db systemtechnik our knowledge: your success€¦ · optimising the brake system on a high-speed...

22
DB Systemtechnik Our Knowledge: Your Success DB Systemtechnik Group

Upload: others

Post on 05-Jul-2020

3 views

Category:

Documents


1 download

TRANSCRIPT

DB SystemtechnikOur Knowledge:

Your Success

DB Systemtechnik Group

We have decades of experience in railwayWe offer all services from a single sourceWe know each vehicleWe test each vehicleWe manage your approval process: anytime, anywhereWe are RU (incl. test trains and locomotive drivers)We master the railway system

Photo credits cover DB Systemtechnik

As a highly capable and customer-focusedservice provider, DB Systemtechnik notonly serves as an expert partner to sup-port Deutsche Bahn with its expertise,but is also increasingly active in the in-ternational railway market.

DB Systemtechnik guarantees its customers

I IndependenceI NeutralityI Confidentiality

regarding their work.

Hans Peter Lang

Managing Director

Christoph Kirschinger

General Manager Sales

Stefan Schneider

General ManagerFinance/Controlling,Human Resources

DB Systemtechnik

1

930 employees

I EngineeringI Engineering designI ConsultingI TestingI International approvalsI Maintenance servicesI Metrology

Revenues of 136 Mio. € in 2019

Sites located in Germany,Austria, France and UK

13 accredited laboratories

50 technology centres

Our product groups

DB Systemtechnik Group

2

Photo credits: DB Systemtechnik, Fotolia

DB Systemtechnik offers a complete range of railway engeneering and test services at 19 locations in Germany.

Together with DB ESG, the subsidiary of DB Systemtechnik, they are a powerfulengineering service provider on the English market. The sister company, Rail-way Approvals is working as a Notified Body in Great Britain, while in Germanythey are supported by the Railway Approvals Germany. The distribution andproject office in Paris is responsible for the customer relation management inFrance and South Europe.

Europas größtes Kompetenzzentrum

für Bahntechnik

DB ESG

DB Systemtechnik

Minden

Kirchmöser

ViennaParis

Derby

Munich

Europe's largest competence centre

for railway technology

3

railway approvalsG E R M A N Y

We offer you technical expertise

from a single source

Infrastructure

I Battery technologyI Lubricants, oilsI Maintenance shopsI Maintenance technologyI Materials scienceI Passenger information systemsI Systems engineeringI Infrastructure monitoring

Interfaces

I Acoustics and vibrationsI AerodynamicsI Electromagnetic compatibilityI Electromagnetic fields (EMF)I SafetyI TelecommunicationI Interaction of

• Pantograph/Catenary• Vehicle – Vehicle• Vehicle – Infrastructure• Vehicle IT with stationary IT

Vehicles

General vehicleI ICEI ICI LocomotivesI DMU, EMUI Freight wagonsI Passenger coaches

Module, component, partI Battery technologyI BogiesI Brake technologyI Buffing and draw gearI Coating systems and corrosion protectionI CouplerI Data bus systems (train bus) for passenger trafficI DiagnosisI Energy supplyI Fatigue strengthI Fire protectionI Glue assemblyI Heating, ventilation and air-conditioningI Lubricants, oilsI Materials engineeringI On-board electrical systemsI PantographI Passenger information systemsI Running technologyI Tilting technologyI Traction technologyI Vehicle softwareI Welding technologyI Wheelsets4

Photo credits: Dr. Kai-Uwe Nielsen

Unser Know-how

Our Knowledge: Your SuccessDB Systemtechnik

TestingsEngineeringMaintenance technologyConsulting

5

The 250 employees of the Business Line Testing support you with their comprehensive knowledge of systems, suitable test methods and tools, alongwith well-founded technical trial expertise.

DB SystemtechnikTestings: from Minden to Mumbai

TestingsI VehiclesI InfrastructureI Components

ApprovalI Approval of vehiclesI Approval managementI Expert assessorsI TSI certifications (NoBo)I AsBo/DeBoI Partial approvals for infrastructure

Measurement technology I Measurement and diagnostic systems

6

Testing with the ICE S in the Gotthard Base Tunnel:

DB Systemtechnik supports AlpTransit Gotthard AG on this outstanding project.

Currently, trial runs are being conducted in the 57 km long Gott -hard Base Tunnel under the direction of the Swiss constructionproject management. TSI energy tests on the overhead line arebeing carried out with the ICE S high-speed train from DB Sys-temtechnik. In these successful trips, the maximum speed of 275km/h was also attained. After several months of trial operations,the Swiss railroad SBB was able to begin operation of the GotthardBase Tunnel on schedule on 11th of December 2016.

Testings

Further references: I TSI testing of the overhead contact line in DenmarkI Shock wave test in a light rail train station in MunichI Occupational noise exposure during shunting workI Approval of the Velaro EurostarI Service life examination of the ICE 1 bogie frameI Climatic measurements of internal flows of the Delhi Metro

7

Photo credits: © AlpTransit Gotthard AG

With a total of 350 employees at various locationsthe Business Line Engineering support you in all to-pics of construction, engineering and digitizationfor vehicles and components.

DB SystemtechnikEngineering: from wheel set to IT

Engineering designI Engineering design support for new vehiclesI Refurbishment of existing vehicles I Engineering design for components/type modificationsI Accident and damage analyses and repair

Engineering I Type supportI Service of assetsI Fleet managementI Procurement supportI Supplier/product qualificationI Carrying out studiesI Rules & regulation and committeesI Obsolescence managementI IT usage & diagnosticsI Software

8

Further references: I Intelligent platform for train to stationary communicationI New IGBT rectifiers for the ICE 2I LED signal lighting for locomotivesI Hybrid drive for the Westfrankenbahn railway: the ECO TrainI Refurbishment of class 474 in HamburgI Consulting for new batteries for existing vehicles

DB Systemtechnik optimises air-conditioning system of the ICE 2

The HVAC section of DB Systemtechnik was tasked by DB Fern-verkehr with the analysis of failure causes and was given a pro-ject to upgrade ICE 2 trains.

Numerous technically possible upgrade measures were put to-gether following a thorough analysis of the causes of failure. Vari-ous measurement campaigns performed on an ICE 2 intermediatecar in the climate chamber run by DB Systemtechnik in Mindenindicated weaknesses in the software control unit in the air-con-ditioning systems. The defined package of measures that resultedwas enthusiastically implemented in the DB Fernverkehr plant inRummelsburg by the summer of 2013.

Engineering

9

Photo credits: DB AG/Claus Weber, DB Systemtechnik

Our 150 employees of the Business Line Mainten-ance Technology are pleased to advise and supportyou in all engineering services for design, construc -tion and optimization of all maintenance systemelements in the field of railway technology and infrastructure.

DB SystemtechnikMaintenance technology: from basic to predicitve

MaintenanceI Development and support of maintenance conceptsI Depot planning and intralogisticsI Testing services and maintenance procedures I Testing and diagnostics equipmentI Metrology/calibration systemsI Non-destructive testingI Materials engineeringI Welding and adhesive bonding

10

Non-destructive testing of axle shafts in their mounted state

Technically innovative solid shaft testing system (VPS) makes up-grading of the complete wheelsets unnecessary in the case offreight wagons.

Previously, non-destructive testing could only be performed onwheelsets with a solid axle after they were removed , which – inaddition to high idle times for the vehicles – entailed intensiveamounts of time and labour. The use of VPS-Mobil makes it possi-ble to reduce these cost factors and increase the quality of themaintenance services. The VPS-ring is expected to be in operationin workshops end 2017.

Maintenance Technology

Further references: I Welding construction support for railway vehicle bodiesI Fire protection tests for equipment and accessoriesI Refurbishment and extension in the rail work pit in Kassel I Inspection of track and track switch damage in Frankfurt I Development of measuring equipment for tramsI Construction of a new washing and de-icing facility for suburban trains in Berlin

11

Photo credits: DB Systemtechnik

DB Systemtechnik is the only provider of consultingservices to be born of an overarching rail operater.We analyse your problems and design solutions justfor you within the rail system as a whole, coveringareas such as rolling stock, components and infra-structure. In doing so, we always keep your econo-mic success in mind and have a laser-like focus onthe financial aspects of the over all rail system.

DB SystemtechnikConsulting: from strategic to technical

SystemconsultingI Strategy and controllingI QualificationI Quality and managementI Environmental dimensionI General system issuesI Operations planning and implementation

Technical consultingI Optimisation of the entire life cycle of rolling stock and componentsI Procurement of rolling stockI Vehicle maintenanceI Workshops

12

Optimising the brake system on a high-speed train.

A high-speed train in Korea kept experiencing serious malfunctionswhen running, caused by excessively high consumption of compres -sed air and locking wheels.

During consultation with the rolling stock manufacturer, the controlbehaviour of the wheel slide protection system was identified as thecause of this fault and a simulation tool developed especially for thisproject was used to highlight potential solutions to the problem.Training was given to development engineers on site to ensure thesolution would be a sustainable one.

Consulting

Further references:I Technical consultation on operation and maintenance of double-deck wagons (Luxembourg)I Consultation on air conditioning concepts for metro trains in Delhi (India)I Technical review of bid documents for metro trains in TaiwanI Consultation on establishing maximum speeds on falling gradients under ETCS Level 2I Master agreements for technical consultation with two European rail operators

Photos: DB Systemtechnik

13

Test equipment andaccredited inspection areas

Test trainsI High-speed reference train ICE-SI VT 612 for tilting technologyI Measurement vehicles and locomotives

Test rigsI Pantograph test rigI Strength test rigI Wheel-rail contactI Friction test rigI Various other

LaboratoriesI Climatic chamberI IT testing laboratoryI TribologyI Materials testingI Various other

Accredited inspection areasI Running dynamicsI Material science and damage analysisI Fatigue testingI Brake technologyI Various other

14

Photo credits: DB Systemtechnik/Alfred Hechenberger, Michael Meister, DB AG/Anette Koch

Our certification, accreditation and recognition as an independentrailway untertaking ensure the success of your projects.

DB Systemtechnik:I Is certified in accordance with DIN EN ISO 9001 I Is an associate partner of EBC I Provides the German Federal Railway Authority (EBA) with administrative support for ECM I Has its inspection centre accredited in accordance with DIN EN ISO/IEC 17 020 I Is accredited in the inspection area safety assessment according CSM-RA I Is recognised by the EBA with the test laboratories and the inspection body, which perform without any disciplinary instructions I Has over 40 EBA-recognised expert assessors as well as other technical expert assessors I Is accredited according to DIN EN ISO/IEC 17 025 in 13 testing laboratories I Has over 200 accredited testing procedures according to DIN EN ISO/IEC 17 025 in 27 competence areas I Has RAL as an integrated NoBo I Is Interim-DeBo in Germany and DeBo in Luxembourg

a railway undertakingcertified and accredited

15

DB Systemtechnik

General Manager SalesChristoph Kirschinger [email protected]

Sales Germany, Austria, SwitzerlandSteve [email protected]

Marketing/Sales Deutsche BahnAlfred [email protected]

Sales UKPaul [email protected]

Sales France, Luxembourg, Belgium, NorwayJérome [email protected]

Sales Asia, America, South and Eastern EuropeSergej [email protected]

16

DB Systemtechnik

Business Line TestingDr. Lars Mü[email protected]

Business Line EngineeringNils [email protected]

Business Line Maintenance SystemsDr. Burkhard [email protected]

DB ESGNick [email protected]

CTO, Innovation Management Dr. Stephan [email protected]

17

Photo credits: DB Systemtechnik, Dr. Kai-Uwe Nielsen, DB E&C, ESG Rail

list of customers

18

Photo credits: DB Systemtechnik/Müller, ESG Rail, SIEMENS AG

Published by

DB Systemtechnik GmbH

Pionierstraße 10

32423 Minden

Germany

Further information:

Website: www.db-systemtechnik.de

E-mail: [email protected]

Contact: Alfred Hechenberger

Subject to change without notice Errors and omissions excepted

Last revised: January 2020