  • 7/29/2019 Daily Record Summary-1

    1/12

    1

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.10.Reinforcement

    1 31/12/2008 2 8 3 3 4/2

    2 31/12/2008 2 8 8 4/7

    3 31/12/2008 2 8 1 7/1 1

    4 31/12/2008 2 8 5 36/1 2

    5 31/12/2008 2 8 5 3 415/1 1,2

    6 30/12/2008 2 8 35/1

    7 30/12/2008 2 8 5 36/1 2

    8 30/12/2008 2 8 3 37/1 1,2

    9 30/12/2008 2 8 3 4/2 2

    10 30/12/2008 2 8 3,5 415/1 1,211 30/12/2008 2 8 8 4/7

    12 30/12/2008 2 8 4/1 1

    13 29/12/2008 2 8 4/1 1

    14 29/12/2008 2 8 3 4/2 2

    15 29/12/2008 2 8 8 6/3 1

    16 29/12/2008 2 8 36/1

    17 29/12/2008 2 8 5 415/1 1

    18 28/12/2008 2 8 3 37/1 2

    19 27/12/2008 2 8 3 7/1 2

    20 27/12/2008 2 8 8 2 8/2

    21 27/12/2008 2 8 8 2 25/1

    22 27/12/2008 2 8 36/1 2

    23 27/12/2008 2 8 3 37/1

    24 26/12/2008 2 8 9 4/825 26/12/2008 2 8 8 9/1 1

    26 26/12/2008 2 8 23/1 2

    27 26/12/2008 2 8 8 25/1

    28 26/12/2008 2 8 2

    29 26/12/2008 2 8 3 37/1 1

    30 24/12/2008 2 8 4/8

    31 24/12/2008 2 8 5 7/4 2

    32 24/12/2008 2 8 3 25/1

    33 24/12/2008 2 8 8 36/2

    33a 24/12/2008 2 8 8 36/3

    34 23/12/2008 2 8 3 23/1

    35 23/12/2008 2 8 8 4/1

    36 23/12/2008 2 8

    37 23/12/2008 2 8 5 7/4

    38 22/12/2008 2 8 1

    39 22/12/2008 2 8 3 6/3

    40 22/12/2008 2 8 3 7/1

    41 22/12/2008 2 8 5 7/4

    42 22/12/2008 2 8 8 9/1

    43 22/12/2008 2 8 4 415/1

    44 21/12/2008 2 8 5 4/7 2

    45 21/12/2008 2 8 4/8

    46 21/12/2008 2 8 5 7/4

    47 21/12/2008 2 8 5 4/7 2

    48 20/12/2008 2 8 4/8

    49 20/12/2008 2 8 7/4 2

    5020/12/2008 2

    8 3 8/2

    51 20/12/2008 2 8 8 9/1

    52 20/12/2008 2 8 5 415/1

    53 19/12/2008 2 8 5 4/7 2

    54 19/12/2008 2 8 1

    55 19/12/2008 2 8 3 419/1

    56 19/12/2008 2 8 8 8/2

    57 17/12/2008 2 8 9 4/7

    58 17/12/2008 2 8

    59 17/12/2008 2 8 9 8/2

    60 17/12/2008 2 8 21/1

    61 17/12/2008 2 8 2 23/1 2

    62 17/12/2008 2 8 415/1

    63 15/12/2008 2 8 8 4/8

    64 15/12/2008 2 8 7/4 265 15/12/2008 2 8 5 8/1 2

    66 15/12/2008 2 8 8 417/1

    67 14/12/2008 2 8 5 8/1 2

    68 13/12/2008 2 8 5 8/1 2

    69 21/11/2008 2 8 5 6/3

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

  • 7/29/2019 Daily Record Summary-1

    2/12

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.

    10.Reinforcement

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

    70 20/11/2008 2 8 8,3 4/1 2

    71 20/11/2008 2 8 5 6/3

    72 19/11/2008 2 8 8 4/1

    73 19/11/2008 2 8 5 6/3

    74 19/11/2008 2 8 7/4 2

    75 19/11/2008 2 8 5 8/1 2

    76 19/11/2008 2 8 8/1 B

    77 19/11/2008 2 8 3 419/1

    78 18/11/2008 2 8 8 4/1

    79 18/11/2008 2 8 4/7

    80 18/11/2008 2 8 5 6/3 1

    81 18/11/2008 2 8 7/4

    82 18/11/2008 2 8 8/1

    83 18/11/2008 2 8 3 28/1 2

    84 18/11/2008 2 8 6 35/1

    85 18/11/2008 2 8 3 415/1 1,2

    86 17/11/2008 2 8 6 7/4

    87 17/11/2008 2 8 5 8/2 1

    88 17/11/2008 2 8 3 415/1 1,2

    89 16/11/2008 2 8 5 8/2 1

    90 16/11/2008 2 8 9 8/1

    91 16/11/2008 2 8 5 8/2

    92 15/11/2008 2 8 4/7 2

    93 15/11/2008 2 8 8 4/8 2

    94 15/11/2008 2 8 5 6/3 1

    95 15/11/2008 2 8 8/1

    96 15/11/2008 2 8 5 8/2

    97 15/11/2008 2 8 5 28/1 2

    98 15/11/2008 2 8 31/1 2

    99 15/11/2008 2 8 3 32/1 2

    100 15/11/2008 2 8 3 415/1 1,2

    101 14/11/2008 2 8 3 415/1

    102 14/11/2008 2 8 4/7

    103 14/11/2008 2 8 8 4/8

    104 14/11/2008 2 8 8/1 B

    105 14/11/2008 2 8 5 8/2

    106 14/11/2008 2 8 4 28/1 C 2

    107 14/11/2008 2 8 6 31/1 1

    108 14/11/2008 2 8 3 32/1 E 2

    109 13/11/2008 2 8 5 6/3 1

    110 13/11/2008 2 8 5 8/2 1111 13/11/2008 2 8 3 28/1 C

    112 12/11/2008 2 8 2 8/1 B 1

    113 11/11/2008 2 8 2 28/1 C 1,2

    114 11/11/2008 2 8 7/4

    115 9/11/2008 2 8 4 6/3

    116 9/11/2008 2 8 4 6/3

    117 9/11/2008 2 8 4 6/3

    118 8/11/2008 2 8

    119 8/11/2008 2 8 3 6/3 1,2

    120 8/11/2008 2 8 8/2

    121 8/11/2008 2 8 2 8/1 B

    122 8/11/2008 2 8 1,3 28/1 C

    123 8/11/2008 2 8 6 35/1

    124 7/11/2008 2 8 2,3 4/7125 7/11/2008 2 8 2,3 6/3

    126 7/11/2008 2 8 4/7

    127 7/11/2008 2 8 3 6/3 1

    128 7/11/2008 2 8 7/4

    129 7/11/2008 2 8 8/1

    130 7/11/2008 2 8 2 28/1

    131 7/11/2008 2 8 6 35/1

    132 6/11/2008 2 8 7/2

    133 6/11/2008 2 8 7/5

    134 6/11/2008 2 8 8/1

    135 6/11/2008 2 8 2 28/1 2

    136 6/11/2008 2 8 3 31/1 1,2

    137 5/11/2008 2 8 4 6/1 2

    138 5/11/2008 2 8 9 6/3

    139 5/11/2008 2 8 2 7/1 1

    140 5/11/2008 2 8 7/5

    141 5/11/2008 2 8 8/1

    142 5/11/2008 2 8 1 28/1 2

  • 7/29/2019 Daily Record Summary-1

    3/12

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.

    10.Reinforcement

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

    143 5/11/2008 2 8 5 31/1 1,2

    144 5/11/2008 2 8 3 415/1 2

    145 4/11/2008 2 8 5 31/1 1,2

    146 4/11/2008 2 8 5 417/1 2

    147 4/11/2008 2 8 5,6 418/1 2

    148 4/11/2008 2 8 8/2 1,2

    149 4/11/2008 2 8 7/1 1

    150 4/11/2008 2 8 7/4

    151 3/11/2008 2 8 7/4

    152 3/11/2008 2 8 3 7/1 1,2

    153 3/11/2008 2 8 9 8/2 1

    154 3/11/2008 2 8 5 418/1 2

    155 3/11/2008 2 8 7 28/1 2

    156 3/11/2008 2 8 4 31/1 1,2

    157 3/11/2008 2 8 8/1 B

    158 2/11/2008 2 8 5 4/1

    159 1/11/2008 2 8 5 4/1

    160 1/11/2008 2 8 1,2 7/1

    161 1/11/2008 2 8 8/2

    162 1/11/2008 2 8 4 31/1 1,2

    163 1/11/2008 2 8 2 27/1 1

    164 1/11/2008 2 8 2 25/1 2

    165 31/10/2008 2 8 5 35/2 1,2

    166 31/10/2008 2 8 36/1

    167 31/10/2008 2 8 36/2 1

    168 31/10/2008 2 8 2 37/1 2

    169 31/10/2008 2 8 7 27/1 2

    170 31/10/2008 2 8 7 25/1 1

    171 31/10/2008 2 8 5 4/1

    172 31/10/2008 2 8 8/2

    173 31/10/2008 2 8 2 7/1 2

    174 31/10/2008 2 8 4 417/1 2

    175 29/10/2008 2 8 5 4/1

    176 29/10/2008 2 8 4 418/1 2

    177 29/10/2008 2 8 4 417/1 2

    178 29/10/2008 2 8 6 35/1

    179 29/10/2008 2 8 2 4/2

    180 29/10/2008 2 8 7/1

    181 29/10/2008 2 8 7/2

    182 29/10/2008 2 8 8/2

    183 29/10/2008 2 8 8 8/1184 30/10/2008 2 8 8/2

    185 30/10/2008 2 8 8/1

    186 30/10/2008 2 8 1 7/1 2

    187 30/10/2008 2 8 5 4/1

    188 30/10/2008 2 8 4,8 418/1 2

    189 30/10/2008 2 8 5 36/3 2

    190 30/10/2008 2 8 5 35/2 2

    191 30/10/2008 2 8 7 37/1 2

    192 25/10/2008 2 8 9 4/1 2

    193 25/10/2008 2 8 3 31/1 1

    194 25/10/2008 2 8 2 32/1 2

    195 25/10/2008 2 8 7 37/1

    196 25/10/2008 2 8 1 415/1 1

    197 25/10/2008 2 8 2 419/1 2198 26/10/2008 2 8 8/1 B

    199 28/10/2008 2 8 4/1

    200 28/10/2008 2 8 3 4/8

    201 28/10/2008 2 8 6 35/1

    202 28/10/2008 2 8 8/2

    203 28/10/2008 2 8 2 415/1 1,2

    204 28/10/2008 2 8 2 415/1

    205 24/10/2008 2 8 3 31/1

    206 24/10/2008 2 8 2 8/1 B

    207 24/10/2008 2 8 3 7/4

    208 24/10/2008 2 8 4 4/1

    209 24/10/2008 2 8 3 8/1

    210 24/10/2008 2 8 8/2

    211 24/10/2008 2 8 2 417/2 2

    212 25/10/2008 2 8 3 7/5

    213 22/10/2008 2 8 1,2 31/1

    214 22/10/2008 2 8 5 4/3

    215 22/10/2008 2 8 4/1 2

  • 7/29/2019 Daily Record Summary-1

    4/12

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.

    10.Reinforcement

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

    216 22/10/2008 2 8 7 419/1

    217 22/10/2008 2 8 7 417/2

    218 22/10/2008 2 8 3 417/1 2

    219 22/10/2008 2 8 3 418/1

    220 23/10/2008 2 8 4 4/1 2

    221 23/10/2008 2 8 5 4/3 2

    222 23/10/2008 2 8 6 35/1

    223 23/10/2008 2 8 2 31/1 1

    224 23/10/2008 2 8 8/1 1

    225 23/10/2008 2 8 8/1 B

    226 23/10/2008 2 8 3 417/1

    227 19/10/2008 2 8 3 418/1

    228 21/10/2008 2 8 4/1

    229 21/10/2008 2 8 5 4/3 2

    230 21/10/2008 2 8 6/3

    231 21/10/2008 2 8 1 31/1

    232 21/10/2008 2 8 6 35/1

    233 21/10/2008 2 8 2 37/1 1

    234 21/10/2008 2 8 3 417/1

    235 21/10/2008 2 8 3 418/1

    236 18/10/2008 2 8 6/3

    237 18/10/2008 2 8 2 417/1

    238 18/10/2008 2 8 2 418/1

    239 17/10/2008 2 8 5 4/8

    240 17/10/2008 2 8 4,5 36/1 1

    241 17/10/2008 2 8 6/3 1

    242 16/10/2008 2 8 3 4/1 2

    243 16/10/2008 2 8 5 4/8 2

    244 16/10/2008 2 8 6/3

    245 16/10/2008 2 8 8/1 B

    246 16/10/2008 2 8 2 35/1

    247 16/10/2008 2 8 2 418/1

    248 15/10/2008 2 8 3 4/1

    249 15/10/2008 2 8 5 4/8 2

    250 15/10/2008 2 8 6/3

    251 15/10/2008 2 8 8/1 B

    252 15/10/2008 2 8 5 418/1

    253 15/10/2008 2 8 5 36/1

    254 13/10/2008 2 8 1 8/1 B

    255 11/10/2008 2 8 3 4/1 2

    256 11/10/2008 2 8 4 4/7 1,2257 11/10/2008 2 8 8/1 B 1

    258 10/10/2008 2 8 3 4/1 2

    259 10/10/2008 2 8 4/7

    260 10/10/2008 2 8 5 4/8 2

    261 10/10/2008 2 8 8/1 B 1

    262 10/10/2008 2 8 1 417/1

    263 10/10/2008 2 8 1 418/1

    264 9/10/2008 2 8 3 4/1

    265 9/10/2008 2 8 9 4/3 2

    266 9/10/2008 2 8 4 4/7 2

    267 9/10/2008 2 8 5 4/8

    268 9/10/2008 2 8 6/2

    269 9/10/2008 2 8 6/3

    270 9/10/2008 2 8 7 8/1 B271 8/10/2008 2 8 3 4/1

    272 8/10/2008 2 8 5 4/8 2

    273 8/10/2008 2 8 6/2

    274 8/10/2008 2 8 6/3 1

    275 8/10/2008 2 8 5 7/4 1

    276 7/10/2008 2 8 3 4/1 2

    277 7/10/2008 2 8 5 4/8 2

    278 7/10/2008 2 8 6/3 1

    279 7/10/2008 2 8 5 7/4

    280 7/10/2008 2 8 5 9/1

    281 6/10/2008 2 8 2 4/1 2

    282 6/10/2008 2 8 3 4/7 2

    283 6/10/2008 2 8 6/3

    284 6/10/2008 2 8 8/1 B

    285 4/10/2008 2 8 4 4/3 2

    286 4/10/2008 2 8 3 6/2 2

    287 4/10/2008 2 8 6/3

    288 4/10/2008 2 8 8/1 B

  • 7/29/2019 Daily Record Summary-1

    5/12

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.

    10.Reinforcement

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

    289 4/10/2008 2 8 4 8/2

    290 3/10/2008 2 8 2 4/7

    291 3/10/2008 2 8 5 4/8

    292 3/10/2008 2 8 3 6/2 2

    293 3/10/2008 2 8 8/1 B

    294 3/10/2008 2 8 4 8/2

    295 3/10/2008 2 8 9 9/1 1

    296 2/10/2008 2 8 4 4/3 2

    297 2/10/2008 2 8 1 4/7 2

    298 2/10/2008 2 8 9 4/8

    299 2/10/2008 2 8 5 7/4

    300 2/10/2008 2 8 8/1 B

    301 2/10/2008 2 8 4 8/2 1

    302 1/10/2008 2 8 4/7 2

    303 1/10/2008 2 8 3 6/1 2

    304 1/10/2008 2 8 2 6/3 1

    305 1/10/2008 2 8 7/4

    306 1/10/2008 2 8 5 7/5

    307 1/10/2008 2 8 9/1

    308 30/9/2008 2 8 3 6/1 2

    309 30/9/2008 2 8 5 7/5

    310 29/9/2008 2 8 3 6/1 2

    311 29/9/2008 2 8 5 7/4

    312 28/9/2008 2 8

    313 28/9/2008 2 8 1 6/3 1

    314 27/9/2008 2 8 3 6/1 2

    315 27/9/2008 2 8 9 7/4 1

    316 27/9/2008 2 8 8/1 B

    317 26/9/2008 2 8 5 7/5 1

    318 26/9/2008 2 8 3 6/1 2

    319 25/9/2008 2 8 5 8/1 1

    320 23/9/2008 2 8 5 8/1 1

    321 23/9/2008 2 8 3 6/3 1

    322 22/9/2008 2 8 3 8/2 1

    323 22/9/2008 2 8 2 6/3 1

    324 20/9/2008 2 8 2 6/2 2

    325 20/9/2008 2 8 2,3 8/2

    326 20/9/2008 2 8 5 8/1

    327 19/9/2008 2 8 1,3 8/2

    328 19/9/2008 2 8 4 9/1

    329 18/9/2008 2 8 3 4/7330 18/9/2008 2 8 2 8/2 1

    331 18/9/2008 2 8 4 9/1

    332 17/9/2008 2 8 2 6/1 1,2

    333 17/9/2008 2 8 3 8/2 1

    334 17/9/2008 2 8 3 9/1

    335 16/9/2008 2 8 2 6/1 2

    336 15/9/2008 2 8 4/8

    337 15/9/2008 2 8 1,2 8/2 1

    338 15/9/2008 2 8 4 7/4

    339 15/9/2008 2 8 3 9/1

    340 13/9/2008 2 8 4/8

    341 13/9/2008 2 8 3,4 8/1

    342 12/9/2008 2 8 4/8

    343 12/9/2008 2 8 1 8/2344 11/9/2008 2 8 2 9/1

    345 11/9/2008 2 8 4/8

    346 10/9/2008 2 8 2 8/2

    347 9/9/2008 2 8 1 8/2

    348 8/9/2008 2 8 3 7/5

    349 7/9/2008 2 8 1 8/2

    350 6/9/2008 2 8 3 7/5

    351 5/9/2008 2 8 3 4/7 1

    352 5/9/2008 2 8 5 13/1 1,2

    353 4/9/2008 2 8 3 4/7 1

    354 4/9/2008 2 8 3 7/4 1

    355 3/9/2008 2 8 6 35/2 2

    356 3/9/2008 2 8 3 7/4

    357 2/9/2008 2 8 3 4/7 2

    358 2/9/2008 2 8 5 13/1

    359 1/9/2008 2 8 3 4/7 2

    360 1/9/2008 2 8 3 8/1

  • 7/29/2019 Daily Record Summary-1

    6/12

    From To SIDE

    1. Embanment 1. Screed conc. 1. leveling 1. LHS2. Excavation 2. Base conc. 2. Compaction 2. RHS3. Sub grade 3. R.Masonry h/w 3. Concreting4. ABC 4. Capping beam 4. Priming5. Prime Coat 5. Deck slab 5. Paving6. Asphalt paving 6. Wall conc. 6. Demolishing7. Side drain 7. Str. Excavation 7. Gravel filling8. Culvert 8. Str. Filling

    9. Sill conc.

    10.Reinforcement

    2.STRUCTURES

    LocationWork Decription

    Culvert

    No.

    Page

    No.

    Date

    schedulePortionItem of WorkWORK

    1. ROAD

  • 7/29/2019 Daily Record Summary-1

    7/12

    Culvert Cleaning

    Demolishing Existing Deck

    Demolishing Existing Deck

    Cleaning Debris

    Demolishing Existing Deck

    Dewatering

    Plastering HW

    Demolishing Existing Deck

    Demolishing Existing Deck

    Plastering HW

    Plastering HW

    Demolishing Existing Deck

    Demolishing Existing Deck

    Deck Form Work

    Demolishing Existing Deck

    Deck Form Work

    Deck Form Work

    Demolishing Existing Deck

    Dewatering

    Drilling for Dowels

    Demolishing Existing Deck

    Demolishing Existing Deck

    Dewatering

    Debris Cleaning

    Demolishing Existing Deck

    Remarks

  • 7/29/2019 Daily Record Summary-1

    8/12

    Remarks

    Demolishing Existing Deck

    Dewatering & Cleaning

    Dewatering & Cleaning

    Demolishing Existing Deck

    Dewatering & Cleaning

    Demolishing Existing Deck

    Plastering

    Demolishing Existing Deck

    Dewatering & Cleaning

    Plastering

    Demolishing Existing Deck

    By Pass Gravel Filling

    Plastering

    Collar Concrete

    Form Work

    Form Work

    Form Work

    Demolishing Existing Deck

    Form Work

    Concrete

    Form Work & Concrete

    Demolishing Existing Deck

    Dewatering

    Base Rebar Work

    Rebar & Form Work

    Demolishing Existing Deck

    Dewatering

    Surface Compaction

    Demolishing Existing Parapet

    Dewatering

    Rebar & Form Work

    Excavation & Dewatering

    Surface Compaction

    Demolishing Existing Deck

    Abutment Formwork

    Formwork & Concrete

    Dewatering

    Base Formwork

    Surface Compaction

    Demolishing Existing Deck

    Excavation & Dewatering

  • 7/29/2019 Daily Record Summary-1

    9/12

    Remarks

    Rebar & Form Work

    Plastering

    Dewatering

    Gravel Filling & Compaction

    Gravel Filling & Compaction

    Abutment & Headwall

    Cleaning Debris

    Rebar & Form Work

    Abutment & Headwall

    Dewatering

    Rebar & Formwork

    Dewatering

    Demolishing Existing Deck

    Rebar & Formwork

    Parapet Wall Concrete

    Parapet Wall Concrete

    Parapet Wall Concrete

    Excavation

    Rebar work for Deck

    Demolishing Existing Deck

    Rebar & Formwork

    Dowels Fixing

    Form Work

    Form Work

    Rebar & Formwork

    Excavation & Dewatering

    Bending Rebar

    Demolishing Existing Deck

    Gravel Filling & ExcavationDemolishing Existing Deck

    Gravel Filling & Compaction

    Excavation

    Form Work

    Form Work

    Form Work

    Excavation

    Dewatering & Sand Filling

    Drilling Work to Old Cap.Beam

    Excavation

    Abutment & Head Wall

    Drop Wall Formwork & Concrete

    Plastering to HW

    Head Wall

    Demolishing Existing Deck

    Formwork & Concrete

    Rebar Fabrication

    Demolishing Existing Deck

    Demolishing Existing Deck

    Rebar Work for Deck

    Demolishing Existing Deck

  • 7/29/2019 Daily Record Summary-1

    10/12

    Remarks

    Demolishing Existing Deck

    Formwork for side wall

    Gravel Filling

    Fabrication of Rebar

    Demolishing Existing Deck

    Formwork

    Cleaning Debris

    Rebar work for Side wall

    Dewatering & Demolishing

    Formwork & Concrete

    Rebar work for Parapet

    Dewatering & Demolishing

    Plastering

    Rebar work

    Demolishing Existing Deck

    Gravel Filling

    Formwork & Rebar Work

    Fabrication of Rebar

    Demolishing Existing Deck

    Shoring Work

    Formwork & Rebar Work

    Rebar Work

    FormworkSand Filling

    Abutment & Headwall

    Formwork

    Formwork

    Excavation for Base

    Formwork

    Formwork

    Demolishing Structure

    Demolishing Existing Deck

    ExcavationAbutment

    Formwork

    Dewatering & Demolishing

    Demolishing Existing Deck

    Rebar Work & Concrete

    Formwork

    Demolishing Existing Deck

    Rebar Work

    Rebar Work & Concrete

    Formwork & Concrete

    Demolishing Existing Deck

    Excavation

    Formwork & Concrete

    Demolishing Existing Deck

    Excavation

  • 7/29/2019 Daily Record Summary-1

    11/12

    Remarks

    Dowels Fixing

    Formwork & Concrete

    Formwork & Plastering to HW

    Abutment & Headwall

    Excavation

    Rebar Work

    Rebar Work

    Formwork for Deck

    Excavation

    Formwork for Capping Beam

    Excavation

    Abutment & Headwall

    Rebar Work & Concrete

    Formwork

    Gravel Filling & Compaction

    Formwork & Plastering

    Formwork & Plastering

    Dewatering & Concrete

    Excavation

    Formwork

    Rebar work

    Dewatering & Concrete

    Rebar work

    Formwork

    Sand Filling

    Culvert 6/3 also RR Masonry

    Formwork & Concrete

    Dewatering

    Formwork & Rebar

    Dewatering

    Demolishing Existing Deck

    East & West Direction

    Rebar Work

    Abutment & Head Wall

    Demolishing Existing Deck

    Excavation

    Demolishing Existing Deck

    Dewatering

    Dewatering

    Rebar Work

  • 7/29/2019 Daily Record Summary-1

    12/12

    Remarks