk studies for Prediction of Extreme wave Condition for the proposed development of Port at Wadhavan for
Chief Manager (PPD) Jawaharlal Nehru Port Trust, Administrative Building Sheva, Taluka Uran, Navi
PH-III 18,68,380
CWPRS Information Bulletin August 2017
5
M/S. JNPT Mumbai Mumbai-400007
24 Sectional model studies for the proposed Metro Rail bridge on river Mula at Pune, Maharashtra
Shri Nivas Kulkarni, Chief Project Manager Maha metro rail corporation Ltd. Pune Metro Project, 1st floor, The Orian Building, Arjun Mansukhani, Road Near Saint, Meera Collage Koregaon Park, Pune-411001 Maharashtra.
BE 22,31,260
25 Mathematical model studies for flood protection works along river Beas, Hamirpur, Himachal Pradesh.
Shri Neeraj Bhogal, Executive Engineer, HPIPH Division-Hamirpur, Dist-Hamirpur, Himachal Pradesh-177001
BE 18,38,400
26 Field data collection at Tarapur for the proposed development of port at Vadhavan, Maharashtra.
Chief Manager (PP & D) Administrative Building, Jawaharlal Nehru Port Trust, Sheva, Navi, Mumbai-400707
CHS 16,16,200
27 Physical hydraulic model studies for the development of new fish jetty near Clark Basin for M/s MDPT, Mumbai, and Maharashtra.
Chief Engineer Mumbai Port Trust, Port House, 3rd floor Shoorji Vallabhdas Marg, Ballard Estate Mumbai-400001
PH-III 16,51,380
28 Mathematical model studies for estimation of Siltation and to assess feasibility of flood/DS-3 dumping grounds for the development of new fish jetty near Clark Basin for M/s MBPT, Mumbai, Maharashtra.
Chief Engineer Mumbai Port Trust, Port House, 3rd floor Shoorji Vallabhdas Marg, Ballard Estate Mumbai-400001
PH-III 21,61,540
29 Wave transformation studies to assess the wave conditions at proposed new fish jetty new Clark Basin for M/s MBPT, Mumbai, Maharashtra.
Chief Engineer, Mumbai Port Trust Port House 3rd floor Shoorji Valiabhdas Marg Ballard Estate Mumbai-400001
PH-III 10,05,280
30 Mathematical model studies for flood Estimation and Elaboration Losses for development of Tapi River front 5 Rejuvenation Project for River Bank at Surat Gujarat.
B.1 Dalal, City Engineer, Sort Municipal Corporation Surat Mahanagar Seva sadan Mugalisara Surat, Gujarat.
HMET 12,85,650
31 Controlled blasting for excavation of rock during expansion of NH-6, at Fangne for M/s 1L & FS Transportation Network Limited Mumbai Maharashtra.
Shri M. kamalapathy Vice President 1L & FS Transportation Network Limited 1L&FS Financed Centre Plot E-22, G Block Bandra Kurla Complex, Mumbai-400051
VT 13,65,963
1.2 Awarded: (14 Nos. totaling to Rs. 4,72,03,156/- + 3,69,450/-for calibration works 09 Nos.)
Sl. No.
Name of Work
Sponsoring Agency Division Amount (Rs.)
1. Mathematical model studies for estimation of littoral drift distribution and shoreline changes for Re-engineering of Fishing Harbour at Moplabay, Dist. Coonoor, Kerala
Chief Engineer, Harbour Engineering Department, Kamaleswaram, Manacaud P.O., Thiruvananthapuram 695 009
MMCE 8,31,330
2. Hydraulic model studies for reservoir flushing of Pakal Dul HE Project Kishtwar Jammu & Kashmir
Chief Engineer (Design) CVPP Ltd, 2nd Floor, JKPCC Bldg., Panama Chowk, Jammu - 180 006
SM 98,86,420
3. Mathematical Model Studies for Reservoir sedimentation of Pakal Dul HE Project Kishtwar, Jammu &
Chief Engineer (Design) CVPP Ltd, 2nd Floor, JKPCC Bldg., Panama Chowk, Jammu - 180 006
HAPT 33,52,050
CWPRS Information Bulletin August 2017
6
Kashmir
4. Hydraulic Model Studies for Spillway (surface spillway, Tunnel Spillway) and Power Intake of Pakal Dul HE Project J & K 1: 70 Scale 3-D Compresive model
Chief Engineer (Design), 2nd Floor, JKPCC Building, Rail Head Complex, Panama Chowk, Jammu - 180 006, Jammu & Kashmir
SED 1,00,59,890
5. Hydraulic Model Studies for surface spillway of Pakal Dul HE Project, Jammu & Kashmir, 1:40 Scale, 2-D Sectional model
Chief Engineer (Design), 2nd Floor, JKPCC Building, Rail Head Complex, Panama Chowk, Jammu - 180 006, Jammu & Kashmir
SED 57,29,500
6. Desk Studies for hydraulic design of Pump Sump and pipeline optimization on Baidmara Weir for Bokaro Steel Plant, SAIL, Bokaro.
General Manager (Utilities), Bokaro Steel Plant, Steel Authority of India Limited, ISPAT Bhawan, Bokaro Steel City-827001 Dist-Bokaro, Jharkhand.
HMC 6,95,860
7. Hydraulic Model Studies of Pump Sump on Baidmara weir for Bokaro Steel Plant, SAIL, Bokaro.
General Manager (Utilities), Bokaro Steel Plant, Steel Authority of India Limited, ISPAT Bhawan, Bokaro Steel City-827001 Dist-Bokaro, Jharkhand.
HMC 4,30,440
8. Surge analysis and Suggesting Surge Protection device for pipeline of Bokaro Steel Plant, SAIL, Bokaro.
General Manager (Utilities), Bokaro Steel Plant, Steel Authority of India Limited, ISPAT Bhawan, Bokaro Steel City-827001 Dist-Bokaro, Jharkhand.
HMC 5,95,600
9. Studies for location & hydraulic design of intake in the River Damodar for Bokaro Steel Plant, Jharkhand.
V. K Jha, General Manager (Utilities) SAIL/Bokaro Steel Palant, Ispect Bhawan, Bokaro Steel City, Jharkhand-827001
BE 16,28,550
10. Hydraulic model studies for Syphon Structure or Koparde Approach Canal Tarali Irrigation Project, Patan Taluka Satara Dist. Maharashtra.
Executive Engineer, Kanher Canal Division No.2 Karawadi, Karad.
SED 98,92,960
11. Maintenance of existing 3-D Physical wave model of Paradip Port during the year 2017-2018
Chief Engineer Civil Paradip port Trust, Dist-Jagatsingpur Paradip Port-754142, Odisha.
CHS 15,81,160
12. MMS on Impact Assessment of Bunda near Belapada Raigad, Maharashtra for CIDCO, Mumbai
Executive Engineer (Ulwe-II), CIDCO, Ist Floor, room No. 6, Commercial Complex, Near Unnati Housing, Sector-19-A, Ulwe, Navi Mumbai - 410 206, Maharashtra
HMET 13,34,000
13. Technical Consultancy for Automation and Up gradation of Teesta Barrage Gate operations under Irrigation and waterways department Government at West Bengal
Irrigation and waterways Department Bhavan 3rd floor Western Block Bidha nagar Slake City Pin-700091
HAPT 7,37,226
14. Slope stability analysis of Bande branch canal of Tillari irrigation Project, Tillari Dist-Sindhudurg, Maharashtra.
The Executive Engineer, Sindhudurg Irrigation Project Construction Division, Charathe Sawantwadi Tal-Sawantwadi, Dist-Sindhudurg 416510, Maharashtra.
GE 4,48,170
CWPRS Information Bulletin August 2017
7
2. REPORTS SUBMITTED: (04 Nos.)
S. No. Title Report No Month/Year
1. Hydrodynamic studies on Integrated Mathematical model for Vishakhapatnam outer harbour, Andhra Pradesh.
5515 08/2017
2. Desk & wave flume studies for the design of breakwater for development of Fishery harbour at Juvvaldinne, Nellore Andhra Pradesh.
5516 08/2017
3. Mathematical model studies for surge analysis of Dhumakwadi, Konjewadi and Awarde lift, Irrigation Schemes, Taluka, Patan, Mahankal Satara, Maharashtra.
5517 08/2017
4. Mathematical model studies for surge analysis of Dhangawadi list Irrigation Schemes, Taluka Karad, Dist.Satara, Maharashtra.
5518 08/2017
3. RESEARCH PAPERS
3.1 Submitted – (07 Nos.)
1. Paper Titled " Generalized extreme value model with cyclic covariate structure for analysis of non-stationary hydro-meteorological extremes” by R.S. Jagtap, Dr. V.K. Gedam, Dr. M.M. Kale , for possible publication in Current Science Journal, ISSN-00113891 Indian Academy of Sciences .
2. Paper Titled “Qualitative assessment of subsurface structural and geological condition from breakthrough curves of tracer techniques " by Sudipta Bhowmick, Mrs. Archana K. Pund for possible publication in “22nd International Conference on HYDRO 2017”.
3. Paper Titled " Effect of acoustic flow measurement location on evaluation of turbine efficiency " by P.M. Abdul Rahiman, T.K. Swain, Dr K. Kumar, S.J. Ghule, K.U. Farande for possible publication in “22nd International Conference on HYDRO 2017”.
4. Paper Titled " Aquifer recharge and sustainance suitable water harvesting approach in tropical, India” by Dr. Rolland Andrade, Dr. Rangarajan R., Dr. Muralidharan for possible publication in " 22nd International Conference on HYDRO 2017”.
5. Paper Titled “Performance of power intake - a case study” by A.K. Agrawal, Dr. K.C. Sahu, K. Rajesh for possible publication in “22nd International Conference on HYDRO 2017”.
6. Paper Titled " Effect of channelization on mitigation of floods of Mithi river, Mumbai" by Uday B. Patil, Dr. Prabhat Chandra, T. Nagendra for possible publication in “22nd International Conference on HYDRO 2017”.
7. Paper Titled “Optimization of water transport terminal using Mathematical Modelling Techniques" by Mrs. A.M. Pardeshi, A.J. Jatkar, M.D. Kudale for possible publication in “22nd International Conference on HYDRO 2017”.
3.2 Published: (05 Nos.)
1. Paper Titled " Modeling of electromagnetic flow meters for reduction of Eddy current effect” by T.K. Swain, Dr. K. Kumar, P.Abdul Rahiman, S. Ajai published in Flotek.g Global Conference 2017 in August, 2017.
CWPRS Information Bulletin August 2017
8
2. Paper Titled” Site Calibration of Radar type Ultrasonic Flow meter using ADCP” by P.M. Abdul Rahiman, N.P Khaparde, Dr. K. Kumar, B. Suresh Kumar, S. Sampath published in Flotek.g Global Conference 2017 in August, 2017.
3. Paper Titled “ Modeling of Sedimentation Pattern in Gulf of Khambhat” by L. R. Ranganath, Dr. A.K. Singh published in 5th National Conference of the Ocean Society of India, OSICON-17 in August, 2017 ( pp: 158). 4. Paper Titled “ Impact on Hydrodynamics and Sedimentation due to construction of harbour in open coast” by A.K. Singh, M. Karthikeyan, L.R. Ranganath, M.D. Kudale published in 5th National Conference of ocean Society of India, OSICON-17 in August, 2017 ( pp: 137). 5. Paper Titled “ 2-d hydrodynamics modeling of tidal currents in thane creek, west coast of India” by Mahesh Shelke, Dr. S.N. Londhe, L.R. Ranganath, Karthikeyan M. published in in 5th National Conference of ocean Society of India, OSICON-17 in August, 2017 ( pp: 139).
3. PARTICIPATION IN SEMINARS/ SYMPOSIA/ CONFERENCES/ - (Event- 2 Nos. 4 Participants)
Sl. No.
Title Place, Date Name of Officer
1. Conference of the Ocean Society of India - OSICON-17 ESSO-NCESS
Thiruvananthapuram. 28 – 30 August, 2017
Shri L.R. Ranganath , Sci-D Dr. A.K. Singh, ARO
2. Flotek-g Global Conference, FCRI
Palakkad, Kerala 28-30 August, 2017
Shri P. Abdul Rahiman, Sci-D Shri T.K. Swain, Sci-C
5. LECTURES DELIVERED –( 1 No.)
Sl. No. Title Event, Place, Date Name of Officer
1. Water Quality Management Water Quality Management including Recycle and Reuse of Water etc.
NWA, Pune. 29 August, 2017
Dr. V.M. Prabhakar Scientist-B `
6. PARTICIPATION IN MEETINGS: 6.1 Technical Committee Meetings: (02 Nos.)
Sl. No.
Name of Committee Place and Date Participant(s)
1. Attended meeting with officials of DRDO and WAPCOS regarding Naval Project
New Delhi, 08 August, 2017
Dr. (Mrs) V.V. Bhosekar ,Director Mrs. A.M. Vaidya, Sci-D
2. Attended meeting of the screening committee for the promotion grade of Sci-D to Sci-E and Sci-B to Sci-C
MoWR, RD & GR, New Delhi 18 August,2017
Dr. (Mrs) V.V. Bhosekar , Director
CWPRS Information Bulletin August 2017
9
6.2 Other Meetings: (3 No.)
Sl. No. Title Place and Date Name of Officer
1. Attended meeting with CPCB and NMCG officials on RTWQMS at NMCG and with CWC officials.
New Delhi 23 August,2017
Shri R.S. Jagtap, Joint Director Dr. (Mrs) Shanti Vaidya, Sci-D Shri S.D. Ranade, Sci-D Dr. V.M. Prabhakar, Sci-B
2. Attended State Level Monitoring Committee (SLMC) meeting at the office of Commissioner of Fisheries.
Vijayawada 01 August, 2017
Shri L.R.Ranganath, Sci-D Shri G. A. Rajkumar, Sci-B
3. Attended meeting with 1st World Bank Mission under NHP at WB Office
New Delhi 24 – 25 August, 2017
Shri R.S. Jagtap, Joint Director Dr. N. D. Atkekar, Sci-D Shri P. Vijayagopal, Sci-C
7. TRAINING OF PERSONNEL – (06 Trainings and 44 Personnel)
Sl. No.
Title Event, Place, Date Name of Officer
1. Financial Management in Government
ISTM, New Delhi 07-11 August, 2017
Dr. Santosh Kumar S., Sci-B
2. GeM and GFRs National Institute of Financial Management, Faridabad
Faridabad, Delhi 21 – 22 August, 2017
Shri B. Suresh Kumar, Sci-C Shri Faiyaz D. Momin, ARO
3. Strategic Issues in Water Resources Sector
NWA, Pune 21-24 August, 2017
Shri N. Vivekanandan, Sci-B
4. MIKE 21 C 2D morphological modeling
DHI, Delhi 23- 25 August, 2017
Mrs. Neena Isaac, Sci-D Dr. R.G. Patil, Sci-D Shri B. Raghuram Singh, Sci-C Shri P.S. Kunjeer, Sci-C Shri Parag D. Patil, Sci-B Shri Kuldeep Malik, Sci-B Shri Arun Kumar, Sci-B Mrs. Kasturi V. Katte, ARO Shri Sarvesh D. Pingale, RA
5. Computer Basics and IT Usages CWPRS, Pune 09-11 August, 2017
15 participants
6. Workshop on Refresher on AWA/TBR, Network Design and Instrumentation
CWPRS, Pune 17 - 21 July, 2017
16 officers from CWPRS
8. IMPORTANT VISITORS: 1. Shri Kshirsagar, Deputy Engineer from Khadakwasla Irrigation Dept, Govt. of Maharashtra visited CWPRS on 14 & 18.08.2017. 2. Shri Rajiv Sinha (Retd. IAS), Advisor, Capt. Subhash Kumar, Marine Advisor and V.G. Gharat, Manager (PPD) of JNPT visited CWPRS on 04.08.2017. 3. Shri S.B. Lagavankar, SE, Shri S. Manna, EE and Shri N.A. Kazi, EE of MBPT visited CWPRS on 23.08.2017.
CWPRS Information Bulletin August 2017
10
9. NEW APPOINTMENTS, PROMOTIONS & RETIREMENTS
Sl. No.
Name of Person Designation Group Division Date
New Entrants
1. Jai Prakash Meena R.A B CT 21.08.17
2. B. H. Dhanshetti C’ man C Mech. W/shop 14.08.17
Promotions
NIL
Retirement
1. Smt. A. M. Advani D’ man-III C SWH 09.08.17
Voluntary Retirement
1. Mrs Sadhana Kulkarni Sci-‘D’ A MMC 02.08.17
2. Shri Ganesh Naik Sci-‘C’ A CFZ 03.08.17
Repatriation/Transfer
1. Sachin Dalal LDC C Admin 04.08.17
Resignation
NIL
Demises
NIL
10. TRAINING PROGRAMMES/ CONFERENCES ORGANIZED: (02 Nos.)
1. Training course on “Computer Basics and IT Usages “ at CWPRS from 09-11 August, 2017.
CWPRS Information Bulletin August 2017
11
2. Training Course on “Refresher on AWA/TBR, Network Design and Instrumentation” at
CWPRS, Pune from 17 - 21 July, 2017.
11. OTHER INFORMATION:
The 34th meeting of the Technical Advisory Committee to the Governing Council of
CWPRS was held at Committee Room, CWPRS, Pune, on 11.08.2017 at 1100 hrs, under the Chairmanship of Shri Narendra Kumar, the Chairman, Central Water Commission. Following committee members:
1. Shri S. K. Shukla, Director (BCD) Central Water Commission, Sewa Bhavan, R K Puram, New Delhi
2. Shri Keshav Deshmukh, GM (D&E) Design & Engineering Division, NHPC, Sector 33, Faridabad
3. Dr. P. L. Patel, Professor , SVNIT, Surat
4. Shri D. IIangovan, Senior Principal Scientist, OED Department, National Institute of
Oceanography, Dona Paula, Goa
5. Shri R. E. Upasani, CE (CDO), Water Resources Department, Dindori Marg, Nashik The committee members visited the following models
• Mumbai Port Tidal Model
• Lower Siang Spillway Model
• Multipurpose Wave Basin Hangar
• Kosi River Model
CWPRS Information Bulletin August 2017
12