dale evans director - @one alliance january...

12
Dale Evans Director - @one Alliance January 2013

Upload: others

Post on 12-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

Dale Evans Director - @one Alliance January 2013

Page 2: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

Presentation covers ….

• Alliance Background

• Key Improvement Strategies

Product Development

Continuous Improvement

• Examples

Page 3: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

3

Need for a different approach!

2005 looking forward:

• Deliver a £ 1 bn five year programme

• Tough efficiency targets

• Operable solutions

• Health and Safety

Only achievable through a different model

Page 4: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

4

Developing an Alliance Model

ALIGNMENT

INTEGRATED TEAMS

VISIBLE PROGRAMMES

COLLABORATION

INCENTIVE BASED MODEL

CONTINUOUS IMPROVEMENT

Page 5: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

5

Alliance Organisation

engineering

Page 6: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

6

The Challenges!

• 25% affordability challenge (over 5 years)

• 50% reduction in embodied carbon

• 20% reduction in operational carbon

• All Capital Delivery targets

A constructive and innovative response to challenge

Page 7: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

7

OFF SITE CONSTRUCTION

PRODUCTION MANAGEMENT

CARBON REDUCTION

CONTINUOUS IMPROVEMENT

WASTE

PRODUCT DEVELOPMENT

Page 8: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

SMART Products

Minimum

Asset

Standard

3D Model

Drawings

Integrat ion

Guide

Health & Safety

Risk Assessment

Calculat ions

Specif icat ion

Procurement

Guide

Framework

Agreement

BOM

Cost data

Acceptance

CriteriaInstallat ion

Guide

Commissioning

Data

Funct ional

Design Spec

Sof tware Block

Maintenance

Schedule

Spares

Schedule

O&M

data

SAP ALM

data

JoECarbon

Footprint

Telemetry

Standards

Asset Monitoring

Frameworks (IRIS)

design the product once

get it right

use it many t imes…“design the product once

get it right

use it many t imes…“

Page 9: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

9

PRODUCT

DEVELOPMENT STANDARD WORK

CONTINUOUS

IMPROVEMENT

The Route to Continuous Improvement

Midi Submersible

Pumping Station

Product Installation

Guide

Rev 2.3 May 2012

Page 10: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

• Carbon and cost reduced to equivalent of refurbishing existing treatment plant

• Water Treatment Works developed from products

• Over 70% off-site construction

• Construction period of 6 months

• 60% reduction in embodied carbon (954 t CO2e from 2503 t)

Product Based WTW

Page 11: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

Product Example – Chlorination

Traditional

Component Sub Assembly Assembly

Product Based

Page 12: Dale Evans Director - @one Alliance January 2013ciria.org/buildoffsite/pdf/Events/2013/Delivering... · 3 Need for a different approach! 2005 looking forward: •Deliver a £ 1 bn

12

Collaboration and Continuous Improvement

• Collaborative model provides:

- open view of performance

- opportunity for challenge

• Initiatives that collectively drive a different way of working

• Continuous Improvement (culture) as core strategy

OFF SITE CONSTRUCTION

PRODUCTION MANAGEMENT

CARBON REDUCTION

CONTINUOUS IMPROVEMENT

WASTE

PRODUCT DEVELOPMENT

OFF SITE CONSTRUCTION

PRODUCTION MANAGEMENT

CARBON REDUCTION

CONTINUOUS IMPROVEMENT

WASTE

PRODUCT DEVELOPMENT