decisive

11
Ghiro Andrea – Burzio Gianfranco 20 Novembre, 2010 WP6 - Industrial validation DECISIVE

Upload: guy-jenkins

Post on 31-Dec-2015

20 views

Category:

Documents


0 download

DESCRIPTION

DECISIVE. WP6 - Industrial validation. AGENDA. Topic & goals Tasks decomposition Relationships to other WPs Timing of tasks Proposed deliverables & delivery time Partners in the WP6 & tasks Proposed task leaders. Topic & goals. - PowerPoint PPT Presentation

TRANSCRIPT

Ghiro Andrea – Burzio Gianfranco

20 Novembre, 2010

WP6 - Industrial validation

DECISIVE

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

AGENDA

• Topic & goals

• Tasks decomposition

• Relationships to other WPs

• Timing of tasks

• Proposed deliverables & delivery time

• Partners in the WP6 & tasks

• Proposed task leaders

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

WP6 covers the definition of use cases for the validation of DECISIVE approach.

Industrial use-cases will be provided for the validation of DECISIVE approach.

Candidate use-cases will be specified as reference models for the validation of DECISIVE techniques in terms of:

•Usability of the solution

•Efficiency

•Benefits for the developed products

Metrics and evaluation techniques will be defined.

These preliminary use cases will be further refined and implemented running on the DECISIVE reference platform demonstrating the full power of the approach for these cases.

Feedback to technology providers Work Packages will be provided .

The overall system including the methodologies, design tool, and platforms, will be benchmarked with the aid of these leading use-cases.

Topic & goals

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

WP6 will accomplish the following activities:

• Specification of candidate use-cases as reference models for the validation of DECISIVE techniques in terms of:

usability of the solution efficiency benefits for the developed products

• Definition of metrics and evaluation techniques

• Use cases refinement and implementation running on the DECISIVE reference platform in order to demonstrate the full power of the approach for these cases.

• Benchmark of the overall system including methodologies, design tool, and platforms, with the aid of the leading use-cases.

Topic & goals

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

The tasks to be accomplished in Work Package 6 are summarized in the table below.

Tasks decomposition

Task Description

T6.1 Industrial validation plan

T6.2.1 Application to a Safety Critical with Certification case-study

T6.2.2 Application to a Safety Critical without Certification case-study

T6.2.3 Application to a Non-Safety Critical case-study

T6.3 Validation of the case-studies

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Relationships to other WPs

WP6 is the validation point of the output provided by the technology packages. It has to:

• provide a feedback to WP2, WP3, WP4, WP5 in order to perform a framework refinement• provide a final validation in order quantify the benefit of the DECISIVE approach. These results will be used during the Dissemination and exploitation phase.

Main risks related to this WP are:• not well defined specification of candidate use-cases• not well defined metric and evaluation technique

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Timing of tasks

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Proposed deliverables & delivery time

Three deliverable are planned for WP6:• D6.1 – Validation plan• D6.2 – Feedback to technology packages• D6.2 – Validation report

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Partners in the WP6 & tasks

Task Partners

T6.1 Atego, CEA, ISYS, LDZ, PHILIPS

T6.2.1 Atego, IKER, ISYS, LDZ, PAJ, PHILIPS , RTU, UES

T6.2.2 Atego, ALM , CRF, RTU

T6.2.3 ISYS, NXP-D, OCE, TUE

T6.3 Atego, CRF, IKER, ISYS, MU, PHILIPS, UES

WP Partners

WP6 Atego, ALM, AVL, CEA, CISC, CRF, IKER, ISYS, LDZ, MU, NXP-D, OCE, PAJ, PHILIPS , RTU, TUE, UES

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Partners in the WP6 & tasks

Partner T6.1 T6.2.

1 T6.2.

2 T6.2.

3 T6.3 Total

PHILIPS 21 60 21 102AVL 36CISC 18PAJ 36 36Atego 6 6 6 6 24CEA 6 6NXP‐D 2 3 5CRF 30 6 36LDZ 4 6 10RTU 2 2 4Almende 24 24OCE 36 36TUE 16 15 31IKER 15 3 18ISYS 6 20 5 14 45MU 5 5UES 16 16 32

37 161 84 58 74 468

DECISIVEThis document contains information which are proprietary of CRF. Neither this document nor the information contained herein shall be used, duplicated nor communicated by any means to any third party, in whole or in part, except with the prior written consent of CRF

27-05-2011

Proposed WP6 task leaders

Task Proposed task leader

T6.1 PHILIPS

T6.2.1 PHILIPS

T6.2.2 CRF

T6.2.3 OCE

T6.3 ISYS