date proposed two-storey building w/ cellar (vanilla …€¦ · second floor plan, schedules,...

15
27 Casey Lane, Mount Sinai, New York 11766 Email: [email protected] Phone No.: (631) 732-3150 TAHIR QURESHI, PE Fax No.: (631) 389-2585 REVISION / DESCRIPTION DATE Long Island Engineering & Architecture TMQ AS NOTED GARDEN CITY, NY 11530 0204-009-07-040 NO. C17011 of 15 01-28-2019 REVISED AS PER VILLAGE COMMENTS 3/15/2019 ARL RELOCATED EXTERIOR STAIR AS PER G.C. 4/12/2019 T-1 TITLE SHEET 1 PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA SHELL) 17-19 NORTH OCEAN AVENUE - PATCHOGUE, NEW YORK 11772 GENERAL NOTES: DRAWING INDEX SECOND FLOOR PLAN, SCHEDULES, DETAILS CELLAR FLOOR PLAN, SCHEDULES, DETAILS TITLE SHEET, DRAWING INDEX, GENERAL NOTES T-1 A-1 A-3 1 SHEET DRAWING TITLE SUFFOLK COUNTY CELLAR & FIRST FLOOR FOR FUTURE RESTAURANT USE FIRST FLOOR PLAN, SCHEDULES, DETAILS A-2 EXTERIOR ELEVATIONS A-4 FOUNDATION PLAN S-1 SECOND FLOOR FRAMING PLAN S-2 ROOF PLAN, DETAILS A-5 ROOF FRAMING PLAN S-3 SECTIONS & DETAILS S-4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 SECTIONS & DETAILS S-5 SECTION & DETAILS S-6 GENERAL STRUCTURAL NOTES S-0A S-7 FIRST FLOOR FRAMING PLAN SECTION & DETAILS S-8 KEY MAP N.T.S. SECOND FLOOR FOR FUTURE OFFICE SPACE USE

Upload: others

Post on 29-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

T-1

TIT

LE

S

HE

ET

1

PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA SHELL)

17-19 NORTH OCEAN AVENUE - PATCHOGUE, NEW YORK 11772

GENERAL NOTES:

DRAWING INDEX

SECOND FLOOR PLAN, SCHEDULES, DETAILS

CELLAR FLOOR PLAN, SCHEDULES, DETAILS

TITLE SHEET, DRAWING INDEX, GENERAL NOTEST-1

A-1

A-3

1

SHEET DRAWING TITLE

SUFFOLK COUNTY

CELLAR & FIRST FLOOR FOR FUTURE RESTAURANT USE

FIRST FLOOR PLAN, SCHEDULES, DETAILSA-2

EXTERIOR ELEVATIONS

A-4

FOUNDATION PLANS-1

SECOND FLOOR FRAMING PLAN

S-2

ROOF PLAN, DETAILS

A-5

ROOF FRAMING PLAN

S-3

SECTIONS & DETAILS

S-4

2

3

4

5

6

7

8

9

10

11

12

13

14

15

SECTIONS & DETAILS

S-5

SECTION & DETAILS

S-6

GENERAL STRUCTURAL NOTESS-0A

S-7

FIRST FLOOR FRAMING PLAN

SECTION & DETAILSS-8

KEY MAP

N.T.S.

SECOND FLOOR FOR FUTURE OFFICE SPACE USE

Page 2: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

A-1

CE

LLA

R F

LO

OR

P

LA

N /

2

FIR

ST

F

LO

OR

F

RA

MIN

G P

LA

N

CELLAR FLOOR PLAN

1/4"=1'-0"

Page 3: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

A-2

FIR

ST

F

LO

OR

P

LA

N

3

FIRST FLOOR PLAN

1/4"=1'-0"

Page 4: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

A-3

SE

CO

ND

F

LO

OR

P

LA

N

4

SECOND FLOOR PLAN

1/4"=1'-0"

Page 5: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

A-4

RO

OF

P

LA

N

5

ROOF PLAN

1/4"=1'-0"

Page 6: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

TENANT 'XYZ'

SIGNAGE

TENANT 'XYZ'

SIGNAGE

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

A-5

EX

TE

RIO

R E

LE

VA

TIO

NS

6

NORTH ELEVATION

1/4"=1'-0"

WEST ELEVATION

1/4"=1'-0"

EAST ELEVATION

1/4"=1'-0"

Page 7: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-0

GE

NE

RA

L N

OT

ES

7

WOOD FRAMING NOTES

BEAMS, OR OTHER MEMBERS BELOW.

PER MANUFACTURER'S SPECIFICATIONS.

ALL AROUND BEAM POCKETS. MULTIPLEMEMBER BEAMS TO BE FASTENED TOGETHER AS

CONCRETE. IN BASEMENT GIRDER LOCATIONS PROVIDE BITUMINOUS MASTIC PROTECTION

NO SPLICING PERMITTED. LAMINATED LUMBER IS NOT TO COME INTO CONTACT WITH

LAMINATED LUMBER TO BE FULL SPAN MEMBERS TO LOCATIONS INDICATED ON PLANS,

LAMINATED LUMBER TO BE TRUS JOIST MICROLLAM LVL 1.9E SERIES (OR EQUAL).

STRUCTURAL POSTS WHERE LOADS ARE TO BE TRANSFERRED TO HEADERS,

SOLID BLOCKING IS TO BE INSTALLED IN FLOOR SYSTEMS BENEATH ALL

MEMBERS ARE TO BE INSTALLED WITH JOIST HANGERS.

ALL FLOOR OR CEILING JOISTS WHICH ATTACH TO FLUSH HEADERS, BEAMS, OR OTHER

OVER ALL WINDOW, DOOR, ARCHWAY ETC. OPENINGS AS PER THE HEADER SCHEDULE

WHERE HEADERS ARE NOT SPECIFICALLY CALLED OUT ON PLANS, PROVIDE HEADERS

FLOOR, CEILING, ROOF JOISTS, HEADERS & WALL STUDS TO BE DOUG. FIR #2 WITH A MIN.

ALL LUMBER & PLYWOOD MUST BE GRADE STAMPED.

5.

6.

3.

4.

fb=825 p.s.i.

1.

2.

GENERAL STRUCTURAL NOTES

1. ALL NOTES ON THE DRAWING SHALL BE ASSUMED TYPICAL UNLESS OTHERWISE SHOWN OR NOTED.

2. DESIGN LOADING CRITERIA:

ROOF 23.1 P.S.F.

GROUND SNOWLOAD 30 P.S.F.

BASIC WIND SPEED 130 M.P.H. 3 SECOND GUST, EXPOSURE C

WIND LOAD 36 P.S.F.

MECHANICAL LOAD 5 P.S.F.

LIVE LOAD 100 P.S.F.

EARTHQUAKE DESIGN DATA:

SEISMIC USE GROUP II

SPECIAL RESPONSE COEFFICIENTS SDS= 0.243

SD1= 0.104

SITE CLASS D

SEISMIC FORCE-RESISTING SYSTEM BEARING WALL/MOMENT FRAME

DESIGN BASE SHEAR V= CsW

ANALYSIS PROCEDURE SIMPLIFIED

3. CONTRACTOR TO VERIFY ALL DIMENSIONS AND ELEVATIONS PRIOR TO FABRICATION AND CONSTRUCTION.

FOUNDATION

1. FOOTINGS SHALL BEAR ON UNDISTURBED NATURAL SOIL WITH AN ALLOWABLE BEARING CAPACITY OF 2000 LBS PSF.

THE FOOTINGS SHALL BE LOWERED OR FOUNDED ON COMPACTED FILL OR AS OTHERWISE DIRECTED BY THE

GEOTECHNICAL ENGINEER.

2. CONTRACTOR IS RESPONSIBLE TO MAINTAIN DRY SOIL FOR BEARING OF FOOTINGS. FOOTINGS SHALL NOT

POURED IN WATER, ON MUD, OR ON FROST.

3. BOTTOM OF ALL EXTERIOR FOOTINGS SHALL BE A MINIMUM OF 3’-0” BELOW FINISH GRADE.

4. PROVIDE CRACK CONTROL MEASURES AS NECESSARY. AVOID AND REINFORCE ALL REENTRANT (or square)

CORNERS.

COMPACTED FILL AND BACKFILLING

1. THE FILL MATERIAL SHALL BE CLEAN, COARSE-GRAINED, WELL GRADED, SAND WITH LITTLE OR NO FINES, IN

ACCORDANCE WITH ASTM D2487, CLASSIFICATION SW. ON SITE MATERIAL MAY BE USED WITH THE

CONCURRENCE OF THE GEOTECHNICAL ENGINEER.

2. THE FILL MATERIAL SHALL BE PLACED IN LAYERS, WHICH, BEFORE COMPACTION, SHALL NOT EXCEED 8". EACH LAYER

SHALL BE SPREAD UNIFORMLY AND EVENLY AND SHALL BE THOROUGHLY MIXED DURING THE SPREAD TO ENSURE

UNIFORMITY OF MATERIAL IN EACH LAYER.

3. EACH LAYER OF THE FILL SHALL BE UNIFORMLY COMPACTED TO NOT LESS THAN 95% OF THE MAXIMUM DRY DENSITY

AS DETERMINED BY ASTM D1557. THE GEOTECHNICAL ENGINEER SHALL OBSERVE AND TEST COMPACTED FILL.

4. BACKFILLING AGAINST GRADE WALLS SHALL NOT BEGIN UNTIL THE WALL STRUCTURES AND GROUND FLOOR SLAB

HAVE ATTAINED THEIR MINIMUM DESIGN STRENGTH.

5. WHERE BACKFILL OCCURS ON BOTH SIDES OF WALL, BACKFILL BOTH SIDES SIMULTANEOUSLY.

POURED-IN-PLACE CONCRETE

1. ALL REINFORCED CONCRETE SHALL BE FURNISHED AND INSTALLED IN ACCORDANCE WITH CURRENT

EDITIONS OF THE "SPECIFICATION FOR STRUCTURAL CONCRETE FOR BUILDINGS" (ACI 301) AND TO THE

"BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318).

2. ALL CONCRETE UNLESS NOTED OTHERWISE, SHALL BE STONE AGGREGATE CONCRETE HAVING A MINIMUM

COMPRESSIVE STRENGTH OF 4000 PSI AT 28 DAYS U.N.O. ALL CONCRETE PERMANENTLY EXPOSED TO WEATHER SHALL

HAVE AN AIR ENTRAINMENT OF 4% TO 6%. NO ADMIXTURES CONTAINING CALCIUM CHLORIDE SHALL BE PERMITTED.

MAXIMUM AGGREGATE SIZE FOR CONCRETE SHALL BE 1", AND MAXIMUM SLUMP SHALL BE 4", UNLESS OTHERWISE NOTED.

3. ALL REINFORCING BARS SHALL CONFORM TO ASTM A-615 GRADE 60. WELDED WIRE FABRIC SHALL CONFORM TO ASTM

A-185.

4. ALL CONTINUOUS REINFORCING SHALL BE LAPPED AT ALL SPLICES, CORNERS, AND INTERSECTIONS A

MINIMUM OF 38 BAR DIAMETERS, OR AS SHOWN ON DRAWINGS.

5. PROVIDE SPACERS, CHAIRS, TIES AS REQUIRED AND NECESSARY FOR ASSEMBLING, PLACING, AND

SUPPORTING ALL REINFORCEMENT IN PROPER POSITION.

6. ALL CONTROLLED CONCRETE WORK SHALL BE INSPECTED BY A TESTING LABORATORY ENGAGED BY THE OWNER AND

APPROVED BY THE STRUCTURAL ENGINEER. SEE SPECIFICATIONS.

7. HOT WEATHER CONCRETING SHALL CONFORM TO THE RECOMMENDATIONS IN ACI 305R-77.

8. COLD WEATHER CONCRETING SHALL CONFORM TO THE RECOMMENDATIONS IN ACI 306R-88.

MASONRY

1. ALL MASONRY CONSTRUCTION SHALL CONFORM TO THE CURRENT PROVISIONS OF THE BUILDING CODE

REGULATIONS FOR MASONRY STRUCTURES - ACI 530 (ASCE 5), AND SPECIFICATIONS FOR MASONRY

STRUCTURES - ACI 530.1 (ASCE 6).

2. ASSUMED COMPRESSIVE STRENGTH OF MASONRY, f'm = 1350 PSI @ 28 DAYS.

3. ALL MASONRY WALLS SHALL HAVE GALVANIZED TRUSS TYPE DUR-O-WAL AT 16" VERTICAL INTERVALS WITH

CORNER AND "T" PIECES UNLESS NOTED. ALL SPLICES SHALL LAP 6" MIN. PROVIDE AN ADDITIONAL ROW OF DUR-O-WAL

ABOVE AND BELOW ALL OPENINGS AND EXTEND 2'-0" BEYOND JAMBS. STOP DUR-O-WAL EACH SIDE OF ALL CONTROL

AND EXPANSION JOINTS.

4. ALL CONCRETE MASONRY UNITS SHALL CONFORM TO ASTM C 90, GRADE N-1, NORMAL WEIGHT.

5. MORTAR FOR ALL WORK SHALL BE TYPE S.

6. GROUT FOR FILLING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH (f'm) OF 2000 PSI, AND SHALL CONFORM TO

ASTM C476. PLACE GROUT FILL IN 4'-0" MAXIMUM LIFTS VERTICALLY.

7. ALL REINFORCING BARS FOR REINFORCED MASONRY CONSTRUCTION SHALL CONFORM TO ASTM A-615 GRADE 60. LAP

LENGTH SHALL BE MINIMUM 40 BAR DIAMETERS.

8. PROVIDE 100% SOLID MASONRY BELOW ALL LINTEL BEARINGS 12" BEYOND THE OPENING FOR THE FULL WALL WIDTH AT

ALL LINTELS FROM THE LINTEL BEARING TO THE FLOOR BELOW.

9. PROVIDE ONE 8" COURSE OF SOLID MASONRY AT JOIST AND BEAM BEARING LINES, UNLESS NOTED OTHERWISE.

10. BRACE AND SHORE ALL MASONRY WALLS AS REQUIRED THROUGHOUT THE COMPACTION AND CONSTRUCTION

PROCESS UNTIL THE GROUND FLOOR SLAB AND SUPPORTING FLOORS OR ROOF HAVE BEEN COMPLETELY INSTALLED.

PRECAST MASONRY LINTELS

1. ALL LINTELS IN MASONRY WALLS SHALL BE AS NOTED BELOW:

MASONRY OPENING < 4'-0" LINTEL SIZE

MIN. END BEARING = 8"

FOR EACH 4" WALL THICKNESS - USE 3.625" X 7.625" w/ (1) #8 TOP & (1) #8 BOTTOM.

2. CONCRETE STRENGTH: 3000 PSI MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS.

3. PROVIDE 100% SOLID MASONRY BELOW ALL LINTEL BEARINGS 8" BEYOND THE OPENING FOR THE FULL WALL WIDTH AT

ALL LINTELS FROM THE LINTEL BEARING TO THE FLOOR BELOW.

4. ALL LINTELS TO BE SET TRUE AND LEVEL

B. DO NOT SCALE DRAWINGS. WRITTEN DIMENSIONS SUPERSEDE SCALED DIMENSIONS.

A. IF IN THE COURSE OF CONSTRUCTION, A CONDITION EXISTS WHICH DISAGREES WITH THAT AS

INDICATED ON THESE PLANS, THE CONTRACTOR SHALL STOP WORK AND NOTIFY THE ARCHITECT

WORK, HE SHALL ASSUME ALL RESPONSIBILITY AND LIABILITY ARISING THEREFROM.

OR ENGINEER. SHOULD THE CONTRACTOR FAIL TO FOLLOW THIS PROCEDURE AND CONTINUE THE

INSPECTION NOTES

INSPECTION:

1. WHERE APPLICATION IS MADE FOR CONSTRUCTION, THE OWNER OR THE REGISTERED DESIGN

PROFESSIONAL IN RESPONSIBLE CHARGE ACTING AS THE OWNER'S AGENT SHALL EMPLOY ONE OR

MORE SPECIAL INSPECTORS TO PROVIDE INSPECTIONS DURING CONSTRUCTION ON THE TYPES OF

WORK LISTED AND REQUIRED UNDER NYS BUILDING CODE CHAPTER 17. THE SPECIAL INSPECTOR

SHALL BE A QUALIFIED PERSON WHO SHALL DEMONSTRATE COMPETENCE, TO THE SATISFACTION OF

THE CODE ENFORCEMENT OFFICIAL, FOR INSPECTION OF THE PARTICULAR TYPE OF CONSTRUCTION

OR OPERATION REQUIRING SPECIAL INSPECTION. THE QUALIFICATIONS OUTLINED IN TABLE 1704.1

IDENTIFY THE MINIMUM QUALIFICATIONS OF THE SPECIAL INSPECTOR. THE SPECIAL INSPECTOR

SHALL PROVIDE WRITTEN DOCUMENTATION TO THE CODE ENFORCEMENT OFFICIAL DEMONSTRATING

THEIR COMPETENCE AND RELEVANT EXPERIENCE OR TRAINING. EXPERIENCE OR TRAINING SHALL BE

CONSIDERED RELEVANT WHEN THE DOCUMENTED EXPERIENCE OR TRAINING IS RELATED IN

COMPLEXITY TO THE SAME TYPE OF SPECIAL INSPECTION ACTIVITIES FOR PROJECTS OF SIMILAR

COMPLEXITY AND MATERIALS QUALITIES.

2. THE SPECIAL INSPECTION COORDINATOR SHALL KEEP RECORDS OF ALL INSPECTIONS AND SHALL

FURNISH INSPECTION REPORTS TO THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE

CHARGE. DISCOVERED DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE

CONTRACTOR FOR CORRECTION. IF SUCH DISCREPANCIES ARE NOT CORRECTED, THE

DISCREPANCIES SHALL BE BROUGHT TO THE ATTENTION OF THE REGISTERED DESIGN

PROFESSIONAL IN RESPONSIBLE CHARGE. THE SPECIAL INSPECTION PROGRAM DOES NOT RELIEVE

THE CONTRACTOR OF HIS OR HER RESPONSIBILITIES.

3. THE INSPECTORS AND TESTING AGENCIES SHALL BE ENGAGED BY THE OWNER OR THE OWNER'S

AGENT, AND NOT BY THE CONTRACTOR OR SUBCONTRACTOR WHOSE WORK IS TO BE INSPECTED OR

TESTED. ANY CONFLICT OF INTEREST MUST BE DISCLOSED TO THE BUILDING OFFICIAL, PRIOR TO

COMMENCING WORK.

4. A FINAL REPORT OF SPECIAL INSPECTIONS DOCUMENTING COMPLETION OF ALL REQUIRED SPECIAL

INSPECTIONS, TESTING AND CORRECTION OF ANY DISCREPANCIES NOTED IN THE INSPECTIONS

SHALL BE SUBMITTED PRIOR TO ISSUANCE OF A CERTIFICATE OF USE AND OCCUPANCY.

REINFORCEMENT

1. REINFORCEMENT WORK OF DETAILING, FABRICATION & ERECTION SHALL CONFORM TO "BUILDING

CODE REQUIREMENTS FOR REINFORCED CONCRETE" (ACI 318-05). "ACI DETAILING MANUAL - 1994"

(SP-66), "CRSI MANUAL OF STANDARD PRACTICE" (MSP 1-97), & "STRUCTURAL WELDING CODE -

REINFORCING STEEL" (AWS D1.4-92).

2. STEEL REINFORCEMENT, UNLESS NOTED OTHERWISE, SHALL CONFORM TO THE FOLLOWING:

(A) BARS, TIES & STIRRUPS ASTM A615 GRADE 60 (FY=60 KSI)

(B) WELDED WIRE FABRIC (WWF) ASTM A185

3. PROVIDE & SCHEDULE ON SHOP DRAWINGS THE NECESSARY ACCESSORIES TO HOLD

REINFOCEMENT SECURELY IN POSITION. MINIMUM REQUIREMENTS SHALL BE: HIGH CHAIRS, 4'-0" O.C.

w/ CONTINUOUS #5 SUPPORT BAR; SLAB BOLSTERS, CONTINUOUS & 3'-6" O.C.; BEAM BOLSTERS, 5'-0"

O.C.

4. MINIMUM CONCRETE PROTECTIVE COVERING FOR REINFORCEMTN, UNLESS NOTED OTHERWISE,

SHALL BE AS FOLLOWS:

(A) UNFORMED SURFACES CAST AGAINST & PERMANENTLY IN CONTACT w/ EARTH: 3.0"

(B) FORMED SURFACES IN CONTACT w/ EARTH OR EXPOSED TO WEATHER:

#6 THROUGH #18 BARS 2.0"

#5 BARS, 5/8" WIRE & SMALLER 1.5"

(C) SURFACES NOT IN CONTACT w/ EARTH OR EXPOSED TO WEATHER - WALLS, SLABS,

JOISTS

#14 & #18 BARS 1.5"

#11 BARS & SMALLER 1.0"

BEAMS, GIRDERS & COLUMNS - PRINCIPAL REINFORCEMENT, TIES, STIRRUPS OR

SPIRALS 1.5"

5. WHERE CONTINUOUS REINFORCEMENT IS CALLED FOR, IS SHALL BE EXTENDED CONTINUOUSLY

AROUND CORNERS & LAPPED AT NECESSARY SPLICES OR HOOKED @ DISCONTINUOUS ENDS. LAPS

SHALL BE CLASS B TENSION LAP SPLICES, UNLESS NOTED OTHERWISE

6. WHERE REINFORCEMENT IS NOT SHOWN ON DRAWINGS, PROVIDE REINFORCEMENT IN

ACCORDANCE w/ APPLICABLE DETAILS AS DETERMINED BY THE ARCHITECT / ENGINEER. IN NO CASE

SHALL REINFORCEMENT BE LESS THAN THE MINIMUM REINFORCEMENT PERMITTED BY THE

APPLICABLE CODES

7. WHERE REINFORCEMENT IS REQUIRED IN SECTION, REINFORCEMENT IS CONSIDERED TYPICAL

WHEREVER THE SECTION APPLIES

8. REINFORCEMENT SHALL BE CONTINUOUS THROUGH CONSTRUCTION JOINTS

9. DOWELS SHALL MATCH BAR SIZE & NUMBER, UNLESS NOTED OTHERWISE

10. WELDED WIRE FABRIC SHALL LAP 8" OR 1

1

2

" SPACES, WHICHEVER IS LARGER & SHALL BE WIRED

TOGETHER

11. REINFORCEMENT SHALL NOT BE TACK-WELDED

12. INSTALLATION OF REINFORCEMENT SHALL BE COMPLETED AT LEAST 24hrs PRIOR TO THE

SCHEDULED CONCRETE PLACEMENT. NOTIFY ARCHITECT / ENGINEER OF COMPLETION AT LEAST

24hrs PRIOR TO THE SCHEDULED COMPLETION OF THE INSTALLATION OF REINFORCEMENT

STRUCTURAL STEEL

1. STRUCTURAL STEEL WORK SHALL CONFORM TO "SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS," (AISC 2005;

"CODE OF STANDARD PRACTICES FOR STEEL BUILDINGS & BRIDGES," (AISC 2005); "SEISMIC PROVISIONS FOR

STRUCTURAL STEEL BUILDINGS" (AISC MARCH 7, 2000); & "STRUCTURAL WELDING CODE 0 STEEL" (AWS D1.1-96).

2. STRUCTURAL STEEL SHALL BE DETAILED IN ACCORDANCE w/ "DETAILING FOR STEEL CONSTRUCTION (AISC)" ^ WHERE

REQUIRED, DESIGNED IN ACCORDANCE w/ CITED REFERENCES

3. STRUCTURAL STEEL DETAILS, NOT SPECIFICALLY SHOWN, SHALL BE TAKEN AS BEING SIMILAR TO THOSE SHOWN FOR

THE MOST NEARLY SIMILAR CONDITION AS DETERMINED BY THE ARCHITECT / ENGINEER

4. STRUCTURAL STEEL SHALL BE NEW STEEL CONFORMING TO THE FOLLOWING:

(A) UNLESS NOTED OTHERWISE ASTM A992 GRADE 50

(Fy= 50 KSI)

(B) ANGLES, CHANNELS, PLATES, Ts, ETC. ASTM A36 (Fy=36 KSI)

(C) TUBES ASTM A500 GRADE B

(Fy= 46 KSI)

(D) PIPES ASTM A501 TYPE E or S

or ASTM A53 GRADE 5

(E) ANCHOR BOLTS ASTM A307

(F) HIGH STRENGTH BOLTS ASTM A325

5. ANCHOR BOLTS, LEVELING PLATES OR BEARING PLATES SHALL BE LOCATED & BUILT INTO CONNECTING WORK,

PRESET BY TEMPLATES OR SIMILAR METHODS. PLATES SHALL BE SET IN FULL BEDS OF NON-SHRINK GROUT

6. BOLTED CONNECTIONS SHOULD BE AS FOLLOWS:

(A) MINIMUM BOLT DIAMETER -

3

4

", TWO BOLTS MINIMUM

(B) STANDARD, OVERSIZED OR HORIZONTAL SHORTS SLOTTED HOLES IN WEBS OF BEAMS

(C) SHEAR CONNECTIONS FOR MOMENT CONNECTED MEMBERS - FRICTION TYPE HIGH STRENGTH BOLTS IN SINGLE

SHEAR

(D) SHEAR CONNECTIONS FOR OTHER MEMBERS 0 SIMPLE SHEAR CONNECTIONS w/ EITHER FRICTION TYPE HIGH

STRENGTH BOLTS IN SINGLE SHEAR OR BEARING TYPE HIGH STRENGTH BOLTS (THREADS INCLUDED IN SHEAR PLANE)

IN SINGLE OR DOUBLE SHEAR

(E) SIMPLE SHEAR CONNECTIONS SHALL BE CAPABLE OF END ROTATION PER AISC REQUIREMENTS FOR

"UNRESTRAINED MEMBERS"

7. WELDED CONNECTIONS SHALL BE MADE BY APPROVED CERTIFIED WELDERS USING FILLER METAL CONFORMING TO

E70XX OR F7X-EXXX w. LOW HYDROGEN

8. WELDS SHALL DEVELOP THE FULL STRENGTH OF THE MATERIALS BEING WELDED, UNLESS NOTED OTHERWISE,

EXCEPT THAT FILLET WELDS SHALL BE A MINIMUM OF

1

4

"

9. BEAM CONNECTIONS, UNLESS NOTED OTHERWISE, SHALL PROVIDE CONNECTION CAPACITY AS FOLLOWS, OR AS

SHOWN ON THE PLANS, WHICHEVER IS LARGER:

(A) BEAMS: SUPPORT A REACTION "R" EQUAL TO

1

2

THE TOTAL UNIFORM LOAD CAPACITY OF BEAMS FOR A GIVEN

SHAPE, SPAN & GRADE OF STEEL PER "MAXIMUM UNIFORM LOADS ON BEAMS" PART 3, AISC MANUAL OF STEEL

CONSTRUCTION, 13th EDITION

10. ENDS OF COLUMNS AT SPLICES & AT OTHER BEARING CONNECTIONS SHALL BE "FINISHED TO BEAR" TO COMPLETE

THE TRUE BEARING

11. PROVIDE STIFFENERS "FINISHED TO BEAR" UNDER ALL LOAD CONCENTRATIONS ON SUPPORTING MEMBERS, OVER

COLUMNS, & WHERE SHOWN ON DRAWINGS

12. PROVIDE TEMPORARY ERECTION BRACING & SUPPORTS TO HOLD STRUCTURAL STEEL FRAMING SECURELY IN

POSITION. SUCH TEMPORARY BRACING & SUPPORTS SHALL NOT BE REMOVED UNTIL PERMANENT BRACING HAS BEEN

INSTALLED

13. STRUCTURAL STEEL FRAMING SHALL BE TRUE & PLUB BEFORE CONNECTIONS ARE FINALLY BOLTED OR WELDED

14. FIELD CUTTING OF STRUCTURAL STEEL OR ANY FIELD MODIFICATIONS OF STRUCTURAL STEEL SHALL NOT BE MADE

WITHOUT PRIOR WRITTED APPROVAL BY ARCHITECT / ENGINEER FOR EACH SPECIFIC CASE

15. STRUCTURAL STEEL ENCASED IN MASONRY SHALL BE COVERED w/ MASTIC COATING PER SPECS

16. STRUCTURAL STEEL MEMBERS & CONNECTIONS EXPOSED TO WEATHER SHALL BE GALVANIZED

17. STRUCTURAL FRAMING PLANS AND DETAILS DO NOT COVER SOME OF THE MISCELLANEOUS METALS SHOWN ON THE

ARCH., MECH., AND ELECT. DRAWINGS INCLUDING, BUT NOT LIMITED TO THE FOLLOWING: CLIPS, BRACKETS, INSERTS,

PLATE OR ANGLE SLAB CLOSURES, CEILING AND EQUIP. BRACES, RAILINGS AND STAIRS, PIPE DUCT AND EQUIP.

SUPPORTS. THE CONTRACTOR SHALL COORDINATE ALL CLEARANCE, ATTACHMENTS, AND ERECTION REQUIREMENTS.

18. PROVISIONS SHALL BE MADE FOR CONNECTIONS OF OTHER TRADES INCLUDING CUTTING AND PUNCHING OF

STRUCTURAL MEMBERS, WHERE REQUIRED BY THE DRAWINGS OR FOR WHICH INFORMATION IS FURNISHED PRIOR TO

FABRICATION.

19. THE USE OF A CUTTING TORCH IN THE FIELD WILL NOT BE PERMITTED, WITHOUT THE APPROVAL OF THE ARCHITECT /

ENGINEER.

20. CONNECTIONS FOR ALL BEAMS MUST BE GOOD FOR REACTIONS FIGURED FROM AISC "ALLOWABLE UNIFORM LOADS"

TABLE OR 35% OF THE ALLOWABLE SHEAR CAPACITY OF THE BEAM WHICHEVER GIVES THE LARGER VALUE, UNLESS

OTHERWISE SHOWN ON PLANS.

21. PROVIDE LOAD INDICATOR WASHERS FOR ALL HIGH STRENGTH BOLTS.

22. ALL BOLTS SHALL BE TIGHTENED WITH A TORQUE WRENCH OR WITH IMPACT WRENCH PRESET FOR THE PRESCRIBED

TORQUE.

23. ALL FIELD HOLES SHALL BE DRILLED NOT BURNT.

24. CONTRACTOR SHALL PROVIDE PIECES OF HEAVY GAUGE METAL WHERE EVER REQUIRED, SUCH AS AROUND

OPENINGS, COLUMNS, ETC.

25. BEAMS SHALL BE EQUALLY SPACED WITHIN THE BAYS, U.O.N.

26. ALL FIELD WELDS FOR STRUCTURAL CONNECTIONS SHALL BE ULTRASONICALLY TESTED FOR FLAWS AND/OR

POROSITY.

27. STEEL COLUMN ENDS SHALL BE MILLED AND THEN FILLET WELDED TO THE STEEL BASE PLATE.

RENOVATION & RESTORATION

1. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT / ENGINEER WHEN, IN THE COURSE OF

CONSTRUCTION OR DEMOLITION, CONDITIONS ARE UNCOVERED WHICH ARE UNANTICIPATED OR

OTHERWISE APPEAR TO PRESENT A DANGEROUS CONDITION

2. DAMAGED LOAD BEARING MASONRY SHALL BE REMOVED & REPLACED OR REPAIRED AS DIRECTED

BY THE ARCHITECT / ENGINEER

3. DAMAGED STONE LINTELS SHALL BE REPAIRED OR REPLACED

4. NEW MASONRY SHALL BE BONDED OR OTHERWISE TIED TO ADJACENT MASONRY WORK

5. SECOND-HAND BRICK SHALL NOT BE USED IN MASONRY BEARING WALLS UNLESS APPROVAL IS

GIVEN BY THE ARCHITECT / ENGINEER FOR EACH SPECIFIC CASE

6. INFORMATION REGARDING EXISTING CONSTRUCTION OR CONDITIONS IS BASED ON AVAILABLE

RECORD DRAWINGS WHICH MAY OR MAY NOT TRULY REFLECT EXISITNG CONDITIONS. SUCH

INFORMATION IS INCLUDED ON ASSUMPTION THAT IT MAY BE OF INTERED TO THE CONTRACTOR, BUT

THE ARCHITECT / ENGINEER ASSUMES NO RESPONSIBILITY FOR ITS ACCURACY OR COMPLETENESS

7. VERIFY ALL DIMENSIONS & CONDITIONS ON THE JOB. DISCREPANCIES SHALL BE BROUGHT

IMMEDIATELY TO THE ATTENTION OF THE ARCHITECT / ENGINEER BEFORE PROCEEDING w/ THAT

PART OF THE WORK

8. WHERE NEW WORK WILL BE ADJACENT TO OR FRAMING EXISTING CONSTRUCTION, VERIFY

DIMENSIONS OF EXISTING CONSTRUCTION PRIOR TO FABRICATION OF NEW MEMBERS

9. PROVIDE ALL LABOR & MATERIAL FOR ANY FRAMING REQUIRED TO CONNECT NEW FRAMING TO

EXISTING CONSTRUCTION. WHEREVER IT IS NECESSARY TO REMOVE EXISTING CONSTRUCTION IN

ORDER TO CONSTRUCT NEW WORK, THE AFFECTED AREA SHALL BE PATCHED & REBUILT TO MATCH

EXISTING ADJACENT WORK TO SATISFACTION OF THE ARCHITECT / ENGINEER

10. DETAILS SHOWN ON ANY DRAWING SHALL BE CONSIDRED TYPICAL FOR ALL SIMILAR CONDITIONS

11. NOTIFY THE ARCHITECT / ENGINEER OF ANY CONTEMPLATED STRUCTURAL ALTERATIONS IN

REASONABLE TIME TO RENDER & DOCUMENT THE ARCHITECT'S / ENGINEER'S DECISION

12. STRUCTURAL MATERIALS & COMPONENTS SHALL HAVE PRIOR APPROVAL OF THE ARCHITECT /

ENGINEER

13. STRUCTURAL WORK ON THIS PROJECT SHALL BE PERFORMED UNDER THE SUPERVISION OF AN

INSPECTOR APPROVED BY THE ARCHITECT / ENGINEER. ALTERATIONS OR MODIFICATIONS NOT

INDICATED ON THE DRAWINGS SHALL BE APPROVED BY THE ARCHITECT / ENGINEER IN WRITING

BEFORE SUCH WORK IS INITIATED. THE ARCHITECT / ENGINEER WILL PERIODICALLY OBSERVE

STRUCTURAL ELEMENTS TO ASSURE GENERAL COMPLIANCE WITH THE CONTRACT DOCUMENTS, BUT

DETAILED INSPECTIONS & TESTING REQUIREMENTS WILL BE PREPARED BY AN INDEPENDENT

TESTING AGENT HIRED BY THE OWNER. DEFICIENCIES NOT INDICATED ON THE DRAWINGS OR

EXPOSED DURING CONSTRUCTION SHALL BE CORRECTED AS DIRECTED BY THE ARCHITECT /

ENGINEER

14. STRUCTURAL ALTERATION SHALL BE PRECEDED BY ADEQUATE SHORING & BRACING

15. SCREW-TYPE SHORING POSTS SHALL BE PROVIDED FOR EXISTING WORK DURING THE REMOVAL OF

EXISTING BEARING WALLS & STRUCTURAL MEMBERS, & THE INSTALLATION OF NEW STRUCTURAL

WORK

16. TEMPORARY SHORES SHALL BE PLACED AS CLOSE AS PRACTICABLE TO THE EXISTING

STRUCTURAL WORK BEING REMOVED

17. HEADERS SHALL BE PLACED ACROSS TOP OF SHORING POSTS & SHALL BE SNUG TIGHT AGAINST

UNDERSIDE OF THE STRUCTURE ABOVE

18. SHORING SHALL BEAR ON SLEEPERS TO PREVENT DAMAGE TO THE STRUCTURE BELOW

19. TEMPORARY SHORES SHALL BE INDIVIDUALLY DESIGNED, ERECTED, SUPPORTED, BRACED &

MAINTAINED BY THE CONTRACTOR TO SAFELY SUPPORT ALL DEAD LOADS PRESENTLY CARRIED BY

THE EXISTING STRUCTURAL WORK BEING REMOVED & ANY CONSTRUCTION LIVE LOADS

20. STRUCTURAL STEEL SHALL BE COMPLETELY INSTALLED BEFORE REMOVING ANY SHORES

21. SHORES SHALL BE RELEASED GRADUALLY & LEFT LOOSELY IN PLACE FOR AT LEAST 2 DAYS TO

ALLOW FOR STRUCTURAL SHAKE OUT

22. DAMAGED JOISTS SHALL BE REPLACED AS DIRECTED BY THE ARCHITECT / ENGINEER

Page 8: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-1

FO

UN

DA

TIO

N P

LA

N

8

FOUNDATION PLAN

1/4"=1'-0"

Page 9: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-2

FIR

ST

F

LO

OR

F

RA

MIN

G P

LA

N

9

FIRST FLOOR FRAMING PLAN

1/4"=1'-0"

Page 10: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-3

SE

CO

ND

F

LO

OR

10

FR

AM

IN

G P

LA

N

SECOND FLOOR FRAMING PLAN

1/4"=1'-0"

Page 11: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-4

RO

OF

11

FR

AM

IN

G P

LA

N

ROOF FRAMING PLAN

1/4"=1'-0"

DETAIL @ADJACENT EXISTING ROOF

1/4"=1'-0"

Page 12: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-5

BU

ILD

IN

G S

EC

TIO

N,

12

DE

TA

ILS

BUILDING SECTION "A-A"

1/4"=1'-0"

Page 13: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-6

BU

ILD

IN

G S

EC

TIO

N,

13

DE

TA

ILS

BUILDING SECTION "B-B"

1/4"=1'-0"

Page 14: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-7

BU

ILD

IN

G S

EC

TIO

N,

14

DE

TA

ILSBUILDING SECTION "C-C"

1/4"=1'-0"

Page 15: DATE PROPOSED TWO-STOREY BUILDING w/ CELLAR (VANILLA …€¦ · second floor plan, schedules, details cellar floor plan, schedules, details t-1 title sheet, drawing index, general

27 C

asey Lane, M

ount S

inai, N

ew

Y

ork 11766

Em

ail: ta

hirq

@o

pto

nlin

e.n

et

Ph

on

e N

o.: (6

31

) 7

32

-3

15

0

TA

HIR

Q

UR

ES

HI, P

E

Fa

x N

o.: (6

31

) 3

89

-2

58

5

RE

VIS

IO

N / D

ES

CR

IP

TIO

ND

AT

E

Long Island E

ngineering &

A

rchitecture

TM

QA

S N

OT

ED

GA

RD

EN

C

IT

Y, N

Y 11530

0204-009-07-040

NO

.

C17011

of

15

01-28-2019

RE

VIS

ED

A

S P

ER

V

ILLA

GE

C

OM

ME

NT

S3/15/2019

AR

L

RE

LO

CA

TE

D E

XT

ER

IO

R S

TA

IR

A

S P

ER

G

.C

.4/12/2019

S-8

BU

ILD

IN

G S

EC

TIO

N,

15

DE

TA

ILSBUILDING SECTION "D-D"

1/4"=1'-0"

DETAIL @ 1st FLOOR SLAB SUPPORT @ CELLAR STAIR