MOA Architecture 821 17th Street, Suite 400 Denver, Colorado 80202 303/308-1190 Phone 303/308-1197 Fax Email:[email protected] DESIGN ADVISORY TEAM MEETING MINUTES PROJECT: NEDERLAND MIDDLE/SENIOR HIGH SCHOOL DATE: September 23, 2009 Boulder Valley School District PROJECT NO: 09117.00 Boulder, Colorado MINUTES BY: Jessica Blanford LOCATION: Nederland Middle/HS PRESENT: Jessica Blanford, John Bollinger, Marsha Clark-Smith, Joe Gierlach, Julie Ikler, Bernadette Kelly, Laura Martz, Jack Mousseau, Fran Nugren, Rick Salaz, Kevin Sullivan DISTRIBUTION: All Present Number Responsibility ITEM / ACTION 01/01 Info Team Introductions were made. 01/02 Info Jack Mousseau presented the power point slide presentation for the Design and DAT process. Included with these meeting minutes is a copy of the slide presentation. 01/03 Info PROJECT TEAM: MOA introduced the main team members for the project including the team from BVSD. Also introduced were the consultants for the project 01/04 Info MOA FIRM PROFILE: MOA’s K-12 educational design experience was presented to the DAT. Previous projects included Southern Hills Middle School and Hinkley High School. 01/05 Info DAT RESPONSIBILITIES/PARTICIPATION: Responsibilities and participation in the DAT process were discussed. BVSD Design Advisory Guidelines were provided. 01/06 Info DESIGN & CONSTRUCTION PHASES: Design and Construction Phases were briefly discussed. More information can be found in the BVSD design Advisory Guidelines. 01/07 Info PROJECT GUIDELINES: The project guidelines on the overall bond program from BVSD were presented and shown to the DAT. This information was from the Educational Facilities Master Plan and is included with these meeting minutes. MUOF and IT upgrades are underway or have been completed. This phase of construction will include items from the Facility Condition Assessment (FCA) and Program Compatibility Assessment (PCA).

Upload: vuongtruc

Post on 10-Mar-2018

214 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

MOA Architecture 821 17th Street, Suite 400

Denver, Colorado 80202 303/308-1190 Phone

303/308-1197 Fax Email:[email protected]

DESIGN ADVISORY TEAM MEETING MINUTES PROJECT: NEDERLAND MIDDLE/SENIOR HIGH SCHOOL DATE: September 23, 2009

Boulder Valley School District PROJECT NO: 09117.00 Boulder, Colorado

MINUTES BY: Jessica Blanford LOCATION: Nederland Middle/HS PRESENT: Jessica Blanford, John Bollinger, Marsha Clark-Smith, Joe Gierlach, Julie Ikler, Bernadette Kelly,

Laura Martz, Jack Mousseau, Fran Nugren, Rick Salaz, Kevin Sullivan DISTRIBUTION: All Present Number Responsibility ITEM / ACTION 01/01 Info Team Introductions were made. 01/02 Info Jack Mousseau presented the power point slide presentation for the Design and

DAT process. Included with these meeting minutes is a copy of the slide presentation.

01/03 Info PROJECT TEAM:

MOA introduced the main team members for the project including the team from BVSD. Also introduced were the consultants for the project

01/04 Info MOA FIRM PROFILE:

MOA’s K-12 educational design experience was presented to the DAT. Previous projects included Southern Hills Middle School and Hinkley High School.

01/05 Info DAT RESPONSIBILITIES/PARTICIPATION: Responsibilities and participation in the DAT process were discussed. BVSD Design Advisory Guidelines were provided.

01/06 Info DESIGN & CONSTRUCTION PHASES:

Design and Construction Phases were briefly discussed. More information can be found in the BVSD design Advisory Guidelines.

01/07 Info PROJECT GUIDELINES: The project guidelines on the overall bond program from BVSD were presented

and shown to the DAT. This information was from the Educational Facilities Master Plan and is included with these meeting minutes. MUOF and IT upgrades are underway or have been completed. This phase of construction will include items from the Facility Condition Assessment (FCA) and Program Compatibility Assessment (PCA).

Page 2: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

DAT Meeting Minutes No. 1 Nederland Middle/High School September 23, 2009 Page 2 DATE / # Responsibility ITEM / ACTION

01/08 Info PROJECT GOALS AND VISION: MOA then turned the discussion over to the DAT members to express their goals

and vision for this project. Those comments and visions are as follows: Environment – capture the “amazing environment”, bring more light and fresh air

into the building, utilize sustainable building practices, relate to the mountains and context of the area and town, connect to the outdoors

Counseling – bring multiple functions that are now interspersed throughout the

school together in one location including the interventionist and social workers, provide a welcoming atmosphere for students, provide better access for parents

Maximize usage of space – increase storage Safety – create a more securable entrance to the school with controlled access,

maintain an environment that accounts for a sometimes harsh environment State of the Art – create a second IT closet to create better data performance,

create spaces that will not become “out dated”, install a paging/intercom/voice over internet protocol (VOIP) system, provide a science room that can accommodate advanced and AP chemistry cirriculum

HVAC Upgrades – eliminate hot and cold rooms Room Numbering – provide one cohesive interior numbering system with interior

signage 01/09 Info PROJECT SCHEDULE: MOA presented the proposed project schedule with approximately five DAT

meetings. Construction Phasing will be considered, but may not be necessary. Additional DAT meetings may be scheduled for review of progress during schematic design, design development and construction document phases. It was decided to move meetings to Tuesdays so that more members could attend. A revised schedule is attached to these meeting minutes.

01/10 Info Next meeting: Tuesday, October 6, 2009 at 3:30 pm at Nederland Middle/High

School.

END OF MEETING MINUTES

This record of the Meeting is considered complete and accurate unless written notice is received by M+O+A

within 5 days of issuance.

Page 3: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

1

NEDERLAND MIDDLE/SENIOR HIGH SCHOOL PROPOSED PROJECT SCHEDULE DAT Process Start September 23, 2009 DAT Programming/Design – Every 2 weeks DAT # 1 Wed. September 23, 2009 DAT # 2 Tue. October 6, 2009 DAT # 3 Tue. October 20, 2009 DAT # 4 Tue. November 3, 2009 DAT # 5 Tue. November 17, 2009 Submission of Schematic Design Documents December 7, 2009 ( 2 wks) To BVSD Completion of Schematic Design Review December 15, 2009 ( 1 wk) Start Design Development December 7, 2009 Submission of Design Development Documents January 25, 2010 ( 5 wks) Completion of Design Development Review February 2, 2010 ( 1 wk) Start Construction Documents January 25, 2010 Submission of Construction Documents to BVSD March 1, 2010 ( 5 wks) Completion of Construction Documents Review March 15, 2010 ( 2 wks) Send out to Bid March 22, 2010 Bid Date April 20, 2010 (Tues) ( 4 wks) Board Approval / GC Contracts May, 2010 Construction Start June 1, 2010 Completion Date – Phase 1 August – 2010 Completion Date – Phase 2 Spring/Summer – 2011

Page 4: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry
Page 5: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

STRUCTURALJVA Consultants

Kristine L. Dunham, PE

STRUCTURALJVA Consultants

Kristine L. Dunham, PE

MECHANICALEnvision Mechanical Engineers

Nick Sauer, PEJay Ferrare, CIPE, LEED AP

MECHANICALEnvision Mechanical Engineers

Nick Sauer, PEJay Ferrare, CIPE, LEED AP

CIVILJVA Consultants

Kevin Tone, PE, LEED AP

CIVILJVA Consultants

Kevin Tone, PE, LEED AP

ELECTRICALR. J. McNutt

Ron Boone, PE

ELECTRICALR. J. McNutt

Ron Boone, PE

LANDSCAPE DESIGNDesign ConceptsCarol Henry, ASLA

LANDSCAPE DESIGNDesign ConceptsCarol Henry, ASLA

ACOUSTICAL DESIGND. L. Adams & Associates

Edward L. Logsdon, PE

ACOUSTICAL DESIGND. L. Adams & Associates

Edward L. Logsdon, PE

PROJECT TEAMExperience and Expertise

Page 6: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

Educational Design Experience:• Over 120 K-12 Schools in the past 24 years• Expertise in Educational Remodel Projects (10 in the past 5 years)• 23 LEED Accredited Professionals

K-12 Renovations and Additions Project Experience:• Southern Hills Middle School – Boulder, CO.• Hinkley High School - Aurora, CO. • Pomona High School– Westminster, CO.• Carbon County Middle School - Rawlins, WY. • Anderson Elementary School - Cheyenne, WY. • Edith Wolford Elementary School – Co. Springs, CO. • Croften Ebert Elementary School - Denver, CO.

Design Awards:• 2006 CEFPI Rockies Design Award

Fort Wingate K-8 School, Gallup N.M.

• 2006 Gold Hard Hat Award – Outstanding Architectural ProjectDiscovery Canyon K-12 Campus

• 2005 Gold Hard Hat Award – Outstanding Educational FacilityDenver Seminary Campus

• 2001 Colorado Architectural Firm of the YearFrom the American Sub-contractors Assoc.

MOA FIRM PROFILE

Page 7: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

PROJECT OUTLINE

246,615 s.f. Renovation49,378 s.f. AdditionKevin Sullivan was the Project Director for MOA

Jack Mousseau was Lead Project Designer

Bernadette Kelly was Project Manager

New Media Center Addition

New Science Wing Addition

New Music Wing Addition

Renovation of Administration Offices

Code and Accessibility Upgrades throughout

PROJECT EXPERIENCESouthern Hills M.S. Remodel

Page 8: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

PROJECT OUTLINE

246,615 s.f. Renovation49,378 s.f. AdditionJoint Venture Project with RTA Architects

Kevin Sullivan was the Project Director for MOA

Jack Mousseau was Lead Project Designer

Consolidate 2 existing buildings into a single school while students remain in session

Coordination of 9 construction phases to keep school operational and all programs running

Complete MEP renovation

Replacement of existing exterior windows and roof

Modernization of existing classrooms

Designed flexibility into the school plan to accommodate Departmental Organization as well as Small School Organization

Upgrades to interior finishes

PROJECT EXPERIENCEHinkley H.S. Remodel

Page 9: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

DESIGN ADVISORY TEAM

DESIGN ADVISORY TEAMSEXPERIENCE:Every school project we have done has involved a Design Advisory Team

Involve representatives from Facilities, School Administration,Community, Teachers, Parents and Students

Charge the participants to keep their peer group informed and represented

Our team works to educate all DAG members as to educational alternatives, the design process, budget realities, project constraints, etc. to a point where the team can make informed decisions

STRATEGIES:Start with Goals and Visions

Structure decisions to resolve issues for the life of the school, not just the immediate future

Layout ground rules at the beginning to structure the decision making process

Clear communication, clear graphics, and make sure everybody is following along

LESSONS LEARNED:Always bring chocolate

Page 10: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

DAT Process Start September 23, 2009DAT Programming/Design – Every 2 weeks

DAT # 1 Wed. September 23, 2009•

DAT # 2 Wed. October 7, 2009•

DAT # 3 Wed. October 21, 2009•

DAT # 4 Wed. November 4, 2009•

DAT # 5 Wed. November 18, 2009•

Submission of Schematic Design Documents December 7, 2009 ( 2 wks) to BVSD• Completion of Schematic Design Review December 15, 2009 ( 1 wk)•

Start Design Development December 7, 2009•

Submission of Design Development Documents January 25, 2010 ( 5 wks)• Completion of Design Development Review February 2, 2010 ( 1 wk)•

Start Construction Documents January 25, 2010•

Submission of Construction Documents to BVSD March 1, 2010 ( 5 wks)• Completion of Construction Documents Review March 15, 2010 ( 2 wks)•

Send out to Bid March 22, 2010•

Bid Date April 20, 2010 (Tues) ( 4 wks)• Board Approval / GC Contracts May, 2010•

Construction Start June 1, 2010• Completion Date – Phase 1 August – 2010•

Completion Date – Phase 2 Spring/Summer – 2011•

p ,

Page 11: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

Existing School

Page 12: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

Existing School

Page 13: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

Scope of Work1st Floor additions/renovations1st Floor additions/renovations

Additions Renovation

Page 14: DESIGN ADVISORY TEAM MEETING MINUTESbvsd.org/bondproject/schools/Ned MSHS Minutes/DAT 1 MtgMin 09-23... · DESIGN ADVISORY TEAM MEETING MINUTES ... accommodate advanced and AP chemistry

Scope of Work2nd Floor additions/renovations2nd Floor additions/renovations

Additions Renovation