Department of Transportation, Infrastructure & EnergyPO Box 2000Charlottetown
Prince Edward IslandCanada C1A 7N8 Tel: 902 368 5180
CAPITAL PROJECTS
A D D E N D U M N U M B E R 1for
NORTH LAKE BRIDGE - STRUCTURE REPLACEMENT(Scheduled Tender Closing 23 July 2019)
TO: All Bidders
FROM: Neil Lawless, P.Eng.Bridge Engineer
DATE: 17 July 2019
SUBJECT: Errata to Schedule ‘A’Errata to Schedule ‘C’Errata to Drawings
1. Schedule A: Bid Item #130921 - 13mm Dia. GFRP Bent
Insert the following new cost item paragraph:The unit price bid price for the above listed item shall be full compensation for each metreof 13 mm diameter bent glass-fibre reinforced polymer (GFRP) concrete reinforcementrequired. Shop drawings shall be provided at no extra cost to the contract. Refer to attachedSchedule ‘F’ and drawings.
2. Schedule A: Bid Item #135101 - Project Layout:
Insert the following paragraph:This cost item shall include all costs associated with locating all of the existing piles at bothpiers on each side of new pier2. Location of piles shall be determined via the Northing andEasting coordinate system using the same project benchmark. Coordinate results shall thenbe submitted to the Department; the Department will then review and adjust (as required)location of new piles at pier #2 so to minimize new piles contacting existing piles.
3. Schedule A: Bid Item #135221 - Steel Pipe Piles: Drive:
Insert the following regarding pile glass fabric protective coating - approved equal:Masterbrace 6061UW Underwater epoxy complete with Masterbrace FIB-900/50 FG Fabric.
Addendum #1North Lake Bridge - Structure Replacement17 July 2019
Page 2 of 4
4. Schedule C:
Discard pages 6 to 9 inclusive dated 4 July 2019 in its entirety.Insert new pages (attached to this addendum) 6 to 9 inclusive of 9 dated 17 July 2019.
The purpose of new pages 6 to 9 inclusive is to account for the quantity of drains from 5 to7, addition of 13mm diameter GFRP bent, and updated GFRP lengths.
5. Drawing S3 of 23:
Clarification:At both existing abutments, existing vertical timber piles are to be cut down to permit locatingand driving the new longitudinal abutment piles. The new vertical abutment piles are locatedbehind the existing abutments.
6. Drawing S5 of 23:
Clarification:Refer to borehole logs for approximate top of bedrock elevation in the related abutment orpier area.
7. Drawing S6 of 23:
Discard drawing S6 of 23 dated 4 July 2019 in its entirety.Insert new drawing S6 of 23 rev1 (attached to this addendum) dated 17 July 2019.
8. Drawing S7 of 23:
Discard drawing S7 of 23 dated 4 July 2019 in its entirety.Insert new drawing S7 of 23 rev1 (attached to this addendum) dated 17 July 2019.
9. Drawing S8 of 23:
Discard drawing S8 of 23 dated 4 July 2019 in its entirety.Insert new drawing S8 of 23 rev1 (attached to this addendum) dated 17 July 2019.
Addendum #1North Lake Bridge - Structure Replacement17 July 2019
Page 3 of 4
10. Drawing S10 of 23: Abutment Elevation 1 and Section 4:
Clarification:The underside elevation of abutment cap will be constant across abutment width.
The top elevation of abutment cap will be constant across abutment width.
Refer also to attached SK-2 for concrete plinth plan dimensions.Each plinth height will be different in magnitude, with the downstream plinth 125mm high, andthe upstream plinth approximately 390mm high. The middle 2 plinths’ height will between125mm and 390mm. Final plinth heights will be determined by the Department as part ofdeveloping Issued for Construction Drawings.
11. Drawing S12 of 23:
Discard drawing S12 of 23 dated 4 July 2019 in its entirety.Insert new drawing S12 of 23 rev1 (attached to this addendum) dated 17 July 2019.
Clarification:The underside elevation of pier cap will be constant across pier width.
The top elevation of pier cap will be constant across pier width.
12. Drawing S13 of 23:
Clarification:The underside elevation of pier cap will be constant across pier width.
The top elevation of pier cap will be constant across pier width.
13. Drawing S14 of 23: Hold-Down Location:
Clarification:There are 46 strands total: 36 bottom within the length of girder, 10 deviated. There are46 strands bottom within the middle 20%L.
14. Drawing S14 of 23: Section ‘E’:
Insert the following leader text pointed to top of flange:intentionally roughen entire top flange area 5mm amplitude at 15mm longitudinal spacing.
15. Drawing S15 of 23:
Discard drawing S15 of 23 dated 4 July 2019 in its entirety.Insert new drawing S15 of 23 rev1 (attached to this addendum) dated 17 July 2019.
Addendum #1North Lake Bridge - Structure Replacement17 July 2019
Page 4 of 4
16. Drawing S16 of 23:
Discard drawing S16 of 23 dated 4 July 2019 in its entirety.Insert new drawing S16 of 23 rev1 (attached to this addendum) dated 17 July 2019.
Refer also to attached SK-2 for concrete plinth plan dimensions.Each plinth height will be different in magnitude, with the downstream plinth 125mm high, andthe upstream plinth approximately 390mm high. The middle 2 plinths’ height will between125mm and 390mm. Final plinth heights will be determined by the Department as part ofdeveloping Issued for Construction Drawings.
17. Drawing S17 of 23:
Discard drawing S17 of 23 dated 4 July 2019 in its entirety.Insert new drawing S17 of 23 rev1 (attached to this addendum) dated 17 July 2019.
Refer also to attached SK-2 for concrete plinth plan dimensions.Each plinth height will be different in magnitude, with the downstream plinth 125mm high, andthe upstream plinth approximately 390mm high. The middle 2 plinths’ height will between125mm and 390mm. Final plinth heights will be determined by the Department as part ofdeveloping Issued for Construction Drawings.
18. Drawing S18 of 23: Section - Barrier
Insert SK-1 barrier section (attached to this addendum) dated 17 July 2019.
A signed copy of this addendum sheet must be included with your bid submission for this project.
Signature of Contractor
25
200
152
312
152
250
50
NOTES:1. ALL STEEL & HARDWARE TO BE HOT DIPPED GALVANIZED2. TOUCH UP FIELD WELD AREAS WITH COLD GALVANIZING3. ALL NUTS TO BE FULLY THREADED/ENGAGED, WITH
EXPOSED THREAD BEYOND NUT.4. ALL CONNECTIONS TO HAVE FLAT WASHER, LOCK
WASHER, AND NUT.5. HSS DESIGNATION SIZES ARE NOMINAL.
200 x 200 x 6.4 THICK PLATE c/w SMOOTH GRINDED EDGES
2 - 20 DIA THREADED STUDS, c/w FLAT WASHER AND LOCKWASHER AND NUT WELDED ALL AROUND TO HSS FACE (TYP.)
6 DIA DRAIN HOLES at 600 MAX.
450 x 300 CONCRETE CURB
W200x46 POSTS AT 1750 MAX.
NEBT1400 PRECAST GIRDER
CONCRETE DECK SLAB
ASPHALT2 - 19 DIA GALVANIZED A307 ANCHOR BOLTS c/w NUTS AND WASHERS
HSS 200 x 100 x 8.0 CONTINUOUS RAIL (CAP EXPOSED ENDSWITH SAME SIZE x 5 PLATES)
CONTINUOUS DRIP CANT
335 x 400 x 20 GALVANIZED CAST-IN ANCHOR PLATE
2 - 32 DIA GALVANIZED A307 ANCHOR BOLTS c/w NUTS AND WASHERS
115235
BASE PLATE 450 x 375 x 32 ON 3mm THICK RUBBER PAD (60 DURO)
TOP OF CURB SLOPES DOWN 1% (TOWARD ROAD)
300
450 x 32 x 375 BASE PLATE
1117
300 70
STEEL FLEXBEAM c/w 2-20 DIA A307 BOLTS
817
70 235 70
7515
015
175
77
38 DIA x 76 SLOT
TO OUTSIDE FACE OF FLANGE
450 x 32 x 375 BASE PLATE
FULL PENETRATION25 DIA x 76 SLOT
6
FULL PENETRATION
5030
050
50 235 50
ANCHOR PLATE
128
TRAFFIC SIDE
TRAFFIC SIDE
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
AS NOTEDCOUNTY:K. MACEACHERN
N. LAWLESS
T.I.E.
2019012
QUEENS
NORTH LAKE BRIDGEREPLACEMENT
SHEET NAME:
JOB: SHEET No.
OF
2SK-1
BARRIER DETAILS
1SK-1
SECTION - BARRIER1:25
2SK-1
DETAIL - POST BASE PLATE1:25
3SK-1
DETAIL - CAST-IN ANCHOR PLATE1:25
1600
675
62°
62°
℄ OFBEARING
℄ OF GIRDER1800
77051°
51°
℄ OFBEARING
℄ OF GIRDER
58°
58°
17701650
℄ OF GIRDER
℄ OF BEARING
℄ OF BEARING
51°
51°
1795
1920
℄ OF GIRDER
℄ OF BEARING
℄ OF BEARING
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
AS NOTEDCOUNTY:K. MACEACHERN
N. LAWLESS
T.I.E.
2019012
QUEENS
NORTH LAKE BRIDGEREPLACEMENT
SHEET NAME:
JOB: SHEET No.
OF
2SK-2
PLINTH DIMENSIONS
1SK-2
ABUTMENT 1 PLINTH1:25
2SK-2
ABUTMENT 2 PLINTH1:25
3SK-2
PIER 1 PLINTH1:25
4SK-2
PIER 2 PLINTH1:25
ABUT
MENT 1
PIER 1
PIER 2
ABUT
MENT 2
REINFORCED CONCRETE PILE CAP ONSTEEL PIPE PILES. SEE PIER DETAIL S12
REINFORCED CONCRETE PILE CAP ONSTEEL PIPE PILES. SEE PIER DETAIL S13
REINFORCED CONCRETEABUTMENT ON STEEL HP PILES.SEE ABUTMENT DETAILS ON S9
APPROACH SLAB.SEE DETAILS ONDWG S9APPROACH SLAB.
SEE DETAILS ONDWG S9
DECK DRAIN (TYP). SEEDRAIN DETAIL ON S13
℄ OFROAD
℄ OF BEARING
℄ OF PIER ℄ OF PIER
℄ OF BEARING
80004350 80008000
8000
4350 45503921
4550END OF
GIRDER AT ITSCENTERLINE
END OF GIRDER AT ITS CENTERLINEEND OFGIRDER AT ITS
CENTERLINE
2480425170
24386
ABUT
MENT 1
PIER 1
PIER 2
ABUT
MENT 2
PIER DIAPHRAGM
1400mm DEEP NEW ENGLANDBULB TEE CONCRETE GIRDERSEE DETAILS ON DWG S14
℄ OFROAD
1000
0 WID
TH O
F BR
IDGE
PIER DIAPHRAGM
R1 = 275.15M
R2 = 285.15M
GIRDER 1
GIRDER 2
GIRDER 3
GIRDER 4
GIRDER 5
GIRDER 6
GIRDER 7
GIRDER 8
GIRDER 9
GIRDER 10
GIRDER 11
GIRDER 12
INTERMEDIATE DIAPHRAGMS AT 13 SPAN
400
1130
D15G13(THROUGHGIRDER)
D15G11
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMDECK & GIRDER PLAN
6
1S6
DECK PLAN1:250
2S6
GIRDER PLAN1:250
3S6
INTERMEDIATE DIAPHRAGM1:50
2S11 5
S122
S13
4 S18
2S11
309/D2OG02 BLL @ 250 c/c
257/D20G01 TUL @ 300 c/c
514/D20G03 TUL @ 300 c/c
1025/D15G03 CURB @ 150 c/c
1025/D15G04 CURB @ 150 c/c
84/D
18G0
7
64/D1
5G05
64/D
15G0
61000 LAP (TYP)
410/D
15G0
1 TLL
& BU
L @ 30
0 c/c
82/D
15G0
2 TLL
& BU
L
D25G
02 @
300 c
/c - D
ROP I
NS
514/D20G04 TUL DROPINS @ 300 c/c - ALTERNATE-W D20G01 BARS
D25G
02 @
300 c
/c - D
ROP I
NS
3 - DG25302
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMDECK REINFORCEMENT
7
1S7
DECK REINFORCEMENT PLAN1:250
2S7
DECK REINFORCING GFRP BAR LIST
NOTE:
ACTUAL DIAMETER REQUIRED IS THAT INDICATEDIN THIS TABLE 16 AND 19 DIAMETER IN SCHEDULEA AND SCHEDULE C CORRESPONDS WITH 15 AND20 DIAMETER RESPECTIVELY
a
G2
G3
G4
G1
G2
G3
G4
G5
G6
G7
G8
G5
G6
G7
G8
G9
G10
G11
G12
G9
G10
G11
G12
℄ ABUTMENT 1
℄ PIER 1
℄ PIER 2℄ ABUTMENT 2
a
a
a
b
c
d
ed
ed
ed
e
b
cb
cb
c
f
f
f
f
DIAPHRAGMS NOTSHOWN FOR CLARITY
℄ OF BRIDGE
FAIRFIELD
EAST POINT
2713
2714
2682
2400
2400
2379
2713
2714
2682
c/c PL
INTH
c/c G
IRDE
R
G1
c/c PL
INTH
SPAN
123
11
2302
2284
c/c G
IRDE
R
2126
2116
2099
c/c GIRDER
2687
2707
2724
c/c PL
INTH
2721
2708
2687
c/c PL
INTH
SPAN
2SPAN 1 SPAN 2 SPAN 3
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMGIRDER DIMENSIONS AND LAYOUT
8
1S8
PLAN - GIRDER DIMENSIONS AND LAYOUT1:100
GIRDER LENGTHSLOCATION LENGTH (mm)
GIRDER 1 - 4ABUT 1 TO PIER 1 25 100
GIRDER 5 - 8PIER 1 TO PIER 2 24 700
GIRDER 9 - 12PIER 2 TO ABUT 2 25 100
LENGTHSKEW OF GIRDERS
LOCATION MARK ANGLEABUTMENT 1 a 28°
PIER 1 b 28°c 32°
PIER 2 d 32°e 39°
ABUTMENT 2 f 39°
ANGLE
ANGLE
LENGTH
PLAN - GIRDER
1200
500
1500
1488 1488 1488 1488 1488 1488 1488 14881488
1
3
15000
804 804
℄PIER
℄BEAM BEARING ℄ BEAM BEARING
25mm CHAMFER(TYP. ALL CORNERS)
CONCRETE PILE CAP
CONCRETEBEARING
BLOCK
ELASTOMERICBEARING PAD
400 400
350 350
1500
VARI
ES
1600
500 508 DIA x 30 STEEL CAP PLATE
c/w 408 HOLE CENTERED INPLATE
6 - 22 DIA STUDS x 200 LONGCENTERED ABOVE PILEWALL
6
OUTLINE OF ELASTOMERICBEARING PAD
SEE SK-2
1500
500
40
5-25M STIRRUPS ATALL PIERS
600 LAP
1600
8-25M CONT TOP c/w350HOOK AT CAP ENDS5-25M EACH FACCE
8-25M CONT BOTTOM c/w 350HOOK AT CAP ENDS. 'L'BEYOND EXTERIOR PILE TOCAP ENDS
20M TIES AT 250 START100 FROM PILE FACE
4-20M TIES EVENLYSPACED OVER EACH PILE
MIN. 600 LAP BETWEEN PILESLATERALLY SPACEDTERMINATE 2 BAR AT PILE c/w
350 HOOK AT EACH END
PILE CAP
50 COVER(TYP.)50
COV
ER(T
YP.)
D13G BARS SEE GFRPLAYOUT TABLE FORAPPLICABLE SIZES &LOCATIONS
D13G BARS SEE GFRP LAYOUTTABLE FOR APPLICABLE SIZES &LOCATIONS
SEE SK-2
15000
1488 1488 1488 1488 1488 1488 1488 1488804 1488 804
1600
387359
102
50
152 330
60°WELDED BEVELCUTTING SHOE TYPE O-14000
SHOE SHALL BE MADE IN ONEPIECE OF CAST STEEL TO ASTMA148 90/60 - HEAT TREATED
CUTTING SHOES REQUIRED FORALL 356Ø ABUTMENT PILES
WELD SHOE TO PILES WITH 8mmFILLET WELD ALL AROUND (TYP.)
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMPIER 1 DETAILS
12
4S12
ELEVATION - PIER 11:100
1S12
PLAN - PIER 1 CAP1:100
2S12
SECTION - PIER 1 CAP1:50
5S12
SECTION - PIER 1 CAP REINFORCEMENT1:50
6S12
PLAN - BEARING BLOCK REINFORCEMENT1:50
8S12
SECTION - BEARINGBLOCK REINFORCEMENT1:50
3S12
PLAN - BEARING BLOCK1:50
7S12
STEEL PIPE PILE CUTTING SHOE DETAIL1:15
ALL PILES 508 DIA x 13 STEEL PIPE PILES
7510 @ 75 = 750
12 @ 100 = 1200
150
9 @ 150 =1350
25 @ 200 = 5000350
7510 @ 75 = 750
12 @ 100 = 1200
1509 @ 150 = 1350
350
℄ OF BEAM
B-4 STIRRUP (TYP.)
B-5 TYP. (TYPE A)
2100 TYPE 'A' REINF. 2100 TYPE 'A' REINF.
20900 TYPE 'B' REINF. EXT SPANS20500 TYPE 'B' REINF. INT SPAN
B-3 @ EA. STIRRUP
250
2 - B-6 & 2 - B-7
6 B-2 @ 2106 B-2 @ 210
F FG
12 @ 306 = 3675 EXT SPANS12 @ 289 = 3475 INT SPAN
25 @ 200 = 5000
12 @ 306 = 3675 EXT SPANS12 @ 289 = 3475 INT SPAN
10 EQ. SPACES
120 23 31 36 38 36 31 23 12 0℄ ABUT. ℄ PIER
AT TRANSFER(APPROXIMATE)
10 EQ. SPACES
180 34 47 55 58 55 47 34 18 0℄ ABUT. ℄ PIER
AT FIELD PLACEMENT(APPROXIMATE)
10 EQ. SPACES
120 23 32 37 40 37 32 23 12 0℄ ABUT. ℄ PIER
AT CASTING SLAB(APPROXIMATE)
DIRECTION
A B
N S
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMGIRDER DETAILS 2
15
1S15
STIRRUP SPACING1:50
PRECAST GIRDER NOTES:
1. ALL GIRDERS TO BE NEW ENGLAND BULB TEE(N.E.B.T.) 1400 STANDARD SECTIONS
2. CONCRETE COMPRESSIVE STRENGTH
A). AT 28 DAYS - 50 MPaB). AT TIME OF PRESTRESS TRANSFER - 35 MPa
3. PRE-STRESSING STEEL: SEVEN WIRE LOWRELAXATION STRANDS (GRADE 1862). SIZE 13 WITHULTIMATE STRENGTH OF 1862 MPa. STRANDS TOCONFORM TO A.S.T.M. A416.
4. STRAND FORCES (PER STRAND):
A). AT JACKING (0.78FPu) 143kNB). IMMEDIATELY AFTER RELEASE(0.74 FPu)136kNC). AFTER LOSSES 100kN
5. ESTIMATED PRESTRESS LOSSES:
A). IMMEDIATELY AFTER RELEASE 165 MPaB). AFTER TRANSFER ONLY 202MPa
6. TRANSFER OF PRESTRESS RELEASE SEQUENCE:
A). DEFLECTED STRANDSB). HOLD DOWN DEVICESC). STRAIGHT STRANDS
7. LIFTING DEVICES TO BE LOCATED AT THE GIRDERBEARING POINTS AND SHALL MEET WITH ENGINEERSAPPROVAL.
8. ROUGHEN TOP OF GIRDER WHERE IT WILL CONTACTHAUNCH TO 5mm AMPLITUDE, SPACING OF 15mm ±AND REMOVE LAITANCE PRIOR TO CASTING DECKAND HAUNCHES.
9. CONTRACTOR TO ENSURE GIRDER STABILITYDURING PHASES OF CONSTRUCTION.
2S15
CAMBER PROFILES1:15
650
CONC
RETE
PLIN
TH H
EIGH
TSE
E AB
UTME
NT A
ND P
IER
DRAW
ING
758 x 470 x 20 EMBEDDED STEEL SHOE PLATE
1110 x 470 x 30 STEEL BEARING PLATE
2 - 38 DIA A307 GALVANIZED ANCHOR BOLTS c/wHARDENED WASHER AND NUTS (TOP ANDBOTTOM) TACK WELD BOTTOM NUT TO ANCHOR
150 DIA. POCKETS FORMED WITHCORRUGATED SLEEVES c/w
MATERFLOW 928 GROUT (OREQUAL APPROVED BY ENGINEER) 20
℄ GIRDER
850 x 450 x 30 STEEL SOLE PLATE -TAPERED FOR ROAD SLOPE,CAMBER AND DEAD LOAD ROTATION
450 x 300 x 20 DURO 70 PLANRUBBER BEARING PAD
66
88
200 200
6 - 22 DIA. SHEAR STUDS 145 LONG
25 CHAMFER OVER SHOE PLATE LENGTH
DETAIL 1
b
a
℄BEARING
450SOLE TAPERED PLATE
'a' (mm) 'b' (mm)PIER 2 32 28
30
END OF GIRDER
SOLE TAPERED PLATE
85 150 150
STEELSHOEPLATE
BEARING PADSTEEL BEARING PLATE
UNDERSIDE OF GIRDER
EAST POINTFAIRFIELD
CONCRETE PLINTH
GIRDER BOTTOMFLANGE (ABOVE)
DURO LAMINATEDRUBBER BEARING
PADSTEEL SOLE PLATE
(TAPERED)
STEEL BEARING PLATE45
010
10
470
SEE SK-2
75480 ANCHOR BOLTS480 ANCHOR BOLTS75
235
235
150
150
555 BEARING PLATE 555 BEARING PLATE
55425 SOLE PLATE425 SOLE PLATE55225 PAD225 PAD
℄ BEARING
SEE SK-2
SEE
SK-2
TYP545°
BEARING PLATE
BEARING PAD
PLINTH
5
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMFIXED BEARING DETAILS
16
3S16
SECTION - BEARING ASSEMBLY1:10
2S16
SECTION - SOLE PLATE1:10
1S16
PLAN - BEARING ASSEMBLY (TYYPICAL)1:20
4S16
DETAIL - KEEPER BAR1:2
NOTE:
ALL STEEL PLATES/ASSEMBLYITEMS AND CONNECTIONHARDWARE TO BE HOT DIPPEDGALVANIZED. TOUCH UP FIELDWELDING WITH COLD GALVANIZING.
600
5 GAP (TYP.)
CONC
RETE
PLIN
TH H
EIGH
TSE
E AB
UTME
NT A
ND P
IER
DRAW
ING 758 x 470 x 20 EMBEDDED
STEEL SHOE PLATE550 x 450 x 30 STEEL SOLE PLATE -TAPERED FOR ROAD SLOPE,CAMBER, AND DEAD LOAD ROTATION
1280 x 500 x 30 MASONRY PLATE
6 - 32 DIA A307 GALVANIZED ANCHOR BOLTS c/wHARDENED WASHER AND NUTS (TOP ANDBOTTOM) TACK WELD BOTTOM NUT TO ANCHOR
100 DIA. POCKETS FORMED WITHCORRUGATED SLEEVES c/w
MATERFLOW 928 GROUT (OREQUAL APPROVED BY ENGINEER)
450 x 350 x 80 DURO 70LAMINATED RUBBER
BEARING PAD50 STIFFENER TYP.
LONGITUDINALEDGES ONLY 6
TYP 6
6
20
DETAIL 1
℄ GIRDER
200 200
6 - 22 DIA. SHEAR STUDS 145 LONG
25 CHAMFER OVER SHOE PLATE LENGTH
b
a
℄BEARING
450SOLE TAPERED PLATE
'a' (mm) 'b' (mm)ABUTMENT 1 32 29PIER 1 32 29ABUTMENT 2 32 28
30
END OF GIRDER
UNDERSIDE OF GIRDERSOLE TAPERED PLATE
STEELSHOEPLATE
BEARING PAD
STEEL MASONRY PLATE
85 150 150
5 TYPICAL GAP ALLAROUND 4 SIDES
SOLE PLATE
MASONRY PLATE
BEARING PAD
10 x 10 STEEL KEEPER PAD (TYP.)
TYP55
45°
SEE SK-21280 MASONRY PLATE
75410 BENT PLATE410 BENT PLATE75758 SHOE PLATE550 SOLE PLATE
450 BEARING PAD
300
300
500
100
150
150
100
1010
1515
015
015
015
250 x 203 x 13 BENT PLATEc/w 4-10 STIFFENER PLATESDURO LAMINATED RUBBER
BEARING PADSTEEL SOLE PLATE (TAPERED)
STEEL SHOE PLATE
STEEL MASONRY PLATE
CONCRETE PLINTH
GIRDER BOTTOMFLANGE (ABOVE)
℄ BEARING480
SEE
SK-2
SCALE:SURVEY BY:
DRAWN BY:
APPROVED BY:
PROJECT No.:
No. REVISIONS DATE SHEET No.
OF
0
AS NOTEDCOUNTY:
23K. MACEACHERN
DEPT OF TRANSPORTATION, INFRASTRUCTURE, AND ENERGY ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH TIE'sSTANDARD SPECIFICATIONS AND ENVIRONMENTAL PROTECTIONPLAN (EPP).
MAINTAIN ENVIRONMENTAL CONTROLS UNTIL VEGETATION HASESTABLISHED OR AS INSTRUCTED ON SITE.
ALL DRIVEWAY CULVERTS AND SIDE SLOPES SHALL BE MIN. 3H:1V
N. LAWLESS
JULY 4, 2019ISSUED FOR TENDERT.I.E.
2019012
KINGSNORTH LAKE BRIDGE REPLACEMENT
SHEET NAME:
JOB:
SCONTROL SECTION:
STATIONING:
1 JULY 17, 2019ISSUED FOR ADDENDUMFREE BEARING DETAILS
17
NOTE:
ALL STEEL PLATES/ASSEMBLYITEMS AND CONNECTIONHARDWARE TO BE HOT DIPPEDGALVANIZED. TOUCH UP FIELDWELDING WITH COLD GALVANIZING.
1S17
PLAN - BEARING ASSEMBLY (TYPICAL)1:20
3S17
SECTION - BEARING ASSEMBLY1:10
2S17
SECTION - SOLE PLATE1:10
4S17
DETAIL KEEPER BAR1:2