d background hampstead islington · the mulberry site is the first phase of king’s aspirations...
TRANSCRIPT
![Page 1: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/1.jpg)
Background
About King’s College LondonKing’s is one of England’s oldest and most prestigious universities: a multi-faculty research-led institution based in the heart of London. King’s is ranked as one of the world’s top 30 universities. It was the Sunday Times UK University of the Year in 2010-11 and is the same newspaper’s Best UK University for Graduate Employment in 2013.
King’s has more than 25,000 students (of whom more than 10,000 are postgraduates) and some 6,500 employees.
King’s has a particularly distinguished reputation in the humanities, law, the sciences (including a wide range of health areas such as psychiatry, medicine, nursing and dentistry) and social sciences including international affairs. It has played a major role in many of the advances that have shaped modern life, such as the discovery of the structure of DNA and research that led to the development of radio, television, mobile phones and radar.
King’s College London and Guy’s and St Thomas’, King’s College Hospital and South London and Maudsley NHS Foundation Trusts are part of King’s Health Partners.
The College’s strategic plansThe College has an ambitious strategy to grow student andacademic staff numbers by 2016. The growth plans include:• providing quality teaching, learning and sports facilities• providing 2000 rooms for student accommodation• providing space for future world leading collaborations and partnerships.
The Canada Water opportunityAs a regeneration area, Canada Water can provide King’s with:• the potential to create a vibrant university environment with new infrastructure and facilities• a convenient location that is only 10 minutes by tube to
Central London and to other King’s campuses• affordability.
Benefits for SouthwarkWith King’s as an integral part of Canada Water’s future, the local community can benefit in these ways:• housing – adding to the local market and helping to address housing shortages• potential to improve access to educational and recreational facilities • direct employment creation – circa 700 new permanent jobs, circa 1,500 construction jobs• indirect employment – circa 70 indirect jobs• local expenditure• car free – The College has no significant requirement for car parking.
OVAL
VICTORIA PARK
HOLLAND PARK
KENSINGTONGARDENS
HYDE PARK
BATTERSEAPARK
GREENPARK
ST JAMES’S
PARK
CLAPHAM COMMON
BROCKWELLPARK
RUSKINPARK
PECKHAM RYE COMMON
REGENT’S PARK
PRIMROSE HILL
HAMPSTEAD HEATH
W A N D S W O R T H
D E N M A R K H I L L
W E S T M I N S T E R
W E S T E N D
B L O O M S B U R Y
C I T Y
H A M P S T E A D I S L I N G T O N
C H E L S E A
R I V E R TH
AM
ES
F INCHLEY ROAD
HOLBORN
HIGH
OXFORD STREET
PICCADILLY
EUSTON RD
STRAND
ALDWYCH
CH
AN
CE
RY
ST THOMAS ST
BO
RO
UG
H
HIG
H S
T
LAMBETH ROAD
WATERLOO RD
KING’S
ROAD
LAM
BE
TH
PA
LAC
E
CLA
PHA
M R
OA
D
PECKHAM ROAD
DE
CRESPIGNY
PARK
DE
NM
AR
K H
ILL
WA
LWO
RT
H R
OA
D
RO
AD
HOLBORN
LAN
E
Hampstead Residence
Intercollegiate Halls
Stamford Street Apartments
Great Dover Street Apartments
Wolfson House
King’s College Hall
TheRectory
Brian Creamer House
Liberty House
St Thomas’ Campus
Denmark Hill Campus
Waterloo Campus
CanadaWater
Guy’s Campus
Strand Campus
Moonraker Point
![Page 2: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/2.jpg)
Site history and emerging context
Regeneration and planning of Canada WaterCanada Water is undergoing major regeneration. In addition to the new transport hub, library and adjacent residential development, the Canada Water Action Area Plan (CWAAP) sets out the vision to transform Canada Water into a vibrant major town centre with new homes, jobs, shopping, leisure and other activities that will support the existing community and grow the local economy. Mulberry Business Park is currently allocated for residential, employment and community uses in the CWAAP. In 2008, planning permission was granted for a new development of the Mulberry site comprising 256 homes and 5,100m2 of offices in a series of buildings of up to 8 storeys. This development was not carried out. The light industrial buildings on the Mulberry site were demolished in 2008 and the site has been vacant since. The adjacent Harmsworth Quays is allocated for offices, with residential and retail uses also being acceptable. With the Daily Mail Printworks vacating and King’s interest in Canada Water, the Council is taking the opportunity to review the CWAAP and specifically the allocations for the Harmsworth Quay site and those immediately surrounding it, including the Mulberry Business Park. The allocations for these sites will change as a result of this process. A university development, including both teaching facilities and student accommodation, could help deliver a level and range of activity, day time uses and vitality beyond those achievable by conventional residential and office land use mixes. The CWAAP review is considering the potential for new educational uses, such as those proposed by King’s, to be provided in the area in addition to those uses mentioned above.
The revised CWAAP will be subject to public consultation later in the spring and, following this, new policies agreed for the area.
1995
1882 1938
1949 1972
2012
Historic Maps
Existing Site from Stave Hill
Existing Surrey Quays Leisure Site
Rear of Surrey Quays Shopping Centre
View towards the new Canada Water Library
Existing Context
Emerging Context
Site A: Glen Howells Architects Site B1: Toronto House, PKS Architects
Surrey Quays Leisure Site, Allies and Morrison Architects
Quebec Way Industrial Estate, Alan Camp Architects
Aerial photograph
Stave Hill
Russia Dock Woodland
Surrey Water
Canada Water
Greenland Dock
Harmsworth Quays Printworks Site
Surrey QuaysShopping Centre
Canada WaterStation
RotherhitheUnderground Station
Alfred SalterPrimary School
Mulberry Business Park Site
InvestecPlot E
Investec Plot C(Decathlon Site)
Site A(Barratt Homes)
Site B(Barratt Homes)
Library
Seven IslandsLeisure Centre
Southwark Park
Surrey Quays Underground Station
Surrey QuaysLeisure Site
Quebec Way Industrial Estate Site
Surrey DocksWatersports Centre
Van Park Site
Canada Water AAP key diagram
Greenland Pier Thames Clipper Stop
![Page 3: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/3.jpg)
Illustrative masterplan King’s vision for Canada Water is to create a town centre with a university environment that promotes regeneration and vitality, mutually beneficial to the College and the local community, that anchors King’s presence and commitment to Canada Water’s long term future and success.
The proposals: • contribute to day time uses and local economy
• provide new homes and jobs for the local community
• incorporate new facilities including sports, leisure and learning for the College and local community
• broaden opportunities for the local community to access and participate in higher education
• establish a high quality car-free quarter with new public spaces and improved connections.
The proposals for the Mulberry site are the first phase of this vision.
Masterplan streets and plots diagram Masterplan use organisation diagram
Illustrative masterplanIllustrative view of heart space
KCL
Leisure / Retail
Residential
![Page 4: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/4.jpg)
The Mulberry site
The site was formerly occupied by the Mulberry Business Park. The light industrial buildings which were built in the 1980s were demolished in 2008 and the site has been vacant since this time.
The Mulberry site is the first phase of King’s aspirations for Canada Water.
The proposed accommodation on site will comprise:
• circa 750 student bedrooms and associated social and ancillary spaces
• affordable housing in a range of unit sizes
• flexible work space for approximately 300 King’s staff
• flexible retail space with the potential to accommodate appropriate health centre/retail/cafe spaces to support the student population and the wider community
• high quality public areas providing open spaces within the site
• separate private external amenity spaces for the student and residential accommodation.
Provisional floorspace figures (gross external area)
Student residential 23,000 m2
Affordable housing 3,300 m2
Offices 4,500 m2
Retail/ health centre 1,100 m2
Ground floor plan
New streets for improved connectivity for residents and businesses
Landscaped street edges retaining existing trees
New pedestrian connection and public space as focal point for the site
Student accommodation arranged as a series of “houses”
New office block (orange) and affordable housing (red)
Roof plan showing the arrangement of “houses” around courtyard gardensStudy bedrooms on the upper floors are arranged with shared kitchen/living rooms and stairs to form “houses”
![Page 5: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/5.jpg)
KING’S COLLEGE LONDON CANADA WATERALLIES AND MORRISON ARCHITECTS12 Street view
Public route
A new public pedestrian route is proposed across the site to connect Albion Channel with future development to the east. The route widens at the centre of the site to form a landscaped public square which is the focal point of the College accommodation. In addition to retail units at ground level, the main entrances to the student residential, office and affordable housing blocks are accessed from this square. We anticipate that the square will become a meeting space for students, staff and local residents with the capacity to accommodate a range of potential functions including temporary markets, play spaces and external seating.
![Page 6: D Background HAMPSTEAD ISLINGTON · The Mulberry site is the first phase of King’s aspirations for Canada Water. The proposed accommodation on site will comprise: • circa 750](https://reader034.vdocument.in/reader034/viewer/2022051916/600886f40236997a8d686b15/html5/thumbnails/6.jpg)
KING’S COLLEGE LONDON CANADA WATERALLIES AND MORRISON ARCHITECTS11 Courtyard garden view
Courtyard Garden
As student residential accomodation is accessed from the main entrance on the public square and then via landscaped ground level courtyard gardens. The student residential accommodation is accessed via landscaped, ground level courtyard gardens.
Large recreation rooms, providing flexible space for College and community use, have generous openings enabling activities to spill into the garden space. These recreation rooms additionally have street frontages facing the primary school and Site E providing the potential for separate community entrances. In addition, glimpsed views into the gardens are provided from these streets.
The courtyard continues at first floor level above the student recreation rooms and service area, providing additional landscaped amenity space for students, and separately, for the adjacent residential units.
Lawn Gardenlying, sunbathing, reading
Terrace Gardeneating, celebrating, outdoor meeting
Contemplation Gardenrelaxing, thinking, reading
Lounge Gardensocialising, lounging, home from home