Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s Gas Fuelled Readiness descriptive notation Leonidas Karistios Global Gas Technology Market Manager

Upload: donhu

Post on 24-Mar-2018

216 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Working together for a safer world

Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s Gas Fuelled Readiness descriptive notation

Leonidas Karistios Global Gas Technology Market Manager

Page 2: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

GAS as FUEL: meets the Regulated GOAL

•ECA compliance •Compliance with EEDI •Future Legislation

Legislative

Page 3: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

LNG as Fuel: a sustainable investment

Sustainability

Compliance

Corporate social

responsibility

Reliability

Supply Chain

Page 4: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Corporate social responsibility – Risks are known and engineered

Page 5: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Compliance - Legislation Developing Probable Completion

2003 formal recognition of the need to address LNG as fuel on ships (MSC 78)

2005 technical discussions & Correspondence Group (CG) established (BLG 9)

2006 initial development of IGF Code and interim guidelines (BLG 10)

2009 interim guidelines* adopted, MSC.285(86) (BLG 13 / MSC 86)

2013 decision taken to develop IGF Code with NG only (BLG 17)

2014 IMO re-organisation, IGF development to continue under CCC sub-committee

CCC1 presented draft IGF to MSC 94, November 2014 for approval

2015 submitted to MSC 95 (June 2015) with view to adoption**

2017 IGF Code probable entry into force: January 2017 (or June 2017)

* Interim Guidelines on Safety for Natural Gas-Fuelled Engine Installations in Ships MSC.285(86) adopted July 2009 ** MSC 95/3/4 Consideration and adoption of amendments to mandatory instruments - Development of International Code of Safety for Ships using Gases or other Low-flashpoint Fuels (IGF Code)

Draft IGF Code

Page 6: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Supply vs Demand a chicken and egg Situation?

Singapore

Fujairah

Tilbury Island

Foss

Los Angeles

Long Beach

Corpus Christi

Houston

Freeport

Galveston

Beaumont

Port Arthur

Geismar

New Orleans Port Fourchon

Sarnia

Ferrol

Gijon

Bilbao

Barcelona

Valencia

Portsmouth

Le Havre Zeebrugge

Livorno

Venice

Trieste Piraeus

Constanza

Varna

Burga

Antwerp Rotterdam

Amsterdam

Hamburg

Bremerhaven

Brunsbuettel

Gothenburg

Stockholm

Gulf of Bothia

Poland

Lithuania

Latvia

Busan

Yokohama

Page 7: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

“Viking Grace” Ferry • Ship to Ship • Ship to Jetty • Simultaneous Safe

Passenger / Cargo / Bunkering operations

“TESO” Ferry • LNG as main fuel • Hybrid Ship: LNG,

Fuel Oil, Batteries & Solar

• Can operate solely on marine diesel if needed

Challenges upscale • Gas Tank • Loss of Cargo volume • Gas/Hybrid Engines • Gas Fuel Systems • Bunkering System • Crew competency • Bunker stations

Gas Fuel application in Sort sea shipping Gas Fuel application in

Deep Sea Shipping

GAS FUELLED SHIPS Reliability is on Technology maturity

Page 8: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Meeting the challenge through Gas Fuelled Readiness

Do I order ships now?

Should I consider

Gas as Fuel

Which Technology

fits

How to ensure crew competency

How to secure

bunkers

To what regulations

If I not choose Gas as Fuel for my new asset, is the investment’s sustainability at risk?

or

Will my new ship become fast obsolete?

And

How to achieve Gas Fuelled Readiness and to what standard?

Page 9: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

LR’s Gas Fuelled Readiness (GR) announced in September 2014 introduces standard for clarity on levels of LNG fuelled preparedness

It is a more structured approach than AIP

Clear standards describes different levels of readiness

Options for gas fuelled in the future can be designed and built today

Clients are able to make sound technical and contractual decisions

It is the first of its type in the market

Page 10: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Gas Fuelled Readiness (GR) descriptive class notation provides recognition to investment decision

The level of gas fuelled readiness is structured in a flexible manner through the following associated characters:

A

Concept Approval

S

Structural arrangements

T

Fuel Tank

P

Piping arrangements

E

Engineering Systems

M/E A/E Boiler Incinerator

GR in accordance with LR’s

Rules & Regulations

at the date of contract for construction

Page 11: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Information to be submitted for review

1. Complete Design Screening as per ShipRight procedure for ARBD-1 (LNG as fuel)

2. Submit drawings and documents for review

i. General / Machinery Space arrangement

ii. Arrangements of ships ventilation

iii. hazardous area plan

iv. Fire protection arrangement related to the gas fuel installation

v. Process flow diagram

vi. Possibly other required information

Approved concept

gas fuel design approved in principle

Page 12: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Appraisal and Survey requirements

structural calculations and information to support approval of proposed tank type, size and location

Build under survey in accordance with the examined plans

Build under survey in accordance with approved drawings, equipment certified suitable for gas fuel operation Design of tank, P&ID, Ventilation, Inert gas and inter-barrier space vent, fire protection, FMEA, Hazardous area plan, ARBD-2 as applicable

Page 13: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Input to Gain GR Notation

Install piping, pumps, valves, etc. including bunker station structural fire protection with approved design, certified suitable for gas fuel operation

Install engineering systems in accordance with approved design, certified suitable for gas as a fuel

Page 14: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Assessment of Risk Based Designs

ARBD-1 GR(A)

GR Notation / ARBD-1 Form

ARBD-3

FMEAs of safety critical equipment

Bunkering Safety Study

ARBD-2 GR(T,P)

HAZID

ARBD-4

HAZOP

Final Design

Assessment

LNG

as

Fuel

GR descriptive note GF class notation .

Page 15: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

ARBD-1

ARBD-1 Screening

WHY

to identify items best addressed early in

developing the concept design requirements.

HOW

Through workshop LR/Designer/Owner

(Consultancy)

Or

Completed Screening Form submitted to LR

WHAT

A complete record for assessing the design concept

against GR requirements

Page 16: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

Gaining GR (A) and/or ARBD-1

Complete a form asking a series of questions

o YES a move towards GR Notation / ARBD-1

o NO or NA provide further details

discuss with LR to resolve

Approved concept

gas fuel design approved in principle

Page 17: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register at ISTEC Working Group on Alternative Fuels- INTERTANKO- Antwerp

LR Gas Fuelled Readiness brings Gas Fuel to deep sea

• Ro-Pax, Cruise Liner, Container Ship, Car Carrier, Bulk Carrier, PSV, Tug, Ice Breaker, Chemical Tanker, Bunker Vessel

Page 18: Decisions on Technology Readiness Levels for Gas … LNG WG 2015/LR - LNG...Working together for a safer world Decisions on Technology Readiness Levels for Gas Fuelled Shipping LR’s

Lloyd’s Register and variants of it are trading names of Lloyd’s Register Group Limited, its subsidiaries and affiliates. Copyright © Lloyd’s Register Group Limited. 2014. A member of the Lloyd’s Register group.

Leo Karistios Global Gas Technology Market Manager Business Development & Innovations T +44 (0)33 8024 9717 E [email protected] Lloyd’s Register Group Limited Global Technology Centre, Southampton Boldrewood Innovation Campus, SO16 7QF, UK