  • Double block and bleed isolation

    by Angus Bowie STATS, Aberdeen, UK

    Pipeline Pigging and Integrity Management Conference

    Marriott Westchase Hotel, Houston, USA 8-9 February, 2012

    Organized by Clarion Technical Conferences

    and Tiratsoo Technical and supported by

    The Professional Institute of Pipeline Engineers

  • Proceedi

    DoubleTheterma pipelipressuriand misolation

    HowevethedefinTheUKdefinesblockva

    Pip

    ngsofthe2012P

    Allrightsreserve

    BlockandBlmDoubleBne or procesedorhaza

    modificationsnsystems.er,althoughnitionoftheHealthandSdoubleblocalveswithab

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    leedIsolatiolockandBleess system.rdousmediu.This termin

    DoubleBloctermisbynSafetyExecukandbleedbleedvalvelo

    Figure1:

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    onedismostlThe term isum to facilitnology isals

    ckandBleednomeansunutiveguidanc(DBB)asaocatedinbe

    DoubleBloc

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    yusedtodes used to dtatebreachisoutilised to

    disauniveriversal.Forcedocumentnisolationmetween.

    kandBleed

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    efinealevelescribe a sangof thepro identify the

    rsallyusedteexample:t,TheSafeIsmethodcons

    DiagramT

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    ofisolationpafe methodressure systee relative int

    ermtospecif

    solationofPsistingofan

    woValves

    2012

    onTechnicalCon

    copyrightowners

    providedbyof isolationem formaintegrityof te

    fyalevelofi

    PlantandEqarrangemen

    nferences,

    s.

    valvesinn from antenanceemporary

    isolation,

    uipment,ntoftwo

  • Proceedi

    TestingwhichstProve twork(un

    BPGuBleedas

    Mostotbleedcathesizebetween

    The BPprovide

    Pip

    ngsofthe2012P

    Allrightsreserve

    andmonitotates(ref.artthe integritynlessyourriseachpartoblockandbleach part ssystemdurinwherepossipressurediffidanceonPs:Double Blointermediatbleedvalveheroperatoanbe leftopof theventnthevalves.Guidance ththesamelev

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    oring the effticle165):yofall isolatskassessmef the isolatioeedschemeshould be pngtheworkible,eachpaferentialracticeforS

    ock and Blee bleed valvwillthenbershavesimipen toaccomt toensure then goes onvelofisolatio

    Figure2:

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    fectiveness o

    tionpointsonthasindicaon shouldb;roved to thactivityartoftheiso

    SafeIsolation

    ed consistsve. The integleftinthecllarspecificatmmodateacthat theacce

    n to explainon.

    SingleDoub

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    of the Isolat

    ofan isolatioatedthatthebeproved se

    e highest p

    olationshoul

    nandReinst

    of the closgrity of botosedpositiotions,howevcceptableupeptable leak

    which type

    bleBlockand

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    tion is speci

    onschemebeuseofnoneparately,e.

    ressure whi

    dbeproved

    atementof

    sure of twoh valves shaonbetweenpverthereispstreamvalvkratewillno

    es of single

    dBleedValve

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    fied in this

    beforeproceprovedisolag.proveeac

    ch can be e

    inthedirec

    Plantspecifi

    block valveall be testedperiodicinteganacceptanve leak ratesotgenerate

    body valves

    eDiagram

    2012

    onTechnicalCon

    copyrightowners

    guidance d

    eedingwithationisaccepch valve ina

    expected w

    ctionofthee

    iesDoubleB

    es in seriesd separatelygritychecks.nceonmanys.Someevepressure in

    can be ass

    nferences,

    s.

    ocument

    intrusiveptable):adouble

    ithin the

    expected

    Blockand

    with anand the.thatthenspecifythevoid

    essed to

  • Proceedi

    The accpressureparallelcavityptobeus

    Themostooling.insideothenrelwhichhtheisolaisolationanypresitisadiftheuninmuchofBefore wDoubleend intacceptab

    Pip

    ngsofthe2012P

    Allrightsreserve

    epted requieinthecorreexpanding gressureprovedthenthey

    stalarminguThis iscompenpipestoocatedto loaveapressuationagainstnfortheamssurebuildufferenttypenitiated.Theftheliteratuwe can lookeBlockandBent while ableleakrate

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    rement forectdirectiongate, doublevidesthedowyrequirespe

    Figure

    useofthetemonlyusedoprovideanocallypressuuretestcapatanyupstrebientisolatioupandsafelyofisolation

    ebleedrefre.k at how teBleedIsolatioaccommodates.

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    such valvesn.Examplese seating bawnstreampoecificTechnic

    3:SplitGatermdoublein theUSAambientprretestthewabilitytoconampressureonandaccepyremovinghanddescribiferredto ist

    mporary isoonweneedting the pra

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    s is that botsofsuchvalvall valves etcositiveseal,calAuthority

    eDoubleBloblockandblandCanadaressurevapowelds.ThesenfirmleaktigeforeithersptablewherehydrocarboningitasDothecapabilit

    olation toolsdtodefineaacticalities o

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    th upstreamvesaresuitac.Double pishouldnotyapproval.

    ockandBleedeediswherawithrefereourbarrierfoetoolshaveghtsealing.Tseal.Althougetheupstrenswhichflasoubleblockaytobleedt

    s can be assaconsistentof pipeline

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    and downsblyspecifiedston seal banormallybe

    dValvereitisusedfence to tooliorwelding.Ttwosealsa

    Thispressureghthisisapamventischoffthepipndbleedcaheupstream

    sessed to prdefinitionwsystems in

    2012

    onTechnicalCon

    copyrightowners

    stream barriddoublewedall valveswusedandif

    forambientingwhich isThesetoolsaagainstthepetestdoesnperfectlysafeapableofprpewall/conanofferconmthroughth

    rovide an eqwhichcovers

    which valv

    nferences,

    s.

    iers holddgegate,here thetheyare

    isolationinsertedareoftenpipewall,notproveelevelofreventingndensate,fusiontohetool in

    quivalentthehighves have

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).

    Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    DoubleBlockandBleedDefinitionThebaselinedefinitionforincumbentvalvesistwovalves,testedandproventofulllinepressureinadirectionconsistentwiththerequiredisolationwiththevoidbetweenthemventedandmonitoredforpressurerise.Althoughthis is idealisticotherthanonbrandnewplant, itdoes formastartingpointforassessment.Theintentofthislevelofisolationisthatnosinglefailurecaninvalidatetheisolation. Failure (or inadvertentoperation)of theprimaryvalvewouldonlyallowpressure toenterthe bled zone between the valves. The second valvewould prevent any hydrocarbons (or otherpipelinepressure)fromaffectingtheworksite. Failure(orinadvertentoperation)ofthesecondaryvalvewouldonlyopentheambientvoidtotheworksiteofferingnodirectrisk.Theprimaryvalvewouldpreventanyhydrocarbons(orotherpipelinepressure)fromaffectingtheworksite.The requirement for the secondary valve to be tested to verify the isolation capacity is key toensuringthatanybypassoftheprimaryvalveisretained.The requirement for thevoidbetween thevalves tobevented toambient isnecessary toensurethatanypressurebuildupfromapassingprimaryvalvewillbedetectedandthatitcanbeventedtoasafearea,whistbeingretainedbythesecondaryvalve.Preventinganyhydrocarbonsorpressurefromaffectingtheworksite.Thisisasimpleconceptwhichiscomplicatedbytherealityofplantdesignandvalvewear.Theresultisthatmostofthetimetwoleaktightvalvesarenotavailable.Asaresultsomepracticalcompromiseisusuallyrequiredwhenincumbentpipelinevalvesareusedtoprovidedoubleblockandbleedisolation.Thefirstpartofthisisthedefinitionofacceptableleakrates on valves. Most operators have an acceptable leak rate criteria based on pipe diameter,pressure, and hazardous nature of the fluid being isolated.Other factors such as available ventcapacityandevenfirefightingcapacitycanalsobeusedwhenassessingwhatleakratecanbesafelyaccommodated.With thiscompromise, thesecondaryvalve (downstream) is testedusingpipelinepressuretovalidateitissealingwithinthedocumentedacceptableleakrate.Thevoidbetweenthevalves is ventedand locked in tomeasure theprimary valve (upstream) leak rate.Once the leakratesareacceptedaswithinallowable levels,thebleed isopenedtoflaretoensurenodifferentialpressurebuildsacrossthedownstreamvalve.Whereasinglevalve istobeusedtoofferequivalent isolation,thesamerulesshouldbeapplied.Where the valve design energises both the upstream and downstream sealswith the upstreampressure, the valve canbe considered fordoubleblock andbleed.However the singlemodesoffailurerequiretobeassessedtoensurethatsufficientsafeguardsareputinplacetomitigateagainstthesefailuremodes.Oneofthemainsinglefailurepointsisthatasingleactuatorfunctioncanremoveboththeprimaryand secondary seals at once, it is critical that inadvertent or accidental operation of the valve

  • Proceedi

    actuatortheisolaAnotherthereisblindflathevalvAsmostthecorrboththeTempor

    There aprovidethatoptsubseagEvenwhneedtoTemporaintegrityintegritybeeffec

    The abidevelopbranchptraditionableednotequacouldno

    Pip

    ngsofthe2012P

    Allrightsreserve

    rmustbeprationisinplarpotentialsinormallyas

    angeissimilaedesignistotpipelinevalrectdirectioneseatsofaD

    aryIsolationre many octhe requiretiondesirablgaspipelinewherethepipebekeptawaary pipeliney for decadey.Examplesctivelytested

    ility to retamentofhotpenetration,nallydeployebetweentheatetodoublotbecounte

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    reventedfroace.inglepointfasingleclosurartoagatewothesameflveseatsaren,althoughDBBvalveat

    nTechniquesccasions whed isolationaleor in somwheretheveelinecanbeayfromthew isolation haes. The earincludeamudandwould

    ain pressuret tap installeutilisingtheedinconjunelinestoptoeblockanddasasecon

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    moccurring

    ailureisthere,withaseawhichisboltactorofsafeepressureaswestillseethesametim

    sere the incuand thepracmecaseseveentingofsevventedtoaworksite.as been perliest isolatioudpack,whnotresistan

    Figure4e behind teed linestopebranchtopctionwithaoolandthebbleedisolatidarybarrier

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    g,preferable

    ballorgate.aloneithertedinplace,etyasablindssisted,itisitoooftenthme.

    umbent valvcticalityofvenviable.Anveralhundreambient,flas

    rformed byon techniquichneededtnysubstantia

    4:MudPackemporary isotoolswhichprovideareagasbag.Thebagtopreveionsincethe.

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    ebyremovin

    .Withasingside.Howevsothiscan

    d.mportantthhevalvecav

    es in a pipienting thepnexampleofedkilometreshofffromc

    a variety ofes were cruthepipevenalpressureth

    Isolationolation devuse lipseal

    actionfortheegasbagisentanypressegasbagcan

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    ngorlocking

    gledoubleblverthepipebemitigated

    hatthevalveitybeingde

    ng system apipelinepresf this isESDsof40pipeondensateo

    methods toude with limntedinorderhatcouldbu

    ices was firtechnology

    emechanicausedasasesurebuildupntresistthe

    2012

    onTechnicalCon

    copyrightowners

    gtheactuat

    lockandbleisasingleskdagainstby

    eintegrityispressurised

    are not suffssuredoesnDVmaintenaeisnotviableorpipebore

    o various demited capabrtoinstall,cildfromflas

    rst attaineddeployed thalrestraint.Tecondarybarp.Thishoweepipelinepre

    nferences,

    s.

    or,while

    edvalve,kinandaensuring

    testedintocheck

    ficient tonotmakenceonae.deposits

    egrees ofbility andcouldnoth.

    d by thehroughaThesearerrierwitheverdoesessureso

  • Proceedi

    Two linelevelisoInthemisolationshapedoperatepressuri

    Thecomclearanccylindricstaticsepipewacanno lthepackandbacSecurepprofilemlock IDpulling tsegmentaxial coconicalrlockmotheteet

    Pip

    ngsofthe2012P

    Allrightsreserve

    estoptoolsolationmid1970s,pininasinglelocks toprod,withahysedpipepriompressionsece on the pcal support realvolumecall.Oncethelongercausekerwhichimkcompressiopluglocatingmachinedinta conical lothe lock segtOD.Thisenmpression orampoftheovement, furh.

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    inserieswit

    iggablemecisolationtooovide thehigdraulictetheortosettingeals inrelaxepipe bore anringon theausesthesesealisrestraesealdeformmprovesthesonfacesandgisprovidedtothelockseck bowl. Ingmentsdownnsurestheloof the pluglockbowla

    rtheractuati

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    Figure5:Linthaventbe

    hanicalplugol.Thisisolatghpressureerandstuffi.edconditionnd an insideplugbody.Wealtoexpandainedbythemation.ThissealonthepdthecylindribyanarrayegmentOD.theunset lon to the lococksegmentby the hydrndengagewon loadgen

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    neStopTooletweenwou

    sfirstcametiontooldessealandaxngboxasse

    compriseae diameterWhenaxiallydintheonlypipebore,isadditionalapipebore.ThcalsupportryoflocksegmThelocksegocation, theckbowl ramtsareheldraraulic cylindewiththepipeeratesacon

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    withGasBagldberequir

    onthemarksignutilisesaxial restraintmblyallowin

    ringwhosewhich matcy compressefreedirectiotisfullyrestactuation lohispackerdering.mentswhichgmentshave locks locpwith the aadiallyclearer causes thebore.Oncentactpressu

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    gedforadou

    ketwhichofacompressio.Theseplugngthetoolt

    outsidediaches the ouedby thehyoni.e.radialtrainedsofuadgeneratesignsealson

    hgripthepipeaconicalinkbowl interassociated rofthepipebhe lock segmethepipebrewiththe

    2012

    onTechnicalCon

    copyrightowners

    ubleblocka

    ffereddoublonpackerangswerehydtobepigged

    meteroffersutside diameydraulic cylinllyouttoconurtheractivatesrubberprenthepipebo

    peborewithnterfacebetwrface is extereduction inboreforpiggments to runborepreventpipeboreto

    nferences,

    s.

    ndbleed

    ebarrierndwedgeraulicallyintothe

    spassingeter of ander, thentactthetionloadessure inore,front

    hatoothweentheended sothe lockging.Then up thesfurtheroengage

  • Proceedi

    ThemajSelfEne

    Thegeowiththelocks(fixandissulockbowTheejecloadtofAnaxialFpEjecFsSeaBalanceNote:Th

    Thisshobyafact1.5.The tapintensifi

    The resueven wimaintain

    Pip

    ngsofthe2012P

    Allrightsreserve

    oradvanceiergisation

    ometric confeplugactivatxedpointreupportedbywlassemblyctionloadthfurtherenergloadbalancectionLoad=lLoad=SealofforcesFp

    hisislookinga

    SealRubber

    owsthatasttor>1.Thisf

    er angle ofcationinasultof thisdith a total fnedacrossth

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    inthistechn

    Fi

    figurationoftion.Theisostraint).Thisythecompreandbeing fenpassesthgisethelockeoverthesePipelinePrelRubberPrep=Fsatsealpressur

    rPressure=

    heisolatedpfactorisdefi

    the lock boimilarpropoesign featurfailure of thheplug.This

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    ologywasfa

    igure6:Isolathis tooldelatedpressusloadactsinessionseal.Tfully restrainhroughtheshkteethintotealshowsapessurexCrosssurexCros

    reintensificat

    =PipelineP

    pipelinepresnedbythes

    owl also canortion.re is that thehe hydraulicsmakesthis

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    ailsafefeatu

    ationPlugSeesign takesaureactsonthnthesameoThecompresnedgeneratehallowconicthepipewallpressureintessSectionalAsSectionalA

    tionanddoes

    Pressurex

    ssureincreassealboreint

    n be geome

    e isolationw system, prisolationsys

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    res:

    lfEnergisatioadvantageoheplugpressorientationassionsealises rubberprcaltaperoft.ensificationoAreaofPipeAreaofSetSe

    nottakeacco

    CrossSecCrossSecti

    ses,therubbhesealdesig

    trically desig

    willbemainoviding a mtemfailsafe

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    onof the isolatesureheadpusthehydrauinitselfsuppressurewithhelockbow

    onthesealr

    eal

    ountofHydrau

    ctionalAreaoonalAreaof

    berpressuregnandisnor

    gned to gen

    tainedby thminimum diffe.

    2012

    onTechnicalCon

    copyrightowners

    edpressureushingittowulicactuatioportedbyth theadditioltogenerate

    ubberpressu

    ulicactuation

    ofPipefSetSeal

    inthesealirmallyinthe

    nerate a rad

    he isolatedpfferential pre

    nferences,

    s.

    toassistwardsthensystemhelock&nal load.earadial

    ure:

    npressure

    ncreaseseorderof

    dial force

    pressure,essure is

  • Proceedi

    PassiveInthecathe plugpipelineinboardTheearsealingpiggingmodernratedto

    Thesecosealandthroughenergise

    Thesetoto assisintroducisolationpressure

    Pip

    ngsofthe2012P

    Allrightsreserve

    Unsetaseonlossogs were despressurecaoftheplug,liestconfigupigging discdisc was veinterpretati

    othefullpipe

    F

    ondgeneratdthelockbo the hydrauedbythepip

    oolshavebet with bendced to remon plugs whicelimitationw

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    ofhydraulicssigned to pannormallynwhichcano

    urationsof th as the secoented and mionofdoublelinepressur

    Figure7:Diationof thispowl.Thetwoulic tether topelinepressu

    eenfurtherdd compliancove the limitch had prevwhichwasba

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    s,intheearlyassively unsnotberemovonlybeachiehisplugdesiondary seal.monitored feblockandre.

    gramandPhplugdesigncompressioo offer a blureaswellas

    Figure8:developedovce during pitations of thviously beenasedonthes

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    ydaysthiscset when thved,thispasvedwhenthignprovided. The void bfor pressurebleed isolat

    hotoofEarlyaddedaseconsealsareseed and mosthehydrau

    DualSealTevertheyearsigging. In thhe hydraulicn limited tostuffingbox

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    couldbecauhe pressuresiveunsetishepipelineindasinglecobetween thebuildup. H

    tionasthes

    ySingleSealcondcompreseparatedbyonitor capablicactivation

    cnoPlugsincludingbhe late 90sc tethers. Th pipe end arestriction.

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    sedbyahyddifferentialachievedbyntegrityisresompressionse compressioHowever thisecondaryse

    IsolationPluessionsealbyanannulusbility. Both tn.

    beingsplitins remote cohese increaseactivities. Th

    2012

    onTechnicalCon

    copyrightowners

    draulictetheis removedyraisingthestored.sealanduseon seal ends would noealwasnot

    gbetween thesringwhichthese seals

    toseparateontrol systemed the ranghey also rem

    nferences,

    s.

    erfailure,d. As thepressure

    edahighand the

    ot pass apressure

    eprimaryisportedare fully

    modulesms werege of themoved a

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).

    Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    There are two plug designs currently on themarket, onewith two lock and sealmodules, eachsimilartotheoriginaldesign,andtheotherbasedonthedualsealandsinglelockarray.Wewilllookat how the two designs compare to theDoubleBlock andBleed Isolation definition later in thisdocument.STATShas also taken the isolationplug selfenergised, fail safe, sealdesign todevelop ahot tapinstalled isolation toolwhich canbe installed through a singlehot tappenetration andoffer theadvantagesofboththemechanicalisolationplugandlinestoptooling.Theothermechanismwhichisusedfortemporaryisolationistheuseoffreezeplugs,wherealiquidoptimally water inside the pipe is frozen, normally by the application of liquid Nitrogen. Thesolidifyingprocesswouldgeneratean iceplugwhichboth sealsandgrips thepipe.This isolationtechnique isattractiveas itdoesnot require fullboreaccess to thepipebore for installationandrecovery,butdoeshave some challenges,particularly the loadingon thepipe fromboth the iceexpansion and the cryogenic effect on pipe. There is also the asphyxiation potential with theNitrogenevaporationandthepotentialtotallossofisolationifthecoolingsystemiscompromised.DoubleBlockandBleedIsolationToolingDouble Block and Bleed is a valve definition, so all temporary isolation techniques and devicesrequire tobe riskassessed tovalidate that theyofferanequivalent isolation level in the requiredapplication. Inorder toassess the comparisonof isolationprovided,weneed first to identify therequirements.Temporaryisolationtechniquesofferdifferentchallengestovalvessocantbeassessedinadirectlyequivalentmanner.Valves are designed to be installed in pipes for many years and a high number of operationsbetweenmaintenance.Asaresulttheyarenormallyprovidedwithacceptableleakrateshigherthanthoseofanewvalve.This,resultsinminimumbleedcapacitiesbeingspecifiedwhereanopenbleedis used. The wear, erosion and corrosion associated with old valves can cause many concerns,although valves in good condition should always at a minimum provide a secure mechanicalrestraint.Temporaryisolationdevicesontheotherhandarenotpermanentlyconnectedtothepipeworkandcan be inspected and tested immediately before use and tend to bemaintained after very fewoperations.The seals canbe replaced foreverydeployment soofferinga consistent levelof sealintegrity.Theonly limitationon this ispipebore conditionwhere the temporary isolationdevicesealsagainst.Allthehighpressureisolationdevicesidentifiedheredoapplysomelocalstressestothepipeatthesetlocationwhichneedtobeassessed.Theabilityoftheisolationintegritytobemonitorediscriticalinthetemporaryisolationassessment.Withvalves,whereanopenbleed isused, themonitoringof the isolation isminimal,asa riseofpressurewouldindicatealossofcontrolovertheisolationratherthananindicationofdeteriorationofeithertheprimarybarrierorventcapability.ThehighspecificationoftheBPrequirementabove,withthebleedlockedinwillofferthefullmonitorbutmaynotbeviablewithvalveleakrates.

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).

    Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    The independenceofcontrolsystemstoensurenosingleoperationcould invalidatebothbarriers,which isacause forconcern inthesingledoubleblockandbleedvalve,mustbeaddressed intheassessmentoftemporaryisolationdevices.Accidentaloperation,whichcausesrestrictionsintheuseofESDVvalvesindoubleblockandbleed,iseasiertocontrolintemporaryisolationsystemssincetheytendtobeindependentofautomatedplantsystems,howeverneedstobecoveredinariskassessment.Whereassessingtheintegrityofanisolation,wethereforeneedtoassessthefollowing:

    Twoindependentbarriers Abilitytotestbothbarriersinthecorrectdirectiontoverifytheisolationintegrity Any single failuremodes are understood and addressed. E.g. single bulkheads such as in

    doubleblockandbleedvalves Bleedlimitations Monitoringcapability Sealintegrity Restraintintegrity Exposuretosingleseal Stabilityofisolationunderunstableloadingfrompressurefluctuations Effectonthepipingsystem

    TheseareallassessedinitiallyinaFMECAforthetoolingthenaHAZIDonthedeploymentforSTATSsuppliedequipment.Thispaperwill lookattheSTATSTecnoPlugandBISEP indetailthencomparewithalternativetechnology.TecnoPlugThe current Tecno Plug is derived from the dual seal tethered isolation plug deployed byTecnomarineSystemssincethemid1980s.Thebasicconceptisfortwocompressionsealsmountedin series outboard of a taper lock array. There are several configurations from single to triplemodulewith themultimodule configurationsbeing connectedby structuralball joints.Thebasicloadingandoperationisthesameforallvarieties.

  • Proceedi

    Themostight spproductpiggedrThesinglock segsegmentthis consealsantwosepThe TecmodulethroughcoverboWhendinternalcreatethtobe isodifferensealcomremaininvalvesto

    Pip

    ngsofthe2012P

    Allrightsreserve

    F

    stcompactpaces, e.g. biontobemaround3DbenglemoduleTgments arraytsinasinglenfiguration, tdlocksdoesaratelockrincno Plug ispigged inwthepipewaoththeisolateployed,thelymountedheinitialbarolated) isvetialisappliempression.Tnghydraulicoensureitis

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    Figure9:Remplugisthesinetween twoaintainedwhndssocanaTecnoPlugyed aroundearrayisthathe loadingsnotchangengs.s normally dwith theplugallwithELFtionplugande isolationphydrauliccylrrier.Oncethntedgeneraed,thetrappheothereffcsetpressursmaintained

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    moteControlnglemoduleo valves or bhilethevalvlsobeusedfhastwocoma single loc

    atbothsealsacross thepwithachang

    deployedwitg thatsetsacommunicatdcontrolsyslug ishydraulinderintheheplugiscoatingapresspedfluidintectisthatthreonce the,evenwithl

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    lTecnoPlugedualsealTebetween aemaintenanforlongdistampressionseck bowl. Thearefullyenplug from thgeinannulu

    th a remotendmonitorstions.Theasstem.ulicallyactivTecnoPlug

    onfirmedasssuredifferentheannulushehydraulicpipe is fullylossofpowe

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    inPiggingecnoPlug.pig trap valvnceisprogreancepiggingealsinseriese advantageergisedbythhedifferentiaspressure,u

    e control syss theplugussessmento

    vatedbythetocontractset,thepresstialacrossthbetweenthepressureinvented is lo

    erinthecont

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    Configuratio

    Thisplugisdve and prodessed.Thispjobs.,supportedof arrayinghedifferentialpressurewunlikethealt

    stemwhichnder instrucfthe isolatio

    controlmodtsosettingtsureinboardheplugmodesealsiscomtheactuatioocked inbyptrolmodule.

    2012

    onTechnicalCon

    copyrightowners

    ondesignedtoduction teeplugcanhow

    byanarraythe conting

    ialacrossthewhichenergternativede

    comprises actionscommon integrity

    dule.Thiscathelocksandd(portionofdule.Asthempressedduonsystemdrpilotoperate

    nferences,

    s.

    besetinto allow

    wever,be

    or6or8gent lockeplug.Ingised thesignwith

    a controlunicatedneedsto

    ausesthedsealstothepipepressureuetotherops.Theedcheck

  • Proceedi

    Once inthepipeannulusthefull(~3 litresubstant

    The isolstandard

    Pip

    ngsofthe2012P

    Allrightsreserve

    boardpresselinepressuristhenventdifferentiales for a 30tialrisk.ation is thendperiodis1

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    Figur

    ure isfullyvreinthecortedtothetapressure.Alt) plug com

    nmonitored2hoursfora

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    re10:TecnoventedtheTrectorientatilpressureathoughthebined with

    d foranexteahighpressu

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    oPlugSealTecnoPlugtion.Thisproandlockedinannuluswillthe low pr

    endedperioureisolation.

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    Verificationsecondarybovestheinten.Thisallowssettleatafessure (~5

    dprior tob.

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    Cyclebarrier istesegrityofthestheprimaryfewbarabobar/ ~70 ps

    breaching the

    2012

    onTechnicalCon

    copyrightowners

    sted insitutesecondaryysealtobetovethesmalsi) does not

    epipe integ

    nferences,

    s.

    toaboveseal.Thetestedtolvolumet offer a

    grity.The

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).

    Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    This offers the closest monitoring to the valve scenario. Both barriers are proven insitu to fullpipelinepressureandthevoidbetweenthesealsisbledtoambientandlockedinformonitoring.Asthe isolationplugsofferhigh integrity sealing, this annuluspressure isnot anticipated to requireventingduringtheisolation.However,iftheannuluspressuredidrise,thentheloadingonthesealwouldbeunchangedandthesystemhasalreadybeentestedtothesecondarysealloadingsodoesnotgooutsidethetestedcondition.Once the isolation certificate is issued, the control system is put in watchdog mode whichautomaticallymonitors theTecnoPlugsensorsand transmitschanges toalert theoperator.Theplugwillnotacceptanycommandwhichwillchangethestatuswhile inwatchdogwhich locksthesystemfrom inadvertentoperation.Thehydraulicunset isalso limitedandhighpressure isolationscantbeunsethydraulicallywithoutequalisingthepressurefirst.Singlefailureassessmentofthisplugistotheextentthattheoutboardmonitorisprotectedbyashuttlevalvetoprotectfromaleakingfitting.ComparingthistotheDoubleBlockandBleedCriteria:

    Both primary and secondary seal are capable and tested to the pipeline pressure in thecorrectdirectionduringthedeployment

    Annulus between the seals is vented and locked in minimising exposure from loss ofsecondarysealintegrity

    Effectofthe loadingonthepipe iswellunderstoodandengineeredfortheapplication.AllplugsaretestedinequivalentpipetoHydrotestpressures

    Both seals and the locks are fully activated by the differential pressure and by hydraulicactivationpressure.Twototallyindependentactuationsystems

    Controlsystemlockedfrominadvertentoperation Automaticmonitorofoutboardpressure, inboardpressure,annuluspressure,hydraulicset

    pressure,hydraulicunsetpressure.Thesesensorswouldgiveadvancenoticeofanychangeofstatusinthesystem.Thereistheabilitytointerveneinacontrolledmannerifrequired

    LookingattheFailureModes:Thepressureheadisasteeldiscsimilarindesigntoablindflangewiththedesignto1.5timestheisolationplugdesignpressure.AsthestandardTecnoPlugworkingpressureisinexcessof3000psiandmostdeploymentsarelessthan2000psi,thenthisoffersadditionalcontingency.Everyisolationtoolistestedinsimilarpipetothecodehydrotestpressurespriortodeployment.Thiscomparestovalvegateswhichonlyrequirea1.1timesMAOPtestpressure.Thefrontcompressionsealistheprimarybarrier.Thissealisheldactivatedbyboththedifferentialpressure and hydraulic set pressure, both of which would require to be lost to invalidate theactivation.Failuremodesassessedarea leakdevelopingandacatastrophic lossofseal.Thesearehighlyunlikelyevents,howevertheconsequencesneedtobeassessed.Aleakpasttheprimarysealwould only restore the annulus pressure to the prevented plug statuswhich had already been

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).

    Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    tested. The secondary seal is proven as a full barrier. The Tecno Plug control system allowscontrolledventingofthispressureifrequired.Acatastrophicfailureoftheprimarysealcouldallowmovementofthepressureheadtowardsthetaperlocks.TheTecnoPlugisthereforedesignedtoaccommodate thismovement to the extent of the full loss on the primary seal rubber volume.However,additionalto thisdefence,thesealwouldnotextrudeontothepipelinepressureasthepipelinepressure isactingagainst it.Extrusiontowardsthesecondarysealwouldbe limitedbythefreevolumearoundtheannulusringsoafullseallossisnotpossible.Theplugdesignhashoweverbeendesignedtoaccommodatetotallossofthisseal.Theannulusringisasolidsteelplateundercompressionwhichissupportedacrossthesurfacewiththecompressionsealsandisdesignedofsufficientthicknesstoretainrigidity.The rear compression seal is the secondary seal. This seal activation is maintained by both thedifferentialacrosstheplugandthehydraulicsetpressure,whetherthere ispressurebetweenthesealsornot.ThesealistestedaspartoftheTecnoPlugdeploymentandheldduringtheisolationwithminimalpressurelockedintheannulus.Thissealisassessedfortwofailurescenarios.Firstlyaleak developing. A leak in this sealwould be identified by the loss of the small pressure in theannulus.Thesmallvolumeandpressureminimisesthepotentialhazard.Thesecondhazardassessedis the catastrophic loss of the secondary seal. Like the primary seal the Tecno Plug stroke isdesigned to accommodate thismovement.However like the primary seal, the sealmovement islimited. For the seal to move forward into the annulus, the limited free annulus volumewouldpreventsealloss.Ifthesealmovedbackwards,themovementwouldbelimitedbythelocks.Hencethecatastrophicsealfailurealsoprotectedagainstbythenatureofthedesign.The lockbowl isasolidsteelringdesignedtotakethefulltestpressure inasimilarmannertotheannulusringandpressurehead.The taper lock segments havemore than 100% contingency arrayed around the lock bowl. Thisensuresthateccentricpipesurfacedegradation(e.g6oclockcorrosion)canbeaccommodated.Thelocksare fullyengagedbyboth thehydraulicsetpressureand thedifferentialpressureacross thepluginasimilarmannertotheseals.Theselocksaretestedtothefullpressureduringtheisolationplugdeploymentandthe loadingfromthedifferentialpressure isconstantwithpipelinepressure.Thealternativeofaxiallyseparating thecontingency locks,placingasetbetween theseals,wouldresultintheloadingonthelockgripchangingiftheannulusbetweenthesealschangesofferingthepotentialonanuntested conditionbeinggeneratedduringan isolation.STATShaveassessed thisriskasbeingmorehazardousthanasinglefullytestedandstablegrip.TecnoPlugshavebeenacceptedbymostmajoroperatorsoverthelast20years.

  • Proceedi

    TecnoPIn2001longtoaPlugddeploym

    OneoftpipelineconsequNACEcowheretseal spemajor ominimisobvious

    Pip

    ngsofthe2012P

    Allrightsreserve

    lugExampTecnomarinallowaweldeploymenta

    mentStatoili

    thechallenge medium. Tuencesofeveomplaint,prohesourconecificallydesoperators. Wingoftheprchoice.

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    plesedeployedadedinESDVvandwaspreisolated2fu

    FigureesintheoilaThe presencenasmallleovidingthetentcanbesigned for soWe had to qroductretain

    Figure12

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    a40remotevalvetobesecededbyarther40exp

    11:Remoteandgaspipece of H2S ieakcanprovcorrectsealimeasured inour serviceaualify the snedbyasing

    2:38Tecno

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    eplugforStastrippedand3dayHAZOportlinesth

    PlugBeingLelineindustryin the pipevefatal.STATingpackermnseveralpeandhave isoeals for 9%glesealisan

    Plugafter

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    atoil,isolatinmaintained

    OPtoassessefollowingy

    LoadedintoPyisthepreseline fluid gTSstandardTmaterial isusercent insteaolated38ahydrogen simportantfa

    SourGasDe

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    nga110bar.Thiswasththerisks.Asyear.

    PigTrapenceofHydrreatly increTecnoPlugssed.STATSaadofppm.Hnd36pipesulphate. Inactormaking

    eployment

    2012

    onTechnicalCon

    copyrightowners

    gaspipelinehefirstremosaresultof

    rogenSulphieases the riaredesignareworkingHereweuseelines for twthis applicagtheTecno

    nferences,

    s.

    e,800kmoteTecnothisfirst

    deinthesks. ThenedtobeinQatar,eaHNBRwoof theation thePlugan

  • Proceedi

    BISEPTheBISETecnoP

    TheBISE

    STATShmechanwhichagenerate

    TheBISEofthedattachedBISEPoutboar

    TheclamInthe1andperm

    Pip

    ngsofthe2012P

    Allrightsreserve

    BranchInsEPistheDlugsealsm

    EPoffersalThepressuretotheTecnoTheBISEPthe BISEPpressure.The BISEPsecondaryseTheBISEPcontinuoussTheBISEPTheBISEPremovedsoweldedfittinhavedevelopicalhot tapllows theasesapenetraEPistheneadleg.Oncdandpressutoberemovrdofthemecmpandpipe8applicatiomanentsolu

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    stalledSelfEoubleBlockmountedona

    llthedualseehead,primoPlug.ishoweveris restraine

    also has aeal. hadpermasafeventingcanaccommcanbeutilisremovingthngs.peda systemclamp isusssemblyon ttioninthepdeployedtocethedeaduretestedagvedleavingachanicalhotwithhottapontherewasution.ThisTe

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    EnergisedPluandBleedliasphericalh

    Fig

    ealadvantagemarysealann

    installedthroed by two so

    secondary

    nenthydrauofanyprima

    modatebacksedinconjunhehazardof

    m, firstuseded toprovidthepipe topipeforthedprovidedoulegisremovgainstthebaaccesstodeptapclampanppenetratiosaflangebrecnoPlugw

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    ugnestoptooleadtoprovi

    gure13:BISEesofaTecnonulusringan

    oughahottolid clevis a

    leak tight p

    ulic connectarysealbypapressuretonctionwithaweldingont

    d to removedeacoldwobepressuredeploymentubleblockaved,atempoackoftheBIploytheTecndsettoproncanthenbreakimmediwasdesigned

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    whichhasbdethedual

    EPoPlugbutdsecondary

    tappenetratarms, each o

    pressure hea

    ion throughass.testthecomaTecnoPlugolivelinesa

    an18deaorkbranch.e tested.AhoftheBISEPndbleedisoorarylaunchSEP.ThisnnoPlug.ThovideDoubleberemovedatelyonthedwithamec

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    beendevelopbarrierisolat

    withsomeasealoperate

    ionsoinsteaof which can

    ad mounted

    the launche

    mpletedpipegtoallowhandthelong

    d leg forBPTheclamp ihot tapmac.lationsofacercompletenewverifiedheTecnoPlueblockandbundertheTee36by18chanicallock

    2012

    onTechnicalCon

    copyrightowners

    pedbySTATtion.

    additionalfeaeinasimilar

    adofthetapn resist the

    d to the rea

    er. Thiswou

    ework.hottapfittintermsecurit

    P in theUK,isadual seachineand va

    cilitatingtheewithTecnoboundaryalugisthendbleedisolatioecnoPlugiteeallowing

    kandretentio

    nferences,

    s.

    S.Ituses

    atures.rmanner

    perlocks,full test

    ar of the

    uld allow

    ngstobetyofsplit

    whereaalvarietyalve then

    removalPlugisllowsthedeployedon.isolation.gaquickonwhich

  • Proceedi

    alloweddesigned

    The whisolation

    BISEPaheadwhbeseen

    Pip

    ngsofthe2012P

    Allrightsreserve

    theplugtodtofilltheb

    Figu

    ole operationthroughoutandTecnoPherethesealontheBISEP

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    beabandonbranchsoeff

    Figur

    ure15:BISEPon was condt.lugsealsalsweresetoPseals.

    Figure16:BI

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    ned inthebfectivelyrem

    re14:BISEP

    PIsolatingPducted unde

    reratedforonhottapsw

    SEPHeada

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    ranchandbmovingthede

    Deployme

    PipelineOner cold wor

    leaktightopwarfandatta

    afterSucces

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    lindedbehineadleg.

    entDuringTe

    SitewithDerk condition

    peration.Theainedaleakt

    sfulSetonH

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    nd it.The len

    esting

    adLegCutAs with doub

    epicturebelotightseal.Th

    HotTapSwar

    2012

    onTechnicalCon

    copyrightowners

    ngthofthe

    Awayble block an

    owshowsaheswarfcan

    rfnferences,

    s.

    plugwas

    nd bleed

    BISEPclearly

  • Proceedi

    The comtrappedimpractichanges

    The volulargerthTecnoPlu

    Pip

    ngsofthe2012P

    Allrightsreserve

    mpetitivede between tical. The loas,potentially

    F

    umebetweehantheTecn

    ug&BISEP

    pelinepigginga

    PipelinePiggingaTiratsooTec

    ed.Thisdocumen

    signwith twhe seals. Opading on eacytoanuntest

    igure17:Coen themodunoPlugand

    areTradeM

    ndintegrityma

    andIntegrityMachnical(adivisiotmaynotberepr

    wo lockandperationallychmodulewtedconditio

    mpetitionDeulesathalfdisonlyisola

    MarksofSTATS

    anagementcon

    nagementconfeonofGreatSouthroducedinanyfo

    sealmodulethis makes

    will also chan.

    esignwithTwthepipelineatedfromthe

    S(UK)Ltd

    nference,Houst

    erence.CopyrighthernPress)andthormwithoutperm

    es required testing botange as the

    woLockandepressure (Oeworksiteb

    ton,February2

    t2012byClarioheauthor(s).missionfromthec

    half thepipth seals in spressure be

    SealModuleOrange in skyasinglesea

    2012

    onTechnicalCon

    copyrightowners

    pelinepressusitu to fulletween the

    esketch) is signal.

    nferences,

    s.

    ure tobepressuremodules

    nificantly

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    Isolationsystem Primarybarriercapability

    Primarysealtest

    Secondarybarriercapability

    Secondarysealtest

    Bleed/monitordescription

    Controlsystemisolation

    CommentsDualvalveandbleed

    Blockvalvepotentialforminorleakratedependantonvalveservicehistory

    Bleedbetweenvalvescanbeusedforafullservicetestattimeofisolation

    Blockvalvepotentialforminorleakratedependantonvalveservicehistory

    Pressurisingthevoidbetweenthevalvestopipelinepressurecanprovesecondaryvalve

    Bleedvalveandmonitorbetweenthevalvesofferstheopportunitytobleedthevoidtoflareandlockinformonitoring.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    Controlvalvestoisolated.Blockvalvestobelockedortagged

    High levelofisolationbutrequiresincumbentvalvesinthesystemtobeavailableandoperatingwithinrequiredacceptancecriteria.

    Singlesplitgatevalve

    Sealonoutboardslab.Actuationonthetaperofthesplitactivatesthesealsonotreliantonpressureenergisation

    Bleedonvalvecavitycanbeusedforafullservicetestattimeofisolation

    Sealoninboardslab.Actuationonthetaperofthesplitactivatesthesealsonotreliantonpressureenergisation,howeverpressureactingonslaboffersadditionalenergisation

    Pressurisingthevalvecavitytopipelinepressurecanprovesecondaryseal

    Bleedvalveandmonitorofvalvecavityofferstheopportunitytobleedthevoidtoflareandlockinformonitoring.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    Singlevalveactuationmustbemechanicallylockedorisolatedfromtheactuatortopreventinadvertentoperation

    Highlevelofisolationbutrequiresincumbentvalveinthesystemtobeavailableandoperatingwithinrequiredacceptancecriteria.

    Floatingslabvalvewithpistonsealontheoutboard

    Pistoneffectsealontheoutboardsideoftheslabprovidespressureenergisedsealwhilevalvecavityisvented.Springactivationofthesealonlywherethevalvecavityisatpipelinepressure

    Bleedonvalvecavitycanbeusedforafullservicetestattimeofisolation

    Sealoninboardslab.Pressureactingonslaboffersmainsealenergisation.Sealremainsenergisedindependentofthevalvecavitypressure

    Pressurisingthevalvecavitytopipelinepressurecanprovesecondaryseal

    Bleedvalveandmonitorofvalvecavityofferstheopportunitytobleedthevoidtoflareandlockinformonitoring.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    Singlevalveactuationmustbemechanicallylockedorisolatedfromtheactuatortopreventinadvertentoperation

    Highlevelofisolationbutrequiresincumbentvalveinthesystemtobeavailableandoperatingwithinrequiredacceptancecriteria.

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    Ballvalvewithdualpistoneffectoninboardseal

    Pistoneffectsealontheoutboardsideoftheballprovidespressureenergisedsealwhilevalvecavityisvented.Springactivationofthesealonlywherethevalvecavityisatpipelinepressure

    Bleedonvalvecavitycanbeusedforafullservicetestattimeofisolation

    Doublepistonusedontheinboardsealtoenergisethesealwiththevalvecavitypressure.Pistonwillalsoworkinreversewithinboardpressureactivatingtheseal.

    Pressurisingthevalvecavitytopipelinepressurecanprovesecondaryseal

    Bleedvalveandmonitorofvalvecavityofferstheopportunitytobleedthevoidtoflareandlockinformonitoring.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    Singlevalveactuationmustbemechanicallylockedorisolatedfromtheactuatortopreventinadvertentoperation

    Highlevelofisolationbutrequiresincumbentvalveinthesystemtobeavailableandoperatingwithinrequiredacceptancecriteria.

    Standardtrunionballvalve

    Pistoneffectsealontheoutboardsideoftheballprovidespressureenergisedsealwhilevalvecavityisvented.Springactivationofthesealonlywherethevalvecavityisatpipelinepressure

    Bleedonvalvecavitycanbeusedforafullservicetestattimeofisolation

    Inboardseatisonlyenergisedbyinboardpressuresocanbeusedforverificationifprimaryseal,butnotsecondarybarrier

    Ventvalvecavitywithpipelinepressureonbothsidesofthevalve.

    Bleedvalveandmonitorofvalvecavityofferstheopportunitytobleedthevoidtoflareandlockinformonitoring.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    Singlevalveactuationmustbemechanicallylockedorisolatedfromtheactuatortopreventinadvertentoperation

    Providessingleprovenblockisolation

    STATSslabgatevalvewithdualinboardseals

    Sealoninboardslab(outerof2concentricseals).Pressureactingonslaboffersmainsealenergisation.Sealremainsenergisedindependentofthevalvecavitypressure

    Bleedbetweenthesealscanbeusedforafullservicetestattimeofisolation

    Sealoninboardslab(innerof2concentricseals).Pressureactingonslaboffersmainsealenergisation.Sealremainsenergisedindependentofthevalvecavitypressure

    Pressurisingtheannulusvoidbetweenthesealstoorabovethepipelinepressureoffersfullsealverification

    Smallvolumebetweenthesealsoffersaverysensitivemonitor.Thisisatemporaryvalveusedforhottappingsosealsarechangedregularlyofferingleaktightsealing.Annuluscanbepressurisedeitherexternallyorwithpipelinepressure.Abilitytobleedpassingsealislimitedduetosmallvolume.

    Differentialpressureacrossthevalvegeneratesfrictionsufficienttopreventvalveoperation.Howeverisolationofactuationsystemismandatory.

    Notsuitableforpermanentinstallationduetosensitivitytosealdamagewhichcouldpreventisolationbeingachieved.

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    TecnoPlugconfiguration

    CompressionsealmaintainedbothbyselfenergisationfromfullDPacrosstheplugandhydraulics

    Bleedbetweenthesealscanbeusedforafullservicetestattimeofisolation

    CompressionsealmaintainedbothbyselfenergisationfromfullDPacrosstheplugandhydraulics

    Pipelinepressuretrappedbysettingsequenceallowsfullservicetestattimeofisolation

    Smallvolumeheldjustaboveambientandcontinuouslymonitored

    Controlsystemactuationsystemiselectronicallylockedbythewatchdogfunction.UnsetsystemisloadlimitedtoensureDifferentialpressurerequirestobelowtoallowunsetting.

    Singlearrayoflocksisfullytestedtotheisolatedpressureandloadingisnoteffectedbythepressurevariationbetweentheseals.Zeroenergyzoneoutboardofsecondarysealinnormaloperation

    Alternativeremoteisolationplugconfiguration

    CompressionsealwithindependentlockringmaintainedbothbyselfenergisationfromhalfDPacrosstheplugandhydraulics

    BleedbetweenthesealslimitedtomaintainDPacrossthesecondarymodulecanbeusedforapartialservicetestattimeofisolation.Fullsealtestperformedpriortomobilisation

    CompressionsealmaintainedbothbyselfenergisationfromhalfDPacrosstheplugandhydraulics

    Sequentialsettingoftheplugmodulescouldallowfullservicetestattimeofisolation

    Significantvolumeheldathalfthepipelinepressure.Pressurelockedinandmonitoredforfluctuation

    NotknowntoSTATS

    Fluctuationsinpipelinepressureorbetweensealannuluspressurescanchangetheplugstatusduringisolation(posttest)e.g.loweringofpipelinepressurecouldbackpressureprimaryseal.Alossofintegrityinsecondarysealwouldbothcontaminatetheworksitewiththetrappedannuluscontentsandapplyanuntestedloadtotheprimarymodule.

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    BISEP CompressionsealmaintainedbothbyselfenergisationfromfullDPacrosstheBISEPandhydraulics

    Bleedbetweenthesealscanbeusedforafullservicetestattimeofisolation

    CompressionsealmaintainedbothbyselfenergisationfromfullDPacrosstheBISEPandhydraulics

    Pressurecanbeappliedtotheannulusbetweenthesealshigherthanthepipelinepressuretoperformfulltestonthesecondaryseal

    Smallvolumeheldjustaboveambientandcontinuouslymonitored.Alsooptiontoopenthebleedtoflaretopreventpressurebuildup.

    ControlsystemactuationsystemHydraulicallylocked.UnsetsystemisloadlimitedtoensureDifferentialpressurerequirestobelowtoallowunsetting.

    Dualclevisarmsofferfullredundancyintheaxialrestraint.Zeroenergyzoneoutboardofsecondarysealinnormaloperation.

    LineStoptoolwithgasbag

    PressurecompetentLipsealleaktight~90%.Energisedbypipelinepressure

    Bleedbetweenthelipsealandthegasbag

    Gasbag notpressurecompetent.

    Bleedbetweenthelipsealandthegasbag

    Separatehottapprovidesbleedformonitoring.Bleedcanbeopenedtosafelocationtopreventpressurebuildupbetweenlinestopandbag

    Isolatedpressurelockstoolinplace.Retractionsystemisnormallynotcapableofrecoverywithoutpressureequalisation.Gasbaginflationlockedin

    Singleprovenisolation

    Weldtesttool Mechanicallyorhydraulicallyactuatedcompressionsealnotenergisedbypipelinepressure

    Pressuretestbetweensealsprovessealintegrity.Toolaxialrestraintishoweverlimitedtocontactfrictionandsolimitedcapability

    Mechanicallyorhydraulicallyactuatedcompressionsealnotenergisedbypipelinepressure

    Pressuretestbetweensealsprovessealintegrity.Toolaxialrestraintishoweverlimitedtocontactfrictionandsolimitedcapability

    Bleedinthisnormallyreferstoanopenbleedthroughthetoolwhichisusedtopreventpressurebuildupoutboardofthetool

    Mechanical/hydrauliclockforactivation.Openventforbleed

    Singleprovenisolationforambientoperation.

    Dualgasbag Inflatedgasbag Pressuretestbetweengasbagsprovesseal

    Inflatedgasbag Pressuretestbetweengasbagsprovesseal

    Pressuremaintainedbetweenthegasbagswithinertfluidensuredhydrocarbonvapoursdonotpass.

    Lockinofgasbagpressure

    Requiredambientisolationwithseparateopenvent.

  • Pipelinepiggingandintegritymanagementconference,Houston,February2012

    Proceedingsofthe2012PipelinePiggingandIntegrityManagementconference.Copyright2012byClarionTechnicalConferences,TiratsooTechnical(adivisionofGreatSouthernPress)andtheauthor(s).Allrightsreserved.Thisdocumentmaynotbereproducedinanyformwithoutpermissionfromthecopyrightowners.

    Singlegasbag Inflatedgasbag None None None none Lockinofgasbagpressure

    Offerssingleunprovenambientisolation.

    Freezeplug Liquidplugfrozeninsidethepipe.Requirescontinuouscoolingtomaintainisolation

    Pressuretestacrosstheplug

    None None Candepressurisetheinboardvoidforservicepressuretest.

    Noisolationofcontrolsystemfeasible.Failureofactivecontrolsystemwillresultinfailureofisolationpossiblecatastrophicfailure.

    Normallyusedinconjunctionwithasecondarysysteme.g.singlevalvetoprovideamorerobustisolation.

    Mudpack Pipeendfilledwithmudtopreventhydrocarbonsreachingworksite

    None None None none Mudpackrequirestobemanuallyremoverordisplacedwithpipelinepressure.Nocontrolsystemtolock

    Singleuntestedambientseal.

    Gelplug Piggablegelslugprovidesambientbarrier

    None Piggablegelslugprovidesambientbarrier

    None None Gelplugsdesignedtomeltinproductionthereforenocontrolsystemlockingrequired.

    Notsuitableforwarmclimates.

    PPIM CoverDouble Block and Bleed Paper - PPIM 2012 web version