Project “Danube WATER integrated management” – WATER
MIS-ETC 166
Contact person: Dr. Mary-Jeanne ADLER, Project manager,
e-mails: [email protected]; [email protected]; [email protected];
Tel: 0040 722 66 11 30
Dd. Magheru, Nr. 31, Sector 1, Bucharest, Romania
Project Objectives
• Improving water monitoring and the warnings system, environmental data dissemination on the Romanian-Bulgarian border counties;
• Implementing at high standards the EC water policy, by increasing institutional capacity
• Improving the water infrastructure by different acquisitions, including a ship for Danube monitoring and pollution intervention
• Processing and conditioning the liquid organic wastes radioactively contaminated from the nuclear plants Cernavodǎ and Kozloduy.
• Monitoring, data processing and forecasting water quantity and quality, under the European Commission standards for a better implementation of the European legislation in the water field (the Water Framework Directive 2000/60/EC, the Flood Directive 2007/60/CE) Increasing capacity for data and warning dissemination at the border areas.
Project Activities
2.Expert System-DSS
5.Activation the Waters’
Rapid Response Center
Danube WATER automated
stations
1.Informational
System for Water
and Environment
Management
4.Warning System in
border area
3.Communication
System in border area
Project Activities
Preventing
floods disasters and pollution accidents intervention
Modernizing the
informational systems:
* hydrologic - HIS
and for
* Water quality – CIS
for the RO-BG Danube
Project Activities
Buton film
expeditie
Dunare
- 12 HYDROLOGICAL STATIONS
- 60 HYDROGEOLOGICAL STATIONS
- 12 GEODETIC LANDMARKS
UPGRADED OR REPLACE EXISTING EQUIPMENT:
- HARMONIZED GEODETIC SYSTEM
- DATA COMMUNICATION
- DATA ANALYSIS
- DANUBE HIDROLOGIC FORECASTING
- EARLY WARNING SYSTEM
Danube WATER- PARTIAL IMPLEMENTED
• Flood and accidental pollution protection by increasing forecasting capacity by automate monitoring, data processing and common models application (hydrological and hydraulic)
• Operational geodatabase as support for models application and data/information dissemination in the border area
Flood and pollution forecasting system
Data processing Hydrograms Hydraulic
models
Stage-discharge rating courve
0
0.005
0.01
0.015
0.02
0.025
0.03
0.035
0.04
0 30000 60000 90000
Time [s]
Fre
qu
en
cy
D5
D14
D11
D10
D8
D15
D17
Hydrographs
Liguria Region
0.50
0.80
0.90
0.95
0.98
0.99
0.995
0.998
0.999
-2
0
2
4
6
8
0.0 2.0 4.0 6.0 8.0 10.0
Simulated Discharge for given T/ Simulated Discharge for T = 2.9 years
Gum
bel
Reduced V
ari
able
Regional
TCEV
Confidence interval (95%)
Simulated Discharge
PREVENTION, INTERVENTION,
REHABILITATION: ACTIONS
IMPLEMENTED BY BASIN
MANAGEMENT PLAN AND
FLOOD AND ACCIDENTAL
POLLUTION PLANS
WARNING SYSTEM
PREPARATION
INTERVENTION
REHABILITATION
Flood monitorng
and flood prevention
plan Planning resources
Rapid Intervention Centers
LOSS EVALUATION
INSTRUMENTS
Danube WATER- PARTIAL IMPLEMENTED
Danube WATER: long term planning –
Implementation of WFD in Romania and Bulgaria
Submit Interim
Report on
Implementation
2012
Implement
Program
of
Measures
2013
Revise
Overview of
Significant
Water
issues
Evaluate 1st
and Prepare
2nd Period
201
5
Update
RBMP
200
9
Gap
Analysis
Develop River Basin
Management Plans
Set up Program of
Measures for River
Basin Districts
Public
Participation
2004
Assess
current
status
200
6
Establish
Monitoring
Programs
Set up
Environmental
Objectives
Project Results
• Joint methodologies, joint standards for water monitoring and Joint aligned databases with interfaces for data exchange and data sharing with the large public, as demanded by INSPIRE Directive and will be shared with the ICPDR and the upstream countries. Warnings will be elaborated in case of floods, low flows and accidental pollution for the relevant actors in the border area, increasing the public awareness through information campaigns on the environmental protection and management in the cross-border area. Finally, a revision of the bilateral agreement for data exchange will be provided.
Target Groups
• Large communities in flood risk areas,
water management authorities, ICPDR,
border counties, NPP Cernavodă -
Romania and Kozloduy - Bulgaria
Buton film
interviuri
Sofia
PARTNERS:
PP1- Ministry of Environment and
Climate Change – Department for
Waters, Forests and Fisheries
PP2- National Administration “Apele
Romane”
PP3- National Institute of Hydrology
and Water Resources
PP4- Civil Engineering Technical
University, Bucharest
PP5- Environmental Protection Agency
PP6- Research Institute in Chemistry
PP7- Polytechnic University, Bucharest
PP8- Research Institute for Nuclear
Research, Pitesti
PP9- Ministry of Environment and Waters, Sofia
PP10- National Institute Of Meteorology and Hydrology
PP11- Executive Agency for Exploration and Maintenance of the Danube River, Russe
PP12- Executive Protection Agency, Sofia
PP13- Institute of Research of Nuclear Energy, Sofia
WE INVITE YOU TO CELEBRATE
THE DANUBE DAY, 29 June, 2014!
THE DANUBE DAY, 29 June, 2014!
• Danube Day is a celebration of a cleaner, safer river following 20 years of international cooperation.
• Meetings and sprtiv competitions on the banks of the rivers; public meetings and fun, educational events payed tribute to the Danube rivers, its peoples and the progress that has been made. Danube Day strengthens our "Danube solidarity" highlighting that, in spite of our different cultures and histories, we have a shared desire and responsibility to protect our precious resource.
• Danube WATER encouraged children to visit their local rivers and create artworks reflecting what the Danube means to them in Giurgiu, and Braila and meeting through the pictures works in Calarasi. By entering the competition, the children not only had a great time making their artwork but are also motivated to consider the future of the rivers and the people and wildife that rely on them. The result was a visual representation of young people's vision for the Danube Basin.