cypark brochure

6
8/19/2019 Cypark Brochure http://slidepdf.com/reader/full/cypark-brochure 1/6 CREATING SUSTAINABLE ENERGY FUTURE RENEWABLE ENERGY PARK RIMBA TERJUN, JOHOR RENEWABLE ENERGY PARK KUALA PERLIS, PERLIS INTEGRATED RENEWABLE ENERGY PARK BUKIT PALONG, NEGERI SEMBILAN INTEGRATED INTEGRATED RENEWABLE ENERGY PARK PAJAM, NEGERI SEMBILAN 1

Upload: matsuda-hagiwara

Post on 07-Jul-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 1/6

CREATING SUSTAINABLE

ENERGY FUTURE

RENEWABLE ENERGY PARK

RIMBA TERJUN, JOHOR

RENEWABLE ENERGY PARK

KUALA PERLIS, PERLIS

INTEGRATED RENEWABLE ENERGY PARK

BUKIT PALONG, NEGERI SEMBILAN

INTEGRATEDINTEGRATED RENEWABLE ENERGY PARK

PAJAM, NEGERI SEMBILAN

1

Page 2: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 2/6

PRE-CLOSURE

POST-CLOSURE ECONOMIC TRANSFORMATION

Transforming dump sites, an environmental bane to an economic and environmental boon is the raison

d’etre of our business. The crit ical goal of landfill remediation is to protect human health and the environment

by eliminating airborne vectors, contaminat ion of land and water, air pollution and a host of other problems

caused by open dumping. The ult imate aim is to return land back to the communit y in a form that will benefit

the environment and the community.

As an environmental technology and engineering specialist, Cypark combines technologies andengineering proficiency, with high-end research and development, to develop systems specifically for

restoring brownfields like the Contaminated Land Assessment Remediation and Information System

(COLARIS), Sustainable Environmental Restoration (SER) and Groundwater Assessment Remediation and

Information System (GARIS).

We have taken our business a step further by venturing into the renewable energy sector. We have

transformed the restored landfill in Pajam, Negeri Sembilan into an integrated renewable energy park,

an Entry Point Project under the nation’s Economic Transformation Programme. Such a project unlocks the

economic potential of landfills, employing landfill by-products like biomass and biogas as well as sunlight

to create renewable energy, which will undoubtedly help meet the countr y’s growing demand for energy.

Leveraging the synergy from restoring landfil ls to the creation of renewal energy has placed Cypark at the

forefront of sustainable development and green energy generation. We are proud to note that the Pajam

Solar Park has been awarded by the Malaysian Book of Records as the largest grid connected solar park in

Malaysia.

At Cypark, we recognise that a balanced enduring

approach is needed to ensure sustainability in

economic activity, environmental responsibility and

social progress. Our commitment to sustainable

development is evidenced by what we do. We help

to preserve our environment, preventing further

degradation to land, water and air with a strong

aspiration to help create a sustainable, healthy and

economically stable environment for our children

and future generations.

INTEGRATED RENEWABLEENERGY PARKBUKIT PALONG, NEGERISEMBILAN

ENVIRONMENTALTRANSFORMATION

2

Page 3: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 3/6

Engineering, Procurement, Construction (EPC)solar plant contract is a complex undertakingthat involves various agencies and many integralcomponents.

As owner, developer and power producer ofMalaysia’s first and largest grid-connectedIntegrated Renewable Energy Park (IREP),Cypark is now pleased to offer our EPC servicesto organisations looking to develop sustainableenergy generation.

Cypark far outshines other solar plant EPCcontractors for one simple fact --- Cypark hasproven its capabili ty, efficiency and effectivenessthrough the timely completion and launch ofMalaysia’s first fully operational 8 MW solar park

(first phase) in Pajam, Negeri Sembilan, Malaysia.Backed by robust technical experience andvast network of contacts, Cypark’s totalsolution, one-stop EPC service encompassesan integrated conception-to-maintenancecycle of a solar farm. From viability studiesand project development, to financing and

obtaining the necessary administrative permits,to engineering, procurement, construction,testing, commissioning, monitoring, operationsand maintenance -- Cypark does it all.

Through a team of young and energeticskilled professionals, with a strong sense ofteamwork, and a clear commitment towardsgreen sustainable energy, Cypark is able to offersolutions that are reliable, cost effective andsustainable for our clients; providing client withsimple EPC contract where there is:

o  Complete Scope of Work

o  Minimum Owner Effort

o  One Point of Contact (Simple, Uncomplicated

to Monitor and Coordinate)

o  Straight-Forward Post-Commissioning Serviceso  Quality Assurance

o  Investment Figure Known from Inception

o  Project Duration and Expectat ions

o  Quali ty Products and Workmanship

o  Cost and ROI Projections

Our Services

INTEGRATED RENEWABLE ENERGY PARKPAJAM, NEGERI SEMBILAN

Integrated Renewable Energy Parks

ECONOMIC TRANSFORMATION

PRE-CLOSURE POST-CLOSURE

ENVIRONMENTAL TRANSFORMATION

3

Page 4: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 4/6

COLARIS

An internally developed comprehensive remediation

and treatment system that provides assessment and

remediation service related to contaminat ions that arise

from mining, industrial, as well as landfill and dumpsite

activi ties. It can be divided into two components: -

s  Contaminated Land Site Assessment

Conducted to determine the condition of the site and its

surroundings before any remediation activities can be

designed and implemented, this process involves preliminar y

assessment as well protrusive assessment which requires

development of monitoring wells, soil investigations,

monitoring works, lab test and so for th.

s  Remediation

Cypark’s remediation services could be divided into

three components

o  on-site remediation (in situ zone remediation,containment, protection, pathway prediction and

fate of offsite receptors)

o  off-site remediation (zone remediation, containment

and protection)

o  special collection and disposal services (on-site

and off-site soil treatment).

Environmental Remediation

Environmental remediation is a complex, scientific,

engineering rehabilitation process that not only

brings about environmental but also economic

transformation. Through our extensive environmental

engineering expertise and experience, coupled

with a broad spectrum of innovative technologies,degraded contaminated areas such as unsightly

and hazardous dump sites would be restored and

transformed into green lungs with economic and

social value.

Environmental Management & Monitoring

Services

Once a contaminated land or environmental

facility project has been completed, the site must

undergo systematic management and monitoring.

Environmental management is a key process

requirement to ensure that completed works are

maintained and not damaged either by external

elements or due to natural occurrences such as land

settlement. Continuous periodic monitoring of water,

air and soil quality within or surrounding the project

boundary of a project is essential. Information

collected over a period of time, through Cypark’s

environmental management and monitoring services

could be used to assess the trends of contamination

levels and alert relevant parties.

PRE-CLOSURE

POST-CLOSURE

ECONOMIC TRANSFORMATION

RENEWABLE ENERGY PARKRIMBA TERJUN, JOHOR

ENVIRONMENTAL TRANSFORMATION

4

Page 5: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 5/6

Integrated Waste Management

(incorporating Waste-to-Energy plant)

Environmentally unfriendly waste management

practices have been attributed globally as one of the

major causes of pollution. Urbanisation and population

growth have made proper waste management to

be very critical to ensure the sustainability of our

environment.

Cypark has the experience, expertise and resources

to facilitate government initiatives in implementing

sustainable integrated waste management facility that

encompasses the following areas:-

o  Transfer Station

o  Collection and Disposal

o  Waste Receiving Facility (WRF)

o Waste Segregation Facility (WSF) with material

recovery/recycling facilityo Fuel Derivation Facility which includes Fully

Anaerobic Bioreactor System (FABIOS) Plant and

Refused-Derived Fuel (RDF)Plant

o Power Generation Facility which includes Biogas

Power Plant and Waste-to-Energy Plant

o Sanitary Landfill for commingled, inert solid waste

and processed waste residuals

o Environmental Treatment Systems including

Leachate Treatment Facility and Passive Landfill

Gas Venting System

o Salvaging Yard for combustible solid

  waste and recyclable

o Administration and Support Facilities

o Operations & Maintenance of Waste

  Facility Infrastructural and

  Ancillary Works

Waste Water Treatment

ECONOMIC TRANSFORMATION

PRE-CLOSURE POST-CLOSURERENEWABLE ENERGY PARKKUALA PERLIS, PERLIS

ENVIRONMENTAL TRANSFORMATION

Developed to support landfill owners manage the leachate

associated with landfill and dumpsites, Cypark’s Leachate

Treatment Plant (LTP) can be divided into two

o  On-site Leachate Treatment Plant

  A large scale comprehensive leachate management system

designed and developed as a long term solution for either anew sanitary or a closed landfill.

o  Mobile Leachate Treatment Plant (MLTP).

Typically used in cases where site size is restricted and the

volume of leachate is not large, this facility allows leachate

treatment process to continue to be part of an integral

component of any waste management facili ty. MLTP could also

be deployed as an emergency response treatment system, for

both planned or unplanned plant shutdown.

Ground Water Assessment, Remediation, And

Information System (GARIS)

An in-house developed process in which detailed assessmentand testing are carried out on the impact of pollution to thegroundwater system. Remediation work would be implementedbased on design developed using the assessment. Uponcompletion, continuous monitoring work and relevant informationsystem would be carried out and managed for referencerespectively.

GARIS would provide critical environmental assessment andmitigation process to help protect groundwater resource from

contamination.

5

Page 6: Cypark Brochure

8/19/2019 Cypark Brochure

http://slidepdf.com/reader/full/cypark-brochure 6/6

Contact Information

Cypark endeavours to build customer loyalty by doingwhat we say we will do every time and on time. We

believe the satisfaction of our customers is the best

measure of our success.

For more information on our services, please contact

us at:

Cypark Resources Berhad

13A-09 Block A, Phileo Damansara II

No. 15 Jalan 16/11,

46350 Petaling Jaya Selangor,

Malaysia.

Tel: +6 03 7660 6170 Fax: +6 03 7660 6169

Email:

o  General Information: info@ crbenv.com

o Investor Relations: [email protected]

o Media Contact: [email protected]

Website: www.crbenv.com

* Some of the fonts used is an ECO FONT, meaning less ink is used during printing.

Cypark Resources Berhad is a leading public listed

company on the Main Board of KLSE. Cypark specialises in

providing integrated renewable energy and environment

engineering services, focusing on

o  integrated renewable energy generation (solar,

biogas, biomass, waste-to-energy)

o  waste management

o  environmental remediation (i.e. landfil l restoration)

o  scientific closure and remediation of contaminated land

through internally developed technology (COLARIS)

o  ground water assessment, remediation and informationsystem (GARIS)

o  environmental monitoring and management, as well as

o  wastewater treatment

Cypark : At a Glance

6