COMMISSIONING COMMISSIONING Jim Snyder Jim Snyder Fort Sill Resident Office Fort Sill Resident Office (580) 355 (580) 355 - - 6148 ext 40 6148 ext 40 [email protected] [email protected] presented by presented by Dale Herron Dale Herron ERDC/CERL ERDC/CERL (217) 373 (217) 373 - - 7278 7278 [email protected] [email protected]

Upload: others

Post on 03-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

COMMISSIONINGCOMMISSIONING

Jim SnyderJim SnyderFort Sill Resident OfficeFort Sill Resident Office(580) 355(580) 355--6148 ext 406148 ext 40

[email protected]@usace.army.mil

presented bypresented by

Dale HerronDale HerronERDC/CERLERDC/CERL

(217) 373(217) [email protected]@erdc.usace.army.mil

Page 2: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

WHY?WHY? ------ COMMISSIONINGCOMMISSIONINGGOALSGOALS

�� Improve system performanceImprove system performance�� Lower operating and maintenance costsLower operating and maintenance costs�� Lower repair costsLower repair costs�� User comfort, safety & IAQUser comfort, safety & IAQ�� Owner quality verificationOwner quality verification�� Conforms with design intentConforms with design intent

Page 3: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

CONSTRUCTION PROBLEMSCONSTRUCTION PROBLEMS

�� Commissioning Schedule & CostCommissioning Schedule & Cost�� Design deficienciesDesign deficiencies�� Construction deficienciesConstruction deficiencies�� Product qualityProduct quality�� HVAC controls operationHVAC controls operation�� EnergyEnergy

Page 4: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

DESIGN REVIEW

REPORT

SUB TAB FIRM

& SPECIALIST

CERTIFICATE

HVAC SYS

READINESS

CHECK DATE

HVAC SYS

READINESS

CHECK

NTP

TEST & COMM HVAC

CONTROLS PER

CEGS 15950 & 15951HVAC CONTROLS

INSTALLED

SUBMIT TAB,

PROCEDURES,

DRAWINGS, REPORT

FORMS & INSTRU. INFO

TAB START DATE

& READINESS

REPORT

BLDG COMPLETE

SUB COMM. PROCEDURES

& SCHD HVAC CONTROLS

TEST & COMM ALSO PVT

PROCEDURES

FOR 15950/15951

PERFORM

HVAC TAB

TAB REPORT

& DATE FOR TAB

VERIFICATION

SUBMITCONTROLS

TEST REPORT

FS7

FS 60

FS30

FIGURE 1

FS21

FS7

FS14

FS7

ACTIVITY

SAMPLE

ACTIVITYNUMBER

DURA-TION

FS = FINISH START LAGS SHOWINGNUMBERS ARE PRESENT GUIDESPECIFICATION REQUIREMENTS

SUB = SUBMITCOMM = COMMISSIONINGTAB = TEST ADJUST & BALANCEINSTRU = INSTRUMENTINFO = INFORMATIONSCHD = SCHEDULENTP = NOTICE TO PROCEEDPVT= PERFORMANCE VERIFICATION

TEST

FS

21

NOTE:CONTROLS COMM & TABCAN BE CONCURRENT. THE PVTSHALL BE PERFORMED AFTERCOMM AND TAB.

PERFORM PVT PER15950/15951

FS30

MECHANICAL SYSTEMS

TESTING FOR

BOILERS, CHILLERS,

COOLING TOWERS ETC.

TAB RELATED HVAC

SUBMITTALSFS7

EMCS TESTING

PER 13814

Page 5: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

PERFORM

PRE-COMM

CHECKLIST ITEMS

COMM. SCHEDULE

SUBMIT COMM

TEAM MEMBERS

APPROVE COMM

. PROCEDURES

SUBMIT COMM.

PROCEDURES

APPROVE

TAB REPORT

TAB

VERIFICATIONTAB VERIFICATION

REPORT

FUNCTIONAL

PERFORMANCE TESTS

FINAL

INSPECTIONSUB. /APPROVE

COMM. TEST REPORT

O&M MANUALS

APPROVED

CONTRACTCOMPLETION

FIGURE 2

FS28

FS7

FS14

FS14

15895 PERFORMACE

TEST (2 DAYS EACH

SYSTEM)

NOTE: PRE-COMMISSIONINGCHECKLIST MAY BE DONE ATAPPROPRIATE TIME DURING CONSTRUCTION

PLUMBING

PERFORMANCE

TEST PER 15400

FIRE DETECTION &ALARM TEST PER13850/13851

FIRE SYSTEM PRELIM

& FINAL TEST PER

13920/13930

FIRE DAMPER TESTPER NFPA 90A &15895

Page 6: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

INTRODUCTIONINTRODUCTION

�� Building commissioningBuilding commissioning -- HVAC,HVAC,plumbing, electrical, fire protectionplumbing, electrical, fire protection

�� PrePre--design, design, construction,design, design, construction,acceptance, postacceptance, post--acceptanceacceptance

Page 7: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

ASHRAE GUIDE 1ASHRAE GUIDE 1--19961996

�� PrePre--design Planingdesign PlaningMeetingsMeetings

�� Design BCO ReviewsDesign BCO Reviews�� Construction QA/QCConstruction QA/QC�� Acceptance Final TestingAcceptance Final Testing

VerificationVerification�� PostPost--acceptance Warrantyacceptance Warranty

Page 8: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

UFGSUFGS –– 15995A15995A

�� Commissioning teamCommissioning team�� Required @ contract completionRequired @ contract completion�� After 15950 & 15990 is completeAfter 15950 & 15990 is complete�� After all tests, reports & O&M ManualsAfter all tests, reports & O&M Manuals�� Repetitive inspection & testingRepetitive inspection & testing�� PrePre--commissioning checklistscommissioning checklists�� Functional performance checklistsFunctional performance checklists

Page 9: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

PREPRE--COMMISSIONINGCOMMISSIONING

�� Installation ChecklistInstallation Checklist�� Required by Contract at Job CompletionRequired by Contract at Job Completion�� Should be Performed as Scheduled?Should be Performed as Scheduled?�� Perform Control & Electrical TestingPerform Control & Electrical Testing

Later?Later?�� Contractor to Complete MasterContractor to Complete Master

ChecklistChecklist

Page 10: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUNCTIONAL PERFORMANCEFUNCTIONAL PERFORMANCE

�� System Testing ChecklistSystem Testing Checklist�� COE Requires Repetitive TestingCOE Requires Repetitive Testing•• PrePre--commissioning Checkscommissioning Checks•• Functional Performance TestsFunctional Performance Tests

�� Other tests are independent from 15995Other tests are independent from 15995�� Tests aborted if not completed correctlyTests aborted if not completed correctly�� Contractor covers cost of retestingContractor covers cost of retesting�� One Complete Certified Test?One Complete Certified Test?

Page 11: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUNCTIONAL PERFORMANCE Cont.FUNCTIONAL PERFORMANCE Cont.

�� All items listed on checklistsAll items listed on checklists�� Test only after PreTest only after Pre--com completedcom completed�� Prove all modes of sequence/operationProve all modes of sequence/operation�� Verify all relevant contract requirementsVerify all relevant contract requirements�� Start with equipment/componentsStart with equipment/components•• Progress through subsystemsProgress through subsystems•• To complete systemsTo complete systems

�� Correct all failures retest w/no errorsCorrect all failures retest w/no errors

Page 12: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

Commissioning TeamCommissioning Team

�� Contractor/QCContractor/QC�� Contractor/MechanicalContractor/Mechanical�� Contractor/TABContractor/TAB�� Contractor/ControlsContractor/Controls�� Contractor/ElectricalContractor/Electrical�� Designers AgentDesigners Agent�� CORCOR�� User/OwnerUser/Owner

Page 13: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

TESTINGTESTING

�� Mechanical SystemMechanical System�� HVAC SystemHVAC System

Page 14: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

MECHANICAL SYSTEMSMECHANICAL SYSTEMS

�� CoolingCooling�� HeatingHeating�� Air distribution & TABAir distribution & TAB�� Controls & EMCSControls & EMCS�� IAQIAQ�� EnergyEnergy

Page 15: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

MECHANICAL SYSTEMSMECHANICAL SYSTEMS

�� Refrigeration systemsRefrigeration systems•• Chilled water pipe testingChilled water pipe testing•• Backflow prevention deviceBackflow prevention device•• Refrigerant pipe testingRefrigerant pipe testing•• Cooling tower testsCooling tower tests•• System performance testsSystem performance tests•• Condenser water quality testsCondenser water quality tests•• Inspections after first yearInspections after first year

Page 16: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

MECHANICAL SYSTEMSMECHANICAL SYSTEMS

�� Hot water heating systemsHot water heating systems•• Backflow prevention deviceBackflow prevention device•• Test during winter conditionsTest during winter conditions•• Pressure test piping systemPressure test piping system•• Operational testOperational test•• Water treatment testWater treatment test•• First year boiler/piping inspectionFirst year boiler/piping inspection•• Boiler flushed and cleanedBoiler flushed and cleaned

Page 17: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

MECHANICAL SYSTEMSMECHANICAL SYSTEMS

�� Air supply and distributionAir supply and distribution•• Ductwork leak testDuctwork leak test•• Cleaning and adjustingCleaning and adjusting•• TABTAB•• Performance testsPerformance tests•• Field trainingField training

Page 18: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

HVAC SYSTEMSHVAC SYSTEMS

�� Control systemsControl systems•• StartStart--up Testup Test•• Coordination with hvac balancingCoordination with hvac balancing•• Calibration, adjustment and startCalibration, adjustment and start--upup•• Performance verification testPerformance verification test•• Posted and panel instructionPosted and panel instruction•• Training courseTraining course

Page 19: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUTURE WHERE ARE WEFUTURE WHERE ARE WEGOING?GOING?

�� 100% Design Build (Transformation)100% Design Build (Transformation)•• 30 page RFP (No user requests)30 page RFP (No user requests)•• All COE Guide Specifications eliminatedAll COE Guide Specifications eliminated•• Design Review 95% (1Design Review 95% (1--2 day only)2 day only)•• A/E responsible for QAA/E responsible for QA•• Delete contractor supplemental QC’sDelete contractor supplemental QC’s•• COE become Code InspectorsCOE become Code Inspectors•• Very few submittalsVery few submittals•• Build it like downtown (type 5 construction)Build it like downtown (type 5 construction)

Page 20: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUTURE WHERE ARE WEFUTURE WHERE ARE WEGOING?GOING?

�� HVAC Commissioning per ASHRAE 1HVAC Commissioning per ASHRAE 1•• States it is for DesignStates it is for Design--bidbid--buildbuild•• Commissioning Agency is independent contractorCommissioning Agency is independent contractor

and works for owner under separate contractand works for owner under separate contract•• Includes other systems besides HVACIncludes other systems besides HVAC•• Commissioning Agent starts at design throughCommissioning Agent starts at design through

construction to acceptance to post acceptanceconstruction to acceptance to post acceptancecommissioningcommissioning

•• What role for COE?What role for COE?

Page 21: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUTURE WHERE ARE WEFUTURE WHERE ARE WEGOING?GOING?

�� HVAC Commissioning per NEBB,AABC, orHVAC Commissioning per NEBB,AABC, orTABBTABB•• Contractor required to hire Commissioning AgentContractor required to hire Commissioning Agent•• Increase Contract CostIncrease Contract Cost•• Includes other systems besides HVACIncludes other systems besides HVAC•• Commissioning Agent starts at design throughCommissioning Agent starts at design through

construction to commissioning to postconstruction to commissioning to postcommissioning (off season testing)commissioning (off season testing)

•• What role for COE?What role for COE?

Page 22: Dale Herron ERDC/CERL (217) 373-7278 Dale.L.Herron@erdc ... · cegs 15950 & 15951 hvac controls installed submit tab, procedures, drawings, report forms & instru. info tab start date

FUTURE WHERE ARE WEFUTURE WHERE ARE WEGOING?GOING?

�� OVERVIEWOVERVIEW•• Appears that COE not responsible for qualityAppears that COE not responsible for quality•• Appears COE responsible for acceptance testingAppears COE responsible for acceptance testing•• Since Contract oversight minimized, S&A may beSince Contract oversight minimized, S&A may be

reducedreduced•• Reduce & consolidate design sections throughoutReduce & consolidate design sections throughout

COE. Standardized RFP’s, very little designCOE. Standardized RFP’s, very little designreview, and hardly any inreview, and hardly any in--house designhouse design

•• Customer Satisfaction?Customer Satisfaction?