deparmentwise status of mp under ph -...
TRANSCRIPT
DEPARMENTWISE STATUS OF MP UNDER PH - 41
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
Acct
2005 390 OS/AC
Diesel Vehicle repl. Of BEA 8694 568 RNS
2006 418 AFA/DNR
Cash Van-repl. Of BGQ-8499 455 REC & C
2006 425 AFA/SPJ
Cash Van- repl of BEG 1770 483 RNS
2007 459 AFA/DHN
Diesel Road Vehicle 544 RNS
2007 506 AFA/MGS
Diesel Vehicle 508 RNS
2008 537 Acct/DNR
Diesel Utility VehicleReplacement of UHG-522
556 RNS
Admin
579 ADM/SPJ
Staff Car( TATA INDIGO) 376 09/08/6055 REC 03-07-2009
25 February 2013 Page 1 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 470 OS/ADM/HJP
Basic Digital Copier 126 RNS
2008 538 ADM/HJP
Basic Digital Copier 406 RNS
2010-11 635 COS/Admin
Photocopier Machine (03 nos.) 506 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
Com
2006 400 08 Consig.
Electronic in motion weighbridge 10112 15/07/6002 POISSD 31-10-2008 07 M/c received in June/July,09, 01 in Oct,09.
2007 466 COM/DNR
Multi Utility Vehicle 508 RNS
Elect
2005 384 DEE/DHN
Submercible Pump(BRKA) 100 RNS
2005 385 DEE/DHN
HS Pump 30000 GPHx250 FT Head for DHN
670 RNS
2005 386 DEE/DHN
Diesel Truck with Body repl. Of BHW 9607(SR.DEE/G/DHN
642 RNS
25 February 2013 Page 2 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2005 387 DEE/DHN
Truck with CAB and load body repl. Of BHW 813(Sr,DEE/G)
410 RNS
2005 388 DEE/DHN
Diesel Vehicle repl.of BHW 880(Sr,DEE/TRD
568 RNS
2005 389 DEE/DHN
Diesel Truck with Body repl.of BPN 8439 for Electric Loco Shed GMO
804 RNS
2006 402 SSE/TRS/GM
Dismantling Kit for Traction Motor(WAG-9)Pinion assembly
951 RNS
2006 403 SSE/TRS/GM
Pressor Calibrator & Sensor checking unit equipped with battery charger and battery
564 RNS
2006 404 SSE/TRS/GM
VCB testing kit comprising of 18 items (for single bottle)
911 RNS
2006 405 SSE/EL/DHN
VS Pumps Water Lubricated 50000 GPH x 250 Ft
1485 0175/15/06 REC One item received on 13.11.09 & other item received on 08.12.09
2006 414 SSE/TD/DNR
Rail Rod Height & Stagger Gauge 546 RNS
25 February 2013 Page 3 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2006 415 SSE/EL/DNR
D.G. set 62.5 KVA 567 RNS
2007 427 SSE/TR/GM
Automatic Oil Test Set for Transformer Oil of WAG-7 Electric Locomotive
392 RNS
2007 428 SSE/TR/GM
Floor Mounting Winch Machine 128 RNS
2007 429 SSE/TR/GM
Automatic Thyrister Regulated Full Wave Half Control Float cum Boost Changer Set
179 RNS
2007 430 SSE/TR/GM
10 KV High Voltage Test Set for Testing ogf VCB used in Electric Locomotives
132 RNS
2007 431 SSE/TR/GM
Speedometer Test Bench 269 RNS
2007 432 SE/EL/PTRU
Pump 40000 GPH x 250 Ft. 475 15/08/6001 POISSD 24-05-2011 On M/s Hindustan Commerce & Industries, Begusarai, DP -28.06.1010, DP again extended upto 30.04.11, RP action to initiated by stores.
2007 433 SE/EL/PTRU
Pump 40000 GPH x 250 Ftr 475 15/08/6001 POISSD 20-04-2011 On M/s Hindustan Commerce & Industries, Begusarai, DP -28.06.1010, DP extended upto 30.02.2011, DP again extended upto 30.04.2011
25 February 2013 Page 4 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 434 SE/EL/PTRU
Pump 40000 GPH x 250 Ft. 475 15/08/6001 POISSD 20-04-2011 On M/s Hindustan Commerce & Industries, Begusarai, DP -28.06.1010, DP extended upto 30.02.2011, DP again extended upto 30.04.2011
2007 435 SSE/EL/GJD
Pump 40000 GPH x 250 Ft. 475 15/08/6001 POISSD 20-04-2011 On M/s Hindustan Commerce & Industries, Begusarai, DP -28.06.1010, DP extended upto 30.02.2011, DP again extended upto 30.04.2011
2007 436 SSE/EL/GJD
Pump 40000 GPH x 250 Ft. 475 15/08/6001 POISSD 20-04-2011 On M/s Hindustan Commerce & Industries, Begusarai, DP -28.06.1010, DP extended upto 30.02.2011, DP again extended upto 30.04.2011
2007 437 SE/EL/PTRU
Pump 15000 GPH x 250 Ft. 300 15/08/6005 POISSD 16-02-2009 DOC - 20.06.09,issued to M/s Hindustan commerce & Industries,Begusarai
2007 438 SE/EL/PTRU
Pump 15000 GPH x 250 Ft. 300 POISSD 16-02-2009 DOC - 20.06.09,issued to M/s Hindustan commerce & Industries,Begusarai
2007 439 SE/EL/PTRU
Pump 30000 GPH x 250 Ft. 400 POISSD 16-02-2009 DOC - 20.06.09,issued to M/s Hindustan commerce & Industries,Begusarai
2007 467 SE/EL/DNR
Mini truck repl of BHR 7075 540 RNS
2007 468 SE/EL/DNR
Diesel Utility Vehicle in replacement of Jeep No. MZV-9253
402 RNS
25 February 2013 Page 5 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 479 SE/TRS/MGS
Diesel Operated Handy Welding Set and Auto Gas cutter
200 RNS
2007 480 SE/TRS/MGS
Platform Trolley Battery Opearated 400 RNS
2007 481 SE/TRS/MGS
Rain Watere Testing Facility 100 RNS
2007 482 SE/TRS/MGS
Oscilloscope 200 RNS
2007 483 SE/EL//MGS
Provision of 1 no Battery Charger 200 Amp input 3 Phase 415 Ac output 110 Volt DC
250 RNS
2007 507 SSE/EL/MGS
Diesel Vehicle Repl. of UPF -7976 572 REC Received
2007 519 SSE/EL/SPJ
Battery operated Platform Truck 2 Ton for TL Depot SPJ
349 09/08/6028 WS 04-02-2011 clubbed with 09/09/6010, to Store on 04.02.11after FAC, reqt.& for return with all parallel RCs
2007 520 SSE/EL/SPJ
Battery operated Platform Truck 2 Ton for DBG depot
349 09/08/6029 WS 04-02-2011 clubbed with 09/08/6010, to Store on 04.02.11after FAC, reqt.& for return with all parallel RCs
25 February 2013 Page 6 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007-08 659 SE/E/SEE
125KVA Trailer Mounted DG Set 894 WM 28-06-2011 Dispensation has been accorded by COFMOW to procure through COS as per Let. No.- COFMOW/IR/E/-771 Pt-II, dt. -24.06.11
2007-08 662 SE/E/SPJ
125KVA Trailer Mounted DG Set 971 WM 28-06-2011 Dispensation has been accorded by COFMOW to procure through COS as per Let. No.- COFMOW/IR/E/-771 Pt-II, dt. -24.06.11
2008 552 SE/TR/MGS
Soldering/disodering (SMT) equipment
319 RNS
2008 553 SE/TR/MGS
Vacuum cleaner 394 RNS
2010-11 636 SSE/TRD/DH
Microprocessor Controlled Multidimensional Gas Chromatographs for Dissolved Gas
829 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 637 DEE/TRS/GM
Single Stage High Vacuum Transformer oil purification & dehydration Plant of 3000 LPH capacity confirming to IS:6034
628 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
Engg
2006 420 SSE/PD/MGS
Diesel Forklift 1500 kg 636 COM Material received on 06.04.09
2007 460 SSE/E/DHN
Diesel Jeep 508 RNS
25 February 2013 Page 7 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 472 SSE/E/MGS
Double Action Weld Trimmer 255 RNS
2007 473 SSE/E/MGS
Hydraulic Rail Tenser 460 RNS
2007 474 SSE/E/MGS
Portable Generator Set 227 RNS
2007 475 SSE/E/MGS
Double Rail Tester 490 RNS
2007 476 SSE/E/MGS
Single Rail Tester 280 RNS
2007 477 SSE/E/MGS
Light Weight Scooter Trolley 240 RNS
2007 478 SSE/E/MGS
Ultra Sonic Rail Tester 189 RNS
2007 516 SE/E/SEE
Diesel Vehicle 568 REC 10-06-2009 Received on 10.06.09
25 February 2013 Page 8 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 531 Engg/SPJ
Diesel Vehicle 508 RNS
2008 534 SE/TR/GM
Diagonostic Tool for 3 -Ph Loco 1399 RNS
2008 556 SE/PD/MGS
Digital Ultrasonic Flaw detector model Einsten-II ( R ) for Axle testing confirming to RDSO specification no:M&C/NDT/125/2004
210 09/09/6017 UTC Sent to division on 14.07.10 for review of demand and fund certification
2008 560 Engg/SEE
Ultrasonic double rail tester 333 RNS
2009 572 Engg/DNR
Diesel Utility VehicleReplacement of BPZ- 5670(For DEN/1/DNR)
370 RNS
2009 573 Engg/DNR
Diesel Utility VehicleReplacement of BEA-1618(For DEN/Br/DNR)
370 RNS
2009 574 Engg/DNR
Diesel Utility VehicleReplacement of WMD - 1508(For
DEN/HQ./DNR)
370 RNS
2009 575 Engg/DNR
Diesel Utility VehicleReplacement of BEA - 8694(For Sr.
DEN/2./DNR)
575 RNS
25 February 2013 Page 9 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2009 577 Engg/SEE
Diesel Utility VehicleReplacement of BR4C- 1142(For Sr. DEN/Co-
ord/SEE)
554 RNS
2010-11 638 CWM/PD/MGS
Semi-Automatic MIG/MAG Welding Thyrister Machine 600 Amps (02 Nos.)
464 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
Mech/
DHN2003 371 SSE/
D/PTRU
Battery Charger Rectifier 112 14/04/6195 POISSD 13-06-2006 DP-17.09.06, Ext-25.02.08 issued to M/s Associate Engineering Works,KKK. Material not received, Dropped due to expiry of currency
2004 372 SSE/CS/DHN
Portable Control Table for LUKAS HRE(1no. For PEH and 1 no. for BRWD)
1130 15/05/10/60 DRPD Case has been discharged and requisition sent to I/O
2006 401 SSE/D/PTRU
Ultrasonic Flaw Detector 185 15/08/6133 REC 26-06-2010 DP - 22.07.10 issued to M/s Electronic Engineering Co. Ltd., Mumbai, Material received on 26.06.10
2006 406 SSE/AR/BRK
Telescopic Jack 1200/600 KN for BRKA
523 09/06/6066/6 REC 28-05-2010 Received on 28.05.08
2006 407 SSE/D/PTRU
Automatic Surge Comparison High voltage AC/DC & Insulation test equipment
525 15/06/6011 WD 12-01-2011 OT-13.05.09, sent to Store on 04.01.11 after clarifications of TR/PR, returned to divn. for review of req,spec. etc on 12.01.11
2006 408 SSE/D/PTRU
High Pressure water/ steam cleaning machine
643 0316/09/07/6 REC & Material received on 06.03.09Commissioned on - 31.03.09Expenditure booked on -03.06.09
25 February 2013 Page 10 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2006 409 SSE/D/PTRU
Pneumatic supply upgradation 1470 DRPD 30-04-2007 Case is dropped by Sr. DME/D/PTRU(Vide Letter No. DSL/S/283, dt. 30.04.07) and as instructed by CMPE/D.
2006 410 SSE/D/PTRU
New Items:Modular cubicle cum work place for shop floor supervisors on turn key basis(set of ten units)
1575 DRPD 30-04-2007 "Case is dropped by Sr. DME/D/PTRU(Vide Letter No. DSL/S/283, dt. 30.04.07) and as instructed by CMPE/D."
2006 411 SSE/D/PTRU
Lube Oil Centrtfugal Machine Cap,1600 LPH
1038 15/07/6019 DRPD 23-07-2008 Case is dropped by Sr. DME/D/PTRU(Vide Letter No. DSL/S/283 M&P, dt. 23.07.08)
2006 413 SSE/D/PTRU
DieselVehicle (Model TATA LPT-1109)
722 09/07/6005 REC 04-01-2012 Received on 04.01.12
2007 440 SSE/CW/BRD
Diesel Driven Portable Welding Machine
475 UC Under Consolidation
2007 441 SSE/CW/BRD
Adjustable Click Type Square Drive Torque Wrinch
210 DRPD Not required
2007 442 SSE/CW/BRD
Ultrasonic Flaw Detector Machine(Digital Type)
211 DRPD Indent returned to Division for changing specification, to be dropped due to price escalation( 02 nos already sanction under DRM Lump sum)
2007 443 SSE/CW/DHN
Portable Reciprocating Air Compressor
338 DRPD Not required
25 February 2013 Page 11 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 444 SSE/CW/GMO
Hydraulic Jack-120/60 T (MFD Type) 485 09/10/6062 WS 25-05-2011 ST - 06.04.2011,sent to Store on 14.03.2011after comliance of observations by divn., under tender section
2007 445 SE/CW/CPU
Hydraulic Jack-65/400R (LUKAS Type)
480 09/10/6061 WS 06-03-2012 OT- 06.04.11, Sent to Store on 15.06.11 after TR/PR, sent to Store on 06.03.12 after review of TR/PR
2007 446 SSE/D/PTRU
Precision Lapping Machine 199 DRPD 02-11-2008 Sr. DME/DSL/PTRU has written to DRM /DHN vide letter no. DSL/S/276/M&P dtd 02.11.08 for droping the case
2007 447 SSE/D/PTRU
Industrial Oven 261 14/07/6260 REC 19-07-2010 DP -03.12.09, ext.- 05.02.10 issued to M/s LAD Equipment & Chemicals ,KKK,Received on 19.07.10
2007 448 SSE/D/PTRU
Mobile Heating Unit 302 09/07/6107 WS 20-04-2011 OT opened on 10.03.11.
2007 449 SSE/D/PTRU
SONOHARS Hardness Tester 468 09/07/6100 WM To be sent to Store after review of requirement of item, spec. and certification of fund for the year 2010-11 by DSL shed/PTRU
2007 450 CS/DH/BRD
Black diamond blade cutter saw 466 REC 08-06-2010 Material Received on 08.06.10, Exp of Rs. 341120 ( 80% of PO cost Rs. 426400) has been booked on 25.08.10
2007 454 SSE/GMO
Air Cooled Diesel Engine Driven Portable Welder,10 KVA Single Phase and 1500 KVA 3 Phase AC Power 30-400 Amp DC Welding current
649 RNS
25 February 2013 Page 12 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 455 SSE/OBRA
Air Cooled Diesel Engine Driven Portable Welder,10 KVA Single Phase and 1500 KVA 3 Phase AC Power 30-400 Amp DC Welding current
649 RNS
2007 456 SSE/D/PTRU
Diesel Fork Lift Truck 648 09/10/6045 REC 17-01-2012 Received on 17.01.12
2007 461 SE/CW/DHN
Diesel Truck 589 REC 03-07-2009 Received on 03.07.09
2007 463 SSE/D/PTRU
Water Demineralization Plant 964 09/07/6089 WS OT opened on 24.03.10, case sent to Store on 21.12.10 after review of TR by SME/D, TCM under signature, tender discharged
2008 532 SE/DPTRU
Baking Oven 693 09/11/6078 WS 13-12-2011 OT-26.03.12, sent to divn. on 12.04.12 for FAC, reqt.& validity of sanc., sent to Store on 21.06.12 after TR/PR & FAC-2012-13
2008 533 SE/D/PTRU
Portable DSL Engine driven welding set 400 amps.
752 WS 20-04-2011 Sent to Store on 06.12.10 after review of spec,requirement, certi.of fund and essentiality/urgency by divn., sent to divn. on 12.03.12 for FAC
2008 590 SSE/CW/DHN
Wire roe type Electric Hoist 412 WD Returned to division on 21.6.10 for detailed specification
2008-09 608 SSE/CS/DHN
Digital Ultrasonic Flaw Detector(BRWD)
458 09/10/6096 WS 06-03-2012 Clubbed with case no. 09/10/6056, OT-17.08.11, sent to Store on 05.12.11 after TR/PR, sent to divn on 06.03.12 to confirm firm's offer
25 February 2013 Page 13 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2008-09 634 SSE/CS/DHN
Telescopic Jack 120/60 T for GMO 496 09/10/6062 WS 20-04-2011 ST - 06.04.2011,sent to Store on 14.03.2011after comliance of observations by divn.
2009 591 SSE/CS/DHN
Welding Transformer-400Amps- 08 nos.
349 09/10/6091 WS 26-08-2011 OT-06.07.11, to Store on 25.01.12 after compl. of its remarks, to Store after clear fund on 19.7.12, to Store after conf. of requirement on 30.7.12
2009 593 SSE/L/DHN
Portable inflatable Emergency Lighting System
709 14/10/6040 REC 13-01-2011 Material received on 13.01.2011
2009 596 SSE/CS/DHN
Battery operated four wheeler Platform Truck 2T (for FM/PTRU Yard)
356 09/10/6031 WS 26-08-2011 Clubbed with 09.10.6027, R/C item, Sent to Store on 26.08.11after validity of sanction , reqt.& FAC-2011-12 with RC copy
2009 598 SSE/CS/DHN
Battery operated four wheeler Platform Truck 2T (for FM/OBRA Yard)
386 09/10/6030 WS 26-08-2011 Clubbed with 09.10.6027, R/C item, Sent to Store on 26.08.11after validity of sanction , reqt.& FAC-2011-12 with RC copy
2009-10 611 SSE/L/BRWD
Re-railing Bridge 384 09/10/6054 WS 06-02-2012 ST - 06.04.2011, TR/PR-31.05.11,sent to Store on 06.02.12 for clari on insp.term i.e visual insp. by RITES, sent to divn on 12.6.12 or insp.term & FAC
2009-10 612 SSE/L/DHN
Axial Piston Pump 106 09/10/6055 DRPD 27-12-2011 Case dropped
2009-10 614 SSE/L/DHN
Control Desk Model FK 1004 complete set (Make MFD OEM) -BRKA&DHN
267 09/10/6057 WS 29-02-2012 ST - 06.04.2011,TR/PR- 20.10.11, sent to Store on 29.02.12 confirming acceptibility of offered make & model.
25 February 2013 Page 14 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2009-10 616 SSE/L/DHN
Sliding Roller Carriage with built in traversing Jack
355 09/10/6058 WS 30-12-2011 OT-21.06.11, TR/PR -12.09.11,sent to Store on 22.12.11 after clari on inspn i.e visual inspn by consignee, under waiver of SD & inspection terms
2009-10 618 SSE/L/DHN
Displacing Jack 120/60 KN 175 09/11/6047 WS 24-01-2012 Clubbed with case no. -09/11/6046, OT- 18.11.11, sent to Store on 24.01.12 after TR/PR.
2009-10 623 SSE/CS/DHN
Roller Carriage with Built in Traversing Jack
363 09/10/6059 WS 22-12-2011 OT-21.06.11, sent to Store on 12.09.11after TR/PR, sent to Store on 22.12.11 after clari on inspection term i.e visual inspection by consignee
2009-10 624 SSE/L/DHN
Greaves make Engine model 4G-11-80HP water pump
671 WD 13-01-2011 Sent to divin. for general description & specification on 13.01.11
2009-10 630 AMM/TRS/GM
Battery operated four wheeler Platform Truck 2T
321 09/10/6029 REC Material received
2009-10 631 SSE/TRS/GM
Battery operated four wheeler Platform Truck 2T
321 09/10/6029 WS 25-05-2011 Clubbed with 09.10.6027, R/C item, under correspondence with M/s Godrej regarding completeness of contract.
2009-10 632 SSE/TRS/GM
Battery operated four wheeler Platform Truck 2T
544 09/10/6029 WS 25-05-2011 Clubbed with 09.10.6027, R/C item, under correspondence with M/s Godrej regarding completeness of contract.
2010-11 639 SSE/L/BRWD
Complete Power Pack with Diesel Engine 530 bar, Lukas reference No.84072/0188
827 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
25 February 2013 Page 15 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2010-11 640 SSE/L/BRWD
Control Desk CT-1 (530 Bar) LUKAS Reference No.84072/0276
821 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 641 SSE/L/DHN/
Diesel Engine Driven Power Pack,Type FK,PAD 6000( for SSE(Loco) DHN & BRKA) - 02 nos.
619 WD 19-08-2011 Returned to divn. on 19.08.11 for clari. & compliance
2010-11 643 SSE/IC/OBR
Semi-Automatic CO2 welding Plant 400 Amp.
381 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 644 SSE/IC/OBR
Air Plasma Cutting Machine. 336 WM 03-10-2011 Indent under consolidation since 03.10.11, indent is being returned to division for corrections in light of observations
2010-11 664 SSE/IC/OBR
Air Plasma Cutting Machine. 336 WM 03-10-2011 Indent under consolidation since 03.10.11, indent is being returned to division for corrections in light of observations
2010-11 671 SSE/L/DHN
Tower Cloth 435 WS 21-02-2012 Sent to Store on 21.02.20121after consolidation and certi. of essentiality of purchase,
2010-11 672 CSRS/DHN
Tower Cloth 445 WS 21-02-2012 Sent to Store on 21.02.2012 after consolidation and certi. of essentiality of purchase,
2011-12 667 CSRS/DHN
Deidel Truck ( for SSE(C&W)/IC/PTRU OBR-02 nos.)
1397 WM 28-09-2011 Indent received in Plg. section on 28.09.2011, under scruitiny
Mech/
DNR
25 February 2013 Page 16 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2006 416 SSE/CW/RNC
High Pressure Coach Washing System
975 RNS Returned to division for review of specification
2006 417 SSE/CW/DNR
Hydraulic Jack system synchronised 360 RNS Returned to division for review of specification
2007 464 SE/CW/RGD
High Pressure coach Washing System at RGD
728 RNS DE vetted, indent under review due to coach cleaning contract already awarded.
Mech/
HQ.2005 391 OS/M
echWork Center Colour Pro 40(A3) 1157 09/10/6073 WM 24-05-2011 OT-25.03.10, no offer received, case to be
returned by stores for review of specs.
Mech/
MGS585 SSE/
D/MGS
Digital Ultrasonic Flaw Detector 363 15/09/6016 WD 17-08-2011 Clubbed with 15/09/6015, OT - 01.02.10 , SSTC, tender discharged, origial reqn. returned to divn, consignee may resubmit reqn.if required
594 SSE/CW/MGS
Portable Digital Ultrasonic Flaw Detector(PH-4)
353 15/09/6043 WD Under TC , sent to division on 14.07.10 for review of demand and fund certification
2002 370 SSE/CW/MGS
Rail cum Road Vehicle 1800 COM 18-05-2009 Received and Commissioned on 18.05.09
2005 392 SSE/CW/MGS
Reconditioning of surface wheell Lathe
12300 15/05/08/602 WD CME/Plg. has written letter (No.-ECR/MEC/PLG/513/MGS, dt.-27.08.09) to DRM/MGS to intervene to form survey committee & sent recom.to HQ.
25 February 2013 Page 17 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2005 393 SSE/CW/MGS
Diesel Forklift Truck capacity 5000Kg
2524 REC & C Material received on 06.04.09DOC - 09.04.09
2006 419 SSE/D/MGS
Industrial Platform Truck 334 REC 06-04-2009 Material received on 08.05.09,DOC - 02.06.09
2006 421 SSE/D/MGS
Effluent Treatment Plant-4KL/Hr. 4224 DOC -12.01.09Exp. Booked -Rs. 1421827 on 31.03.09, remaining 10% to be paid.
2006 471 SSE/CW/MGS
Electric Hoist - 02T 192 09/07/6074, REC 21-08-2010 Received on 21.08.10
2007 484 SSE/CW/MGS
Ultrasonic Flaw Detector 363 15/07/6022 REC 10-02-2010 Material received on 10.02.10
2007 485 SSE/CW/MGS
Hydraulic Gang Operated Jack 280 09/09/6003 WS 27-01-2012 Cld with 09/09/6001, OT-1 29.04.10, OT-2 - 24.01.2011,TR/PR-01.04.11,tender discharged,fresh indent may be placed
2007 486 SSE/D/MGS
Induction Heater 500 14/10/6105 WS 06-01-2012 Clubbed with 14/10/6031, returned from divn. on 21.11.11 after FAC, Sent to Store on 06.01.12 after TR/PR
2007 487 SSE/D/MGS
Digital Ultrasonic Flaw Detector 180 15/07/6022 COM 12-03-2010 Material received on 10.02.10,DOC - 12.03.10Exp. booked on 15.03.10 (1.61 lakh)
25 February 2013 Page 18 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 488 SSE/D/MGS
Battery Charger 200 UC Under consolidation
2007 489 SSE/D/MGS
Computerised SFC Recorder 316 09/10/6086 WS 06-02-2012 OT - 08.03.2011, SMM DA case,TR/PR-01.04.11, STS on 06.02.12 after review of sanc., validity & reqt. by divn, STS on 02.05.12 after FAC-2012-13
2007 490 SSE/D/MGS
Fully Automatic Trident Make Refrigeration Type Compressed Air Drier
500 09/10/6087 POISSD 22-03-2012 PO No.- 09/10/6087/1/15481, dt-22.03.12, DP- 22.06.12 issued to M/s SYNDICATE INDUSTRIAL SERVICES, LUCKNOW
2007 491 SSE/P/MGS
Roller Sliding carriage with Built in Traversing Cylinder for ART MGS
371 15/08/6161 REC 15-12-2011 Material received on 15.12.11
2007 492 SSE/P/GYA
Roller Sliding carriage with Built in Traversing Cylinder for ART Gaya
371 09/09/6022 REC 15-12-2011 Material received on 15.12.11
2007 501 SSE/D/MGS
Computerised MG(GE) Governer Test Stand(Model No. U1650 of UI 650 of UI grand or Similar
954 RNS
2007 502 SSE/CW/MGS
Electronic in Motion Weigh Bridge 1264 0047/15/07/6 REC 30-01-2010 Material received on 30.01.10 , installation work is in progress
2007 503 MGS/ GYA
Power Pack,Model GC-3 (Petrol Driven),Ref 84072/9328,Make LUKAS/Germany
1348 15/08/6163 POISSD 16-02-2012 PO No. -15/08/6163/1/15397, dt.-16.02.2012, DP-24.07.12, issued to M/s Premier India Agency, VSKP
25 February 2013 Page 19 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 504 MGS /GYA
Control Table, Model –CT-1, Ref.84072/0276,Make-LUKAS/Germany for HRE set/GAYA
1305 15/08/6162 POISSD 16-03-2011 on M/s Premier India agency, VSKP, DP - 15.09.11, sent to Store on 06.02.12 for visual inspection by consignee/RITES, material not received
2007 505 SSE/P/MGS
Diesel Vehicle 568 REC Received
2007 508 SSE/CW/MGS
Reconditioning of surface Wheel Lathe
14115 RNS CME/Plg. has written letter (No.-ECR/MEC/PLG/513/MGS, dt.-27.08.09) to DRM/MGS to intervene for vetting of this indent
2007 595 SSE/CW/MGS
Ultrasonic Flaw Detector 363 15/09/6015 WD 26-09-2011 Clubbed with 15/09/6016, OT - 01.02.10 , SSTC, tender discharged, sent to divn on 26.09.11 for revalidation
2008 539 SE/CW/MGS
Battery operated platform truck- 2T 350 09/10/6029 WS 26-08-2011 Clubbed with 09.10.6027, Sent to Store on 26.08.11after validity of sanction , reqt.& FAC-2011-12 with RC copy
2008 540 SE/CW/MGS
High productivity continuous welding machine
325 RNS
2008 547 SSE/D/MGS
One ton pillar crane 316 09/10/6113 POISSD 22-12-2011 PO No. -09/10/6113/1/15367, dt.- 12.01.2012, DP- 19.03.12 issued to M/s PRECISE MECHANICAL ENGINEERS, GAZIBAD
2008 548 SSE/D/MGS
Winch Pull-Cap-30KN 400 09/10/6160 WS 12-01-2012 OT - 05.07.11, sent to Store on 18.11.11after TR/PR, sent to Store on 12.01.2012 after review of TR/PR
25 February 2013 Page 20 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2008 549 SSE/D/MGS
CIP kit for in situ cleaning of plate type lube oil cooler
280 09/10/6109 WS 19-09-2011 OT - 05.07.11, Store on 20.04.12 as it is not possible to evaluate firm's offers, returned to Store after furnishing more source on 19.06.12
2008 550 SSE/D/MGS
Electronic torque tester 266 09/10/6111 WS 09-01-2012 OT - 05.07.11, sent to Store on 18.11.11after TR/PR, sent to Store on 09.01.12 after review of TR/PR in light of firms' replies
2008 551 SSE/D/MGS
10 T cap. Press 254 09/10/6112 WS 20-01-2012 OT - 05.07.11, TR/PR - 18.11.11, sent to Store on 20.01.12 after review of TR/PR in light of firms' replies
2008 554 SSE/P/MGS
Roller sliding carriage with built in traversingcylinder/ jack
371 RNS
2008 558 SSE/D/MGS
Hydraulic Torque Wrench 2241 15/09/6041 REC 05-07-2011 Material received on 05.07.11, DOC 27.07.11
2009 586 SSE/CW/MGS
Photo Copier M/c 148 REC 10-06-2010 Material received on 10.06.10, Exp of Rs. 143454 (100% of SO cost Rs. 143454) has been booked on 04.09.10)
2009 587 SSE/CW/GYA
Battery operated plateform truck - 2T 317 09/10/6032 WS 26-08-2011 Clubbed with 09.10.6027, R/C item, Sent to Store on 26.08.11after validity of sanction , reqt.& FAC-2011-12 with RC copy
2009 588 SSE/CW/MGS
Three phase hydraulic power unit suitable for Bul-lock/Huck bolt up to dia 11/8” with hand held unit,Nose assembly and hydraulic hose.
920 10/09/6058/ REC 01-05-2010 Material received on 01.05.10, Exp of Rs. 548434 ( 80% of PO cost Rs. 685547) has been booked on 26.07.10
25 February 2013 Page 21 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2009 589 SSE/CW/MGS
Hand held unit for 1/2" dia. to 3/4" dia. BOXN HL wagons
243 09/10/6099 WS 23-01-2012 OT-25.04.11, TR/PR- 29.07.11, to Store on 28.11.11 after review of firm's reply on TR/PR, to Store on 23.01.12 after confirming suitability of offer
2009 599 SSE/CW/MGS
Battery operated four wheeler Platform Truck 2T
350 09/10/6029 WS 17-06-2011 Clubbed with 09/10/6027 , to be submitted to COS after FAC-2011-12 of case no. -09/10/6031 which has been sent to DHN divn. on 15.06.11
2009-10 609 SSE/CW/MGS
Catridge tapered roller bearing 387 09/10/6100 WS 25-10-2011 OT-27.04.11, sent to Store on 25.10.11after TR/PR
2010-11 668 SSE/CW/MGS
Pulling winch Machine 328 09/11/6067 WS 27-10-2011 Sent to Store on 27.10.2011after consolidation and certi. of essentiality of purchase, OT-26.03.12, sent to Store on 06.12.12 after TR/PR
2010-11 669 SSE/CW/MGS
Double End Automatic Greasing Press & weighing Equipment
920 09/11/6066 WS 27-10-2011 Sent to Store on 27.10.2011after consolidation and certi. of essentiality of purchase, sent to Store on 20.04.12 after TR/PR
Mech/S
EE2004 373 SSE/
CW/SEE
Power pack Diesel driven(SEE) 362 09/07/6084 DRPD 03-08-2010 DP-28.02.09 issued to Shiv Trading Corporation ,KKK Dropped as per Sr. DME/C&W letter NO. M/198/42/C&W,dt. -03.08.10
2004 374 SSE/CW/SEE
Power pack Petrol driven(BJU/ARME)
331 05/05/06/60 DRPD Proper specification not provided
2004 375 SSE/CW/SEE
Power pack Diesel driven(BJU) 331 DRPD vetted indent under review of Sr. DME/CW/SEE
25 February 2013 Page 22 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2004 376 SSE/CW/SEE
Portable engine arc welding set(BJU)
477 13/05/10/606 REC 27-06-2010 As perSr.DME/C&W/SEE Letter No. M/198/42/C&W, dt.-03.08.10, material received on 27.06.2010
2004 377 SSE/CW/SEE
Portable engine arc welding set(MFP)
432 DRPD Case is dropped as per order of Sr.DME(C&W)/SEE
2004 378 SSE/CW/SEE
D.V Test bench(MFP) 228 DRPD Requisition return to Sr. DME/SEE for review of specification and estimated value. dropped.
2005 394 SSE/CW/SEE
Portable control table, SEE(MFD) 138 STS
2005 395 SSE/CW/SEE
Petrol engine power circular saw (cut off saw),SEE(ART&ARME)
298 RNS Specificaion under preparation; not indented
2005 396 SSE/CW/SEE
Displacing jack 120/60 KN,SEE(MFD)
389 DRPD Dropped due to currency of sanction has been expired
2007 511 SSE/CW/SEE
Synchronised lifting jack electrical operated hydaulic jacks for lifting and lowering coaches ( set of 05 jacks) - 15 tonnes
635 WM Under consolidation. Ref letter no.-ECR/MEC/MAT/607/GEN, dt.-11.09.09 & 24.02.10, consolidation near completion, to be placed on COS shortly
2009-10 592 SSE/CW/BJU
Displacing Jack (01 Nos.) 182 09/11/6046 WS 24-01-2012 Clubbed with case no. -09/11/6047, OT- 18.11.11, sent to Store on 24.01.12 after TR/PR
Mech/S
PJ
25 February 2013 Page 23 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
605 SSE/D/SPJ
High Pressure hot water steam jet cleaning machine
0 09/10/6037 POISSD 08-12-2011 PO No. - 09/10/6037/1/15305, dt. -08.12.11,DP- 12.04.12 issued to M/s INVENTA CLEANTEC P LTD., NEW DELHI
606 SSE/D/SPJ
Micro processor based shock pulse 0 01/10/6006 WS 16-02-2012 Sent to Store on 14.06.2011 after correction in DS-2 & FAC for 2011-12, sent to Store on 16.02.12 after clarification on purchase group
670 SSE/CW/SPJ
Diesel Engine Driven Welding Generator
WM Under consolidation
2004 379 SSE/D/SPJ
Forwarding Boom Type Portable crane for Dsl. Shed.
134.5 DRPD Proper specification not available
2004 380 SSE/D/SPJ
Car body Filter Cleaning plant for Dsl.shed
836 15/05/07/601 DRPD Proper specification not available
2004 381 SSE/D/SPJ
Air Compressor (Kirloskar) Non-Lubricating reciprocating for Diesel shed
525 15/05/11/604 DRPD 20-03-2009 Dropped as per letter of SMM(S&T)/ECR/Patna letter No.-0273/15/05/10/6041 dt.-20.03.09
2005 397 SSE/CW/SPJ
Incinerator 270 15/06/04 DRPD DP - 30.07.07 on M/s Indus. Services Corp. KKK. not received, RP notice issued on 05.07.07 case returned to I/O for ammend. in tech terms, dropped
2006 423 SSE/CW/SPJ
Portable DSL Arc welding (250Amps)
440 13/06/05/600 DRPD OT-14.02.06, RT - 13.05.2008,under JAG TC, case may be discharged and dropped
25 February 2013 Page 24 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2006 424 SSE/D/SPJ
Electric Pallet Truck for SPJ Diesel Shed
594 09/07/6112 REC 18-07-2009 Received on 18.07.09
2006 426 SSE/D/SPJ
Effluent Treatment Plant-4KL/Hr. 3717 COM 08-10-2009 DOC - 08.10.09
2007 521 SSE/CW/SPJ
50 T Single Acting General purpose Jack for Mobile Road Vehicle for C&W depot SPJ
321 DRPD Proper specification not provided
2007 522 SSE/CW/SPJ
50 T Single Acting General purpose Jack for Mobile Rerailing Van for C&W depot SPJ
321 DRPD Proper specification not provided
2007 523 SSE/D/SPJ
Hydraulic Puller And Pusher 237 09/08/6022 REC 01-07-2009 Material received on 01.07.09
2007 524 SSE/D/SPJ
Automatic Scrubber Driver 186 09/08/6023 REC 27-07-2009 Material received on 27.07.09
2007 526 SSE/WS/SPJ
Forklift Truck Capacity –3 ton 905 09/08/6050 WD 12-07-2010 Returned to WS on 12.07.10 for review of requirement/speci.and for fund certi.
2007 527 SSE/D/SPJ
Thermal Imaging 738 15/08/6135 REC 31-05-2011 On M/s Toshniwal Sensor, DP-31.05.11, received on 31.05.11
25 February 2013 Page 25 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 528 SSE/CW/SPJ
Electrical Operated Jack 555 09/08/6061 WD returned to division, to be dropped
2008 567 SSE/D/SPJ
All geared shaper M/c 497 09/10/6065 WS 14-11-2011 OT1 - 23.03.11, OT2-27.04.12, sent to Store on 08.07.12 after TR/PR
2008 568 SSE/D/SPJ
Air brake valve testing bench 280 09/10/6089 POISSD 07-03-2012 PO No.- 09/10/6089/1/15455, dt- 07.03.12, DP- 09.07.12 issued to M/s PERFECT HYDRO TECH ENGINEERS, MUNGER
2008 569 SSE/D/SPJ
Coil Spring testing machine 652 09/10/6067 WS 25-01-2012 OT -24.03.2011, sent to Store on 29.07.11 after TR/PR, sent to divn. on 25.01.12 for review of specification in light of retender being processed
2008 570 SSE/D/SPJ
Single side lapping machine 602 09/10/6063 POISSD 13-02-2012 PO No.- 09/10/6063/1/15413, dt - 13.02.12, DP- 19.06.12 issued to M/s GUINDY TECHNOCRATES, KKK
2008-09 619 SSE/D/SPJ
Mobile Heating Unit 463 09/10/6070 WD 20-06-2011 Clubbed with 09/07/6107, OT - 10.03.2011, sent to DSL Shed/ SPJ for re-sanction on 20.06.11
2008-09 629 SSE/D/SPJ
Hydraulic Press Cap. - 50T 387 09/10/6097 WS 29-02-2012 OT - 27.04.2011,to Store on 13.10.11 after clari. on TR/PR, to Store on 09.12.11, 31.12.11& 29.02.12 after review of TR/PR on firm's reply & obser.
2009 580 SSE/D/SPJ
Steam Boiler 459 09/10/6098 NT OT - 25.04.11, case not traceable, Search Memo No. ECR/MEC/PLG/508/S.Memo dt.-21.05.12 has been issued
25 February 2013 Page 26 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2009 581 SSE/D/SPJ
Battery Charger 176 WM 03-12-2010 Returned to DSL Shed/SPJ on 03.03.10 to resubmit with detailed specifications. UC,Uniform Specification under preparation at HQ.
2009 582 SSE/D/SPJ
Electric Wire Rope 185 WD Returned to DSL Shed/SPJ on 03.03.10 to resubmit with detailed specifications. Specification under review at HQ.
2009 583 SSE/D/SPJ
C3 W Distributor Valve Test Rack 358 09/10/6088 POISSD 22-03-2012 PO No.- 09/10/6088/1/15482, dt-22.03.12, DP- 28.06.12 issued to M/s HEAVY ELECTRO WORKS PVT LTD., KANPUR
2009 584 SSE/D/SPJ
High Capacity Insulation Tester 143 REC 31-01-2011 Received on 31.01.2011, expenditure booked in June,11
2009 600 SSE/L/NKE
Portable Power Pack GC-3 774 09/10/6081 POISSD 18-10-2011 PO No.-09/10/6080/1/15237, dt.-18.10.11, DP-09.04.12 to M/s Premier India Agency, KKK
2009 601 SSE/L/NKE
Portable Control Table CT-I 714 09/10/6082 RECD 07-04-2012 Material received on 08.05.12
2009-10 602 SSE/D/SPJ
Test Bench for AC Fuel Pump Motor 292 09/10/6040 POISSD 28-06-2011 PO No.-09/10/6039/1/15068, dt.-28.06.11, DP-25.11 issued to M/S Singnatron India Pvt. Ltd., KKK
2009-10 603 SSE/D/SPJ
Test Bench for AC Crank Case & AC Cyclonic Filter Motor
286 09/10/6039 POISSD 28-06-2011 PO No.-09/10/6039/1/15068, dt.-28.06.11, DP-25.11 issued to M/S Singnatron India Pvt. Ltd., KKK
25 February 2013 Page 27 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2009-10 604 SSE/D/SPJ
Induction Heater, Cap.-40 KVA 711 14/10/6031 WS 06-01-2012 Clubbed with 14/10/6105, OT-30.09.11, returned from divn. on 21.11.11 after FAC, Sent to Store on 06.01.12 after TR/PR
2009-10 613 SSE/CW/SHC
Control Table (Desk) for MFD HRE 130 09/10/6056 WS 29-02-2012 ST - 06.04.2011,TR/PR- 20.10.11, sent to Store on 29.02.12 confirming acceptibility of offered make & model.
2009-10 621 SSE/D/SPJ
Bogie Frame Manupulator 2452 09/10/6076 WD 24-10-2011 OT- 08-03.11, sent to Store on 26.07.11after TR/PR & FAC, sent to divn. on 24.10.11 for clarification
2009-10 625 SSE/CW/SPJ
Power Pack Petrol Engine driven for HRE
312 09/10/6079 WS 28-02-2012 ST -18.02.11, SMM DA case, TR/PR - 14.03.11 , sent to Store on 20.09.11 after FAC, sent to Store. on 28.02.12 after PR & clear fund
2009-10 626 SSE/CW/SPJ
Portable Power Pack GC -3 886 09/10/6080 RECD 08-05-2012 Material received on 08.05.12
2009-10 627 SSE/CW/SPJ
Portable Control Table - CT - 1 778 09/10/6083 POISSD 18-10-2011 PO No.-09/10/6082/1/15242, dt.-18.10.11, DP-09.04.12 to M/s Premier India Agency, KKK
2009-10 628 SSE/CW/SPJ
Engine Block Cylinder Base Reboring M/c with face plate
900 09/10/6077 POISSD 09-02-2012 PO No. - 09/10/6077/1/15410. dt -09.02.12, DP- 17.08.12 issued to M/s EXCEL INDUSTRIES, NEW DELHI
2010-11 607 SSE/D/SPJ
All Geared Heavy Duty Lathe 1493 09/10/6078 OT - 10.03.2011 , Sent to Store on 04.03.11after review of Spec. under review of specn.
25 February 2013 Page 28 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2010-11 622 SSE/D/SPJ
Hydraulic Torque Wrench 3179 09/10/6075 WS 14-06-2011 OT - 08.03.2011, SSTC case, sent to Store on 14.06.11 for dropping the case, Spec. under preparation for fresh procu action to be initiated later on
2010-11 645 SSE/D/SPJ
Air Dryer Test Bench 841 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 646 SSE/D/SPJ
Air Compressor 781 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 653 SSE/CW/SPJ
Single Coach Test Rig 186 09/11/6014 WS 06-02-2012 Sent to Store on 25.05.2011after consol and certi. of essen of purchase, sent to Store after clari of obser on 22.08.11,TR/PR-06.02.12
2010-11 654 SSE/CW/SPJ
Fully Thyristorised Copper Would DC MMA Welding Rectifier 600Amps
300 09/11/6009 WS 25-05-2011 Sent to Store on 25.05.2011after consolidation and certification of essentiality of purchase, sent to Store on 05.08.11 after compliance of remarks
2010-11 655 SSE/CW/SPJ
Black Diamond Blade Circular Saw 213 09/11/6080 WS 25-05-2011 OT-26.03.12, TR/PR-20.04.12, to Store on 16.05.12 after review of TR/PR in light of Store's remarks, to Store on 14.06.12 to ask the firm tech. inf.
2010-11 656 SSE/CW/SPJ
Black Diamond Blade Circular Saw 213 09/11/6079 WS 25-05-2011 OT-26.03.12, TR/PR-20.04.12,to Store on 16.05.12 after review of TR/PR in light of Store's remarks, to Store on 14.06.12 to ask the firm tech. inf.
2010-11 657 SSE/D/SPJ
DC arc welding Transformer/Rectifier Capacity 600 Amp
312 09/11/6011 WS 25-05-2011 STS on 25.05.2011after consol and certi. of essen.of purchase, STS on 22.08.11after clari. of obser., sent to Store on 20.04.12 after TR/PR
25 February 2013 Page 29 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2010-11 663 SSE/CW/SPJ
Petrol Engine Driven Power Pack, Make - Francis Klein
312 WD 16-09-2011 Returned to division on 16.09.11 for review of DS-2 regarding PAC
2011-12 673 CWM/SPJ
Portable Edge Beveling Maching 872 WS 15-05-2012 Sent to Store on 15.05.2012 after consolidation and certi. of essentiality of purchase,
2011-12 674 CWM/SPJ
Refrigerated type Air Dryer 398 WD 12-06-2012 Sent to Store on 12.06.12 for compliance of remarks
2011-12 676 SSE/D/SPJ
Towing Equipment 493 WD 12-06-2012 Sent to Store on 12.06.12 for compliance of remarks
Med
578 MS/DNR
ECG Machine 10.5 Sent to Dy. CMM/S&T on 17.04.09 for process by Medical deptt.
2005 382 MS/DHN
Multi para unit(DHN) 150 RNS Req. has not received to plg.section
2005 383 MS/DHN
X-Ray Portable Machine(CPU) RNS Req. has not received to plg.section
2005 398 MS/SPJ
Fully Automatic Bio-chemical Analyser
1000 RNS
25 February 2013 Page 30 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 451 MS/DHN
Bed Size Monitor with ECG and Pulse Oxymeter
179 RNS
2007 452 MS/DHN
Advanced Bed HI- LOICE two way longitudinal Tilt
284 RNS
2007 453 MS/DHN
Touch Semi Auto Analyser 244 WS 03-08-2009 Sent to SMM/S&T on 03.08.09 for further process
2007 457 MS/DHN
Ultra Sound Scanner with 3D Doppler
910 WS 04-09-2008 Sent to Dy.CMM-IV on 04.09.08 for further process
2007 458 MS/DHN
X-Ray unit 300 MA 617 RNS
2007 493 MS/MGS
TMT Machine 310 RNS
2007 494 MS/MGS
Automatic Hamatology Analyser 495 RNS
2007 495 MS/MGS
Wheel mounted fogging m/c 349 RNS
25 February 2013 Page 31 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 496 MS/MGS
Electrolyte analyser 165 RNS
2007 509 MS/SEE
Anesthesia M/c 472 WS Sent to SMM/S&T on 08.05.09 for futher process
2007 510 MS/SEE
Para Monitor 333 WS Sent to CMS/SEE on 07.08.09
2007 512 MS/SEE
Ultra Sound System 961 WS Sent to Dy. CMM/S&T on 28.07.09 with fresh specification for further process.
2007 529 MS/SPJ
Operative Laparoscopy 993 WS Sent to Dy. CMM/S&T on 30.03.09
2007 530 MS/SPJ
Boyle's Machine Advanced Anesthesia Machine with Penlon vaporiser,Ventilator and circle Absorber
627 Sent to CMS/SPJ on 24.07.09 for parawise remarks/clarification.
2008 536 MS/DNR
C-Arm Image Intensifier with 9” IITV system 02 nos 15” monitor Digital image processor with Sterile cover and clips
998 RNS
2008 541 Med/GYA
Horizontal steriliser 333 RNS
25 February 2013 Page 32 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2008 542 Med/GYA
Surgical diathermy 135 RNS
2008 543 Med/GYA
Shadow less lamp 187 RNS
2008 544 Med/GYA
Wheel mounted fogging m/c 371 RNS
2008 545 Med/GYA
Electrolyte analyser 175 RNS
2008 546 Med/GYA
Defribillator 183 RNS
2008 555 Med/GYA
300 MA X-ray M/C 565 RNS
2008 559 MS/SEE
Autorefractometer Machine 310 RNS
2008 562 MS/SEE
300 MA X-ray M/C 596 RNS
25 February 2013 Page 33 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2008 565 MS/SEE
Fibro Optic Endoscopywith Video Camera of Upper Gastointestinal M/c
1106 WS Sent to Dy. CMM/S&T on 26.06.09 with specification as per guidelines.
2008 566 MS/SEE
300 MA X-RAY M/c with motorised table (two pulse full wave rectified 24KW X-RAY Generator with two tubes, two pair HT cables etc
596 RNS
2008 571 MS/SPJ
Mechanical Ventilator 1219 RNS
2010-11 647 MD/CH/PNBE
Automatic Lensometer 135 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 648 MD/CH/PNBE
Velescope unit for dental department 388 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 649 MD/CH/PNBE
Dental Surgical Operating Microscope
988 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 650 MD/CH/PNBE
Diode Laser for dental Unit 650 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
2010-11 651 MD/CH/PNBE
Radio Visuography unit for Dental 262 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
25 February 2013 Page 34 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2010-11 652 CMS/SEE
Operating Microscope 833 RNS Memorandum No. ECR/MECH/PLG/502/law book, dt.- 04.02.2011(under GMLS), Indent awaited
Optg
2006 422 DOM/SEE
Diesel Vehicle(MUV)-repl of USB-8443
422 RNS
2007 525 OPTG/SPJ
Recograph Digital Making Duplicator 453 RNS
Psnl
2007 469 OS/PNL/HJP
Digital photocopier 556 REC Received
S&T
2008 557 SE/S&T/MGS
Diesel Utility VehicleReplacement of UPF-5838
516 REC
Secu
2005 399 Utility Vehicle repl. Of BRG 2326 490 RNS
2007 462 Secu/DHN
Diesel Vehicle 541 RNS
25 February 2013 Page 35 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 499 Secu/MGS
Door Frame Metal Detector 250 RNS
2007 500 Secu/MGS
Hand Held Metal Detector 60 RNS
2007 517 Secu/GHZ
Diesel Utility Vehicle 437 RNS
2007 518 Secu/GHZ
Bus-32 seater 752 RNS
2008 535 Sec/DHN
Bomb Disposal Equipments 2931 RNS
2008 564 Secu/SEE
Wheeler -Vehicle (MUV) Replacement of BHD 1385
563 RNS
2009 576 Secu/HQ.
Motor Cycle(For CSC/RPF/ECR/HJP)
268 RNS
ST
2006 412 OS/ST/DHN
Diesel Vehicle-repl. Of BPW-6580 398 REC
25 February 2013 Page 36 of 38
Deptt YearSan SancID Consig Description EstCost CaseNo Status StatusDate Remarks
2007 465 ST/ISP/DNR
Augementation of Power supply station at Islampur Station
638 RNS
Store
2007 497 AMM/MGS
Battery operated Platform Truck 2 Ton
300 UPO PO yet to be issued
2007 498 AMM/MGS
Platform Truck Battery Operated 2 T 400 09/08/6048 WS 15-06-2011 clubbed with 09/08/6010, Sent to Store on 15.06.11 after clari. of validity of sanction & reqt.
2007 513 AMM/GHZ
Selective Pallet Racking 918 RNS
2007 514 AMM/GHZ
Dock leveller 378 RNS
2007 515 AMM/GHZ
3D Mobile Racking System 514 RNS
2008 561 ST/GHZ
Electronic in Motion Weigh Bridge 1264 0047/15/07/6 REC 01-10-2009 Material received on 01.10.09
2008 563 ST/GHZ
Selective Pallet Racking 3579 RNS
25 February 2013 Page 37 of 38