deludge system checklist
DESCRIPTION
Deluge systemTRANSCRIPT
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 01A
BLOW DOWN AREA
DatePRINT NAME / SIGNATURE BADGE NUMBER DATE
Area Operator
Supervisor
Foreman
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves1- Accessible, open and car-sealed2- No corrosion and no leaks
NOZZLE CHECK UP
113-K-0002 CBS Offgas Compressor
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-K-0003 CBS Offgas Compressor
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-K-0004 CBS Offgas Compressor
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-K-0005 CBS Offgas Compressor
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-D-0029 CBS Offgas K.O Drum
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0018A Heavy Slop Oil Recovery Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0018B Heavy Slop Oil Recovery Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
General Condition
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 01B
FRACTIONATOR AREA
PRINT NAME / SIGNATURE BADGE NUMBER DATE
Area Operator
SupervisorForeman
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableDescription Y N N/A Remarks
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves
1- Accessible, open and car-sealed
2- No corrosion and no leaks
NOZZLE CHECK UP
113-G-0001A Furnace Charge Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0001B Furnace Charge Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0001C Furnace Charge Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0002A HCGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0002B HCGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
General Condition
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableDescription Y N N/A Remarks
113-G-0003A FZGO Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0003B FZGO Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0024A HHGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0024B HHGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0025A Distillate Recycle Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0025B Distillate Recycle Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 01C
FRACTIONATOR AREA
DatePRINT NAME / SIGNATURE BADGE NUMBER DATE
Area Operator
SupervisorForeman
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves
1- Accessible, open and car-sealed
2- No corrosion and no leaks
NOZZLE CHECK UP
113-G-0004A HCGO Product Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0004B HCGO Product Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0005A LCGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0005B LCGO Pump Around
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
General Condition
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
113-G-0006A LCGO Product Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0006B LCGO Product Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0014A
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0014B
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0014C
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
Debutanizer Lean Oil Recirculation Pump
Debutanizer Lean Oil Recirculation Pump
Debutanizer Lean Oil Recirculation Pump
-
PERIODICAL CHECK LISTDELUDGE SYSTEM - 02A
GAS PLANT AREA
DatePRINT NAME / SIGNATURE
OPERATOR
SUPERVISORFOREMAN
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicable
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves
1- Accessible, open and car-sealed
2- No corrosion and no leaks
NOZZLE CHECK UP
113-D-0009 Inter Stage Drum
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-D-0010 ReContact Drum
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
General Condition
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 02A
GAS PLANT AREA
BADGE NUMBER DATE
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
NOZZLE CHECK UP
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 02B
GAS PLANT AREA
PRINT NAME / SIGNATURE BADGE NUMBER DATE
Area Operator
SupervisorForeman
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableDescription Y N N/A Remarks
General Condition
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves1- Accessible, open and car-sealed
2- No corrosion and no leaks
NOZZLE CHECK UP
113-G-0008A Frationator OVHD water Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0008B Frationator OVHD water Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0009A First stage Suction Drum Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0009B First stage Suction Drum Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0011A Inter stage Drum Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0011B Inter stage Drum Pump
Direction of NozzleCondition of sensor BulbIf Any Obstruction
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableDescription Y N N/A Remarks113-G-0011B Inter stage Drum Pump
If Any Leakages
113-K-0001 Wet Gas Compressor
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-U-0033
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-E-0073A/B HCGO seal Oil Cooler
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-E-0075A/B LCGO seal Oil Cooler
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0075A HCGO seal Oil Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0075B HCGO seal Oil Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0079A LCGO seal Oil Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0079B LCGO seal Oil Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-U-0045 HCGO seal Oil Package
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-U-0046 LCGO seal Oil Package
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
Wet Gas Compressor Lube oil Skid
-
PERIODICAL CHECK LISTDELUDGE SYSTEM - 02C
GAS PLANT AREA
DatePRINT NAME / SIGNATURE
Area Operator
SupervisorForeman
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicable
Alarm devices
Gauges Make sure all gauges are operational and calibrated (5 Years)
Control Valves1- Accessible, open and car-sealed
2- No corrosion and no leaks
NOZZLE CHECK UP
113-D-0013 Lean Sponge Oil Coalescer
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0010A Inter Stage Drum Naphtha Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0010B Inter Stage Drum Naphtha Pump
Direction of Nozzle
General Condition
Inspect spray nozzles, nozzle pipe, hangers, and valves to make sure they are in good condition.Check for physical damage and that electrical connections are secure
Hydraulic Nameplate
If system is hydraulically calculated, ensure nameplate is legible and securely attached.
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicable
113-G-0010B Inter Stage Drum Naphtha Pump Condition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0012A Stripper Feed Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicable
113-G-0012B Stripper Feed Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0012C Stripper Feed Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0013A Stripper Bottom Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0013B Stripper Bottom Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
113-G-0013C Stripper Bottom Pump
Direction of NozzleCondition of sensor BulbIf Any ObstructionIf Any Leakages
-
PERIODICAL CHECK LIST MonthlyDELUDGE SYSTEM - 02C
GAS PLANT AREA
BADGE NUMBER DATE
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
NOZZLE CHECK UP
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
-
Y = Satisfactory N = Unsatisfactory (explain below) N/A = Not applicableY N N/A Remarks
Deludge-01ADeludge-01BDeludge-01CDeludge-02ADeludge-02BDeludge-02C