  • 8/14/2019 Den So 080928 Transfer Mold

    1/12

    ESTIMATION

    Messrs : Sankyu - Thai Co.,Ltd.

    Wellgrow Industrial Estate Ph III

    90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,A.Bangpakong

    Chachoengsao 24180 . Tel 038-522280 - 7 Fax. 038-522287

    Attn. : Mr. Surathep Lertsara

    Manager

    CC. :

    Supervisor

    Project: Transfer Mold Machine

    Locatio: DNTH WELLGROW

    Title of works : Main Power Supply For Transfer Mold Machine

    Job No.: SKT 080928

    Revisio: 0

    EIR ENGINEERING CO.,LTD.

    228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 10270

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .com

    228/94 5 . . . . 10270

  • 8/14/2019 Den So 080928 Transfer Mold

    2/12

  • 8/14/2019 Den So 080928 Transfer Mold

    3/12

  • 8/14/2019 Den So 080928 Transfer Mold

    4/12

  • 8/14/2019 Den So 080928 Transfer Mold

    5/12Page 5 of 12 EIR Engineering Co.,Ltd.

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarintara rd.,T.Bang-muang , A.Muang , Samutprakarn 102

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @ gmail .co

    QUOTATION

    Quotation: SKT 080928

    Messrs. : Sankyu - Thai Co.,Ltd. Date : 9 July 2008

    : Wellgrow Industrial Estate Ph III Validity of Quotation :

    : 90/16 M.9 Bangna-Trad Rd., Km.36,T.Bangwua,Preparing Period :

    : .A.Bangpakong Chachoengsao 24180 Delivery :

    Tel. : Tel 038-522280 - 7 Fax. 038-522288 Revised : 0

    Attn. : Mr. Surathep LertsaraP/O No.

    :

    : Manager

    1) Price ( Baht 36,708.00 Excluded Vat 7%

    2) Project Transfer Mold Machine

    3) Title of work Main Power Supply For Transfer Mold Machine

    4) Term of Payment Within 30 days

    Item Description uantitUnit Amount

    1 DIRECT COST 1 LOT 27,420.00

    2 INDIRECT COST 1 LOT 4,500.00

    3 EXPENSE & PROFIT 1 LOT 4,788.00

    TOTAL 36,708.00VAT 7% 2,569.56

    FINAL AMOUNT 39,277.56

    We hope that our confirmation will meet with your requirement and look forward to receiving your val

    Your Faithfully,

  • 8/14/2019 Den So 080928 Transfer Mold

    6/12Page 6 of 12 EIR Engineering Co.,Ltd.

    Sukhon Thewaran

    Manager

  • 8/14/2019 Den So 080928 Transfer Mold

    7/12Page 7 of 12 EIR Engineering Co.,Ltd.

    0

    uable order in due course

  • 8/14/2019 Den So 080928 Transfer Mold

    8/12Page 8 of 12 EIR Engineering Co.,Ltd.

  • 8/14/2019 Den So 080928 Transfer Mold

    9/12Page 9 of 12 EIR Engineering Co.,Ltd.

    EIR ENGINEERING CO.,LTD.228/94 Moo 5,Srinakarin rd.,T.Bang-muang , A.Muang , Samutprakar

    Tel : 0-27031367 ~ 9 Fax: 0-23882687 E-Mail : eirengineering @

    SUMMARY OF QUOTATION

    Bidder : EIR ENGINEERING CO.,LTD. Quotation No. : SKT 080928

    Client : Sankyu - Thai Co.,Ltd. Date : 9 July 2008

    Project : Transfer Mold Machine Revision No. : 0

    Title of : Main Power Supply For Transfer Mold Machine

    ItemDescription Q'ty UnitUnit Cost Total Amount

    1 Direct Cost

    1.1 Main Power Supply For Transfer Mold Mac 1 lot 27,420.00

    1.2 0 1 lot -

    Subtotal 1 27,420.00

    2 Indirect Cost

    2.1 Site Staff and Supervisor 1 lot -2.2 Transportation 1 lot 3,000.00

    2.3Rent House 1 lot

    2.4 Tool and consumption 1 lot 1,500.00

    2.5 Site Expense 1 lot -

    1 Temporary Facilities

    2 Small Construction Supplies

    3 Utility Supply Costs

    Subtotal 2 4,500.00

    3 Expense & Profit 4,788.00

    GRAND TOTAL 36,708.00

  • 8/14/2019 Den So 080928 Transfer Mold

    10/12Page 10 of 12 EIR Engineering Co.,Ltd.

    10270

    gmail .com

  • 8/14/2019 Den So 080928 Transfer Mold

    11/12

    8453265.xlsBOQ Page 11 of12 EIR Engineering Co.,Ltd.

    Estimation SheetClient Sankyu - Thai Co.,Ltd. Date : 9 July 2008

    Project Transfer Mold Machine Job Number : SKT 080928

    Location DNTH WELLGROW Revision : 0

    Title Of Wo Main Power Supply For Transfer Mold Machine

    No. Description Q'ty Unit Unit Price Total Cost

    1 DIRECT COST

    1.1 Main Power Supply For Transfer Mold Machine

    -SUB-PANEL 12 1 SET Existing

    -ABB T1N 160AT 3P MCCB 1 SET Existing HOT RUN

    -ABB T1N 32AT 3P MCCB 1 SET Existing MOLD CHANGE

    -TRANSFER MOLD MACHINE 1 SET Existing

    -HOT RUN PANEL 150 AT 1 SET Existing

    -MOLD CHANGE PANEL 32AT 1 SET Existing

    -WIRE AND CABLE CV3C-50 SQ.MM. (R,S,T) 1 Lot Existing From Injection M/C 11

    - WIRE AND CABLE THW 1-16 SQ.MM. (G) 1 Lot Existing From Injection M/C 11

    -WIRE AND CABLE CV4C-6 SQ.MM. (R,S,T,G) 1 Lot Existing From Injection M/C 11

    -WIRING CONNECT ACCESSORIES 1 LOT 1,000.00 1,000.00

    -WIRE WAY 100X100 3 SET 1,600.00 4,800.00

    -HORIZONTAL WIREWAY 100X100 5 SET 700.00 3,500.00

    -TEE WIREWAY 100X100 1 SET 820.00 820.00

    -VER-IN WIREWAY 100X100 1 SET 700.00 700.00

    -SPECIAL TEE WIREWAY 100X100 1 SET 1,300.00 1,300.00

    -WIREWAY ACCESSORIES 1 LOT 2,500.00 2,500.00

    -FLEXIBLE CONDUI 2 " 10 M 230.00 2,300.00

    -FLEX CONDUIT ACCESSORIES 1 LOT 500.00 500.00

    -CABLE RACK W:300 L:3000 1 Lot Existing From Injection M/C 12

    -CABLE RACK W:200 L:3000 1 Lot Existing From Injection M/C 12

    -STEEL SUPPORT 1 Lot 3,000.00 3,000.00

    -LABOR CHARGE 1 LOT 7,000.00 7,000.00

    -

    TOTAL 1.1 27,420.00