cycling roads in istanbul - halime tekin, ibb ukome
DESCRIPTION
Presented at the Visioning Workshop organized by EMBARQ Turkey on September 15th. Learn more about how EMBARQ Turkey is building a bike culture in Turkey: http://bit.ly/1saxnB0TRANSCRIPT
İSTANBUL CYCLE ROADS
İstanbul Metropolitan MunicipalityHead of Transport
Transport Coordination Directorate
Present Cycling Roads : 83,3 km
The Roads whose " Implementation Projects" had been completed and
will be constructed: 82,3 km.
CYCLING ROADS WHOSE IMPLEMENTATION PROJECTS HAD BEEN COMPLETED & THE CURRENT ONES
TARGETED CYCLING LINES IN İSTANBUL
İSTANBUL METROPOLITAN MUNICIPALITY’S CYCLING ROADS TARGET IS 1.050 KM…
EUROPEAN SIDE
Present Cycling Roads
PRESENT CYCLING ROADS1. İstanbul Avenue/Küçükçekmece Road/ Atatürk’s Villa……………………………..……………..…………(0,67 Km)2. Florya Beach- Polat Hotel ………………………………………………………………………………….…………..(4,66 Km)3. Kennedy Avenue/ Bakırköy Port - Yenikapı …………………………………………………………….….…….(7,97 Km)4. Ekrem KURT Avenue/ Taşhan Junction- Zeytinburnu Transfer Point ………………....................(3,20 Km)
TOTAL : …………………………………………………………….………………………………………………(16,50 Km)
1
2
3
4
CYCLING ROADS WHOSE IMPLEMENTATION PROJECTS HAD BEEN COMPELETED
First Prior
1. İstanbul Avenue/Küçükçekmece Lake ………………………………………..…………………………….………………. (1,10 Km)2. İstanbul Avenue (Beach) /Atatürk’s Villa ………………………………………………………………………………….. (0,70 Km)3. Florya Avenue ………………………………………………………………………………………………………………………… (3,70 Km)4. Yeşilköy Demiryolu Avenue/ Bakırköy Port / Polat Hotel ………………………………………………………….... (5,40 Km)5. 10.th Year Avenue/ Topkapı Transfer Point……………………………………………………………………..…….….. (3,50 Km)6. Kennedy Avenue/ Yenikapı- Sirkeci ………………………………………………………………………………………... (5,60 Km)
TOPLAM …………………………………………………………………………………………………….……………… (20.00 Km)
12
3
4
56
Transfer Point
UYGULANDI
PLANNED LINES FOR EUROPEAN SIDE - I
NAME: İstanbul Avenue/Küçükçekmece Lake ……………………………………(1,10 Km)TYPE : Completely Separated Cycling Road
PRESENT SITUATION SUGGESTED SITUATION
KÜÇÜKÇEKMECE LAKE IMPLEMENTATION PROJECT
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN KÜÇÜKÇEKMECE LAKE
PLANNED LINES FOR EUROPEAN SIDE - II
NAME: İstanbul Avenue (Beach) /Atatürk’s Villa…..……………………………(0,70 Km)TYPE : Semi Separated Cycling Road (Roadside cycling lane)
PLANNED LINES FOR EUROPEAN SIDE - III
NAME: Florya Avenue…………………………………………..…….……………………(3,70 Km)TYPE : Semi Separated Cycling Road (Roadside cycling lane)
FLORYA ATATÜRK’s VILLA IMPLEMENTATION PROJECT
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN FLORYA ATATÜRK’s VILLA
PLANNED LINES FOR EUROPEAN SIDE - IV
NAME: Yeşilköy Demiryolu Avenue/ Bakırköy Port Polat Hotel……………(5,40 Km)TYPE : Completely Separated Cycling Road
YEŞİLYURT AIR FORCE ACADEMY IMPLEMENTATION PROJECT
PLANNED LINES FOR EUROPEAN SIDE - V
NAME: Aksu Avenue/ Taşhan Junctıon- Zeytinburnu Transfer Point ……(3,20 Km)TYPE : Completely Separated Cycling Road
TAŞHAN JUNCTION IMPLEMENTATION PROJECT
ROAD
Current Road
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN TAŞHAN JUNCTION
EUROPEAN SIDE CYCLING ROADS IMPLEMENTATION PROJECT - 1
EUROPEAN SIDE CYCLING ROADS IMPLEMENTATION PROJECT - 2
PLANNED LINES FOR EUROPEAN SIDE - VI
NAME: 10.th Year Avenue/ Topkapı Transfer Point ………………………………(3,51 Km)TYPE : Semi Separated Cycling Road
10.th YEAR AVENUE IMPLEMENTATION PROJECT
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN 10.th YEAR AVENUE
PLANNED LINES FOR EUROPEAN SIDE - VII
NAME: Kennedy Avenue/ Yenikapı- Eminönü ……………………………………(5,61 Km)TYPE : Completely & Semi Separated Cycling Road (Roadside cycling lane)
FIRST STEP OF CYCLING ROAD – COMPLETED
FIRST STEP OF CYCLING ROAD – COMPLETED
ANATOLIAN SIDE
1. Bostancı Ferry Port-İDO…………………………..……………..………………………………………….…..…………(41,00 Km)2. Bostancı- Fenerbahçe ……………………………………………………………………………………………………..(4,00 Km)3. Aydos Yahya Kemal Beyatlı Avenue ………………………………………………………………………………….….(1,70 Km)4. Sancaktepe Mimar Sinan Avenue……………………………………………………………….……………………....(3,00 Km)5. Maltepe Recreation Area ……………..………………………………………….…………………………………….….(7,00 Km)
TOTAL : ………………………..…………………………………………………….………………………..……(56,70 Km)
PRESENT CYCLING ROADS
1
3
2
4
TOTAL……………………………………………………………KADIKÖY IN GENERAL 18 Km
CYCLING ROADS WHOSE IMPLEMENTATION PROJECTS HAD BEEN COMPELETED
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN FENERBAHÇE STADIUM ROAD
SITUATION AFTER IMPLEMENTATION OF THE PROJECT IN BAĞDAT AVENUE
SAMPLE - CYCLING ROADS
BAĞDAT AVENUE – GÖZTEPE PARK IMPLEMENTATION PROJECT
BAĞDAT AVENUE – GÖZTEPE PARK IMPLEMENTATION PROJECT
SITUATION AFTER IMPLEMENTATION OF THE PRE-PROJECT IN BAĞDAT AVENUE (GÖZTEPE PARK CROSSING SECTION)
Ulaşım Koordinasyon Müdürlüğü
SITUATION AFTER IMPLEMENTATION OF THE PRE-PROJECT IN BAĞDAT AVENUE (GÖZTEPE PARK CROSSING SECTION)
VARIOUS CYCLING ROAD SIGNS IN USE
Avcılar Belediye Ek Hizmet Binası Arıtma Tesisi Arası Peyzaj Düzenleme Projesi
Beykoz Karlıtepe "C" tipi Mesire Alanı Düzenleme Projesi
Beykoz, Çubuklu Beach Bandı Geometrik Düzenleme Projesi
Çekmeköy Korutepe Mesire Alanının Düzenleme Projesi
Eyüp Alibeyköy Deresi Çevresi Kent Parkı Projesi
Fatih Yenikapı Rekreasyon ve Etkinlik Alanı Projesi
Fatih Yenikapı Rekreasyon ve Etkinlik Alanı Projesi
Kadıköy Meydanı Düzenleme Projesi (1. Etap)
Küçükçekmece Gölü Kenarı Su Sporları Parkı Projesi
Küçükçekmece Menekşe Deresi Yanı Rekreasyon Projesi
Pendik Beachi ve Çevre Düzenleme Projesi
Pendik, Dedepaşa Caddesi Bisiklet Yolu ve Koşu Parkuru Düzenleme Projesi
Sarıyer Aşiyan Önü Balık Tutma İskeleleri ve Yürüyüş Yolu Düzenleme Projesi
Sarıyer Emirgan Beach Düzenleme Projesi BAŞLANDI
Şile Dolgu Alanı (Spor Parkı) Düzenleme Projesi
İSTANBUL İLİ MEVCUT BİSİKLET YOLLARI
AVRUPA YAKASI 16.50 Km.ANADOLU YAKASI 56.70 Km.
TOPLAM 73.20 Km.
İSTANBUL GENELİ UYGULAMA PROJELERİ HAZIRLANMIŞ BİSİKLET YOLLARI
AVRUPA YAKASI51.544 Km.ANADOLU YAKASI 35.928 Km.
TOPLAM 87.472 Km.30+30=60 KM İHALE AŞAMASINDA