dell - hpc-29mai2012
TRANSCRIPT
Dell – Simplify HPC
Marius PURICE
Next Generation Data Center Solutions Consultant - SEE
Global Marketing
Infrastructure
Server Storage
Network Software
The raw materials needed to support application deployments and business growth.
Global Marketing
The Balancing Act
5
Global Marketing
New Dependencies
6
Global Marketing
Dell’s approach to HPC
Enabling discovery with flexible, modular, market-ready departmental HPC solutions
Global Marketing
Intelligent partnering built-in
Storage Engineering
Meeting Specific Customer Needs with the Industry’s Broadest Server Portfolio
Customer's Application
Hyper Scale
Scale
Single Machine
Applications
Hardware
Resiliency and
Availability
Standalone
Ha Clusters
Virtual Farms
HPC
Cloud
PowerEdge Core
PowerEdge Blades
PowerEdge C
DCS Classic
Broad Usage Models Specialized Customized
Design & Features
20 Customers
Up to 1000’s of Servers
Please note the diagram is conceptual and not to scale
T620
32 x M420
8 x C6220 + C410x
Global Marketing
The HPCS – 5 key touchstones
Drive R&D
Self-sustainable cost centre
Regional large-scale
shared service
Customer focused
Industrial partnership
Centralised University research
computing & data service
Global Marketing
Cambridge HPC history
• Cambridge has had a large scale central HPC service for the last 15 years
• The first 10 years the service operated as a traditional supercomputer centre – with traditional big iron and traditional top sliced central funding, traditional UK University service model
• Five years ago the HPC provision within Cambridge underwent major restructuring to become a customer focused HPC service with a self-sustaining charge at point of use HPC cloud business model
Global Marketing
Post-restructuring gains
• Move from position 270 to 20 in top 500 – from 1 TF to 18 TF
• A reduction in hardware costs from £6M to £2M (54 fold increase in value)
• 80 to 622 registered users - 14 to 162 research groups - 8 to 30 departments
• 3 fold increase in HPC related publication rate - 370 articles in 4 years
• 4 fold increase in PhDs trained 170 in 4 years
• Move from a 100 % subsidised model to a 100% self funding
Global Marketing
• 700 Dell servers – 4,000 cores – Woodcrest / Westmere
• 40 TF of sustained performance
• 4,000 network connections
– Ethernet, SDR IB, QDR IB
• 600 TB storage – Very high-performance parallel file system
• Planning a Q1 2012 upgrade
– 600 Sandy bridge nodes – 2 PB storage – 40 cabinets – 32 tones – Half megawatt
Dell/Cambridge HPC Solution Centre
Global Marketing
Solution centre expertise
• HPC operational experience – How to configure and run large scale HPC service systems – processes – tools etc
• HPC Storage – HPC storage lab – wide range of HPC storage hardware – Lustre storage on commodity hardware – MD3200 /MD1200 – NFS – IPOB / RDMA – Now pushing into data archiving
• GPU computing
• Application profiling – optimisation /Tuning benchmarking
• Commodity visualisation
Global Marketing
TACC provides researchers with data analysis capabilities that advance discoveries, thanks to partnership with Dell
Stampede Supercomputer
Texas Advanced Computing Center
10 Petaflops
Institutul de Geodinamică al Academiei Române de Științe
High Performance Visualization Cluster
CYBERDYN - Infrastructură Cibernetică pentru Studii Geodinamice Relaționate cu Zona Seismogenică Vrancea
High Performance Computing Cluster
Tomografie seismica 3D pentru zona Vrancea
Thank You