Page 1 of 16 Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017 Extraction Methodology: Point clouds from the mobile scanner (Leica Pegasus 2) and static scanner (Leica P40) were used due to the areas being difficult to access with conventional methods. The Leica Cyclone clearance measurement tool was utilized to find the lowest vertical clearance (VC) location. Once the lowest VC was found a planar patch was fitted to the roadway surface and the measurement was taken from the lowest VC point normal to the created patch per the “Draft ODOT Vertical Clearance Measurement” document (dated 01/13/2017). Accuracy Statement: The Leica Pegasus 2 Mobile Mapping System has a stated vertical accuracy of 0.015m RMS. Assumed Intended Use: Per Region 1 survey request (K19531, dated 10/12/16), the project team needs to validate the existing condition to assess vertical clearance impacts and coordinate with Department of Motor Carrier. Highway Number, Milepost, and Structure Number: Multiple – see following photos. All vertical clearance measurements were performed by Jonathan Rawlings and Sam Farber-Kaiser in March 2017 using point clouds provided by the Geometronics unit, static scans completed by Region 1 Survey, and Leica Cyclone software (v9.1.5).

Upload: others

Post on 22-May-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 1 of 16

Date of Mobile Data Collection: 05/01/2016

Date of Vertical Clearance Extraction: 03/13/2017

Extraction Methodology: Point clouds from the mobile scanner (Leica Pegasus 2) and static scanner (Leica P40) were used due

to the areas being difficult to access with conventional methods. The Leica Cyclone clearance measurement tool was utilized to find

the lowest vertical clearance (VC) location. Once the lowest VC was found a planar patch was fitted to the roadway surface and the

measurement was taken from the lowest VC point normal to the created patch per the “Draft ODOT Vertical Clearance

Measurement” document (dated 01/13/2017).

Accuracy Statement: The Leica Pegasus 2 Mobile Mapping System has a stated vertical accuracy of 0.015m RMS.

Assumed Intended Use: Per Region 1 survey request (K19531, dated 10/12/16), the project team needs to validate the existing

condition to assess vertical clearance impacts and coordinate with Department of Motor Carrier.

Highway Number, Milepost, and Structure Number: Multiple – see following photos.

All vertical clearance measurements were performed by Jonathan Rawlings and Sam Farber-Kaiser in March 2017 using point clouds

provided by the Geometronics unit, static scans completed by Region 1 Survey, and Leica Cyclone software (v9.1.5).

Page 2: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 2 of 16

Overview Image Showing Vertical Clearance Locations

Page 3: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 3 of 16

16’-6”

VC1 - NB I-5 IN THE ADD MILEAGE CONNECTOR UY ON ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

16’-8”

EXT 2

EXT 1

BRIDGE CLEARANCE DIAGRAM NB I-5 to WB I-84 CROSSING UNDER E BURNSIDE ST

BRIDGE NO: 00511B HWY: 001 MP: 301.52 RD ID: 001 UY

Ramp D

No VC Loss

Deck Seal only

Page 4: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 4 of 16

15’-5”

BRIDGE CLEARANCE DIAGRAM NB I-5 CROSSING UNDER EB I-84

BRIDGE NO: 08588C HWY: 001 MP: 301.64 RD ID: 001 UY

15’-9”

EXT 2

EXT 1

VC2 - NB I-5 IN THE ADD MILEAGE CONNECTOR UY ON ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

Ramp D

No VC Loss

Deck Seal only

Page 5: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 5 of 16

BRIDGE CLEARANCE DIAGRAM NB I-5 to EB I-84 CROSSING UNDER NE MLK BLVD SB BRIDGE NO: 02350A HWY: 002 MP: 0.46 RD ID: 001

17’-2” 18’-3”

ENT 2

ENT 1

VC3 – EB I-84 IN THE ADD MILEAGE CONNECTOR ON ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

Ramp D

No VC Loss

Deck Seal only

Page 6: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 6 of 16

16’-6” Existing 16’-5” Proposed

15’-3” Existing 15’-2” Proposed

18’-0” Existing 17’-11” Proposed

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 NB/SB CROSSING UNDER NE MLK BLVD SB

BRIDGE NO: 02350A HWY: 002 MP: 0.39 RD ID: 002

VC4 - WB I-84 IN THE NON-ADD MILEAGE SECTION OF ROADWAY 002

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

EXT 1

EXT 2

LN 1

Ramp A and B

1” VC Loss proposed

Deck Overlay

Page 7: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 7 of 16

18’-2” Existing 18’-1” Proposed

18’-4” Existing 18’-3” Proposed

EXT 1

VC5 - WB I-84 IN THE ADD MILEAGE OF CONNECTOR AB ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 SB CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 19381 HWY: 002 MP: 0.41 RD ID: 001AB

EXT 2

Ramp B

1” VC Loss proposed

Deck Overlay

Page 8: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 8 of 16

VC6 - WB I-84 IN THE NON-ADD MILEAGE SECTION OF ROADWAY 002

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 NB CROSSING UNDER SIGN BRIDGE BRIDGE NO: 19381 HWY: 002 MP: 0.34 RD ID: 002

19’-10” Existing 19’-9” Proposed

LN 1

Ramp A

1” VC Loss proposed

Deck Overlay

Page 9: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 9 of 16

15’-8” Existing 15’-7” Proposed

15’-1” Existing 15’-0” Proposed

EXT 2 EXT 1

VC7 - WB I-84 IN THE ADD MILEAGE OF CONNECTOR AB ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 SB CROSSING UNDER EB I-84

BRIDGE NO: 08588C HWY: 002 MP: 0.53 RD ID: 001AB

Ramp B

1” VC Loss proposed

Deck Overlay

Page 10: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 10 of 16

ENT 1

’10”

ENT 2

’10”

16’-11” Existing 16’-10” Proposed

’10”

17’-3” Existing 17’-2” Proposed

’10”

VC8 - SB I-5 IN THE NON-ADD MILEAGE OF CONNECTOR ON ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-84 WB to SB I-5 CROSSING UNDER E BURNSIDE ST

BRIDGE NO: 00511B HWY: 001 MP: 301.50 RD ID: 001

Ramp B

1” VC Loss proposed

Deck Overlay

Page 11: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 11 of 16

?

VC9 - WB I-84 IN THE NON-ADD MILEAGE SECTION OF ROADWAY 002

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

18’-11” Existing 18’-10” Proposed

LN 2

LN 1

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 NB CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 0M161 HWY: 002 MP: 0.28 RD ID: 002

Ramp A

1” VC Loss proposed

Deck Overlay

Page 12: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 12 of 16

18’-2” Existing 18’-1” Proposed

VC10 - WB I-84 IN THE NON-ADD MILEAGE SECTION OF ROADWAY 002

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-84 WB to I-5 NB CROSSING UNDER SIGN BRIDGE BRIDGE NO: 22687 HWY: 002 MP: 0.17 RD ID: 002

LN 1

Ramp A

1” VC Loss proposed

Deck Overlay

Page 13: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 13 of 16

VC11 - WB I-84 IN THE ADD MILEAGE OF CONNECTOR AF ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM WB I-84 CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 22687 HWY: 002 MP: 0.17 RD ID: 001AF

243”

EXT 1

Page 14: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 14 of 16

BRIDGE CLEARANCE DIAGRAM NB I-5 CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 08920A HWY: 001 MP: 301.84 RD ID: 002

VC12 - NB I-5 IN THE NON-ADD SECTION OF ROADWAY 002

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

258” 262”

LN1 LN2

Page 15: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 15 of 16

BRIDGE CLEARANCE DIAGRAM SB I-5 CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 08920A HWY: 001 MP: 301.87 RD ID: 001

VC13 - SB I-5 IN THE NON-ADD SECTION OF ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

267”

LN1 LN2

268”

Page 16: Date of Mobile Data Collection: Date of Vertical Clearance ... Document...Oct 17, 2017  · Date of Mobile Data Collection: 05/01/2016 Date of Vertical Clearance Extraction: 03/13/2017

Page 16 of 16

VC14 - SB I-5 IN THE NON-ADD SECTION OF ROADWAY 001

MEASUREMENTS BY JONATHAN RAWLINGS, SAM FARBER-KAISER AND MIKE BRINTON IN MARCH 2017 UTILIZING MOBILE LIDAR

COLLECTED WITH A LEICA PEGASUS: 2 IN MAY 2016. DIAGRAM MADE 3/29/2017 BY CHRIS GLANTZ, ODOT 503-986-3540.

CLEARANCE DIMENSIONS ARE VERTICAL, MEASURED FROM 3D POINT CLOUDS.

BRIDGE CLEARANCE DIAGRAM I-5 SB to I-84 EB CROSSING UNDER SIGN BRIDGE

BRIDGE NO: 08920A HWY: 001 MP: 301.87 RD ID: 001

EXT 1

22’11” Existing 22’-10” Proposed

Ramp C

1” VC Loss proposed

Deck Overlay