dcn template 12-23-98
TRANSCRIPT
DCN Project EngagementWorldwide Sales Meeting
January 11-15, 1999San Francisco, Ca.
Solution Engagement Presentation TemplateOverview
• Project Description• Key Activities and Deliverables• Major Challenges• Lessons Learned
Project Description
• Project Description – GSMS – MQAQC
• Client Profile (e.g. title, organizational entity, etc.)
• Business Issues Addressed• Our Proposed Solution
What is Regulatory Submissions?
• Regulatory Submissions are:– Information submitted by
Pharmaceutical Companies to regulatory agencies, e.g., FDA, EMEA, HPB
– Typical Documents• INDs• Annual Reports• NDAs (~1Million pages)• MAAs• BLA• Other related documents
The Framework
GSMS
TRO
LL
CLI
NA
R
PRE-
CLI
NIC
AL
&R
ESEA
RC
H
MQAQC
ENTERPRISE STUDY : TROLL; CLINAR; MQAQC; GSMSAPR - JUN ‘97
DEFINED METHODOLOGY, TOOLS, INFRASTRUCTURE, WORKING RELATIONSHIP, & BEST PRACTICES FOR CHIRONFEB - JUN ‘98
The Framework
ENTERPRISE STUDY:
GSMS
TRO
LL
CLI
NA
RPR
E-C
LIN
ICA
L &
RES
EAR
CH
ENHANCED PLANFOR GSMS
IMPLEMENTATION PLANFOR GSMS
MQAQC
ENHANCED PLANFOR MQAQC
IMPLEMENTATION PLANFOR MQAQC
DEFINED METHODOLOGY, TOOLS, INFRASTRUCTURE, WORKING RELATIONSHIP, & BEST PRACTICES FOR CHIRON
TROLL; CLINAR; MQAQC; GSMSAPR - JUN ‘97
FEB - JUN ‘98
AUG‘98
SEP ‘98
Regulatory Submissions Systems & Knowledge Chain Management
KN
OW
LED
GE
KN
OW
LED
GE
RegulatorySubmission
SystemPhase IClinical Study
Phase IIClinical Study
SubmissionTracking
Phase IIIClinicalStudy
Research
New Drug Process
RegulatoryApproval
ClinicalPhase I
ClinicalPhase II
ClinicalPhase IIIPre-Clinical
PRO
CES
SPR
OC
ESS
• NotebooksNotebooks• Research notesResearch notes• IND & BLAIND & BLA• Site ProtocolSite Protocol• Project ManagementProject Management
• CRFsCRFs• SAS outputSAS output• Adverse EventsAdverse Events• Safety ReportsSafety Reports• Status & Annual ReportsStatus & Annual Reports
• Annual ReportsAnnual Reports• NDA & NDSNDA & NDS• MAAMAA• CorrespondencesCorrespondences• Other related docsOther related docs
Documentum RSS FrameworkK
now
ledg
eK
now
ledg
e
RegulatorySubmission
SystemPhase IClinical Study
Phase IIClinical Study
SubmissionTracking
Phase IIIClinicalStudy
Research
DocumentumDocumentum
CoreDossier/XDAPublishing
DocumentProfiling
DMSAssemblevia VDM
PIPER• Workflow• GUI• Enterprise Structure
• Bus. Model
RSS Framework Project Plan
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
Month 1 Month 2 Month 3 Month 4 Month 5 Month 6 Month 7 Month 8 Month 9 Month 10 Month 11 Month 12
WorkflowUser Requirements & Design Docs.
===>>> Development UnitTesting
===>>> ===>>>
DocumentRepository
User Requirements & Design Docs.
===>>> DevelopmentUnitTesting ===>>>
Publishing Vendor SelectionDesign Docs.Installation & Configuration ===>>> UnitTesting
ValidationTest Cases Validation
Testing ===>>> ===>>> ===>>>Master Test Plan ===>>>
Infra-structure
Infrastructure Plan & PurchasesInstallation & ConfigurationIntegration & Customization Performance Tuning
===>>> ===>>> ===>>> ===>>> ===>>> ===>>> ===>>> ===>>>
Training Training Plan Training ===>>> ===>>> ===>>> ===>>>
Back FileConversion
Service Bureau SelectionDocument Preparation Document Scanning ===>>> ===>>> ===>>> ===>>> ===>>>
Deployment Deployment Plan Pilot Deployment ===>>> ===>>> ===>>> ===>>> ===>>> ===>>> ===>>>
Documentum Manufacturing Framework
Idea
s Id
eas Knowledge
Chain ProductDevelopment
Planningand Infra-structure
ServiceMarketingand Sales
Research
Manufacturing SalesPurchasing Production DistributionProductionPlanning
Raw
Mat
eria
lsR
aw M
ater
ials
• Production PlansProduction Plans• Production ReportsProduction Reports• Recipes & FormulationsRecipes & Formulations• Material SpecificationsMaterial Specifications
• Standard Operating Standard Operating ProceduresProcedures
• Quality Test ProtocolsQuality Test Protocols• Design DrawingsDesign Drawings
• Sales ProposalsSales Proposals• Sales OrdersSales Orders• Product InfoProduct Info• Financial ReportsFinancial Reports
Master Batch Records
Batch ProductionRecord - Printed
Distribute andControl BPR
Batch Release,Scan & Archive
SAP
Start
Order or Batch NumberManagement - GOLD
Mater Batch Record
ArchiveLinkArchiveLink
Classify, File,Classify, File,Secure, Index,Secure, Index,Render & RouteRender & Route
SAP R/3 Print ListsSAP R/3 Print Lists
Replicate Reports Replicate Reports for Viewing at for Viewing at
Other SitesOther Sites
SAP & Documentum Link
Search and View Search and View withwith
R/3 Print List ViewerR/3 Print List Viewer
Search and View Search and View withwith
Web BrowserWeb Browser
Project Status
MQAQC Imple-
mentation
Plan
Back FileConversion
Identify service vendorScannin
g Scanning ===>>> ===>>>
EnterpriseStudy
StartedEnterprise
Study.
SubmittedEnterprise
Study.
TROLL Design Go Live!Develop-
ment.Test &Train
CLINAR Design Go Live!Develop-
ment.Test &Train ===>>>
GSMS Imple-
mentation
Plan
===>>> ===>>> ===>>> ===>>> ===>>>MethodologyTools, Infra,
Best Practice
Defined Methodology, Tools, Infrastructure, Working relationship and Best Practices
Apr’97 June’97 Mar ‘98 April ‘98 May 98 June 98 Feb ‘98 1999 Nov ‘98 1999 1999 1999
Apr’97 June’97 Mar ‘98 April ‘98 May 98 June 98 Feb ‘98 1999 Nov ‘98 1999 1999 1999
Design
Design
Go Live!
Go Live!
Develop-ment.
Develop-ment.
Validate& Train
Validate& Train
Rqm’ts&
Scope
Rqm’ts&
Scope
Centralized DMS Library
Centralized Library :• Central Docbase• Corp. Knowledge• Division Standards• Project Templates• Validation Documents
ApplicationFramework
Submission Batch Record
Chiron Intranet & LAN/WAN
Research
TROLL
SubmissionApplication
CLINAR
Manufacturing
Specifications
ControlledDocuments
Reference
Key Activities & Deliverables
• High Level Project Plan Overview • Engagement Length(s) and Fees• Consulting Resources Used (e.g. 2-4 DCTM
Consultants, X # of sub-contractors from ABC)
Major Challenges
• List 3-5 major challenges encountered • How you overcame (or didn’t) the challenges
Lessons Learned
• Top 3-5 lessons learned• What would you have done differently, if
anything?• Collateral material produced on the
project that could be re-used/re-purposed by other consultants (workplans, code, deliverables, tools/techniques, etc.)