deepakverma

4
Mobile: 8763265876 [email protected] DEEPAK VERMA SKILL SET Technical PLC : Allen Bradley, Siemens, ABB, Omron, Keyence, Schneider. SCADA : Wonderware Intouch & Intellution Fix. Programming Languages : Ladder, FBD. DCS : Honeywell Expersion & ABB 800XA. Electrical panel : 6.6 Kv swbd, PCC, MCC, PDB, LDB. Business Process Tools : MS Word, MS Excel, MS Power point, MS Outlook. Page 1 of 4 Professional Summary 3 Years and 11 months of experience in Erection, Testing and commissioning. Extensive knowledge and experience in execution of project engineering involving installation, commissioning & testing of electrical equipment’s such as HT switchgears consisting of VCB breakers, PMCC/MCC, HT/LT motors, power and distribution transformer utilities. Extensive knowledge of soft starters and VFD. Good Understanding of Project Requirement Documents, Functional and System Requirement Documents. Primary Responsibilities Site supervision and understanding the requirements and issues clearly. Supervise & manage vendor engineering and equipment deliverable to ensure compliance with project standards and specifications. Reviewing and reporting of the project status. Planning for resources and manpower for planned shutdown of the plant. Material procurement through SAP and maintaining minimum spares for attending breakdown and reducing breakdown time. HT, LT and control cable tray routing, structural earthing and grounding of whole plant. Lighting system of whole plant. HT, LT switchgear erection, testing and commissioning. Editing of electrical drawing, cable scheduling, ferruling. Commissioning of Hydraulics power pack, proximity sensors, and solenoid valves. Hard wiring for PLC and VFD. Spotlight and applause certificates from Customer for MIPS Reduction ideas and Process improvement. Star of the Month award from TCS.

Upload: deepak-verma

Post on 07-Aug-2015

32 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DeepakVerma

Mobile: 8763265876 [email protected]

DEEPAK VERMA

SKILL SET

Technical

PLC : Allen Bradley, Siemens, ABB, Omron, Keyence, Schneider.SCADA : Wonderware Intouch & Intellution Fix.Programming Languages : Ladder, FBD.DCS : Honeywell Expersion & ABB 800XA.Electrical panel : 6.6 Kv swbd, PCC, MCC, PDB, LDB.Business Process Tools : MS Word, MS Excel, MS Power point, MS Outlook.

Functional

Raise and manage issues/risks related to Project. Requirement gathering. Conducting demos and knowledge sharing sessions. Manage project related activities.

Page 1 of 3

Professional Summary

3 Years and 11 months of experience in Erection, Testing and commissioning.Extensive knowledge and experience in execution of project engineering involving

installation, commissioning & testing of electrical equipment’s such as HT switchgears consisting of VCB breakers, PMCC/MCC, HT/LT motors, power and distribution transformer utilities.

Extensive knowledge of soft starters and VFD.Good Understanding of Project Requirement Documents, Functional and System

Requirement Documents.

Primary Responsibilities

Site supervision and understanding the requirements and issues clearly.Supervise & manage vendor engineering and equipment deliverable to ensure compliance

with project standards and specifications.Reviewing and reporting of the project status.Planning for resources and manpower for planned shutdown of the plant.Material procurement through SAP and maintaining minimum spares for attending

breakdown and reducing breakdown time.HT, LT and control cable tray routing, structural earthing and grounding of whole plant.Lighting system of whole plant.HT, LT switchgear erection, testing and commissioning.Editing of electrical drawing, cable scheduling, ferruling.Commissioning of Hydraulics power pack, proximity sensors, and solenoid valves.Hard wiring for PLC and VFD.

Spotlight and applause certificates from Customer for MIPS Reduction ideas and Process improvement.

Star of the Month award from TCS.

Page 2: DeepakVerma

Mobile: 8763265876 [email protected]

EXPERIENCE PURVIEW

Bhushan Power & Steel Ltd, sambalpur (Odisha) 27th Dec, 2010– 27th Nov, 2014

Tension Leveler Line Project

Duration : 6 months

Automation : ABB

Electrical Panel : MCC, PDB

Role : G.E.T.

Responsibilities :

Involved in power & control wiring and testing.

Hydraulic power pack

CRS & CTL Project

Duration : 6 months

Automation : Siemens

Electrical Panel : PLC, MCC, Drive

Role : Project Engineer

Responsibilities :

Team supervision, cable scheduling, cable tray routing, panel installation & commissioning, power & control wiring, interfacing with commissioning Engineer.

Wet Flux Line Project

Duration : 3 months

Automation : Allen Bradley

Electrical Panel : Drive, PLC, PCC, MCC, PDB, LDB

Role : Project Engineer

Responsibilities :

Team supervision, cable scheduling, cable tray routing, panel installation & commissioning, power & control wiring, interfacing with commissioning Engineer.

Iron Ore and Pelletizing Project

Duration : 1 year

Electrical Panel : 33 Kv swbd, 6.6 Kv swbd, PCC, MCC, PDB, LDB.

Role : Project Engineer

Responsibilities :

Team supervision, cable scheduling, cable tray routing, panel installation & commissioning, power & control wiring, interfacing with commissioning Engineer.

ACADEMIA

Page 2 of 3

Page 3: DeepakVerma

Mobile: 8763265876 [email protected]

B.Tech Electrical Engineering, July 2010 From: Hindu College of Engineering, M.D. University (Rohtak), Haryana

PERSONAL DETAILS

Date of Birth : 24th Jan, 1989Permanent Address : H.No. 531/9, Old Housing Board Colony, Sonipat-131001, Haryana Passport Available : Yes.Languages Known : English

Hindi

Page 3 of 3