AMEC Environment & Infrastructure A division of AMEC Americas Limited 140 Quarry Park Blvd. SE Calgary, AB, CANADA T2C 3G3 Tel +1 (403) 248-4331 Fax +1 (403) 248-2188 www.amec.com
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011
Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 1
December 19, 2011
CG25352.300
Mr. Ross Dickson
Alberta Transportation
2nd Floor, 803 Manning Road NE
Calgary, AB T2E 7M8
Dear Ross:
Re: Southern Region Geohazard Assessment
Fall 2011 Instrumentation Monitoring Results
Site S38: Highway 22:08, Callum Creek Landslide Site
This letter documents the Fall 2011 instrument readings at the above-noted site and presents
an updated site plan sketch, instrument data, and plots.
1.0 OBSERVATIONS
1.1 Field Program and Instrumentation Status
One slope inclinometer (SI) and two vibrating wire piezometers were read at the S38 –
Highway 22:08 site on November 1, 2011 by Mr. Tyler Clay, EIT of AMEC Environment &
Infrastructure (AMEC), a division of AMEC Americas Limited.
The SI’s were read using a metric Slope Indicator probe and Digitilt Datamate readout
manufactured by Durham Geo Slope Indicator (DGSI). Inclinometer reading depths were
referenced to the top of the SI casing. The vibrating wire piezometer was read using a VW data
recorder also manufactured by DGSI.
Please refer to the attached Figure S38-1 for a site plan showing the instrument locations.
The geotechnical investigation and instrument installations were recommended by AMEC after
a site inspection was performed on March 3, 2011 at Alberta Transportation’s (AT) request. At
the time of the site inspection, the road surface was exhibiting arc shaped cracking and
settlement across an approximately 80 to 100 m long segment of the road, indicating a potential
landslide headscarp. The road at the site has two lanes and appears to be a cut/fill embankment
along the natural valley slope. The slope below the road is at an angle of 17 to 18°. Settlement
of the road surface downslope of the cracking was in the order of 50 to 100 mm, with visible
deflection of the guardrail. The northern end of the affected road segment had a series of
Alberta Transportation Fall 2011 Instrumentation Monitoring Results Southern Region Site S38 – Highway 22:08, Callum Creek Landslide Site December 19, 2011
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011
Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 2
tension cracks in the pavement, roughly parallel to the road direction, and possibly indicating
future expansion of the arc-shaped cracking.
The geotechnical investigation and instrument installations were recommended to investigate
the subsurface and ground movement conditions, provide information to be used in potential
future repair work, and establish ongoing monitoring of slope movement and groundwater
pressure at the site. Please refer to the 2011 Geotechnical Investigation, Instrument
Installations and Initial Readings report for further background information1.
2.0 INTERPRETATION
2.1 General
Plots of the instrument data are presented in the attached figures, and summarized in the following sections.
2.2 Zones of Movement
The previously identified movement zone in SI 11-01 at 11 m depth shows continued
displacement. No new movement zones have been identified.
2.3 Interpretation of Monitoring Results and Recommendations
2.3.1 Interpretation
SI 11-01 (Figures S38-2 and S38-4)
• The November 2011 readings show continued displacement at and above the movement zone at 11 m depth identified from the July 2011 readings. The total displacement at this zone is now approximately 42 mm since May 2011, an increase of 11 mm since the July 2011 readings. The rate of movement since July 2011 is lower than was measured between May and July 2011.
SI 11-02 (Figures S38-5 and S38-6)
• This SI was found obstructed at 9.4 m depth during the July 2011 readings, likely due to landslide movement causing excessive deformation of the SI casing. The May 2011 readings had indicated that movement was occurring above 9.4 m depth over a broad movement zone.
Vibrating Wire Piezometers VW# 10-6697 and VW# 10-6710 (Figure S38-7 and Table S38-2)
• VW# 10-6697 – This piezometer tip is installed approximately 14 m below the ground surface. To date it has only measured relatively small pressures and it is possible that the piezometer tip is above the groundwater level and not fully saturated.
1 AMEC Report, “S38 – Hwy 22:08 – Callum Creek Landslide Site 2011 Geotechnical Investigation,
Instrument Installations and Initial Readings”, submitted to Alberta Transportation, June 2011, AMEC File
No CG25359.
Alberta Transportation Fall 2011 Instrumentation Monitoring Results Southern Region Site S38 – Highway 22:08, Callum Creek Landslide Site December 19, 2011
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011
Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 3
• VW# 10-6710 – This piezometer tip is installed approximately 6.5 m below the ground
surface. The current piezometric elevation measured at this tip is approximately 2.2 m
below the ground surface or an equivalent pressure of 41.7 kPa. This is comparable to
the previous reading in July 2011. Since this piezometer tip is fully saturated and is
installed at a higher elevation than the 10-6697 tip, it may be indicative of a perched
water table in this area. These water pressures could be contributing to the active
movement observed at this site.
3.0 RECOMMENDATIONS AND PATH FORWARD
AMEC will be designing repair measures for this site during the winter of 2011/2012, and it is
understood that AT is planning on constructing a repair in Summer 2012.
As part of the upcoming repair design, AMEC will assess the need for additional readings of the
functioning SI and the piezometers, and will provide recommendations for additional instrument
installations and post-repair monitoring in the report on the repair design.
The annual site inspections by AT and AMEC personnel should be continued in 2012.
4.0 INSTRUMENTATION REPAIRS AND MAINTENANCE REQUIRED
No repairs are required at this time. Recommendations for the replacement of SI 11-02 (and
SI 11-01 if it goes out of service), if warranted for post-repair monitoring, will be provided in the
upcoming repair design report.
Alberta Transportation Fall 2011 Instrumentation Monitoring Results Southern Region Site S38 – Highway 22:08, Callum Creek Landslide Site December 19, 2011
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 4
TABLE S38-1
FALL 2011 – Callum Creek Landslide
Slope Inclinometer Instrumentation
Reading Summary
Date Monitored: November 1, 2011
INSTRUMENT
NAME
DATE
INITIALIZED
TOTAL
CUMULATIVE
RESULTANT
MOVEMENT AT
DEPTH SINCE
INITIAL
READING
MAXIMUM
RATE OF
MOVEMENT
CURRENT
STATUS
DATE OF
PREVIOUS
READING
SINCE PREVIOUS READING
INCREMENTAL
MOVEMENT
RATE OF
MOVEMENT
CHANGE IN
RATE OF
MOVEMENT
SI 11-01
April 12, 2011
42.2 mm at 11 m
depth
159 mm/yr
(July 2011)
Operational July 2011 11.2 mm 37 mm/yr -122 mm/yr
SI 11-02
April 12, 2011
Sheared at
9.40 m BGS
(July 2011)
n/a Out of operation July 2011 n/a n/a n/a
Alberta Transportation Fall 2011 Instrumentation Monitoring Results Southern Region Site S38 – Highway 22:08, Callum Creek Landslide Site December 19, 2011
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 5
TABLE S38-2
Fall 2011 – Callum Creek Landslide
Piezometer Instrumentation, Reading Summary
Date Monitored: November 1, 2011
INSTRUMENT
TIP SERIAL
NUMBER
DATE
INITIALIZED
TIP DEPTH
BGS
(m)
GROUND
ELEVATION
(m)
CURRENT
STATUS
MINIUMUM
EQUIVALENT
PIEZOMETRIC
DEPTH BGS
(m)
CURRENT
EQUIVALENT
PIEZOMETRIC
DEPTH BGS
(m)
PREVIOUS
EQUIVALENT
PIEZOMETRIC
DEPTH BGS
(m)
CHANGE IN
CALCULATED
EQUIVALENT
PIEZOMETRIC
DEPTH SINCE
PREVIOUS READING
(m)
PORE WATER
PRESSURE
RATIO
(ru)
VW #10-6697 April 12, 2011 14
1340* Operational
13.35
(November
2011)
13.35
13.53 + 0.18 0.02
VW #10-6710 April 12, 2011 6.5
1340* Operational 1.91
(July 2011)
2.21
1.91 - 0.30 0.36
*approximate GPS point ± 3 m
Alberta Transportation Fall 2011 Instrumentation Monitoring Results Southern Region Site S38 – Highway 22:08, Callum Creek Landslide Site December 19, 2011
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011
Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
Page 6
5.0 CLOSURE
This report has been prepared for the exclusive use of Alberta Transportation for the specific
project described herein. Any use which a third party makes of this report, or any reliance on or
decisions to be made based on it are the responsibility of such third parties. AMEC Environment
& Infrastructure, a division of AMEC Americas Limited, cannot accept responsibility for such
damages, if any, suffered by any third party as a result of decisions made or actions based on
this report. This report has been prepared in accordance with accepted geotechnical
engineering practices. No other warranty, expressed or implied, is made.
We trust that this meets your needs at this time. Please contact the undersigned if you have any
questions or require any further information.
Respectfully Submitted,
AMEC Environment & Infrastructure,
a division of AMEC Americas Limited
[ORIGINAL SIGNED AND STAMPED ON DECEMEBER 19, 2011]
Tyler Clay, B.A.Sc., EIT Bryan Bale, M.Sc., P.Eng.
Geological Engineer Geotechnical Engineer
Reviewed by: APEGGA Permit to Practice No. P-04546
Andrew Bidwell, M.Eng., P.Eng.
Associate Geological Engineer
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011
Report\Fall 2011 AT Monitoring - S38,FINAL,tc,bb,ab.doc
SECTION D
Southern Region Geohazard Assignment
Site S38 – Callum Creek Landslide
Fall 2011 Instrument Data and Plots
BH#11-01
HWY 22
N
Project Revision
Hwy 22:08 - Callum Creek Site
Alberta TransportationClient
Figure S38-1
Date:
Dec-11
LEGEND
Area of cracking /
settlement
Slope Inclinometers
VW Piezometers
BH #11-02
BH #11-03
• VW #10-6679
• VW #10-6710
0 m 100 m
Job No.
File No.:
CG25352.300
Hwy 22:08 - Callum Creek Site
Site Plan and Location
Dec-11
SCALE AND INSTRUMENT LOCATIONS ARE APPROXIMATE
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
LEGEND
Initial 12 Apr2011
12 Apr2011
2 May2011
14 Jul2011
1 Nov2011
Figure S38-2
Towards 060° (Downslope) Towards 060° (Downslope)
Cumulative Deflection
Direction A
Deflection (mm)
Incremental Deflection
Direction A
Deflection (mm)
Ref. Elevation 1340 m
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Data\CallumCK_11-01.gtl
S38 - Callum Creek, Inclinometer SI 11-01
Alberta Transportation
AMEC Environment & Infrastructure - Calgary, AB
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
-100 -50 0 50 100
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
LEGEND
Initial 12 Apr2011
12 Apr2011
2 May2011
14 Jul2011
1 Nov2011
Figure S38-3
Towards 150° Towards 150°
Cumulative Deflection
Direction B
Deflection (mm)
Incremental Deflection
Direction B
Deflection (mm)
Ref. Elevation 1340 m
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Data\CallumCK_11-01.gtl
S38 - Callum Creek, Inclinometer SI 11-01
Alberta Transportation
AMEC Environment & Infrastructure - Calgary, AB
15
20
25
30
35
40
45
50
Dis
pla
cem
en
t (m
m)
November 2011 -
42 mm displacment at
43 degrees bearing
Client
Project Revision
movement_fall2011.xlsx
Alberta Transportation Figure S38-4
S38 - Hwy 22:08, Callum Creek SiteDate:
Dec-11
SI 11-01
Resultant Displacement at 11 m Depth
Job No.
CG25352.300File No.:
0
5
10
15
26-Feb-11 17-Apr-11 6-Jun-11 26-Jul-11 14-Sep-11 3-Nov-11 23-Dec-11
20
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
20
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
20
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-10 -5 0 5 10
20
18
16
14
12
10
8
6
4
2
0
-10 -5 0 5 10
LEGEND
Initial 12 Apr2011
12 Apr2011
2 May2011
Figure S38-5
Towards 100° (Downslope)
July 14, 2011 - SI Pinched at
9.40 m below ground surface.
Towards 100° (Downslope)
July 14, 2011 - SI Pinched at
9.40 m below ground surface.
Cumulative Deflection
Direction A
Deflection (mm)
Incremental Deflection
Direction A
Deflection (mm)
Ref. Elevation 1340 m
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Data\CallumCK_11-02.gtl
Callum Creek, Inclinometer 11-02
Alberta Transportation
AMEC Environment & Infrastructure - Calgary, AB
20
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-50 -25 0 25 50
20
18
16
14
12
10
8
6
4
2
0
-50 -25 0 25 50
20
18
16
14
12
10
8
6
4
2
0
Depth
(m)
-10 -5 0 5 10
20
18
16
14
12
10
8
6
4
2
0
-10 -5 0 5 10
LEGEND
Initial 12 Apr2011
12 Apr2011
2 May2011
Figure S38-6
Towards 190°
July 14, 2011 - SI Pinched at
9.40 m below ground surface.
Towards 190°
July 14, 2011 - SI Pinched at
9.40 m below ground surface.
Cumulative Deflection
Direction B
Deflection (mm)
Incremental Deflection
Direction B
Deflection (mm)
Ref. Elevation 1340 m
R:\Projects\Calgary Geo\CG25XXX - AT Projects\CE061_2008\CG25352 - AT Southern Region 2011\300 - Monitoring\SI Data + reports\S38 - Callum Creek\Fall 2011 Data\CallumCK_11-02.gtl
Callum Creek, Inclinometer 11-02
Alberta Transportation
AMEC Environment & Infrastructure - Calgary, AB
1326
1328
1330
1332
1334
1336
1338
1340
1342
Eq
uiv
ale
nt
Pie
zo
me
tric
Ele
va
tio
n (
m)
Client
Project Revision
File No.:
Callum_Piezos.xlsx
Alberta Transportation Figure S38-7
Hwy 22:08 - Callum Creek SiteDate:
Dec-11
BH# 11-03 - Equivalent Piezometric Elevations
Job No.
CG25352.300
1322
1324
Eq
uiv
ale
nt
Pie
zo
me
tric
Ele
va
tio
n (
m)
VW#10-6710 VW# 10-6710 Tip Elev VW#10-6697
VW# 10-6697 Tip Elev Ground Elev
Note:Elevations relative to assumed ground level of 1340 m.