Cyberinfrastructure Release 2

Production Readiness Review

12 December 2013

Page 2: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Agenda

Time Topic Presenter

1000/1300 Introduction: Entry and Exit Criteria

Kathy Carr

1015/1315 Overview of Project State Mike Kelly

1030/1330 R2 Demonstration Tim Ampe / Luke Campbell

1130/1430 R2 Engineering Status - Test and Integration

Tim Ampe

1200/1500 R2 Verification Kathy Carr

1230/1530 R2 Deployment Rod Cressey

1245/1545 Wrap-up / Q&A Kathy Carr

Page 3: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Entry Criteria

The entry criteria for PRR are completion of the review

artifacts listed in Table 5 of Section 4.2. of the CI System

Life Cycle Plan:

Artifact Set Content

Management System Life Cycle PlanLCO, LCA & IOC Report and ResponseITV Strategy Integration and Verification Plan (baselined)

Requirements None

Design None

Implementation Source code repositoryTest Reports (baselined)Integration and Verification Procedures (baselined)Integration Report (baselined)Verification Report (baselined)Beta Testing Report (baselined)Defect List

Deployment Integrated and Verified Release (baselined)Deployment Plan (baselined)

Page 4: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Success Criteria / Exit Criteria(from SEMP and CI System Life Cycle Plan)

•Have all of the blocker and major defects been

corrected?

• Is the integrated and verified release mature and

stable enough for deployment into a production

environment?

• Is the integrated and verified release ready for

PMO acceptance?

• Is there appropriate final documentation to inform

and train the user and operations communities?

• Is the release ready to transition to operation?

Page 5: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

R2 Timeline

•LCO: Aug 30 – Sep 1, 2011

•LCA: March 20-21, 2012

• IOC: Nov 16, 2012

•Beta Testing: December 2012 – January 2013

•Pathfinder Testing: Feb 1, 2013 – March 28, 2013

•MIRR: Sept 18, 2013

•Load Tests: Oct 24, 2013; Dec 11, 2013

•PRR: Dec 12, 2013

Page 6: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

R2 Assumptions for Production/Operations

• R2 will only be used by Marine IOs and will not be exposed to external

users.

• The San Diego facility will host OOINet R2 after PRR during initial

operations.

• OOINet will be in state such that, upon passing the PRR, the Marine

Operators can begin using it for their operational tasks the next day for

the deployed Endurance platforms. The initial tasks of the Marine

Operators may be to transition “planned” assets into a “deployed” state

and to edit the information about those assets. Thus OOINet must

support those tasks.

• No non-operational information will be included in production baseline

version of OOINet. For example, the CI Bench Test Facility will not be

listed. 

• No data or metadata entered in the system will be lost during software

upgrades during production.

Page 7: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

PRR Documents• CI Release 2 System Integration Test Procedures -2160-

00100

• CI Release 2 System Integration Test Report - 2160-00101

• CI Release 2 Verification Procedures - 2160-00103

• CI Release 2 Verification Report - 2160-00104 (Confluence)

• CI Release 2 Beta Test Plan - 2160-00105

• CI Release 2 Beta Test Report - 2160-00106

• CI Release 2 Test Report - 2160-00102

• CI Deployment Plan - 2160-00200

Page 8: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Additional Release 2 documents

•R2 LCO Report

•R2 LCA Report

•R2 IOC Report

•R2 Pathfinder Effort Summary (2013-04-04)

•R2 Load Test Report (1152-02191; 2013-11-13)

•Online Help Documentation

Page 9: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Load Tests

October 24, 2013 December 11, 2013

# participants 31 26

Length of test 3 hours 3 hours

Test Procedure Version 0-05 Version 2-01

Functionality Coverage 100% of test steps (95% of functionality)

100% of test steps (95% of functionality)

# Blockers 2 0

# Majors 28 TBD

# Minors 61 TBD

Page 10: Cyberinfrastructure Release 2 Production Readiness Review 12 December 2013

Next Steps• If R2 passes PRR:

– R2 will move to the Production environment

– MIOs may start using it to manage deployed marine

platforms

– PMO will begin validation testing.  (R2 won’t actually be in

“Operations” until PMO validation testing is complete.) 

• If panel determines that R2 is not ready to transition to

operations:

– R2 will remain in the Transition phase until whatever

Actions we determine are completed.