DELAY DELAY IN GOVERNMENT CONSTRUCTION IN GOVERNMENT CONSTRUCTION PROJECTS, PROJECTS, Types Types & & Causes Causes Prepared by: : Twana Ahmed Xeyat. Civil Engineer (1996-2000) Master of Business Administration(2013-2015) , [email protected] .krd , 07701528521 1

Upload: twana-ahmad

Post on 19-Jan-2017

337 views

Category:

Engineering


5 download

TRANSCRIPT

Page 1: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

DELAY DELAY IN GOVERNMENT CONSTRUCTION IN GOVERNMENT CONSTRUCTION PROJECTS,PROJECTS,

Types Types & & CausesCauses

Prepared by: :

Twana Ahmed Xeyat.Civil Engineer (1996-2000)Master of Business Administration(2013-2015) , [email protected] , 07701528521

1

Page 2: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

INTRODUCTION

� Definition� Types� Factors & Causes � Impacts� Conclusion

2

Page 3: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

• To make something happen later than expected,or to be performed later than planned.

Delay Definition

later than planned.

• A situation where the contractor and the project owner jointly or severally contribute to the non-completion of the project within the agreed contract period.

3

Page 4: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Types Of Delay :

4

Page 5: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

1. Critical & non Critical Delay:

• Critical delays: Prevent the contractor from finishing the work on the scheduled completion date

• Non critical delays:affect the progress of the work.

5

Page 6: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

2. Excusable Or Non Excusable Delay:

Excusable Delays: Unpredicted

1. General labor strikes,Fires,Floods , Owner-directed changes.

2. Errors & omissions in the plans and specifications.2. Errors & omissions in the plans and specifications.

3. Differing site conditions or concealed conditions.

4. Usually sever weathers.

5. Intervention by outside agencies.

6

Page 7: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

2. Excusable Or Non Excusable Delay:

Non excusable :

1. Late performance of subcontractors.2. Untimely performance by suppliers.3. Faulty workmanship by the contractor and subcontractors.4. A project specific labor strike.

7

Page 8: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

3. Compensable or Noncompensable Delay:

A compensable delay:

• Time extension • Additional compensation. • Only excusable delays can be compensable.

A noncompensable delay:

• Neither additional compensation nor a time extension.

8

Page 9: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Note:

Compensable depends primarily on the terms of the contract.

But in most cases:Does not receive any additional money but time extension.

9

Page 10: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

4.Concurrent or Non Concurrent Delay:

• Two or more delays that occur or overlap within the same period,

• One an employer risk event, the other a contractor risk event

• The effects of which are felt at the same time.

10

Page 11: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Factors and Causes of Delay :

1. Internal Factors

2. External Factors

11

Page 12: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Delay Factors

Internal Factors

Consultant Related

Contractor Related

Design Related

External Factors

Natural Disasters, Government Laws,

Economic Conditions, etc.

Design Related

Client Related

Labor Related

Material Related

Equipment Related

12

Page 13: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Internal Related Factors of Delay Internal Related Factors of Delay

13

Page 14: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

14

Page 15: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

15

Page 16: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

16

Page 17: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

17

Page 18: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

18

Page 19: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

19

Page 20: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

20

Page 21: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

21

Page 22: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

22

Page 23: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

23

Page 24: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

External Related Factors of Delay External Related Factors of Delay

24

Page 25: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

25

Page 26: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Methodology

Likert five-point scale ranging from 1 (Very Low) to 5 (Very High).

five point scale starting from (1 =Very Low), (2= Low). (3= High), (4= Medium) and (5 =Very High). The Relative Importance Indices (RII) is computed as follows;follows;

Where,

W is the weighting given to each factor by the respondents starting from 1 to 5

A is the highest weight in the scale which is 5,

N is the total number of respondents (which is 47 people).

26

Page 27: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Impacts of Delay

1. Cost overrun.2. Overtime .3. Disputes.3. Disputes.4. Lawsuits.5. Abandonement.

27

Page 28: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

Conclusion

Delays are inevitable( unavoidable);

But can be minimized by:But can be minimized by:● Detailed Site Investigations.● Careful monitoring and regular meetings.● Effective site management.● Collaborative working and effective coordination.● Careful scheduling.● Full commitment to the project by all parties.

28

Page 29: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

1] Construction Delay: Understanding them clearly, analyzing them correctly. Second edition by Theodore J. Trauner Jr.Ar25,2009 ,PP( 25-31) [2] Construction Project Delays: Assessing the Effectiveness of Supervisor Paperback – May 2, 2013by Najat Krima (Author)[3] Analysis of Construction Project Delays and Cost overruns: Construction Projects in Universities and Higher Education Institutes of Pakistan as Case Study Paperback – April 9, 2014by Attaullah Shah (Author)[4] Factors Causing Delay in Construction Projects: Delay and Speed Factors of Construction Projects in Malaysia Paperback – January

Refrences

3, 2012 by Wa'el Alaghbari (Author)[5] Enshassi, A., Hallaq, K. and Mohamed, S. (2006). Causes of contractor’s business failure in developing countries: the case of Palestine. Journal of Construction in Developing Countries, Vol. 11, No. 2. [6] Chitkara, K. (2004). Construction Project Management, Planning, Scheduling, and Controlling. Tata McGraw Hill, 4th edition, India.

[7] Gündüz, M., Nielsen, Y., and Özdemir, M., 2013, Quantification of delay factors using the relative importance index method for construction projects in Turkey, Journal of Management in Engineering, 29(2), pp. 133–139. [8] Hemanta, D., Anil, S., Iyer, K. C., and Sameer, R. 2012, Analysing factors affecting delays in Indian construction projects, International journal of Project Management, 30(4), pp. 479 – 489. [9] Aibinu, A. A., and Odeyinka, H. A., 2006, Construction delays and their causative factors in Nigeria, Journal of Construction Engineering and Management, 132, pp. 667–677.

29

Page 30: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

30

Page 31: DELAY IN GOVERNMENT CONSTRUCTION PROJECT , Types & Factors

31