defining an item revision_spd

18
System Process Document Defining an Item Revision Department Responsibility/Role File Name 27761634.doc Revision Document Generation Date 18/01/2010 09:37:00 Date Modified 1/18/2010 09:37:00 AM Last Changed by Status Defining an Item Revision Trigger: Concept The Item Revisions page enables you to define any number of revisions for an item and any number of routing revisions for an item's routing. You can assign each revision a unique three character alphanumeric revision identifie r (such as A, B, B1, and so on) and a revision date. Use letters and/or numbers to label revisions. Letters are always upper case and numbers may include decimals. When you create an item or a routing, the beginning revision defaults to the value for Starting Revision in the Organization Parameters page.  When you create or update a bill of material or routing, you can choose to create a new revision or modify an existing revision. When adding new re visions, you must be sure that the revision date you enter does not overlap with other existing revision dates. Revisions are time-stamped, so you can determine the latest re vision for multiple revisions defined on the same date. New revision numbers must be greater than the revision number of the currently effective revision. Different versions of a bill of material or routing can be defined within the same revision.  In this topic, you will define an Item Revision. Required Field(s) Comments Output - Result(s) Comments Additional Information Last changed on: 1/18/2010 09:37:00 AM Page 1

Upload: larry-sherrod

Post on 30-May-2018

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 1/17

System Process DocumentDefining an Item Revision

Department

Responsibility/Role

File Name 27761634.docRevision

Document Generation Date 18/01/2010 09:37:00

Date Modified 1/18/2010 09:37:00 AM

Last Changed by

Status

Defining an Item Revision

Trigger:

Concept

The Item Revisions page enables you to define any number of revisions for an item and any

number of routing revisions for an item's routing. You can assign each revision a unique three

character alphanumeric revision identifier (such as A, B, B1, and so on) and a revision date. Use

letters and/or numbers to label revisions. Letters are always upper case and numbers may include

decimals. When you create an item or a routing, the beginning revision defaults to the value for 

Starting Revision in the Organization Parameters page.

 When you create or update a bill of material or routing, you can choose to create a new revision

or modify an existing revision. When adding new revisions, you must be sure that the revision

date you enter does not overlap with other existing revision dates. Revisions are time-stamped, soyou can determine the latest revision for multiple revisions defined on the same date. New

revision numbers must be greater than the revision number of the currently effective revision.

Different versions of a bill of material or routing can be defined within the same revision.

 

In this topic, you will define an Item Revision.

Required Field(s) Comments

Output - Result(s) Comments

Additional Information

Last changed on: 1/18/2010 09:37:00 AM Page 1

Page 2: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 2/17

System Process DocumentDefining an Item Revision

Procedure

Step Action

1. Begin by navigating to the Bills of Material page.

Click the vertical scrollbar.

Page 2 Last changed on: 1/18/2010 09:37:00 AM

Page 3: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 3/17

System Process DocumentDefining an Item Revision

Step Action

2. Click the Manufacturing and Distribution Manager link.

Last changed on: 1/18/2010 09:37:00 AM Page 3

Page 4: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 4/17

System Process DocumentDefining an Item Revision

Step Action

3. Click the vertical scrollbar.

Step Action

4. Click the Bills link.

Page 4 Last changed on: 1/18/2010 09:37:00 AM

Page 5: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 5/17

System Process DocumentDefining an Item Revision

Step Action

5. Use the Organizations page to select your organization.

Last changed on: 1/18/2010 09:37:00 AM Page 5

Page 6: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 6/17

System Process DocumentDefining an Item Revision

Step Action

6. Click the M1 Seattle Manufacturing list item.

Step Action

7. Click the OK button.

or Press [Alt+O].

Page 6 Last changed on: 1/18/2010 09:37:00 AM

Page 7: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 7/17

System Process DocumentDefining an Item Revision

Step Action

8. Use the Bills of Material page to enter an item and define its revision.

Last changed on: 1/18/2010 09:37:00 AM Page 7

Page 8: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 8/17

System Process DocumentDefining an Item Revision

Step Action

9. Click in the Item field.

Step Action

10. Press [F11].

Page 8 Last changed on: 1/18/2010 09:37:00 AM

Page 9: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 9/17

System Process DocumentDefining an Item Revision

Step Action

11. Enter the desired information into the Item field. Enter "RT1000".

Last changed on: 1/18/2010 09:37:00 AM Page 9

Page 10: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 10/17

System Process DocumentDefining an Item Revision

Step Action

12. Press [Ctrl+F11].

Step Action

13. Click the Revision button.

or Press [Alt+R].

Page 10 Last changed on: 1/18/2010 09:37:00 AM

Page 11: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 11/17

System Process DocumentDefining an Item Revision

Step Action

14. Use the Item Revisions page to define an item revision.

When you create an item or a routing, the beginning revision defaults to the value

for Starting Revision in the Organization Parameters page.

Last changed on: 1/18/2010 09:37:00 AM Page 11

Page 12: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 12/17

System Process DocumentDefining an Item Revision

Step Action

15. Click in the Revision field.

Step Action

16. Enter the desired information into the Revision field. Enter "A1".

Page 12 Last changed on: 1/18/2010 09:37:00 AM

Page 13: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 13/17

System Process DocumentDefining an Item Revision

Step Action

17. Click in the Revision Label field.

Last changed on: 1/18/2010 09:37:00 AM Page 13

Page 14: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 14/17

System Process DocumentDefining an Item Revision

Step Action

18. Click in the Effective Date field.

Step Action

19. Use the Calendar page to select the desired date.

Page 14 Last changed on: 1/18/2010 09:37:00 AM

Page 15: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 15/17

System Process DocumentDefining an Item Revision

Step Action

20. Click the desired date.

Last changed on: 1/18/2010 09:37:00 AM Page 15

Page 16: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 16/17

System Process DocumentDefining an Item Revision

Step Action

21. Click the OK button.

Step Action

22. Click the Save button.

Page 16 Last changed on: 1/18/2010 09:37:00 AM

Page 17: Defining an Item Revision_SPD

8/14/2019 Defining an Item Revision_SPD

http://slidepdf.com/reader/full/defining-an-item-revisionspd 17/17

System Process DocumentDefining an Item Revision

Step Action

23. You have completed the Defining an Item Revision procedure.

End of Procedure.

Last changed on: 1/18/2010 09:37:00 AM Page 17