WINTER • Q1 2020 TEXAS DEPARTMENT OF TRANSPORTATION DALLAS DISTRICT 0960_123019 COLLIN COUNTY DESIGN PROJECTS 2020 HIGHWAY PROJECTS: Connecting You With Texas Dallas District Office 4777 E. Highway 80 Mesquite, TX 75150 CONTACT INFORMATION Emily McCann – Public Information Officer (214) 320-4485 [email protected] COLLIN COUNTY DESIGN PROJECTS (WINTER Q1 2020) # CSJ Hwy Project Limits Description Est. Let Date Est. Cost (M) 1 0047-04-022 SH 5 SH 121 to CR 375 Reconstruct and widen 2-lane rural roadway to 4-lane urban Sep-2024 $68 M 2 0091-03-022 SH 289 N BUS 289C, north of Celina to N CR 60/CR107 (Grayson C/L) Reconstruct and widen 2-lane rural to 4-lane divided urban (Ultimate 6) Sep-2026 $17 M 3 0047-06-161 US 75 At Ridgeview Drive Reconstruct ridgeview interchange Sep-2022 $25 M 4 0047-06-158 US 75 Dallas C/L to Bethany Drive Remove HOV lanes and add peak hour travel lanes Aug-2022 $7 M 5 0364-04-049 SS 399 At SH 5 Construct grade separation Mar-2023 $16 M 6 1013-01-035 FM 546 West of Almeta Lane to the Crossings Drive Reconstruct existing pavement and add shoulders Jun-2020 $2 M 7 2247-01-011 FM 2194 Business SH 78E to 0.25 mi east of CR 657 Provide additional paved surface width; safety treated fixed objects Apr-2020 $2.5 M 8 2351-01-017 FM 2478 US 380 to FM 1461 Widen 2-lane rural highway to 4-lane divided; realign intersection at FM 1461; (Ultimate 6-lane) Sep-2020 $35 M 9 2351-02-014 FM 2478 FM 1461 to north of FM 1461 Widen two lane rural highway to 4-lane divided (Ultimate 6-lane); realign intersection of FM 1461 Sep-2020 $3.2 M 10 2056-01-042 FM 2551 FM 2514 to FM 2170 Reconstruct and widen 2 lane rural to 6 lane urban divided Jul-2022 $38.10 M 11 2679-03-015 FM 2514 E of Lavon Pkwy. to N of Drain Dr. Widen facility from 2-lane to 4-lane urban divided (Ultimate 6-lane divided) Jan-2022 $11.1 M 12 2679-03-016 FM 2514 N of Drain Dr. to Brown St. Widen facility from 2-lane to 4-lane urban divided (Ultimate 6-lane divided) Jan-2022 $20 M 13 0047-14-053 US 75 North of CR 370 to Grayson County Line Widen and reconstruct from 4 Lane to 6 lane rural freeway and reconstruct existing frontage roads Sep-2023 $107 M 14 0047-05-054 SH 5 SS 399 to south of CR 275 Reconstruct and widen two lane rural highway to four lane urban Dec-2022 $75.9 M 15 0047-09-034 SH 5 South of FM 1378 to S 399 Reconstruct and widen two lane rural highway to four lane urban Feb-2023 $10.0 M 16 0451-03-013 SH 205 North of John King to SH 78 Widen two lane rural to 4 lane divided Dec-2020 $33.9 M 17 0549-03-021 SH 121 North of FM 455 to the Fannin County Line Reconstruct and widen 2 lane rurual to 4 lane rural divided; construct interhchange at FM 2862 Aug-2045 $8.0 M 18 0549-03-024 SH 121 Collin County Outer Loop to north of FM 455 Reconstruct and widen 2 lane rurual to 4 lane rural divided; construct interhchang at FM 455 Jun-2020 $50.8 M 19 0549-03-028 SH 121 South of SH 160 to north of SH 160 Reconstruct and widen 2 lane rural to 2 lane rural divided Sep-2022 $18.5 M 20 1012-02-030 FM 545 FM 2933 to BI-78D Re-align existing roadway and add shoulders Aug-2022 $20.4 M 21 2845-01-020 FM 455 SH 5 to east of Wildwood Trail Reconstruct and widen 2 lane rural to 4 lane urban divided Dec-2025 $11.6 M 22 0047-06-163 US 75 Bethany Drive to SH 121 Remove HOV lanes and add peak hour travel lanes Dec-2021 $5.2 M 23 0135-03-046 US 380 Airport Rd. to 4th St. Widen 4-lane roadway to 6-lane with raised median Jan-2023 $30 M 24 0135-04-033 US 380 4th St. to CR 458 Widen 4-lane roadway to 6-lane with raised median Jan-2023 $4.5 M ESTIMATED TOTAL $620.7 M TxDOT graphic SOURCE: Texas Department of Transportation. TxDOT graphic SOURCE: Texas Department of Transportation. 15 2 1 13 4 3 5 6 7 8 9 10 11 12 14 16 17 18 19 20 21 22 23 24 N 2 miles 30 67 COLLIN CO. COLLIN CO. COLLIN CO. DENTON CO. COLLIN CO. DENTON CO. COLLIN CO. DALLAS CO. COLLIN CO. DALLAS CO. GRAYSON CO. COLLIN CO. COLLIN CO. HUNT CO. FANNIN CO. COLLIN CO. COLLIN CO. GRAYSON CO. ROCKWALL CO. 78 78 78 78 78 66 66 121 121 121 455 543 545 981 981 815 981 455 982 547 546 544 3356 3133 2862 2862 1377 1827 1827 2933 1377 2756 2194 1461 2478 2478 2478 2478 2514 3537 1138 1138 2755 1777 Melissa New Hope Lowry Crossing Princeton Fate Sasche Garland Celina Anna Westminster Van Alstyne Weston Prosper Lucas Parker Wylie Lavon Nevada Preston Rd. Preston Rd. Blue Ridge Trenton Farmersville Allen Plano FRISCO DALLAS Josephine Murphy Royse City 5 5 5 5 380 380 380 75 75 75 75 121 160 121 289 289 289 121 289 289 289 190 190 190 205 121 69 DNT DNT 75 36 6 6 Lavon Lake Lake Ray Hubbard Design Project Limits ROCKWALL 1461 455 2551 Richardson McKINNEY

Upload: others

Post on 12-Feb-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

WINTER • Q1 2020TEXAS DEPARTMENT OF TRANSPORTATION

D A L L A S D I S T R I C T

0960

_123

019

COLLIN COUNTY DESIGN PROJECTS2020 HIGHWAY PROJECTS:

Connecting You With Texas

Dallas District Office4777 E. Highway 80Mesquite, TX 75150

CONTACT INFORMATIONEmily McCann – Public Information Officer (214) 320-4485 • [email protected]

COLLIN COUNTY DESIGN PROJECTS (WINTER Q1 2020)# CSJ Hwy Project Limits Description Est. Let Date Est. Cost (M)

1 0047-04-022 SH 5 SH 121 to CR 375 Reconstruct and widen 2-lane rural roadway to 4-lane urban Sep-2024 $68 M

2 0091-03-022 SH 289N BUS 289C, north of Celina to N CR 60/CR107 (Grayson C/L)

Reconstruct and widen 2-lane rural to 4-lane divided urban (Ultimate 6)

Sep-2026 $17 M

3 0047-06-161 US 75 At Ridgeview Drive Reconstruct ridgeview interchange Sep-2022 $25 M

4 0047-06-158 US 75 Dallas C/L to Bethany Drive Remove HOV lanes and add peak hour travel lanes Aug-2022 $7 M

5 0364-04-049 SS 399 At SH 5 Construct grade separation Mar-2023 $16 M

6 1013-01-035 FM 546West of Almeta Lane to the Crossings Drive

Reconstruct existing pavement and add shoulders Jun-2020 $2 M

7 2247-01-011 FM 2194Business SH 78E to 0.25 mi east of CR 657

Provide additional paved surface width; safety treated fixed objects Apr-2020 $2.5 M

8 2351-01-017 FM 2478 US 380 to FM 1461Widen 2-lane rural highway to 4-lane divided; realign intersection at FM 1461; (Ultimate 6-lane)

Sep-2020 $35 M

9 2351-02-014 FM 2478 FM 1461 to north of FM 1461 Widen two lane rural highway to 4-lane divided (Ultimate 6-lane); realign intersection of FM 1461 Sep-2020 $3.2 M

10 2056-01-042 FM 2551 FM 2514 to FM 2170 Reconstruct and widen 2 lane rural to 6 lane urban divided Jul-2022 $38.10 M

11 2679-03-015 FM 2514 E of Lavon Pkwy. to N of Drain Dr.Widen facility from 2-lane to 4-lane urban divided (Ultimate 6-lane divided)

Jan-2022 $11.1 M

12 2679-03-016 FM 2514 N of Drain Dr. to Brown St.Widen facility from 2-lane to 4-lane urban divided (Ultimate 6-lane divided)

Jan-2022 $20 M

13 0047-14-053 US 75 North of CR 370 to Grayson County Line

Widen and reconstruct from 4 Lane to 6 lane rural freeway and reconstruct existing frontage roads Sep-2023 $107 M

14 0047-05-054 SH 5 SS 399 to south of CR 275 Reconstruct and widen two lane rural highway to four lane urban Dec-2022 $75.9 M

15 0047-09-034 SH 5 South of FM 1378 to S 399 Reconstruct and widen two lane rural highway to four lane urban Feb-2023 $10.0 M

16 0451-03-013 SH 205 North of John King to SH 78 Widen two lane rural to 4 lane divided Dec-2020 $33.9 M

17 0549-03-021 SH 121 North of FM 455 to the Fannin County Line

Reconstruct and widen 2 lane rurual to 4 lane rural divided; construct interhchange at FM 2862

Aug-2045 $8.0 M

18 0549-03-024 SH 121 Collin County Outer Loop to north of FM 455

Reconstruct and widen 2 lane rurual to 4 lane rural divided; construct interhchang at FM 455

Jun-2020 $50.8 M

19 0549-03-028 SH 121 South of SH 160 to north of SH 160 Reconstruct and widen 2 lane rural to 2 lane rural divided Sep-2022 $18.5 M

20 1012-02-030 FM 545 FM 2933 to BI-78D Re-align existing roadway and add shoulders Aug-2022 $20.4 M

21 2845-01-020 FM 455 SH 5 to east of Wildwood Trail Reconstruct and widen 2 lane rural to 4 lane urban divided Dec-2025 $11.6 M

22 0047-06-163 US 75 Bethany Drive to SH 121 Remove HOV lanes and add peak hour travel lanes Dec-2021 $5.2 M

23 0135-03-046 US 380 Airport Rd. to 4th St. Widen 4-lane roadway to 6-lane with raised median Jan-2023 $30 M

24 0135-04-033 US 380 4th St. to CR 458 Widen 4-lane roadway to 6-lane with raised median Jan-2023 $4.5 M

ESTIMATED TOTAL $620.7 M

TxDOT graphicSOURCE: Texas Department of Transportation.

TxDOT graphicSOURCE: Texas Department of Transportation.

15

2

1

13

4

3

5

6

7

8

9

10 11

12

14

16

1718

19

20

21

22

23

24

N

2 miles30

67

COLLIN CO. COLLIN CO.

COLLIN CO.

DENT

ON CO

.

COLL

IN CO

.

DENT

ON CO

.

COLL

IN CO

.

DALLAS CO.

COLLIN CO.

DALLAS CO.

GRAYSON CO.

COLL

IN CO

.CO

LLIN

CO.

HUNT

CO.

FANNIN CO.

COLLIN CO.

COLLIN CO.

GRAYSON CO.

ROCKWALL CO.

78

78

78

78

78

66

66

121121

121

455

543

545

981

981815

981

455

982

547

546

544

3356

3133

2862

2862

13771827

18272933

1377

2756

2194

14612478

2478

2478

2478

2514

3537

1138

11382755

1777

Melissa

New Hope

LowryCrossing

Princeton

Fate

Sasche

Garland

Celina

Anna Westminster

Van Alstyne

Weston

Prosper

Lucas

Parker

Wylie Lavon

Nevada

Pres

ton

Rd.

Pres

ton

Rd.

BlueRidge

Trenton

Farmersville

Allen

Plano

FRISCO

DALLAS

Josephine

Murphy

Royse City

5

5

5

5

380

380380

75

75

75

75

121160

121

289

289

289

121

289

289

289

190190

190

205

121

69

DNT

DNT

75

36

6

6

LavonLake

Lake RayHubbard

Design Project Limits

ROCKWALL

1461

455

2551

Richardson

McKINNEY