Implementing the Australian Rail Risk Model (ARRM) at Metro Trains MelbourneDarren Quinlivan, Strategy & Risk ManagerSafety, Environment & Risk
![Page 2: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/2.jpg)
What is the Australian Rail Risk Model (ARRM)?
• Quantitative model estimating the risk of various hazardous events that could occur on a
railway
• RISSB project stage 1 due for delivery late 2017
• The project is associating occurrence data from ONRSR into the model
Metro | RISSB Rail Safety Conference | April 2017
![Page 3: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/3.jpg)
Hazardous Events
A model of safety risk on Australian Railways
Metro | RISSB Rail Safety Conference | April 2017
![Page 4: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/4.jpg)
Example taken from UK Safety risk model
Taken from UK RSSB Annual Safety Performance Report 2015/2016 rssb.co.uk
Metro | RISSB Rail Safety Conference | April 2017
![Page 5: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/5.jpg)
Example – Hazardous Event
Model includes possible ranges of harm from
derailments and the probabilities of escalation
• The worst derailment in Australia was
Granville, in 1977, when 83 died
• But most derailments result in no harm to
persons
Metro | RISSB Rail Safety Conference | April 2017
![Page 6: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/6.jpg)
Risk Estimates
• The unit of risk will be Fatalities and Weighted Injuries per year (FWI/yr), where one FWI is equivalent to:
one fatality, or 10 serious injuries, or 200 minor injuries.
• Risk estimates will be iteratively updated based on the occurrence data in the last period of collection
• Risk values will be normalised for your operations:
• e.g. Track length, Freight kilometres travelled, Passenger kilometres travelled, Infrastructure
worker hours, Passenger journeys per year.
Metro | RISSB Rail Safety Conference | April 2017
![Page 7: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/7.jpg)
So…How will this improve safety on the Melbourne Network?
Metro | RISSB Rail Safety Conference | April 2017
![Page 8: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/8.jpg)
Benefits
ARRM provides a greater understanding of risk, its causes and consequences
• Measuring Safety Performance
• Setting priorities• Benchmarking against other operators
• Making Safe Decisions
• New projects coming on line• Decisions to ensure continued safety of changes to legacy assets
Metro | RISSB Rail Safety Conference | April 2017
![Page 9: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/9.jpg)
Melbourne Network
Undergoing the greatest network transformation in its history:
• 50 Level Crossing removals
• 65 High Capacity Metro Trains
• Metro Tunnel Project
• High Capacity Signalling(including CBTC)
Metro | RISSB Rail Safety Conference | April 2017
![Page 10: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/10.jpg)
Measuring Safety Performance
Some conventional measures:
• All injury frequency rate
• Lost time injury frequency rate and severity rate
• Customer injury frequency rate
• Rate of Signals Passed at Danger
Metro | RISSB Rail Safety Conference | April 2017
![Page 11: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/11.jpg)
Metro | RISSB Rail Safety Conference | April 2017
How do we measure safety risk?
![Page 12: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/12.jpg)
Measuring Safety Performance
Metro | RISSB Rail Safety Conference | April 2017 Consequence Severity
Frequency of Occurrence
Slips, trips and falls
Musculoskeletal injury
Electrical risk
Collisions/derailment risks
![Page 13: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/13.jpg)
UK 10 year trend in risk precursors
Metro | RISSB Rail Safety Conference | April 2017
![Page 14: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/14.jpg)
Level crossing removals
Metro | RISSB Rail Safety Conference | April 2017
![Page 15: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/15.jpg)
Metro | RISSB Rail Safety Conference | April 2017
![Page 16: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/16.jpg)
UK Estimated risk vs observed rate of harm
Taken from UK RSSB SRM-Risk Profile Bulletin rssb.co.ukMetro | RISSB Rail Safety Conference | April 2017
![Page 17: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/17.jpg)
UK Summary of overall safety risk
Taken from UK RSSB SRM-Risk Profile Bulletin rssb.co.ukMetro | RISSB Rail Safety Conference | April 2017
![Page 18: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/18.jpg)
Sources of risk UK
Taken from UK RSSB SRM-Risk Profile Bulletin rssb.co.ukMetro | RISSB Rail Safety Conference | April 2017
![Page 19: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/19.jpg)
Making Safe Decisions
Support quantitative risk analysis and cost benefit analysis
As the operator ARRM will assist validation of analyses provided by projects
Metro | RISSB Rail Safety Conference | April 2017
![Page 20: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/20.jpg)
ONRSR Major Projects Guideline
Metro | RISSB Rail Safety Conference | April 2017
Section 4.4 Quantitative safety limits As a minimum, the ONRSR expects: • major projects to document the upper
limit for individual or collective risks of equivalent fatality; and
• major projects to ensure documented limits are consistent with the relevant RTO’s SMS.
![Page 21: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/21.jpg)
Melbourne Tunnel Project
Metro | RISSB Rail Safety Conference | April 2017
![Page 22: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/22.jpg)
Making Safe Decisions
Compare Options or Benchmark against the Industry
Metro | RISSB Rail Safety Conference | April 2017
00.5
11.5
22.5
33.5
4
Current risk Option AOption B
Industry Average
![Page 23: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/23.jpg)
Examples of Sensitivity Tests
Assess risk/benefit from changes to:
• Protection arrangements at a level crossing
• Line-speed on track sections
• New signalling equipment or different train protection strategies
• Configuration change or upgrades to rolling stock
• Train service frequency
Metro | RISSB Rail Safety Conference | April 2017
• Carriage of dangerous goods
• Track maintenance
• Driver training and competence systems
• Introducing escalators rather than stairs
![Page 24: Darren Quinlivan - Metro Trains Melbourne](https://reader033.vdocument.in/reader033/viewer/2022051101/58e4bf1e1a28abc24e8b47cb/html5/thumbnails/24.jpg)
Thank youMetro | RISSB Rail Safety Conference | April 2017
Project contactsJesse Baker - RISSBNeil Robinson - RBG Assurance
[email protected]@rgbassurance.com.au