Consultancy Services – M/s Unihorn India Pvt Ltd Monthly Report on Audit of Traffic / July 2015 NATIONAL HIGHWAYS AUTHORITY OF INDIA (MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS) DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS (G – 5 & 6, Sect – 10, Dwarka, New Delhi – 110075) (CONSULTANCY SERVICES – M/S UNIHORN INDIA PRIVATE LIMITED) Consulting Services as Independent Engineer during Operation & Maintenance and Fee Collection of 4-lane dual Carriageway from km. 407.100 to km. 456.100 of NH – 3 (Old NH – 1) {Jalandhar-Amritsar Section} in the State of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire. REPORTS ON AUDIT OF THE TRAFFIC (July 2015) CONCESSIONAIRE: M/s HEAD OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, P–2, 1 st Floor, Green Park Extension, New Delhi – 110 016 SITE OFFICE Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 1

Upload: phungnhan

Post on 24-Apr-2019

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

NATIONAL HIGHWAYS AUTHORITY OF INDIA(MINISTRY OF SHIPPING, ROAD TRANSPORT & HIGHWAYS)

DEPARTMENT OF ROAD TRANSPORT & HIGHWAYS(G – 5 & 6, Sect – 10, Dwarka, New Delhi – 110075)

(CONSULTANCY SERVICES – M/S UNIHORN INDIA PRIVATE LIMITED)

Consulting Services as Independent Engineer during Operation & Maintenance and Fee Collection of 4-lane dual Carriageway from km. 407.100 to km. 456.100 of NH – 3 (Old NH – 1)

{Jalandhar-Amritsar Section} in the State of Punjab on Build, Operate and Transfer (BOT) basis through a Concessionaire.

REPORTS ON AUDIT OF THE TRAFFIC(July 2015)

CONCESSIONAIRE:

M/sHEAD OFFICEJALANDHAR AMRITSAR TOLLWAYS LTD, P–2, 1st Floor, Green Park Extension, New Delhi – 110 016 SITE OFFICE JALANDHAR AMRITSAR TOLLWAYS LTD, Toll Plaza – 1 at Km. 410 NH – 1, G. T. Road, Dhilwan - 144804

INDEPENDENT CONSULTANT:

HEAD OFFICEM/S UNIHORN INDIA PRIVATE LIMITED,Unit No. 404, 4th Floor, IRIS Tech Park, Sector – 48, Sohna Road, Gurgaon (Haryana) – 122 002SITE OFFICE # 584 (D II), Housefed Complex, G T Road, New Amritsar, Amritsar–143 010 (Punjab)

CONTENTS

Sr. No. Descriptions Page No. Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 1

Page 2: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

1 Project Details 03

1.1 Executive Summary 03

1.2 Contract Details 03 – 04

1.3 Scope of Works 05

1.4 General Specifications 05

1.5 Service Roads 06

1.6 Junction (At Grade) 06

1.7 Bridges 07

1.8 Road Over Bridge (ROB) 08

1.9 Underpasses 08

1.10 Culverts 09 – 10

2. Deployment of Independent Engineer 11

3. Independent Engineer's Review during O&M Period 12

3.1. Traffic Sampling 12

3.2 Traffic Operation and Safety Requirement 12

3.3 Toll Plaza and Fees Collection System12

Annexure – A(13 – 34)

3.4 Traffic Report / Data at Toll Plazas12

Annexure – B(35 – 37)

3.5 Highway Accident Report12

Annexure – C(38 – 40)

3.6 Incident Management Data12

Annexure – D(41 – 42)

1. PROJECT DETAILS 1.%2% Executive Summary

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 2

Page 3: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 National Highway NH -3 (Old NH-1) from Delhi to Pakistan border at Wagha is an important link passing through states of

Haryana and Punjab. This link also serves some major industrial areas of Panipat, Ambala, Ludhiana, Jalandhar and holy city of

Amritsar. Some of the sections between Delhi and Jalandhar have already been converted into four lane configurations.

In order to provide a safe and better service to both Commercial and Defense related vehicular traffic, the National Highways

Authority of India (NHAI) decided to wide four lane configurations from exiting two lane from Km 407.100 to Km 456.100 under

NHDP in the districts of Kapurthala and Amritsar in the state of Punjab which includes Major & Minor Bridges, ROBs,

Underpasses, Service Roads and improving junctions etc on Build, Operate and Transfer (BOT) basis. This section of road

passes through urban areas like Dhilwan, Beas, Rayya and Jandiala etc. Index map of the Project Road is as below:

The Project Highway traverses through plain terrain from Chainage km 407.100 on Jalandhar side to km 456.100 at Verka

Chowk, Amritsar and generally lies between latitudes 31.19 N – 31.38 N and longitudes 74.53 E – 75.78 E respectively. The

climatic features highlight the variation of temperature from – 20C in winter to a maximum of 460C during peak summer and

recorded normal rainfall is 813 mm.

The Detailed Engineering Report was prepared by M/s ICT, New Delhi.

The work awarded to M/s Jalandhar Amritsar Tollways Limited (JATL), New Delhi on 30th November 2005.

JATL appointed M/s NICE, Delhi as their Structural Consultants and M/s IVRCL Infrastructure Projects Ltd., Hyderabad as

EPC-Contractor. The Structural consultants M//s NICE, Delhi as appointed by JATL worked in the project initially three months

and then got demobilized.

NHAI has appointed M/s Consulting Engineering Services (India) Private Limited, New Delhi (CES) to act as Independent

Consultants for this project vide Agreement No. IC/PhIIIA/NH1/Pb/009 dated 13th April 2006.

NHAI again awarded this project for O&M Phase to M/s Unihorn India Private Limited, Gurgaon to act as Independent

Consultant for this project vide NHAI/BOT/11023/11/2006/23318 dated 23.11.2011

1.2 Contract Details

Project name : 4-Laning of Jalandhar-Amritsar BOT Project of NH-1 (Km 407.100 to Km 456.100)

Concessionaire : Jalandhar Amritsar Tollways Limited

State : Punjab

Component : National Highway No. 1

Location : Dhilwan (Km 407.100) to Verka Chowk (Km 456.100)

Estimated Project Cost :Rs 263 Crores(In Financial Document Rs. 237.75 Crores Original + 105.8 Crores Additional total Rs. 343.55 Crores as per the Concessionaire MPR )

Estimated Completion Date : November 2008

Civil Contract

EPC Contractor : M/s IVCRL Limited

Contract Limit : Km 407.100 to Km 456.100

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 3

Page 4: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Contract Length : 49.000 Km

Contract Location : Dhilwan to Verka Chowk

State : Punjab

District : Kapurthala / Amritsar

Concessionaire Agreement Signed : 30.11.2005

Completion of Pre-Construction Activity : 30.05.2006

Commencement Dated : 29.05.2006

Original Completion Date : 30.11.2008

Provisional Completion Date : 29.04.2010

Original Construction Period : 30 months

Revised Construction Period : 43 months

Original Concession Period : 20 Years (Including Construction Period)

Initial Operation & Maintenance Period : 17.5 Years

Revised Operation & Maintenance Period : 16.4 Years

Performance Security : 3% of Contract Price

Independent Consultant : M/s Unihorn India Private Limited

Contract Limit : Operation & Maintenance - 36 months

Contract Signed : 22.11.2011

Commencement Date : 07.12.2011

Original Contract Period : 36 months for O&M Period

Original Contract Amount : Rs. 2,76,98,000/-

Performance Security (BG No. ININ1DL11G320474 for Rs. 692,450/- :

(BG No. ININ1DL11G320474 for Rs. 692,450/- being 2.5% of Contract Value valid till 31 January 2015Further Extended up to 31 January 2016

1.3 Scope of Works

Length of Road Sector - 49 Km Completed

(Km 407+100 to Km 456+100)

Service Road - 14 Km Completed

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 4

Page 5: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 Culverts - 51 Nos. Completed

Minor Bridge - 10 Nos. Completed

Major Bridge (Including Beas Bridge) - 4 Nos. Completed

Under Passes (One Double Cell) - 8 Nos. Completed

ROB - 3 Nos (2 Carriageway) Completed

1 Nos (4 Carriageway) Completed

Major Road Junctions - 7 Nos. Completed

Toll Plazas - 2 Nos. Completed

1.4 General Specifications

Main Road - Four Lane Divided Carriageway

2 x (7.0m + 1.5m + 2.0m shoulder)

wide separated by 4.5m wide median

Design Speed - 100 kmph

Cross slope - 2.5%

Maximum Super Elevation - 5%

Service Road (Carriageway) - 5.5 / 7.0 m

1.5 Service Roads

Service roads provided at the followings stretches.

SL NO

Location Length (m)

Width (m)

SideRemark

From (Km+m)

To (Km+m)

1 408+900 409+320 420 7.00 LHS Dhilwan (New )

2 409+050 409+320 270 7.00 RHS Dhilwan (New )

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 5

Page 6: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

3 413+380 414+565 1185 7.00 LHS Beas (Urban)

4 413+650 414+400 750 7.00 RHS Beas (Urban)

5 417+250 418+680 2860 5.50 LHS&RHS Umranangal (Semi Urban)

6 419+400 420+260 1720 7.00 LHS&RHS Rayya (Urban)

7 425+500 426+350 1700 7.00 LHS&RHS Khalchian (Urban)

8 430+500 431+100 600 7.00 RHS Tangra (Urban)

9 438+600 439+650 1050 7.00 LHS Jandiyalaguru (Urban)

10 438+750 439+650 900 7.00 RHS Jandiyalaguru (Urban)

11 448+300 449+050 1500 5.50 LHS&RHS Daburji ( Semi Urban)

12 452+320 453+000 680 7.00 RHS Walla ( New )

13 452+400 453+000 600 7.00 LHS Walla ( New )

Total 0 (5.5m Width – 4360m & 7.0m Width – 9710m)

1.6 Major Junction (at grade)–

Major Junctions (at grade) provided at following locations:

Sl. No. Location (New Chainage) Name of Junction

1. Km. 413.630 Beas

2. Km. 416.775 Batala

3. Km. 440.875 Taran Taran

4. Km. 449.530 Bypass

5. Km. 452.200 Mehata Chowk

6. Km. 452.400 Vallah Chowk

7. Km. 455.800 Verka Chowk

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 6

Page 7: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

1.7 Bridges Details of Major and Minor Bridges

Sr. No. Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure Span ArrangementsLength of Structure (in mtr)

Type of Structure Span Arrangements

Length of Structure (in mtr)

I. Major Bridges

1413/1(Beas)

412+294 RCC Slab over PSC Girder 2x6.8+15x37.81 580.75RCC Slab over

PSC Girder1x10.04.14x37.81.1x3

1.953.1x10.40581.73 2-lane

2

415/4(Dera Baba Jaimal

Singh bridge)414+644 RCC T-Beam and Slab 5x19.87 99.35

RCCT-Beam and Slab

5x20.00 100.00 2-lane

3434/1

(Patti nallah bridge433+523 RCC T-Beam and Slab

4x15.72(Skew 38)

62.88RCC

T-Beam and Slab2x16.532.2x15.746 64.556 2-lane

4 447/1 (Kasur nallah bridge)

446+049 RCC T-Beam and Slab 6x13.5 81 PSC Voided Slab 3x27.00 81.00 2-lane

II. Minor Bridges

1 409/1 408+081 RCC T – Beam and Slab 2x20 40.00RCC T – Beam

and Slab2x20 40.00 4-lane

2 421/4 420+476 RCC T – Beam and Slab 1x28.397 28.397RCC Slab over PSC Girders

1x28x397 28.397 4-lane

3 421/6 420+618 RCC Solid Slab 1x11.216 (Skew) 8.45 Box Bridge 1x11.216 (Skew) 11.216 4-lance

4 428/1 427+072RCC Solid Slab

(Khalchian drain)4x7.00 28.00 RCC Solid Slab 4x7.00 28.00 2-lane

5 428/2 427+123 Arch Bridge 1x10.70 10.0 Box Bridge 1x10.70 10.70 4-lane

6437/1

(Kasurcanal bridge)436+609 Arch Bridge 1x36.50 (Skew) 9.75

RCC Slab Over PSC Girders

1x36.50 (Skew) 36.50 4-lane

7 443/2 442+067 RCC Solid Slab 1x27.00 28.32 PSC Voided Slab 1x27.00 27.00 4-lane8 447/2 446+466 RCC Solid Slab 1x7.02 7.00 Box Bridge 1x7.02 7.02 2-lane9 453/1 452+258 RCC, T – Beam & Slab 1x10.02 10.02 Box Bridge 1x10.02 10.02 6-lane

10 453/2 452+300 RCC T-Beam and Slab 3x15.14 45.42RCC T-Beam

and Slab3x15.50 45.50 3-lane

1.8 Road Over Bridge (ROB)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 7

Page 8: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Details of ROBs

Sr. No. Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure Span ArrangementsLength of

Structure (in mtr)

Type of Structure Span ArrangementsLength of Structure (in mtr)

1 409/2 408.500 RCC Slab over steel girders1x36.423.1x45.77

(Skew)68.97 RCC Slab over PSC girders

1x36.423.1x45.77 (Skew)

82.193 4-lane

2 416/1 415.208 RCC Solid Slab 1x10.90 (Skew) 10.90 RCC Slab over PSC girders 1x37.05 (Skew) 37.05 2-lane

3 452/1 451.273 RCC Slab over steel girders 1x12.90 (Skew) 12.90 RCC Slab over PSC girders 1x27.79 (Skew) 27.79 2-lane

4 456/2 455.686 RCC Slab over steel girders 1x6.75 6.75 RCC Slab over PSC girders 1x23.10 23.10 2-lane

1.9 Underpasses-Details of Underpasses

Sr No Structure Chainage

Existing New Constructed

Rem

arks

Type of Structure

Span Arrangements

Length of Structure (in mtr)

Type of Structure

Span Arrangements

Length of Structure (in mtr)

1 410/1 (Dhilwan) 409+050 - - - Box 1x7.00x3.80 7.00

2 415/1 (Beas) 414+120 - - - Box 1x10.00x3.80 10.00

3 415/2 (Beas – Dera) 414+565 - - - Box 2x10.00x3.80 20.00

4 420/1 (Rayya) 419+765 - - - Box 1x7.00x3.80 7.00

5 426/3 (Khalchian) 425+950 - - - Box 1x7.00x3.80 7.00

6 440/1 (Jandiala village) 439+100 - - - Box 1x7.00x3.80 7.00

7 448.675 (Daburje) 448+675 - - - Box 1x7.00x3.80 7.00

8 453/7 (Vallah) 452+710 - - - Box 1x7.00x3.80 7.00

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 8

Page 9: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 1.10 Culverts –

Details of Culverts

Sl No Structure No. Chainage Type Size (m) Type of Construction Remarks

1 410/2 409+275 B 1.2x1.2 RE Construction

2 410/3 409+463 1x1.0 New Construction

3 411/1 410+207 B 1.2x1.2 RE Construction

4 413/2 412+900 2x0.9 New Construction

5 414/1 413+100 B 2.0x2.0 RE Construction

6 414/2 413+632 B 1.5x1.5 New Construction

7 418/1 417+483 S 5.25 New Construction

8 419/1 418+190 1x1 New Construction

9 420/1 419+000 S 1.5 New Construction

10 421/1 420+322 1.5x1.2 RE Construction

11 421/2 420+425 B 4.0 RE Construction

12 421/3 420+443 B 4.0 RE Construction

13 421/5 420+520 B 2.0x1.2 RE Construction

14 421/7 420+900 1x1 New Construction

15 422/1 421+900 1x1 New Construction

16 423/1 422+400 B 1.2x1.2 New Construction

17 424/1 423+400 1x1 New Construction

18 425/1 424+277 B 1.5x1.2 New Construction

19 426/1 425+075 B 1.5X1.2 RE Construction

20 426/2 425+510 1x1 New Construction

21 427/1 426+490 B 1.5X1.2 New Construction

22 428/3 427+700 1x1 New Construction

23 429/1 428+500 1x1 New Construction

24 430/1 429+000 1x1 New Construction

25 430/2 429+600 1x1 New Construction

26 433/1 432+800 B 1.2x1.2 New Construction

Sl No Structure No. Chainage Type Size (m) Type of Construction Remarks

27 435/1 434+494 S 3 RE Construction

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 9

Page 10: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

28 438/1 437+400 B 2x(1.5x1.5) New Construction

29 440/2 439+230 1x1 New Construction

30 442/1 441+100 1x1 New Construction

31 442/2 441+363 B 2x(2x1.2) RE Construction

32 443/2 442+780 B 1.2x1.2 New Construction

33 444/1 443+845 B 3x1.2 RE Construction

34 445/1 444+700 B 2x (2x1.2) RE Construction

35 448/1 447+177 B 2x(1.5x1.2) New Construction

36 449/1 448+210 S 5 RE Construction

37 449/2 448+625 B 2x (2x1.2) RE Construction

38 450/1 449+070 B 2x(1.5x1.5) RE Construction

39 450/2 449+693 1x1 RE Construction

40 451/1 450+602 1x1 RE Construction

41 451/2 450+920 1x0.6 RE Construction

42 452/2 451+906 1x1 New Construction

43 453/3 452+370 B 3x1.2 RE Construction

44 453/4 452+435 1x1 RE Construction

45 453/5 452+484 B 2x1.2 RE Construction

46 453/6 452+696 B 1.2x1.2 RE Construction

47 453/8 452+765 B 1.5x1.2 RE Construction

48 453/9 452+965 B 1.2x1.2 RE Construction

49 454/1 453+254 S 2 RE Construction

50 456/1 455+140 1.2x1.2 RE Construction

51 457/1 456+037 S 6 Widening

Legend: - S - SlabB - Box

-Pipe

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 10

Page 11: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 2. DEPLOYMENT OF INDEPENDENT ENGINEER

Sl.No Position Name

Revised Man Month

w.e.f. 07.12.2011 to

31.08.2015

Project Deployments Man Month

Cumulative up to July 2015 Balance

Unit Unit

Key Personnel

1 Team Leader cum Sr. Highway Engineer Mr. Gurmej Singh Gill 44.600 43.600 1.000

2 Sr. Pavement Specialist Mr. N Dharamrajan 6.000 5.600 0.4003 Financial Expert Mr Ajay Singh 6.000 5.400 0.6004 Legal Expert Col (Retd) Dharampal 3.999 3.999 -

Sub-Professional

1 Bridge Engineer Mr. Aniruddha Swami 6.000 5.500 0.5002 Quality / Material Engineer Mr. Praveen Kr. Jain 4.000 4.000 -

3 Traffic and Transportation Engineer TBN - - -

4 Assistant Highway Engineer Mr. Harbans Singh 43.533 42.404 1.129

5 Assistant Bridge Engineer Mr. Biprendra Kumar 38.301 24.301 1.100Mr. Bhupinder Singh 12.900

Support Staff

1 Office Manager cum Accountant Mr. Anil Kumar 44.300 43.134 1.166

2 Secretary cum Computer Operator

Mr. Vikash Sharma 44.667 41.434 3.233Mr. Kartar Chand

8 Office Boy Mr. Ravi Kumar /Mangat Singh 44.300 43.134 1.166

1. Note: Consultancy Agreement for O&M Phase which has been allotted to us w.e.f. 07.12.2011 for 36 months has been expired on 06.12.2014. Proposal for Extension of IE’s Services for a further period from 07.12.2014 to 31.08.2015 in O&M Period has been submitted to NHAI. In submitted proposal of the staff strength / input of man month has been kept same for O&M Period as provided in the Original Agreement and the quoted rates have also been kept same enhancing the same at the rate 8% for every 18 months wherever applicable.

In this regards refer NHAI HQ letter no. NHAI/BOT/11023/11/ 2006/ 2155 dated 02.06.2015 wherein based on the recommendation of PD NHAI and RO Chd; Competent Authority of NHAI has accorded the approval of service of IE for further period from 07.12.2014 to 31.08.2015 or till the appointment of New IE whichever is earlier.

During discussion with NHAI Jalandhar it has been conveyed that since bidding process for appointment of new IE may take some time so we have been advised to submit further extension of our services up to 31st December 2015. Accordingly it is submitted as under: The proposal for extension of our consultancy services vide letter no. 1887 dated 04.08.2015 from 01.09.2015 to 31.12.2015 is amounting Rs. 3956364.00 {Rs. 3570920.00 (Financial Implication from 01.09.2015 to 31.12.2015) + Rs. 385444.00 (Escalation by increasing 16.64% on Remuneration of employed personnel designated in Indian Currency pursuant to the rates set forth in the Appendix G&H which shall be adjusted after every 18months from the date of commencement i.e. 07.12.2011 by increasing it by a factor 8%.). In submitted proposal the deployment of personals i.e Sh. N. Dharamrajan, Sr. Pavement Specialist and Sh. P. K. Jain, Quality cum Material Engineer is also required for supervising the work of renewal coat / overlay of project highway which is due to be done by Concessionaire

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 11

Page 12: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 3. INDEPENDENT CONSULTANT'S REVIEW DURING O&M PERIOD:

IC’s responsibility during O&M Phase has been clearly mentioned vide Clause 3.3 along with sub causes 3.3.1 to 3.3.8. Reporting criteria has been en-framed in Clause 5 © , Page O 16 of CA VOL II during O&M Phase. Monthly reporting requirement is envisaged covering all aspects of O&M, Toll Booths, Bridges or other structures, Traffic Management and Safety, Telephone and Ambulance etc.

3.1 Traffic Sampling (Vide Schedule P of Page P1 Concession Agreement VOL II):

As Independent Consultant is authorized / obligated vide Clauses referred above to undertake traffic sampling for the purpose of determination and / or verification of the actual traffic plying on project highways, Automatic Traffic Count cum Classifier is to be procured by Concessionaire earlier i. e. as ensured by Concessionaire vide letter no 3198 dated 02.02.2011by 25.02.2011.In compliance to the Schedule – P of Concession Agreement, Concessionaire mobilized IRD (CANADA) make Automatic Traffic Count – cum – Classifier and had put up the same on trial for two days in June 2011 but subsequently it was found that the equipment is lacking from proper functioning and needs repair / replacement. The replacement of Calibrated Equipment is being placed at site from 1st week of July 2011.

Traffic Sampling / Recording System (TRS) conducted by Concessionaire in presence of IC at Km. 416.500 from date 22.12.2011 to 25.12.2011 as per Schedule – P of Concession Agreement Vol II and recent test has been conducted in the month of June 2012.

3.2 Traffic Operation and Safety Requirement (Independent Consultant’s Involvement is validated vide Clause 3.3.8, Page O –

14 Under Head of IC’s TOR of Concession Agreement Vol – II):

Independent Consultant is effective by minimizing disruption to traffic in the event of accidents or other incidents affecting the safety and use of the Project Highway by providing a rapid and effective response and maintaining liaison procedures with emergency services.

The Concessionaire's adherence to the safety standards set out in Schedule ‘S’ are strictly complied with in the event of any lane closure or diversion of traffic. Compliance with Schedule ‘S’ gets monitored by the Independent Consultant and a breach by the Concessionaire of its obligations in respect of this Schedule identified by the Independent Consultant gets notified immediately and is required to be cured within 24 hours of its notification notwithstanding inspection, reporting procedures outlined elsewhere in this Agreement. In addition, each notified breach shall lead to the award of a penalty point to the Concessionaire. A total of five penalty points in any continuous period of 365 days shall constitute a Material Breach of this Agreement.

3.3 Toll Plaza and Fees Collection System (Independent Consultant’s Involvement is validated vide Clause 3.3.3,

Page O – 14 Under Head of IC’s TOR of Concession Agreement Vol – II):

Concessionaire is charging / collecting and retaining the Fees in accordance with the Agreement by refurbishment of tolling system and hardware and other equipment. The revised rate of Toll Collection Fee commencing w.e.f 01st Sept 2014 at Toll Plaza 1&2 along with substance of Gazette Notification no. S.O. 1592(E) dated 30.06.2009 was got published for the information in two local Newspapers i. e. "The Tribune" in English and "Daily Jagbani" in Punjabi language both as follows:

User Fee to be Applicable to each Toll Plaza i.e. at Km. 410.140 and 442.890 w.e.f. 01st September 2014 from Km. 407.100 to Km. 456.100 (Total Length 49 Km. i.e. 24.50 Km. for each Plaza)

Sr. No. Particulars Car LCV Truck

/ BusMulti Axle Vehicle

(>2 Axles)EME / HCM

1 Fee for the Traffic Crossing any one Plaza 25 43 87 140 186

2 Fee for the Local Personal Traffic (25% of the applicable fees for the specific category of Vehicle) 6 - - - -

3 Fee for the Local Commercial Traffic (50% of the applicable fees for the specific category of Vehicle) 12 22 43 70 93

4 Fee for Multiple Journey within a day for each Plaza(One & half time of notified rate) 37 65 130 209 279

5 Fee for Monthly Passes for Frequent Journey for each Plaza (payment of charges equal to 30time notified rate) 744 1303 2606 4187 5583

IC presents the monthly tollable traffic statement for both the toll plazas as submitted by the Concessionaire as Annexure – A3.4 Traffic Data at Toll Plazas : Annexure B3.5 Highway Accident Report : Annexure C3.6 Incident Management : Annexure D

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 12

Page 13: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Annexure – A

Monthly Tollable Traffic Statement for both the toll plazas

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 13

Page 14: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-IName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 1,412 0.09 1,786 0.11 937 10 0.06 0.00 947 0.06

Light Commercial Vehicle (LCV) including Mini Bus 103 0.02 0 0.00 0 158 0.00 0.03 158 0.03

Truck/Bus 41 0.02 0 0.00 0 36 0.00 0.02 36 0.02

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 1,556 0.13 1,786 0.11 937 204 0.06 0.05 1,141 0.11

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-II Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 14

Page 15: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Name of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 5,150 0.31 8,701 0.54 3,496 89 0.21 0.01 3,585 0.22

Light Commercial Vehicle (LCV) including Mini Bus 8 0.00 28 0.01 0 14 0.00 0.00 14 0.00

Truck/Bus 41 0.02 143 0.06 0 12 0.00 0.01 12 0.01

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 5,199 0.33 8,872 0.60 3496 115 0.21 0.02 3,611 0.23

MONTHLY FEE COLLECTION STATEMENT OF LOCAL TOLLED TRAFFIC FOR TOLL PLAZA-I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITED

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 15

Page 16: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Date of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f. 01.09.2014 till

31.08.2015

LP LC LP LC LP LC LP LC LP LC LP LC

Car, Passenger van or jeep 4 9 5 9 5 10 5 11 6 12 6 12

Light Commercial Vehicle (LCV) including Mini Bus 8 16 8 16 0 18 0 19 0 20 0 22

Truck/Bus 15 31 16 32 0 35 0 38 0 41 0 43

Multi Axle vehicle (>2 Axle) 25 51 25 51 0 56 0 61 0 66 0 70

Earth moving equipments and heavy construction machinery 33 65 34 68 0 75 0 82 0 88 0 93

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos.Amount

in Rs.Lacs

Nos. AmountNos. Amount in Rs.Lacs

Nos. Amount in Rs. LacsLP LC LP LC

Car, Passenger van or jeep 6,562 0.40 10,487 0.64 4433 99 0.27 0.01 4,532 0.28

Light Commercial Vehicle (LCV) including Mini Bus 111 0.02 28 0.01 0 172 0.00 0.04 172 0.04

Truck/Bus 82 0.04 143 0.06 0 48 0.00 0.02 48 0.02

Multi Axle vehicle (>2 Axle) 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Earth moving equipments and heavy construction machinery 0 0.00 0 0.00 0 0 0.00 0.00 0 0.00

Gross Total 6,755 1.13 10,658 0.71 4433 319 0.27 0.07 4,752 0.34

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-IName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 16

Page 17: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Fee rates ( in Rs.)

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos.

Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 217,881 68.52 184,335 55.41 91,770 122,051 9 22.94 45.16 0.07 213,830 68.17

Light Commercial Vehicle (LCV) including Mini Bus 44,705 25.15 41,950 22.48 17,660 25,039 28 7.59 16.28 0.36 42,727 24.23

Truck/Bus 27,107 31.03 27,788 29.89 10,705 16,095 39 9.31 20.92 1.02 26,839 31.25

Multi Axle vehicle (>2 Axle) 14,591 22.27 16,105 22.86 10,648 1,948 8 14.91 4.07 0.33 12,604 19.31Earth moving equipments and heavy

construction machinery 77 0.15 97 0.17 64 5 0 0.12 0.01 0.00 69 0.13

Gross Total 304,361 147.12 270,275 130.81 130,847 165,138 84 54.88 86.44 1.78 296069 143.10

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015

Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 17

Page 18: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos.

Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 202,960 64.47 184,868 56.81 78,076 124,366 21 19.52 46.02 0.16 202,463 65.69

Light Commercial Vehicle (LCV) including Mini Bus 34,915 19.45 35,052 18.73 13,419 20,026 20 5.77 13.02 0.26 33,465 19.05

Truck/Bus 20,339 23.42 20,923 22.70 7,856 11,105 35 6.83 14.44 0.91 18,996 22.18

Multi Axle vehicle (>2 Axle) 16,352 24.42 14,118 20.24 11,879 1,676 5 16.63 3.50 0.21 13,560 20.34Earth moving equipments and heavy

construction machinery 124 0.26 139 0.28 74 20 0 0.14 0.06 0.00 94 0.19

Gross Total 274,690 132.02 255,100 118.76 111,304 157,193 81 48.89 77.03 1.54 268578 127.46

MONTHLY FEE COLLECTION STATEMENT OF THROUGH TOLLED TRAFFIC FOR PLAZA-I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015

Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 18

Page 19: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f 01.09.2011 to

31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012

to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle Type Previous Month Corresponding Month during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos.

Amount in

Rs.LacsSJ DP MP SJ DP MPCar, Passenger van or jeep 420,841 132.99 369,203 112.21 169846 246417 30 39.06 86.25 0.21 416,293 133.86

Light Commercial Vehicle (LCV) including Mini Bus 79,620 44.60 77,002 41.22 31079 45065 48 12.74 27.49 0.59 76,192 43.28

Truck/Bus 47,446 54.45 48,711 52.59 18561 27200 74 15.03 33.46 1.82 45,835 53.44

Multi Axle vehicle (>2 Axle) 30,943 46.69 30,223 43.10 22527 3624 13 29.74 7.18 0.51 26,164 39.66Earth moving equipments and heavy construction machinery 201 0.41 236 0.45 138 25 0 0.24 0.07 0.00 163 0.33

Gross Total 579,051 279.14 525,375 249.57 242151 322331 165 96.82 154.43 3.13 564,647 270.56

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA-I

Name of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 19

Page 20: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012 to

31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month

Corresponding Month during Previous Year

Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs.LacsNos. Amount in

Rs.LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 219,293 68.61 186,121 55.52 91770 122051 937 10 9 22.94 45.16 0.06 0.00 0.07 214,777 68.23

Light Commercial Vehicle (LCV) including Mini Bus 44,808 25.17 41,950 22.48 17660 25039 0 158 28 7.59 16.28 0.00 0.03 0.36 42,885 24.27

Truck/Bus 27,148 31.05 27,788 29.89 10705 16095 0 36 39 9.31 20.92 0.00 0.01 1.02 26,875 31.27

Multi Axle vehicle (>2 Axle) 14,591 22.27 16,105 22.86 10648 1948 0 0 8 14.91 4.07 0.00 0.00 0.33 12,604 19.31Earth moving equipments and heavy construction

machinery77 0.15 97 0.17 64 5 0 0 0 0.12 0.01 0.00 0.00 0.00 69 0.13

Gross Total 305,917 147.25 272,061 130.92 130847 165138 937 204 84 54.88 86.44 0.06 0.05 1.78 297210 143.21

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA-IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 20

Page 21: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f. 01.09.2012 to

31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013

to 31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount Nos. Amount in Rs.Lacs Nos. Amount in

Rs.LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 208,110 64.78 193,569 57.34 78076 124366 3496 89 21 19.52 46.02 0.21 0.01 0.16 206,048 65.91

Light Commercial Vehicle (LCV) including Mini Bus 34,923 19.45 35,080 18.74 13419 20026 0 14 20 5.77 13.02 0.00 0.00 0.26 33,479 19.05

Truck/Bus 20,380 23.44 21,066 22.76 7856 11105 0 12 35 6.83 14.44 0.00 0.01 0.91 19,008 22.19

Multi Axle vehicle (>2 Axle) 16,352 24.42 14,118 20.24 11879 1676 0 0 5 16.63 3.50 0.00 0.00 0.21 13,560 20.34Earth moving equipments and heavy construction

machinery124 0.26 139 0.28 74 20 0 0 0 0.14 0.06 0.00 0.00 0.00 94 0.19

Gross Total 279,889 132.35 263,972 119.3617 111304 157193 3496 115 81 48.89 77.03 0.21 0.02 1.54 272,189 127.69

MONTHLY FEE COLLECTION STATEMENT OF TOTAL TOLLED TRAFFIC FOR PLAZA- I & IIName of Work: JALANDHAR AMRITSAR TOLLWAYS LIMITEDDate of commencement of fee collection : 30.04.2010 Report for month ending : July 2015Fee rates ( in Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 21

Page 22: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Vehicle TypeFee rates on

commencement

Rates during YR 10-11

w.e.f.01.09.2010 to 31.08.2011

Rates during YR 11 -12 applied w.e.f

01.09.2011 to 31.08.2012

Rates during YR 12 -13 applied w.e.f.

01.09.2012 to 31.08.2014

Rates during YR 13-14 applied w.e.f. 01.09.2013 to

31.08.2014

Rates during YR 14-15 Present applied w.e.f.

01.09.2014 till 31.08.2015

SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP SJ DP MP

Car, Passenger van or jeep 17 26 523 18 27 543 20 30 601 22 33 654 23 35 702 25 37 744

Light Commercial Vehicle (LCV) including Mini Bus 31 46 916 32 48 951 35 53 1051 38 57 1145 41 61 1229 43 65 1303

Truck/Bus 61 92 1832 63 95 1902 70 105 2102 76 114 2290 82 123 2459 87 130 2606

Multi Axle vehicle (>2 Axle) 98 147 2944 102 153 3057 113 169 3379 123 184 3680 132 198 3951 140 209 4187

Earth moving equipments and heavy construction machinery 131 196 3925 204 204 4076 150 225 4505 164 245 4907 176 263 5268 186 279 5583

Collection during month under report (Amount in Rs. Lacs)

Vehicle TypePrevious Month Corresponding Month

during Previous Year Current Month

Nos. Amount in Rs.Lacs Nos. Amount

Nos. Amount in Rs. LacsNos.

Amount in Rs. LacsSJ DP LP LC MP SJ DP LP LC MP

Car, Passenger van or jeep 427,403 133.39 379,690 112.858 169846 246417 4,433 99 30 42.46 91.17 0.27 0.01 0.21 420,825 134.12

Light Commercial Vehicle (LCV) including Mini Bus 79,731 44.62 77030 41.2222 31079 45065 0 172 48 13.36 29.29 0.00 0.03 0.59 76,364 43.28

Truck/Bus 47,528 54.49 48854 52.6539 18561 27200 0 48 74 16.15 35.36 0.00 0.02 1.82 45,883 53.35

Multi Axle vehicle (>2 Axle) 30,943 46.69 30223 43.0969 22527 3624 0 0 13 31.54 7.57 0.00 0.00 0.51 26,164 39.63Earth moving equipments and heavy construction

machinery201 0.41 236 0.4519 138 25 0 0 0 0.26 0.07 0.00 0.00 0.00 163 0.33

Gross Total 585,806 279.60 536,033 250.283 242151 322331 4,433 319 165 103.77 163.47 0.27 0.07 3.13 569,399 270.71

STATEMENT OF DAILY TRAFFIC & COLLECTION (Toll Plaza 1)(A) Tolled Traffic & Collection (Cash)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle Earth moving equipments and heavy

construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 22

Page 23: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

1–July–15 6,606 209646 1437 80689 915 103470 409 61262 1 186 9,368 4552532– July–15 6,558 206358 1,509 84137 937 105298 444 66645 1 186 9,449 4626243– July–15 9913 292525 1869 99177 1061 116172 480 73272 3 558 13,326 5817044– July–15 11914 378382 1,851 104519 983 111536 489 73911 6 1116 15,243 669464

5– July–15 15393 479493 2,286 125996 1060 118450 342 51399 2 372 19,083 775710

6– July–15 6490 202930 1,163 65189 873 98526 454 67838 3 558 8,983 4350417– July–15 5456 174152 1,384 77574 917 104117 441 67329 0 0 8,198 4231728– July–15 5845 186697 1,366 76250 861 97009 437 66079 2 372 8,511 4264079– July–15 5710 183226 1,387 77571 879 99263 431 64549 4 744 8,411 42535310– July–15 6435 204051 1,381 76653 864 98130 428 64612 1 186 9,109 44363211– July–15 7655 240431 1,307 73537 836 94103 364 55031 1 186 10,163 46328812– July–15 8230 261454 1,102 61818 659 74748 279 41268 2 372 10,272 43966013– July–15 6215 195647 1,074 60922 816 91761 381 58584 2 372 8,488 40728614– July–15 5541 178041 1325 74157 820 91679 421 63425 1 186 8,108 40748815– July–15 6177 200961 1371 76245 814 92017 436 64973 1 186 8,799 43438216– July–15 6266 203426 1361 76981 850 96181 412 62648 0 0 8,889 43923617– July–15 6233 196925 1292 71792 846 96005 464 70273 5 1023 8,840 43601818– July–15 7887 249891 1,184 65058 840 94408 328 49232 2 372 10,241 45896119– July–15 8107 257347 1,180 66074 695 78353 273 40773 0 0 10,255 44254720– July–15 6,045 193761 1,096 61692 833 93928 343 51884 5 930 8,322 40219521– July–15 5402 176102 1,239 69755 866 98046 325 49502 4 744 7,836 39414922– July–15 5528 180272 1313 74169 866 97272 379 57890 4 744 8,090 41034723– July–15 5,397 175677 1,366 77636 855 97605 403 60146 1 186 8,022 41125024– July–15 6111 196467 1,377 76019 881 99781 429 64338 3 558 8,801 43716325– July–15 7589 243737 1,343 75613 872 98482 416 62725 2 465 10,222 48102226– July–15 7816 253276 1168 65470 720 81345 369 55041 1 186 10,074 45531827– July–15 5,413 173473 1,259 70813 872 99170 413 62719 1 186 7,958 40636128– July–15 4909 161293 1,306 73692 864 97743 428 64405 0 0 7,507 39713329– July–15 5194 171106 1,410 79330 907 102516 454 68735 6 1302 7,971 42298930– July–15 5471 178811 1,481 83417 859 97136 467 69175 2 372 8,280 42891131-July–15 6310 204430 1,512 84970 879 99435 457 68189 3 651 9,161 457675

Total 213,816 6,809,988 42,699 2,386,915 26,800 3,023,685 12,596 1,897,852 69 13,299 295,980 14,131,739

(B) Local Tolled Traffic & Collection (Through Smart Cards)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Earth moving equipments and

heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)1–July–15 34 204 1 22 0 0 0 0 0 0 35 2262– July–15 27 162 6 132 0 0 0 0 0 0 33 2943– July–15 23 150 1 22 0 0 0 0 0 0 24 172

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 23

Page 24: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

4– July–15 30 180 1 22 0 0 0 0 0 0 31 202

5– July–15 20 120 1 22 0 0 0 0 0 0 21 142

6– July–15 29 174 5 110 2 86 0 0 0 0 36 370

7– July–15 27 162 8 176 0 0 0 0 0 0 35 338

8– July–15 25 150 8 176 2 86 0 0 0 0 35 4129– July–15 23 138 5 110 0 0 0 0 0 0 28 248

10– July–15 33 198 5 110 2 86 0 0 0 0 40 39411– July–15 36 216 6 132 3 129 0 0 0 0 45 477

12– July–15 30 192 1 22 3 129 0 0 0 0 34 34313– July–15 27 162 5 110 3 129 0 0 0 0 35 40114– July–15 39 234 10 220 0 0 0 0 0 0 49 45415– July–15 42 264 7 154 2 86 0 0 0 0 51 50416– July–15 36 216 6 132 2 86 0 0 0 0 44 43417– July–15 30 180 7 154 1 43 0 0 0 0 38 37718– July–15 29 186 2 44 0 0 0 0 0 0 31 23019– July–15 29 174 1 22 2 86 0 0 0 0 32 28220– July–15 37 222 7 154 1 43 0 0 0 0 45 41921– July–15 39 234 6 132 0 0 0 0 0 0 45 36622– July–15 42 252 4 88 3 129 0 0 0 0 49 46923– July–15 25 150 7 154 1 43 0 0 0 0 33 34724– July–15 26 156 7 154 0 0 0 0 0 0 33 31025– July–15 37 222 5 110 1 43 0 0 0 0 43 37526– July–15 42 264 4 88 1 43 0 0 0 0 47 39527– July–15 20 120 8 176 1 43 0 0 0 0 29 33928– July–15 24 144 6 132 1 43 0 0 0 0 31 31929– July–15 32 192 6 132 1 43 0 0 0 0 39 36730– July–15 32 192 7 154 1 43 0 0 0 0 40 38931-July–15 22 132 5 110 3 129 0 0 0 0 30 371

Total 947 5742 158 3476 36 1548 0 0 0 0 1141 10766

Total Tolled Traffic & Collection (A+B)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle) Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1–July–15 6,640 209,850 1,438 80,711 915 103,470 409 61,262 1 186 9403 4554792– July–15 6,585 206,520 1,515 84,269 937 105,298 444 66,645 1 186 9482 4629183– July–15 9,936 292,675 1,870 99,199 1,061 116,172 480 73,272 3 558 13350 581876

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 24

Page 25: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

4– July–15 11,944 378,562 1,852 104,541 983 111,536 489 73,911 6 1,116 15274 6696665– July–15 15,413 479,613 2,287 126,018 1,060 118,450 342 51,399 2 372 19104 7758526– July–15 6,519 203,104 1,168 65,299 875 98,612 454 67,838 3 558 9019 4354117– July–15 5,483 174,314 1,392 77,750 917 104,117 441 67,329 0 0 8233 4235108– July–15 5,870 186,847 1,374 76,426 863 97,095 437 66,079 2 372 8546 4268199– July–15 5,733 183,364 1,392 77,681 879 99,263 431 64,549 4 744 8439 42560110– July–15 6,468 204,249 1,386 76,763 866 98,216 428 64,612 1 186 9149 44402611– July–15 7,691 240,647 1,313 73,669 839 94,232 364 55,031 1 186 10208 46376512– July–15 8,260 261,646 1,103 61,840 662 74,877 279 41,268 2 372 10306 44000313– July–15 6,242 195,809 1,079 61,032 819 91,890 381 58,584 2 372 8523 40768714– July–15 5,580 178,275 1,335 74,377 820 91,679 421 63,425 1 186 8157 40794215– July–15 6,219 201,225 1,378 76,399 816 92,103 436 64,973 1 186 8850 43488616– July–15 6,302 203,642 1,367 77,113 852 96,267 412 62,648 0 0 8933 43967017– July–15 6,263 197,105 1,299 71,946 847 96,048 464 70,273 5 1,023 8878 43639518– July–15 7,916 250,077 1,186 65,102 840 94,408 328 49,232 2 372 10272 45919119– July–15 8,136 257,521 1,181 66,096 697 78,439 273 40,773 0 0 10287 44282920– July–15 6,082 193,983 1,103 61,846 834 93,971 343 51,884 5 930 8367 402614

21– July–15 5,441 176,336 1,245 69,887 866 98,046 325 49,502 4 744 7881 394515

22– July–15 5,570 180,524 1,317 74,257 869 97,401 379 57,890 4 744 8139 41081623– July–15 5,422 175,827 1,373 77,790 856 97,648 403 60,146 1 186 8055 41159724– July–15 6,137 196,623 1,384 76,173 881 99,781 429 64,338 3 558 8834 43747325– July–15 7,626 243,959 1,348 75,723 873 98,525 416 62,725 2 465 10265 48139726– July–15 7,858 253,540 1,172 65,558 721 81,388 369 55,041 1 186 10121 45571327– July–15 5,433 173,593 1,267 70,989 873 99,213 413 62,719 1 186 7987 40670028– July–15 4,933 161,437 1,312 73,824 865 97,786 428 64,405 0 0 7538 397452

29– July–15 5,226 171,298 1,416 79,462 908 102,559 454 68,735 6 1,302 8010 423356

30– July–15 5,503 179,003 1,488 83,571 860 97,179 467 69,175 2 372 8320 429300

31-July–15 6,332 204,562 1,517 85,080 882 99,564 457 68,189 3 651 9191 458046Total 214,763 6,815,730 42,857 2,390,391 26,836 3,025,233 12,596 1,897,852 69 13,299 297,121 14,142,505

(C) Exempted Traffic

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (>2 axle)

Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)1–July–15 297 7425 28 1204 11 957 2 280 0 0 338 98662– July–15 294 7350 21 903 25 2175 3 420 0 0 343 108483– July–15 273 6825 33 1419 23 2001 5 700 0 0 334 109454– July–15 364 9100 13 559 12 1044 5 700 0 0 394 114035– July–15 346 8650 24 1032 8 696 2 280 0 0 380 10658

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 25

Page 26: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

6– July–15 224 5600 18 774 15 1305 2 280 0 0 259 79597– July–15 243 6075 25 1075 34 2958 3 420 0 0 305 105288– July–15 273 6825 22 946 19 1653 4 560 1 186 319 101709– July–15 248 6200 22 946 22 1914 1 140 0 0 293 9200

10– July–15 268 6700 21 903 19 1653 2 280 0 0 310 953611– July–15 335 8375 13 559 17 1479 7 980 0 0 372 1139312– July–15 361 9025 24 1032 4 348 1 140 0 0 390 1054513– July–15 266 6650 19 817 27 2349 2 280 0 0 314 1009614– July–15 229 5725 30 1290 22 1914 2 280 0 0 283 920915– July–15 288 7200 19 817 24 2088 1 140 0 0 332 1024516– July–15 312 7800 30 1290 24 2088 3 420 0 0 369 1159817– July–15 323 8075 35 1505 24 2088 3 420 0 0 385 1208818– July–15 382 9550 19 817 7 609 3 420 0 0 411 1139619– July–15 355 8875 11 473 3 261 0 0 0 0 369 960920– July–15 304 7600 26 1118 16 1392 3 420 0 0 349 1053021– July–15 272 6800 22 946 12 1044 2 280 0 0 308 9070

22– July–15 238 5950 21 903 15 1305 1 140 0 0 275 829823– July–15 264 6600 30 1290 21 1827 1 140 0 0 316 985724– July–15 246 6150 27 1161 20 1740 5 700 0 0 298 9751

25– July–15 271 6775 34 1462 23 2001 0 0 0 0 328 1023826– July–15 315 7875 30 1290 6 522 1 140 0 0 352 982727– July–15 313 7825 41 1763 28 2436 3 420 0 0 385 12444

28– July–15 245 6125 22 946 21 1827 1 140 0 0 289 9038

29– July–15 236 5900 20 860 20 1740 1 140 0 0 277 8640

30– July–15 253 6325 23 989 8 696 0 0 0 0 284 8010

31-July–15 281 7025 28 1204 14 1218 3 420 0 0 326 9867

Total 8919 222975 751 32293 544 47328 72 10080 1 186 10287 312862

(D) Bar Code Traffic

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle(>2 axle)

Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1–July–15 2934 73350 857 36851 668 58116 70 9800 0 0 4529 178117

2– July–15 2998 74950 877 37711 616 53592 111 15540 0 0 4602 1817933– July–15 2628 65700 830 35690 613 53331 148 20720 0 0 4219 1754414– July–15 3435 85875 853 36679 553 48111 131 18340 0 0 4972 189005

5– July–15 3391 84775 645 27735 298 25926 82 11480 0 0 4416 149916

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 26

Page 27: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

6– July–15 2720 68000 693 29799 558 48546 61 8540 0 0 4032 1548857– July–15 3143 78575 915 39345 745 64815 94 13160 0 0 4897 1958958– July–15 2708 67700 854 36722 595 51765 94 13160 0 0 4251 1693479– July–15 2770 69250 804 34572 598 52026 132 18480 1 186 4305 174514

10– July–15 2885 72125 798 34314 627 54549 82 11480 0 0 4392 17246811– July–15 2894 72350 735 31605 621 54027 90 12600 0 0 4340 17058212– July–15 3472 86800 553 23779 438 38106 50 7000 0 0 4513 15568513– July–15 2681 67025 649 27907 555 48285 61 8540 0 0 3946 15175714– July–15 2595 64875 713 30659 569 49503 84 11760 0 0 3961 15679715– July–15 3670 91750 912 39216 622 54114 75 10500 0 0 5279 19558016– July–15 4292 107300 1023 43989 687 59769 71 9940 0 0 6073 22099817– July–15 3094 77350 803 34529 677 58899 92 12880 1 186 4667 18384418– July–15 3488 87200 740 31820 620 53940 77 10780 0 0 4925 18374019– July–15 3991 99775 600 25800 447 38889 38 5320 0 0 5076 16978420– July–15 3361 84025 765 32895 611 53157 58 8120 0 0 4795 17819721– July–15 3295 82375 801 34443 670 58290 75 10500 0 0 4841 18560822– July–15 3188 79700 888 38184 642 55854 70 9800 0 0 4788 18353823– July–15 3262 81550 951 40893 643 55941 71 9940 0 0 4927 18832424– July–15 3323 83075 844 36292 671 58377 67 9380 0 0 4905 18712425– July–15 3628 90700 916 39388 601 52287 88 12320 2 372 5235 19506726– July–15 4587 114675 665 28595 482 41934 70 9800 1 186 5805 19519027– July–15 2982 74550 834 35862 567 49329 65 9100 0 0 4448 16884128– July–15 2891 72275 805 34615 607 52809 72 10080 0 0 4375 16977929– July–15 3212 80300 940 40420 614 53418 83 11620 1 186 4850 18594430– July–15 3198 79950 960 41280 569 49503 88 12320 3 558 4818 183611

31-July–15 3568 89200 995 42785 602 52374 70 9800 1 186 5236 194345Total 100284 2507100 25218 1084374 18386 1599582 2520 352800 10 1860 146418 5545716

Grand Total of Traffic & Collection (A+B+C+D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(>2 axle)Earth moving equipments and heavy construction machinery Grand Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount (Rs.)

1–July–15 9,871 290,625 2,323 118,766 1,594 162,543 481 71,342 1 186 14270 6434622– July–15 9,877 288,820 2,413 122,883 1,578 161,065 558 82,605 1 186 14427 6555593– July–15 12,837 365,200 2,733 136,308 1,697 171,504 633 94,692 3 558 17903 7682624– July–15 15,743 473,537 2,718 141,779 1,548 160,691 625 92,951 6 1,116 20640 8700745– July–15 19,150 573,038 2,956 154,785 1,366 145,072 426 63,159 2 372 23900 9364266– July–15 9,463 276,704 1,879 95,872 1,448 148,463 517 76,658 3 558 13310 5982557– July–15 8,869 258,964 2,332 118,170 1,696 171,890 538 80,909 0 0 13435 6299338– July–15 8,851 261,372 2,250 114,094 1,477 150,513 535 79,799 3 558 13116 606336

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 27

Page 28: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

9– July–15 8,751 258,814 2,218 113,199 1,499 153,203 564 83,169 5 930 13037 60931510– July–15 9,621 283,074 2,205 111,980 1,512 154,418 512 76,372 1 186 13851 62603011– July–15 10,920 321,372 2,061 105,833 1,477 149,738 461 68,611 1 186 14920 64574012– July–15 12,093 357,471 1,680 86,651 1,104 113,331 330 48,408 2 372 15209 60623313– July–15 9,189 269,484 1,747 89,756 1,401 142,524 444 67,404 2 372 12783 56954014– July–15 8,404 248,875 2,078 106,326 1,411 143,096 507 75,465 1 186 12401 57394815– July–15 10,177 300,175 2,309 116,432 1,462 148,305 512 75,613 1 186 14461 64071116– July–15 10,906 318,742 2,420 122,392 1,563 158,124 486 73,008 0 0 15375 67226617– July–15 9,680 282,530 2,137 107,980 1,548 157,035 559 83,573 6 1,209 13930 63232718– July–15 11,786 346,827 1,945 97,739 1,467 148,957 408 60,432 2 372 15608 65432719– July–15 12,482 366,171 1,792 92,369 1,147 117,589 311 46,093 0 0 15732 62222220– July–15 9,747 285,608 1,894 95,859 1,461 148,520 404 60,424 5 930 13511 59134121– July–15 9,008 265,511 2,068 105,276 1,548 157,380 402 60,282 4 744 13030 58919322– July–15 8,996 266,174 2,226 113,344 1,526 154,560 450 67,830 4 744 13202 60265223– July–15 8,948 263,977 2,354 119,973 1,520 155,416 475 70,226 1 186 13298 60977824– July–15 9,706 285,848 2,255 113,626 1,572 159,898 501 74,418 3 558 14037 63434825– July–15 11,525 341,434 2,298 116,573 1,497 152,813 504 75,045 4 837 15828 68670226– July–15 12,760 376,090 1,867 95,443 1,209 123,844 440 64,981 2 372 16278 66073027– July–15 8,728 255,968 2,142 108,614 1,468 150,978 481 72,239 1 186 12820 58798528– July–15 8,069 239,837 2,139 109,385 1,493 152,422 501 74,625 0 0 12202 576269

29– July–15 8,674 257,498 2,376 120,742 1,542 157,717 538 80,495 7 1,488 13137 61794030– July–15 8,954 265,278 2,471 125,840 1,437 147,378 555 81,495 5 930 13422 62092131-July–15 10,181 300,787 2,540 129,069 1,498 153,156 530 78,409 4 837 14753 662258

Total 323,966 9,545,805 68,826 3,507,058 45,766 4,672,143 15,188 2,260,732 80 15,345 453,826 20,001,083STATEMENT OF DAILY TRAFFIC & COLLECTION(Toll Plaza 2)

(A) Tolled Traffic & Collection (Cash)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle)

Earth moving equipments and heavy construction

machineryTotal

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount (Rs.) Nos. Amount1–July–15 6641 213353 1141 64045 639 71976 419 62386 2 558 8842 4123182– July–15 6210 200706 1155 64911 620 69334 435 66075 8 1488 8428 4025143– July–15 6998 222434 1168 65932 649 73362 483 73002 4 744 9302 4354744– July–15 9067 291415 1222 67902 692 77103 519 77076 6 1209 11506 5147055– July–15 8318 265106 967 53483 573 63224 364 53444 2 465 10224 4357226– July–15 6625 210841 976 54266 637 71200 512 76027 3 558 8753 4128927– July–15 5837 187697 1176 65748 666 73981 526 78608 1 186 8206 4062208– July–15 5964 193632 1079 60565 617 68385 445 66164 6 1395 8111 3901419– July–15 5882 190898 1120 62548 638 71760 473 70291 8 1488 8121 39698510– July–15 6690 214422 1100 61006 618 69203 495 73854 0 0 8903 41848511– July–15 7779 247611 1117 62705 594 67072 404 60010 4 837 9898 438235 Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 28

Page 29: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 12– July–15 8038 256222 891 49313 490 55057 418 60797 2 465 9839 42185413– July–15 6394 205198 887 49537 549 62340 414 61962 1 186 8245 37922314– July–15 5767 187471 1106 62034 627 69040 473 68980 3 651 7976 38817615– July–15 6200 202712 1143 64197 609 68033 457 67430 2 372 8411 40274416– July–15 5822 189806 1050 59450 608 68118 419 62248 1 186 7900 37980817– July–15 6364 203920 1060 59088 587 66291 465 69171 4 837 8480 39930718– July–15 7831 251359 978 54308 586 66118 381 56307 1 186 9777 42827819– July–15 7744 247912 909 50989 519 57752 349 50930 2 372 9523 40795520– July–15 6299 206123 959 54327 557 64498 432 63999 6 1209 8253 39015621– July–15 5654 185390 1064 60470 605 67685 375 56157 4 744 7702 37044622– July–15 5829 191973 1116 63630 650 71944 384 56865 4 744 7983 38515623– July–15 5624 184232 1252 70534 646 73359 406 60842 2 372 7930 38933924– July–15 6099 198687 1085 60713 618 69891 466 69242 6 1395 8274 39992825– July–15 7634 247166 1078 60478 652 73494 441 65466 0 0 9805 44660426– July–15 7354 240058 918 51838 506 56793 387 56871 1 186 9166 405746

27– July–15 5458 178198 976 55520 615 69802 411 61059 2 465 7462 36504428– July–15 5188 172744 1158 65590 695 76891 460 68264 0 0 7501 38348929– July–15 5391 179499 1189 67649 637 71630 479 71890 4 837 7700 39150530– July–15 5434 179314 1190 67428 622 58325 432 64068 0 0 7678 36913531-July–15 6308 207368 1215 68503 640 71891 431 63859 5 1209 8599 412830

Total 202443 6553467 33445 1878707 18961 2115552 13555 2013344 94 19344 268498 12580414(B) Local Tolled Traffic & Collection (Through Smart cards)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle)

Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1–July–15 186 1134 0 0 3 129 0 0 0 0 189 12632– July–15 106 654 0 0 0 0 0 0 0 0 106 654

3– July–15 185 1122 0 0 0 0 0 0 0 0 185 11224– July–15 141 846 0 0 0 0 0 0 0 0 141 8465– July–15 226 1374 0 0 0 0 0 0 0 0 226 1374

6– July–15 77 498 0 0 0 0 0 0 0 0 77 498

7– July–15 115 714 2 44 1 43 0 0 0 0 118 801

8– July–15 127 768 0 0 0 0 0 0 0 0 127 7689– July–15 125 786 0 0 1 43 0 0 0 0 126 829

10– July–15 147 888 1 22 0 0 0 0 0 0 148 910

11– July–15 90 576 0 0 0 0 0 0 0 0 90 57612– July–15 73 450 0 0 0 0 0 0 0 0 73 45013– July–15 100 624 0 0 0 0 0 0 0 0 100 624

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 29

Page 30: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

14– July–15 89 546 0 0 2 86 0 0 0 0 91 63215– July–15 93 564 0 0 0 0 0 0 0 0 93 56416– July–15 77 474 1 22 0 0 0 0 0 0 78 49617– July–15 114 696 0 0 0 0 0 0 0 0 114 69618– July–15 121 738 0 0 1 43 0 0 0 0 122 78119– July–15 85 516 0 0 0 0 0 0 0 0 85 51620– July–15 113 684 0 0 1 43 0 0 0 0 114 72721– July–15 99 612 1 22 0 0 0 0 0 0 100 63422– July–15 104 624 1 22 0 0 0 0 0 0 105 64623– July–15 117 732 1 22 1 43 0 0 0 0 119 79724– July–15 104 660 1 22 1 43 0 0 0 0 106 72525– July–15 79 474 1 22 0 0 0 0 0 0 80 49626– July–15 105 636 0 0 0 0 0 0 0 0 105 63627– July–15 118 744 2 44 0 0 0 0 0 0 120 78828– July–15 71 450 1 22 1 43 0 0 0 0 73 51529– July–15 123 786 0 0 0 0 0 0 0 0 123 78630– July–15 156 954 1 22 0 0 0 0 0 157 97631-July–15 119 720 1 22 0 0 0 0 0 0 0 742

Total 3585 22044 14 308 12 516 0 0 0 0 3491 22868Total Tolled Traffic & Collection (A+B)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Earth moving equipments and

heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1–July–15 6827 214487 1141 64045 642 72105 419 62386 2 558 9031 4135812– July–15 6316 201360 1155 64911 620 69334 435 66075 8 1488 8534 4031683– July–15 7183 223556 1168 65932 649 73362 483 73002 4 744 9487 4365964– July–15 9208 292261 1222 67902 692 77103 519 77076 6 1209 11647 5155515– July–15 8544 266480 967 53483 573 63224 364 53444 2 465 10450 4370966– July–15 6702 211339 976 54266 637 71200 512 76027 3 558 8830 4133907– July–15 5952 188411 1178 65792 667 74024 526 78608 1 186 8324 4070218– July–15 6091 194400 1079 60565 617 68385 445 66164 6 1395 8238 3909099– July–15 6007 191684 1120 62548 639 71803 473 70291 8 1488 8247 39781410– July–15 6837 215310 1101 61028 618 69203 495 73854 0 0 9051 41939511– July–15 7869 248187 1117 62705 594 67072 404 60010 4 837 9988 43881112– July–15 8111 256672 891 49313 490 55057 418 60797 2 465 9912 42230413– July–15 6494 205822 887 49537 549 62340 414 61962 1 186 8345 37984714– July–15 5856 188017 1106 62034 629 69126 473 68980 3 651 8067 38880815– July–15 6293 203276 1143 64197 609 68033 457 67430 2 372 8504 40330816– July–15 5899 190280 1051 59472 608 68118 419 62248 1 186 7978 380304

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 30

Page 31: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

17– July–15 6478 204616 1060 59088 587 66291 465 69171 4 837 8594 40000318– July–15 7952 252097 978 54308 587 66161 381 56307 1 186 9899 42905919– July–15 7829 248428 909 50989 519 57752 349 50930 2 372 9608 40847120– July–15 6412 206807 959 54327 558 64541 432 63999 6 1209 8367 39088321– July–15 5753 186002 1065 60492 605 67685 375 56157 4 744 7802 37108022– July–15 5933 192597 1117 63652 650 71944 384 56865 4 744 8088 38580223– July–15 5741 184964 1253 70556 647 73402 406 60842 2 372 8049 39013624– July–15 6203 199347 1086 60735 619 69934 466 69242 6 1395 8380 40065325– July–15 7713 247640 1079 60500 652 73494 441 65466 0 0 9885 44710026– July–15 7459 240694 918 51838 506 56793 387 56871 1 186 9271 40638227– July–15 5576 178942 978 55564 615 69802 411 61059 2 465 7582 36583228– July–15 5259 173194 1159 65612 696 76934 460 68264 0 0 7574 38400429– July–15 5514 180285 1189 67649 637 71630 479 71890 4 837 7823 39229130– July–15 5590 180268 1191 67450 622 58325 432 64068 0 0 7835 37011131-July–15 6427 208088 1216 68525 640 71891 431 63859 5 1209 8719 413572

Total 206028 6575511 33459 1879015 18973 2116068 13555 2013344 94 19344 272109 12603282(C) Exempted Traffic

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle)

Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1–July–15 312 7800 25 1075 8 696 7 980 0 0 352 105512– July–15 264 6600 13 559 13 1131 3 420 0 0 293 8710

3– July–15 273 6825 27 1161 11 957 0 0 0 0 0 89434– July–15 348 8700 24 1032 12 1044 2 280 0 0 386 110565– July–15 309 7725 15 645 9 783 3 420 0 0 336 95736– July–15 344 8600 23 989 19 1653 3 420 0 0 389 116627– July–15 300 7500 17 731 19 1653 5 700 0 0 341 105848– July–15 246 6150 20 860 16 1392 3 420 1 186 286 90089– July–15 298 7450 32 1376 17 1479 3 420 0 0 350 1072510– July–15 324 8100 35 1505 12 1044 2 280 0 0 373 1092911– July–15 407 10175 30 1290 14 1218 3 420 0 0 454 1310312– July–15 450 11250 28 1204 8 696 3 420 0 0 489 1357013– July–15 343 8575 31 1333 26 2262 1 140 0 0 401 1231014– July–15 280 7000 32 1376 18 1566 2 280 0 0 332 1022215– July–15 279 6975 25 1075 14 1218 2 280 0 0 320 954816– July–15 278 6950 28 1204 16 1392 2 280 0 0 324 982617– July–15 292 7300 32 1376 19 1653 4 560 0 0 347 1088918– July–15 393 9825 21 903 15 1305 4 560 1 186 434 1277919– July–15 372 9300 30 1290 10 870 2 280 0 0 414 11740

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 31

Page 32: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

20– July–15 328 8200 38 1634 11 957 3 420 0 0 380 1121121– July–15 303 7575 38 1634 15 1305 3 420 0 0 359 1093422– July–15 290 7250 35 1505 24 2088 1 140 0 0 350 1098323– July–15 298 7450 43 1849 24 2088 3 420 0 0 368 1180724– July–15 230 5750 38 1634 26 2262 4 560 1 186 299 1039225– July–15 356 8900 31 1333 24 2088 0 0 0 0 411 1232126– July–15 404 10100 36 1548 12 1044 2 280 0 0 454 1297227– July–15 322 8050 46 1978 22 1914 5 700 0 0 395 1264228– July–15 248 6200 27 1161 12 1044 1 140 0 0 288 854529– July–15 289 7225 32 1376 26 2262 2 280 0 0 349 1114330– July–15 246 6150 25 1075 21 1827 1 140 0 0 293 919231-July–15 277 6925 25 1075 24 2088 3 420 2 372 331 10880

Total 9703 242575 902 38786 517 44979 82 11480 5 930 10898 338750

Barcode Traffic (From Nijjerpura Toll Plaza)(D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle

(> 2 axle)Earth moving equipments and heavy construction machinery Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount1–July–15 3719 92975 728 31304 362 31494 73 10220 1 186 4883 1661792– July–15 3560 89000 702 30186 387 33669 127 17780 0 0 4776 1706353– July–15 3715 92875 815 35045 415 36105 121 16940 0 0 5066 1809654– July–15 4323 108075 743 31949 361 31407 84 11760 1 186 5512 1833775– July–15 4151 103775 526 22618 238 20706 67 9380 2 372 4984 1568516– July–15 4104 102600 678 29154 377 32799 76 10640 0 0 5235 1751937– July–15 3920 98000 789 33927 454 39498 119 16660 0 0 5282 1880858– July–15 3536 88400 722 31046 378 32886 91 12740 4 744 4731 1658169– July–15 3957 98925 814 35002 395 34365 97 13580 1 186 5264 182058

10– July–15 4221 105525 798 34314 403 35061 115 16100 0 0 5537 19100011– July–15 4070 101750 781 33583 426 37062 118 16520 1 186 5396 18910112– July–15 4875 121875 589 25327 310 26970 48 6720 1 186 5823 18107813– July–15 4121 103025 662 28466 380 33060 81 11340 0 0 5244 17589114– July–15 3899 97475 788 33884 374 32538 105 14700 1 186 5167 17878315– July–15 4287 107175 864 37152 362 31494 74 10360 0 0 5587 18618116– July–15 4190 104750 870 37410 414 36018 99 13860 2 372 5575 19241017– July–15 3941 98525 797 34271 398 34626 114 15960 1 186 5251 18356818– July–15 4253 106325 689 29627 370 32190 103 14420 0 0 5415 18256219– July–15 5024 125600 636 27348 390 33930 82 11480 0 0 6132 19835820– July–15 4474 111850 778 33454 453 39411 89 12460 1 186 5795 19736121– July–15 4074 101850 859 36937 434 37758 109 15260 0 0 5476 191805

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 32

Page 33: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

22– July–15 4271 106775 965 41495 422 36714 79 11060 0 0 5737 19604423– July–15 3957 98925 986 42398 438 38106 91 12740 1 186 5473 19235524– July–15 3985 99625 845 36335 486 42282 94 13160 3 558 5413 191960

25– July–15 4435 110875 763 32809 432 37584 111 15540 0 0 5741 19680826– July–15 4747 118675 548 23564 309 26883 42 5880 0 0 5646 17500227– July–15 3904 97600 821 35303 408 35496 90 12600 1 186 5224 18118528– July–15 4049 101225 883 37969 450 39150 85 11900 0 0 5467 19024429– July–15 4240 106000 1021 43903 472 41064 138 19320 1 186 5872 21047330– July–15 4120 103000 992 42656 447 38889 195 27300 0 0 5754 21184531-July–15 4378 109450 961 41323 414 36018 93 13020 3 558 5849 200369

Total 128500 3212500 24413 1049759 12359 1075233 3010 421400 25 4650 168307 5763542Grand Total of Traffic & Collection (A+B+C+D)

Date Car, Passenger Van or Jeep Light Commercial Vehicle Truck/Bus Multi Axle Vehicle (> 2 axle) Earth moving equipments and

heavy construction machinery Grand Total

Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount Nos. Amount

1–July–15 10858 315262 1894 96424 1012 104295 499 73586 3 744 14266 5903112– July–15 10140 296960 1870 95656 1020 104134 565 84275 8 1488 13603 582513

3– July–15 11171 323256 2010 102138 1075 110424 604 89942 4 744 14864 6265044– July–15 13879 409036 1989 100883 1065 109554 605 89116 7 1395 17545 7099845– July–15 13004 377980 1508 76746 820 84713 434 63244 4 837 15770 6035206– July–15 11150 322539 1677 84409 1033 105652 591 87087 3 558 14454 6002457– July–15 10172 293911 1984 100450 1140 115175 650 95968 1 186 13947 6056908– July–15 9873 288950 1821 92471 1011 102663 539 79324 11 2325 13255 5657339– July–15 10262 298059 1966 98926 1051 107647 573 84291 9 1674 13861 59059710– July–15 11382 328935 1934 96847 1033 105308 612 90234 0 0 14961 62132411– July–15 12346 360112 1928 97578 1034 105352 525 76950 5 1023 15838 64101512– July–15 13436 389797 1508 75844 808 82723 469 67937 3 651 16224 61695213– July–15 10958 317422 1580 79336 955 97662 496 73442 1 186 13990 56804814– July–15 10035 292492 1926 97294 1021 103230 580 83960 4 837 13566 57781315– July–15 10859 317426 2032 102424 985 100745 533 78070 2 372 14411 59903716– July–15 10367 301980 1949 98086 1038 105528 520 76388 3 558 13877 58254017– July–15 10711 310441 1889 94735 1004 102570 583 85691 5 1023 14192 59446018– July–15 12598 368247 1688 84838 972 99656 488 71287 2 372 15748 62440019– July–15 13225 383328 1575 79627 919 92552 433 62690 2 372 16154 61856920– July–15 11214 326857 1775 89415 1022 104909 524 76879 7 1395 14542 59945521– July–15 10130 295427 1962 99063 1054 106748 487 71837 4 744 13637 57381922– July–15 10494 306622 2117 106652 1096 110746 464 68065 4 744 14175 59282923– July–15 9996 291339 2282 114803 1109 113596 500 74002 3 558 13890 594298

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 33

Page 34: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

24– July–15 10418 304722 1969 98704 1131 114478 564 82962 10 2139 14092 60300525– July–15 12504 367415 1873 94642 1108 113166 552 81006 0 0 16037 65622926– July–15 12610 369469 1502 76950 827 84720 431 63031 1 186 15371 59435627– July–15 9802 284592 1845 92845 1045 107212 506 74359 3 651 13201 55965928– July–15 9556 280619 2069 104742 1158 117128 546 80304 0 0 13329 58279329– July–15 10043 293510 2242 112928 1135 114956 619 91490 5 1023 14044 613907

30– July–15 9956 289418 2208 111181 1090 99041 628 91508 0 0 13882 591148

31-July–15 11082 324463 2202 110923 1078 109997 527 77299 10 2139 14899 624821Total 344231 10030586 58774 2967560 31849 3236280 16647 2446224 124 24924 451625 18705574

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 34

Page 35: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Annexure B

Traffic Data at Toll Plazas

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 35

Page 36: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Grand Total of Traffic at Toll Plaza – 1

DateCar, Passenger

Van or Jeep

Light Commercial

VehicleTruck/Bus

Multi Axle Vehicle (>2 axle)

Earth moving equipments and heavy construction machinery

Grand Total

1–July–15 9,871 2,323 1,594 481 1 14270

2– July–15 9,877 2,413 1,578 558 1 14427

3– July–15 12,837 2,733 1,697 633 3 17903

4– July–15 15,743 2,718 1,548 625 6 20640

5– July–15 19,150 2,956 1,366 426 2 23900

6– July–15 9,463 1,879 1,448 517 3 13310

7– July–15 8,869 2,332 1,696 538 0 13435

8– July–15 8,851 2,250 1,477 535 3 13116

9– July–15 8,751 2,218 1,499 564 5 13037

10– July–15 9,621 2,205 1,512 512 1 13851

11– July–15 10,920 2,061 1,477 461 1 14920

12– July–15 12,093 1,680 1,104 330 2 15209

13– July–15 9,189 1,747 1,401 444 2 12783

14– July–15 8,404 2,078 1,411 507 1 12401

15– July–15 10,177 2,309 1,462 512 1 14461

16– July–15 10,906 2,420 1,563 486 0 15375

17– July–15 9,680 2,137 1,548 559 6 13930

18– July–15 11,786 1,945 1,467 408 2 15608

19– July–15 12,482 1,792 1,147 311 0 15732

20– July–15 9,747 1,894 1,461 404 5 13511

21– July–15 9,008 2,068 1,548 402 4 13030

22– July–15 8,996 2,226 1,526 450 4 13202

23– July–15 8,948 2,354 1,520 475 1 13298

24– July–15 9,706 2,255 1,572 501 3 14037

25– July–15 11,525 2,298 1,497 504 4 15828

26– July–15 12,760 1,867 1,209 440 2 16278

27– July–15 8,728 2,142 1,468 481 1 12820

28– July–15 8,069 2,139 1,493 501 0 12202

29– July–15 8,674 2,376 1,542 538 7 13137

30– July–15 8,954 2,471 1,437 555 5 13422

31-July–15 10,181 2,540 1,498 530 4 14753

Total 323,966 68,826 45,766 15,188 80 453,826

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 36

Page 37: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015 Grand Total of Traffic at Toll Plaza – 2

DateCar, Passenger

Van or Jeep

Light Commercial

VehicleTruck/Bus

Multi Axle Vehicle (>2 axle)

Earth moving equipments and

heavy construction machinery

Grand Total

1–July–15 10858 1894 1012 499 3 14266

2– July–15 10140 1870 1020 565 8 13603

3– July–15 11171 2010 1075 604 4 14864

4– July–15 13879 1989 1065 605 7 17545

5– July–15 13004 1508 820 434 4 15770

6– July–15 11150 1677 1033 591 3 14454

7– July–15 10172 1984 1140 650 1 13947

8– July–15 9873 1821 1011 539 11 13255

9– July–15 10262 1966 1051 573 9 13861

10– July–15 11382 1934 1033 612 0 14961

11– July–15 12346 1928 1034 525 5 15838

12– July–15 13436 1508 808 469 3 16224

13– July–15 10958 1580 955 496 1 13990

14– July–15 10035 1926 1021 580 4 13566

15– July–15 10859 2032 985 533 2 14411

16– July–15 10367 1949 1038 520 3 13877

17– July–15 10711 1889 1004 583 5 14192

18– July–15 12598 1688 972 488 2 15748

19– July–15 13225 1575 919 433 2 16154

20– July–15 11214 1775 1022 524 7 14542

21– July–15 10130 1962 1054 487 4 13637

22– July–15 10494 2117 1096 464 4 14175

23– July–15 9996 2282 1109 500 3 13890

24– July–15 10418 1969 1131 564 10 14092

25– July–15 12504 1873 1108 552 0 16037

26– July–15 12610 1502 827 431 1 15371

27– July–15 9802 1845 1045 506 3 13201

28– July–15 9556 2069 1158 546 0 13329

29– July–15 10043 2242 1135 619 5 14044

30– July–15 9956 2208 1090 628 0 13882

31-July–15 11082 2202 1078 527 10 14899

Total 344231 58774 31849 16647 124 451625

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 37

Page 38: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Annexure C

Highway Accident Report

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 38

Page 39: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

National Highway No.: NH - 3 Month: July- 2015

Sr. No. Date

Tim

e of

Acc

iden

t

Acci

dent

Lo

catio

ns

Natu

re o

f Ac

cide

nt

Clas

sific

atio

n of

Ac

cide

nt

Caus

es

Road

Fai

lure

Road

con

ditio

n

Inte

rsec

tion

Type

an

d Co

ntro

l

Wea

ther

Co

nditi

on

Vehi

cle

resp

onsi

ble No. of Affected

Person

No. o

f Ani

mal

s ki

lled

if an

y

Help Provided by Ambulance/

trauma Vehicle /

Patrolling

Rem

arks

Fata

l

Grie

vous

Min

or

Non

Inju

red

A B C D E F G H

1

3-Ju

l-15

4:00

AM

Km-4

32.6

50

LHS

8- O

ther

s

1- F

atal 2 – Over

speeding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1 - Fine Car 2 0 0 0 0 Ambulance/

Recovery

Car coming from Jalandhar side in full speed the driver of the car lodt there control over the vehicle and directly hit into the BullnoseTwo no died on the spot. Shifted to Amritsar Civil Hospital

2

3-Ju

l-15

10:1

5 AM

Km-4

18.7

86 L

HS

8- O

ther

s

3 - M

inor

Inju

red 4 - Fault of Driver

of Motor Vehicle / driver of other

vehicle / cyclist / pedestrian / passenger, 4-

Fou

r lan

e or

m

ore

with

divi

der

1 - S

traig

ht R

oad

Nil 1 - Fine Truck 0 0 1 0 0

Ambulance/Recovery/

Route Patrol Vehicle

Car coming from Jalandhar side and tried to took Right side turn to entered into link road in the mean time one truck which is coming from wrong side and hit into the car side wise one no minor injury shifted to baba bakala civil hospital.

3

9-Ju

l-15

1:00

PM

Km-4

36.8

00 L

HS

8- O

ther

s

2 - G

rievo

us In

jury

/ 3

- Min

or In

jure

d

2 - Over speeding

4- F

our l

ane

or

mor

e wi

th d

ivide

r

1 - S

traig

ht R

oad

Nil Fine Car 0 2 3 0 0Ambulance /

Recovery Van

Car coming from Jalandhar side in the mean time one animal suddenly came from the shoulder side and the car struck with the animal and toppled down. 2 nos serious injury shifted to Amandeep Hospital Amritsar and 3 nos minor injury first aid given at site. car No-RJ-12-UA-3950.

4

11-J

ul-1

5

1:00

AM

Km-4

40.8

55

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry 3 - Vehicle out of Control

4- F

our l

ane

or m

ore

with

di

vider

1 - T

- Ju

nctio

n

Nil Fine Car 0 0 1 0 0Ambulance /

Recovery Van

Car coming fromJalandhar Side in full speed the driver of the car lost there control over car and hit into the Kerb-Island. One no minor injury. First Aid-given at site.

5

12-J

ul-1

5

10:0

0 AM

Km-4

19.6

50

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry

4 - Fault of Driver of Motor Vehicle /

driver of other vehicle / cyclist /

pedestrian / passenger, 4-

Fou

r lan

e or

m

ore

with

di

vider

1 - S

traig

ht

Road Nil Fine LCV 0 2 0 0 0

Ambulance / Recovery

Van

LCV coming from Jalandhar side in full speed and the driver of the car lost there control over the vehicle and hit into the Bus from Back side. Two nos got leg fracture shifted to baba bakala.

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 39

Page 40: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

6

15-J

ul-1

5

10:0

0 AM

Km-4

52.0

00 L

HS

3- R

ear E

nd

Collis

ion

2 - G

rievo

us

Inju

ry/

3-M

inor

Inju

ry

2 – Over speeding

4- F

our l

ane

or

mor

e wi

th d

ivide

r

1 - S

traig

ht R

oad

Nil 1 - Fine, Car 0 1 1 0 0

Ambulance/Recovery/

Route Patrol Vehicle

Car coming from Jalandhar side in full speed in the mean time another car which is back side and struck side wise. One no serious injury and one no minor injury.

7

22-J

ul-1

5

7:55

AM

Km-4

36.8

80

LHS

8- O

ther

s

2 - G

rievo

us

Inju

ry 2 – Over speeding

4- F

our l

ane

or m

ore

with

di

vider

1 - S

traig

ht

Road Nil 1 -

Fine, Car 0 2 0 0 0Ambulance/ Recovery

Van

Truck coming from Jalandhar side in full speed and hit into the standing truck which is standing shoulder side. Driver and Helper got leg fracture. Shifted to Govt Hospital.

Total 2 7 6 0 0 -A. Urban / Rural and Details of Surrounding Landuse.B 1- Overturning, 2- Head in Collision, 3- Rear End Collision, 4 - Collision Brush / Side Wipe, 5 - Right Turn Collision, 6 - Skidding, 8- OthersC 1- Fatal, 2 – Grievous Injury, 3 - Minor Injured, 4 - Non Injury

D 1- Drunken, 2 - Over speeding, 3 - Vehicle out of Control, 4 - Fault of Driver of Motor Vehicle / driver of other vehicle / cyclist / pedestrian / passenger, 5 - Defect in Mechanical Condition of motor Vehicle / road condition.

E 1- Single lane, 2 - Two Lane, 3- Three lane or more without central divider (Median) 4- Four lane or more without dividerF 1 - Straight Road, 2 - Slight Curve, 3 - Sharp Curve, 4 - Flat Road, 5 - Gentle Incline, 6 - Steep Incline, 7 - Hump, 8 - DipG 1 - T - Junction, 2- Y - Junction, 3 - Four Arm Junction, 4 - Staggered Junction, 5 - Junction with more than 4 arms, 6 - Roundabout Junction, 7 - Manned rails Crossing, 8 - Unmanned Rail CrossingH 1 - Fine, 2 - Mist / Fog, 3- Cloudy, 4 - Light Rain, 5 - Heavy Rain, 6 - Hail / Sleet, 7 - Snow, 8 - String Wind, 9 - Dust Strom, 10 - Very Cold, 11 - Very Cold, 12 - Other extraodinary Weather condition.4* Traffic has been put both way in same carriageway due to temporary blockage of other carriageway for construction purpose.

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 40

Page 41: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

Annexure D

Incident Management

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 41

Page 42: Deployment of Independent Engineer Report on Audit of... · Web view2 x (7.0m + 1.5m + 2.0m shoulder) wide separated by 4.5m wide median Design Speed -100 kmph Cross slope -2.5% Maximum

Consultancy Services – M/s Unihorn India Pvt LtdMonthly Report on Audit of Traffic / July 2015

INCIDENT MANAGEMENT DATA (Reference is made to NHAI HQ letter No. NHAI/CM/Inc Man/2011 Dated 24.05.2011)Date From 01.07.2015 to 31.07.2015 Sl.No General Information Route Patrol Vehicle Ambulance-1

TP-IAmbulance-2

TP-IITow Away

Crane Total Remarks

1 PIU Jalandhar 2 NH Nos. New NH-3 (OLD NH-1)

3 Stretch 407+100 to 456+100 Total-49 Km

4 Location of Incident ManagementVehicle Km-410+200-Toll Plaza-I &

Km-442+800 Toll Plaza-II

5 Registration No. PB-02-AX-0859 PB-02-AX-0842 PB-02-BF-9911 PB-09-H-9561 6 Total No. of Accidents Reported 7 7 7 Number of accident cases Attedend 7 7 8 Numbers of injured Shifted to Hospitals 2 5 7

0 Number of other help provided by the Route Patrol( other than accidents ) 2 1

10 Number of other help provided by the Tow Away Vehicle ( other than accidents ) 7 7

11 No. of vehicles painted in stripes as per approved Colour Scheme 1

1 0 1 3

12 No. of vehicles with Requisite T&P and accessories as per contact 1 1 1 1 4

13 No. of vehicles as per approved illuminated boards on too 1 1 0 1 3

14 No. of Vehicles man power as per contact 1 1 1 1 4

15 No. of vehicles lifted with GPS/VTS 1 1 0 0 2

16 No. of reflective signages showing emergency contact no. 20 20

17 No. of plazas where emergency No. are installed 2 2

18 No. of plazas where emergency contact detail is being printed on back of toll tickets 2 2

Printed on the Front of The

Ticket

19 Date of last inspection by PD/RO 31.07.2015

Project: 4-Laning of Jalandhar-Amritsar BOT Project of NH – 3 (Old NH-1) in the State of Punjab Page - 42