DC Water Sewer Services Facility at Ames Place 3101 Ames Place NE, Washington, DC 20032
1
Virginia
Potomac
River
Riv
er
Anacostia
Maryland
DC Water Site
DC Water Sewer Services at Ames PlaceOverview
DC Water maintains storm and sanitary sewers throughout the District of Columbia. Different field groups within the Sewer Services department undertake this work. The primary group is currently located at the Main and O Campus at 125 O Street, SE. How-ever, portions of this campus are slated for future redevelopment by DMPED. There-fore, DC Water has agreed to relocate the Sewer Services functions to 3101 Ames Place, NE.
Existing Site and Environs
The Ames Place site consists of approximately 3.95 acres, and is currently being used by WMATA for bus parking. Most of the existing site is paved with asphalt, and contains a prefabricated office trailer that is in poor condition. The environment surrounding the site can be characterized as an industrial area. To the south is an extensive zone of warehouse buildings lining both sides of V Street, NE. To the east is a large staging yard for Fort Meyer Construction Corporation, containing large construction vehicles and stockpiles of construction materials. To the north is the Teamsters Local building. To the west is a parking lot for DHL delivery vehicles.
Proposed Site Work
The new Sewer Services facility will be for use by DC Water employees only, and is not intended to be accessed by members of the public. The entire site perimeter will be fenced and secured. Most of the proposed site will be paved with heavy-duty concrete to accommodate a work yard and staging for approximately 120 DC Water vehicles of various sizes. Another area of the site will be an asphalt paved parking lot for employ-ees’ personal vehicles, with landscaping. The remainder of the open site area will be used primarily for landscaped above-ground stormwater management and open green space. New curb & gutter, sidewalk, and tree plantings will be provided along both Ames Place and 31st Street.
Proposed Main Building
The new Sewer Services Building will be an approximately 9,000 SF, two story building containing office space, training room, locker rooms, and break room. DC Water re-quested that this building be of a “retro-industrial” style, borrowing design elements from early 20th Century industrial architecture that is rapidly disappearing from the District. The most visible building material will be two shades of red ironspot brick, presenting a very subtle contrast between the brick arches, corbelled cornices, and pi-lasters. A sand colored cast stone will be used for parapets, sills, water table, and other masonry accents. The windows will be narrow mullion curtainwall type, reminiscent of industrial steel windows. The roof will be a vegetative “green” type, with raised clere-stories capped with photovoltaic panels. The project will be designed to LEED Silver standards.
Proposed Secondary Structures
The project includes construction of three additional structures on the site:
Vac Truck Storage Building. Approximately 3,500 SF, one story pre-engineered metal building. This building will house DC Water’s vacuum trucks and other items requiring indoor storage. The roof will be a shed-style south-facing metal roof cov-ered with photovoltaic panels.
Materials Bins Structure. Open-air covered storage bins for fill dirt, sand, and grav-el, etc. with concrete walls and metal roof. No road salt or de-icing agents will be stored in these bins.
Guard Booth: Small prefabricated set-in-place structure, with brick base to match the main Sewer Services Building.
2
Fort Myer Construction
TeamstersLocal
DHLDepot
warehouses
warehouses
National Arboretum
Ames Pl, NE
Adams St, NE
Channing St, NE
30th
St,
NE
31st
St,
NE
33rd
St,
NE
33rd
St,
NE
V St, NE
New York Ave, NE (US-50)
railroad tracks
Fort Lincoln Dr, NE
33rd PL, NE
South Dakota Ave, NE
DC Water Site
3EXISTING SITE FACING EAST
4EXISTING SITE FACING EAST
5EXISTING SITE FACING WEST
6EXISTING SITE FACING SOUTH
7
CIV0101Existing Conditions Plan
| | | |
DC WATER SEWER SERVICES FACILITYEXISTING SITE PLAN
8
PAVING LEGENDSITE KEYNOTES:
CIV0105Site Plan
DC WATER SEWER SERVICES FACILITYPROPOSED SITE PLAN
9
NORTH
DC WATER SEWER SERVICES FACILITY3101 AMES PLACE, NE WASHINGTON, DC 20032DC WATER
MARCH 29, 2019
1" = 50'
0 50' 100' 150'
PLANT LIST
PLANT LIST - GREEN ROOF
BIO-RETENTION PLANT LIST
L0101LANDSCAPE PLAN
6" /
1'-0"
6" /
1'-0"
AMES PLACE N.E.
GRAVEL ALLEY
31S
T S
TRE
ET
N.E
.
LAWN TYP.
GUARD SHACK
30' SEWER EASEMENT
SIDEWALK TYP.
SPECIALITYPAVER
TYP.
5 QHP
TREEPLANTING
TYP.
SHRUB & GROUNDCOVER,TYP.
ORNAMENTALTREE, TYP.
22 CV
4 QHP
7 QHP
5 QHP
21 RAG
10 RAG
60 POD
220 CEN660 ILV330 ANG
394 CEN1178 ILV589 ANG
EXTENSIVEGREEN ROOF
BIORETENTION,TYP.
77 CGE52 SLB103 VES
77 CGE52 SLB103 VES
77 CGE52 SLB103 VES
77 CGE52 SLB103 VES
77 CGE52 SLB103 VES
7225 CGE3983 SLB7967 VES
59 CGE40 SLB79 VES
99 CGE66 SLB132 VES
39 CGE26 SLB52 VES
39 CGE26 SLB52 VES
39 CGE26 SLB52 VES
116 CGE78 SLB155 VES
447 CGE298 SLB580 VES
23 ILG
1463 PGC1463 SJI1463 SAL1463 SJC1463 SKM1463 SSF1463 SSX1463 TCL
LANDSCAPE PLAN
10
UP
DN
DN
C
E
1 3
B
21.8
A
4
F
C.9
1.9
WOM
EN'S
LOCK
ERS
MEN'S LOCKERS
LOUNGE ENTRY
MECH STAIR 2
14' -
0"1'
- 4"
1' - 0
"23
' - 8"
2' - 0
"28
' - 8"
30' -
5"10
' - 7"
2' - 4
"
100'
- 0"
WOMENMEN
ELECT
CORR
IDOR
CORR
IDOR
LAUNDRY
53' - 4"
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4" 14' - 0"
101'
- 4"
12' -
8"
54' - 8"
UP
D
C
E
1 3
B
21.8
A
4
F
C.9
1.9
OFFICE OFFICE
TRAINING
OPEN OFFICE
ELEVATOR
CHAIR STORAGE DATA
OPEN TO BELOW
MEN
WOMEN
BSSTORAGE
CORR
IDOR
STAIR 1
STAIR 2
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4"
2' - 4
"10
' - 7"
30' -
5"28
' - 8"
2' - 0
"23
' - 8"
1' - 0
"1'
- 4"
100'
- 0"
53' - 4"
D
101'
- 4"
54' - 8"
C
E
1 3
B
21.8
A
4
F
C.9
1.9
D
100'
- 0"
53' - 4"
101'
- 4 7/
8"
54' - 8"
FIRST FLOOR PLAN
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0
"1' -
4"1' -
0"23
' - 8"
2' - 0"
28' - 8
"30
' - 5"
100' -
0"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' -
4"12
' - 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
11
UP
DN
DN
C
E
1 3
B
21.8
A
4
F
C.9
1.9
WOM
EN'S
LOCK
ERS
MEN'S LOCKERS
LOUNGE ENTRY
MECH STAIR 2
14' -
0"1'
- 4"
1' - 0
"23
' - 8"
2' - 0
"28
' - 8"
30' -
5"10
' - 7"
2' - 4
"
100'
- 0"
WOMENMEN
ELECT
CORR
IDOR
CORR
IDOR
LAUNDRY
53' - 4"
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4" 14' - 0"
101'
- 4"
12' -
8"
54' - 8"
UP
D
C
E
1 3
B
21.8
A
4
F
C.9
1.9
OFFICE OFFICE
TRAINING
OPEN OFFICE
ELEVATOR
CHAIR STORAGE DATA
OPEN TO BELOW
MEN
WOMEN
BSSTORAGE
CORR
IDOR
STAIR 1
STAIR 2
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4"
2' - 4
"10
' - 7"
30' -
5"28
' - 8"
2' - 0
"23
' - 8"
1' - 0
"1'
- 4"
100'
- 0"
53' - 4"
D
101'
- 4"
54' - 8"
C
E
1 3
B
21.8
A
4
F
C.9
1.9
D
100'
- 0"
53' - 4"
101'
- 4 7/
8"
54' - 8"
SECOND FLOOR PLAN
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0
"1' -
4"1' -
0"23
' - 8"
2' - 0"
28' - 8
"30
' - 5"
100' -
0"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' -
4"12
' - 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
12
UP
DN
DN
C
E
1 3
B
21.8
A
4
F
C.9
1.9
WOM
EN'S
LOCK
ERS
MEN'S LOCKERS
LOUNGE ENTRY
MECH STAIR 2
14' -
0"1'
- 4"
1' - 0
"23
' - 8"
2' - 0
"28
' - 8"
30' -
5"10
' - 7"
2' - 4
"
100'
- 0"
WOMENMEN
ELECT
CORR
IDOR
CORR
IDOR
LAUNDRY
53' - 4"
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4" 14' - 0"
101'
- 4"
12' -
8"
54' - 8"
UP
D
C
E
1 3
B
21.8
A
4
F
C.9
1.9
OFFICE OFFICE
TRAINING
OPEN OFFICE
ELEVATOR
CHAIR STORAGE DATA
OPEN TO BELOW
MEN
WOMEN
BSSTORAGE
CORR
IDOR
STAIR 1
STAIR 2
2' - 4" 21' - 4" 10" 10" 25' - 8" 1' - 0" 1' - 4"
2' - 4
"10
' - 7"
30' -
5"28
' - 8"
2' - 0
"23
' - 8"
1' - 0
"1'
- 4"
100'
- 0"
53' - 4"
D
101'
- 4"
54' - 8"
C
E
1 3
B
21.8
A
4
F
C.9
1.9
D
100'
- 0"
53' - 4"
101'
- 4 7/
8"
54' - 8"
ROOF PLAN
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0
"1' -
4"1' -
0"23
' - 8"
2' - 0"
28' - 8
"30
' - 5"
100' -
0"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' -
4"12
' - 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
13
LEVEL 10.00'
LEVEL 214.67'
TOM31.33'
LEVEL 10.00'
LEVEL 214.67'
TOM31.33'
.DC WATER SEWER SERVICES FACILITYBUILDING ELEVATIONS
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0"
1' - 4"
1' - 0"
23' - 8"
2' - 0"
28' - 8"
30' - 5"
100' - 0
"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' - 4
"12'
- 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
14
LEVEL 10.00'
LEVEL 214.67'
TOM31.33'
LEVEL 10.00'
LEVEL 214.67'
TOM31.33'
.DC WATER SEWER SERVICES FACILITYBUILDING ELEVATIONS
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0"
1' - 4"
1' - 0"
23' - 8"
2' - 0"
28' - 8"
30' - 5"
100' - 0
"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' - 4
"12'
- 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
15
1' - 0" 1' - 0" 20' - 2"
13' -
0"13
' - 0"
13' -
0"13
' - 0"
13' -
0"13
' - 0"
79' -
2"
9' - 0" 1' - 0" 12' - 2"
22' - 2"
1 1
2 2
24' - 0"
27' -
2"52
' - 0"
79' -
2"
16' - 0"
1 1/2" / 1'-0"
1 1/2" / 1'-0"
STANDING SEAM METAL ROOF
1 1/2" / 1'-0"
24' - 0"
9' - 0
".12
' - 0"
10' -
0"
9' - 0
"12
' - 0"
10' -
0"
1 1/2" / 1'-0"
16' - 0"
UnnamedDC WATER SEWER SERVICES FACILITY MATERIAL BINS
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0"
1' - 4"
1' - 0"
23' - 8"
2' - 0"
28' - 8"
30' - 5"
100' - 0
"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' - 4
"12'
- 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
Floor Plan Roof Plan Section 2
Section 1
16
V1 V2 V3 V4
VC
VB
VA
81' - 0"
44' -
4"
VAC TRUCK STORAGEV100
12' H CHAIN LINK FENCE4' W 8'H GATE
(6) 24"D X 36"W X 87"H ADJ. METAL SHELVING UNIT.
(10) 24"D X 36"W X 87"H ADJ. METAL SHELVING UNIT.
19 -
6".
UnnamedDC WATER SEWER SERVICES FACILITYVAC STORAGE SHED
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0"
1' - 4"
1' - 0"
23' - 8"
2' - 0"
28' - 8"
30' - 5"
100' - 0
"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' - 4
"12'
- 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
17
V1 V2 V3 V4
VC
VB
VA
82' - 0"
45' -
4"
PV SYSTEM ATTACH TO STANDING SEAM METAL ROOF
19' -
6".
15' -
9"
1" / 1'-0"
UnnamedDC WATER SEWER SERVICES FACILITYVAC STORAGE SHED
UP
C
E
B
F
C.9
WOME
N'S LO
CKER
S
MEN'S LOCKERS
LOUNGE ENTRY
14' - 0"
1' - 4"
1' - 0"
23' - 8"
2' - 0"
28' - 8"
30' - 5"
100' - 0
"
WOMENMEN
CORR
IDOR
CORR
IDOR
LAUNDRY
101' - 4
"12'
- 8"
54' - 8"
D
N
0' 4' 8' 16' 32'
18
19
20
21
22
23
24
25
26
27BRICK SAMPLES