Demystifying Testing Standards C t B ildi F dCommon to Building Facades
John Runkle, P.E.
Director Forensic ServicesDirector, Forensic Services
Architectural Testing, Inc. Architectural Testing
Learning Objectives
• Understand laboratory and field test standards related to building envelope performance.related to building envelope performance.
• Identify and manage risks that could impact the test results.
• Learn the benefits and limitations of laboratory testing with respect to actual field performance.
D l d t di f h t l t th b t• Develop an understanding of how to select the best performance predictors for future projects.
2
Function of Facades• Aesthetically pleasing• Provide environmental separationp
– Air Barrier– Vapor Barrier– Drainage Layer– Thermal Layer– Acoustical BoundaryAcoustical Boundary– Withstand Structural
Loads
Façade Aesthetics Testing
3
ASTM G 155
4
ASTM D 2244Standard Test Method for Calculation of Color Differences from Instrumentally Measured Color Coordinates
ASTM C 1185
5
Façade Air Leakage Testing
ASTM E 2178
6
ASTM E 2357 AssemblyASTM E 2357 Assembly
Post Applied Brick Ties
7
© Retro-Specs Consultants
ASTM E 1186
8
ASTM E 1186
ASTM
E 1186
9
ASTM E 1186
ASTM E 1186
10
11
12
13
14
15
© Retro-Specs Consultants
ASTM E 779
16
ASTM E 1186
AAMA 101 Testing
17
ASTM E 283
ASTM E 783
18
ASTM E 783
ASTM E 783
19
Problem - Extraneous Air Flow
Continuous mullions in a curtain wall
SolutionSeal off any areas that are not intended to be included in the test with spray foam, p yduct tape, butyl tape, plastic, or sealant.
20
Problem - Qualitative or Quantitative Test Method?
SolutionCustomize testing protocol to meet the project budget and project team needs.p j g p j
21
Problem – Limited access Limited budget
SolutionConsider infra-red thermography
Discontinuous air barrier at roof soffit allowing escape of warm, moist air from natatorium
22
Façade Water Testing
AAMA 101 Testing
23
ASTM E 331
ASTM E 547
24
AAMA 501.1
AAMA 501.1
25
AAMA 501.1
AAMA 501.2
26
Problem - Lack of Access -Exterior
• Tare Applicationpp
• Specimen Inspection
• Spray Rack
Attachment
Solutions
• Excluding tare is acceptable if total air flow is equal to or less than window allowable flow, qelse interior tare is an option.
• Mirrors are an option if specimen contains operable windows.
• Hanging a spray rack carefully from an openHanging a spray rack carefully from an open area above specimen.
27
Solutions
Static vs. dynamic differential pressurep
28
Static or Dynamic Pressure Differential?
Static Air Pressure Differential?
29
Static Air Pressure Differential
Section at window sill
Dynamic Air Pressure Differential?
AAMA 501.1
30
Dynamic Air Pressure Differential
Section at window sill
Interior or Exterior Chamber?
Brick Mass Wall
31
Brick Mass Wall
Vacuum
Brick Veneer Cavity Wall
32
Brick Veneer Cavity Wall
Vacuum
33
Problem – Inadequate Water Pressure
Solutions
34
Problem: Definition of Water Leakage
35
Water penetration within innermost plane passing per AAMA 502-02, 502-08; however, failing the less than ½ ounce requirement per AAMA 503-03
ASTM E 2273
36
ASTM C 1715
Test DurationIf possible, complete test to identify all leaks
Leak #1 Leak #4
Leak #2Leak #3
37
Test Duration?
38
How long would you test these substrates?
39
NFRC 102 / AAMA 1503
NFRC 102 / AAMA 1503
40
Condensation Resistance
41
AAMA 501.5
AAMA 501.5
42
CondensationResistanceResistance
CondensationResistance
43
44
NFRC 100 (U-factor), 200 (SHGC), 500 (CRF)
45
FAÇADE ACOUSTICAL TESTING
46
ASTM E 90
Acoustical Testing
47
Outdoor SPL Measurements
ASTM E 966
48
Façade Structural Testing
ASTM E 330Structural Loading
49
Miami, Dade Co nt FLCounty – FL
Product Approval
50
D.O.D.
51
ASTM D 4541, ASTM E 488
52
53
Is Tomorrow’s Mold … Energy?
Façade Energy Components
• U-Factor
• Air Infiltration
• Solar Heat Gain
54
Solar Heat Gain
SHGCT ittTransmittanceReflectanceAbsorbtanceEmittance
Existing/Original Window and Facade
55
Cold Chamber
Typical Cold Chamber Set-up
56
Existing/Original Window and Interior
Warm Chamber with Controls
57
New Window
New Window, Sealants, and Flashing
58
Cold Chamber
Typical Cold Chamber Set-up
59
New Window and Interior Sealant
Warm Chamber with Controls
60
Field U-factor Tests Results
U-factor Original
U-factorReplacement
Difference in U-factor
Calculating Energy Savings
SHGC Air LeakageU-factor
Energy Savings or Loss
61
Questions?Questions?
Comments?
Insults?
John Runkle, P.E.Architectural Testing, [email protected]
Façade Material Property Testing
62
ASTM D 4114
Durability / Design Life
63
Durability / Design Life
Durability / Design Life
64
ASTM E 576
65
66