Design and Control of QualityDesign and Control of Quality
Ian BradburyIan Bradbury
peaker services, inc.
![Page 2: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/2.jpg)
Quality AssuranceQuality Assurance
Two kinds of people (Scholtes)Views on Outcomes:
Assurance that outcomes conform to requirements
Loss to Society (Taguchi)
Two kinds of people (Scholtes)Views on Outcomes:
Assurance that outcomes conform to requirements
Loss to Society (Taguchi)
LSL USLT
0%Loss
100%Loss
100%Loss
LSL USLT
![Page 3: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/3.jpg)
Methods for Quality AssuranceMethods for Quality Assurance
Take action on outcomesTake action on the process
(means/context of production)Take action on inputs
Take action on outcomesTake action on the process
(means/context of production)Take action on inputs
WorkInputs Outputs
Action on Action onAction on
![Page 4: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/4.jpg)
Acceptance SamplingAcceptance Sampling
A form of taking action on outcomesA form of taking action on outcomes
Loti+j
Samplei+j
AcceptanceCriterion
Loti+j-1
Samplei+j-1
AcceptanceCriterion
Loti
Samplei
AcceptanceCriterion
Accept Reject Accept Reject Accept Reject
![Page 5: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/5.jpg)
Advantages of Acceptance Sampling
Advantages of Acceptance Sampling
Rules for application are largely context independentDifferences due to levels of risk, type of
measurement etc., but not whether it’s drugs, food or missiles being produced)
Approach may therefore be prescribed quite tightly and audited without much domain knowledge for judgment
Rules for application are largely context independentDifferences due to levels of risk, type of
measurement etc., but not whether it’s drugs, food or missiles being produced)
Approach may therefore be prescribed quite tightly and audited without much domain knowledge for judgment
![Page 6: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/6.jpg)
Disadvantages of Acceptance Sampling
Disadvantages of Acceptance Sampling
Effectiveness depends upon assumptions about the nature of variation in outcomes w/o built in diagnostic test of whether such assumptions are reasonable
Implicit goalpost view of the cost of variationIn and of itself, it does not produce change
that reduces the likelihood of future non-conformance (maintenance vs. improvement)
More expensive than 0% or 100% inspection
Effectiveness depends upon assumptions about the nature of variation in outcomes w/o built in diagnostic test of whether such assumptions are reasonable
Implicit goalpost view of the cost of variationIn and of itself, it does not produce change
that reduces the likelihood of future non-conformance (maintenance vs. improvement)
More expensive than 0% or 100% inspection
![Page 7: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/7.jpg)
Outcome VariationOutcome Variation
![Page 8: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/8.jpg)
Stable Underlying ProcessStable Underlying Process
![Page 9: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/9.jpg)
Alternative Underlying ProcessesAlternative Underlying Processes
![Page 10: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/10.jpg)
Deming’s k-p rules (simple case)Deming’s k-p rules (simple case)
Let p be the average fraction defective
Let k1 be the cost to inspect one unit
Let k2 be the cost of a defective unit ‘down the line’
0<k1/k2<1 is referred to as breakeven quality
Let p be the average fraction defective
Let k1 be the cost to inspect one unit
Let k2 be the cost of a defective unit ‘down the line’
0<k1/k2<1 is referred to as breakeven quality
![Page 11: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/11.jpg)
Simple CasesSimple Cases
Case 1: If the worst lot will still have p<k1/k2, 0% inspection yields minimum cost
Case 2: If the best lot will still have p>k1/k2, 100% inspection yields minimum cost
Case 3: If p is stable (i.e. the result of a process that’s in a state of statistical control): If p<k1/k2, 0% inspection yields minimum cost If p>k1/k2, 100% inspection yields minimum cost
Other cases, and some rationale in OOTC chapter 15. More theory in Some Theory of Sampling
Case 1: If the worst lot will still have p<k1/k2, 0% inspection yields minimum cost
Case 2: If the best lot will still have p>k1/k2, 100% inspection yields minimum cost
Case 3: If p is stable (i.e. the result of a process that’s in a state of statistical control): If p<k1/k2, 0% inspection yields minimum cost If p>k1/k2, 100% inspection yields minimum cost
Other cases, and some rationale in OOTC chapter 15. More theory in Some Theory of Sampling
![Page 12: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/12.jpg)
Point 3 of Deming’s 14 Points for Management
Point 3 of Deming’s 14 Points for Management
Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into the product in the first place
Cease dependence on inspection to achieve quality. Eliminate the need for inspection on a mass basis by building quality into the product in the first place
![Page 13: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/13.jpg)
Methods for Quality AssuranceMethods for Quality Assurance
Take action on outcomesTake action on the process
(means/context of production)Take action on inputs
Take action on outcomesTake action on the process
(means/context of production)Take action on inputs
WorkInputs Outputs
Action on Action onAction on
![Page 14: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/14.jpg)
Taking Action on the Cause System
Taking Action on the Cause System
Outcomes
EnvironmentMaterials
PeopleProcessEquipment
![Page 15: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/15.jpg)
Advantages of the ApproachAdvantages of the Approach
Leverage - cost effectivenessLevel of Assurance that’s possibleMore in depth knowledge development
of the nature of variation in outcomesRational basis for PredictionKnowledge input for design & redesign
Leverage - cost effectivenessLevel of Assurance that’s possibleMore in depth knowledge development
of the nature of variation in outcomesRational basis for PredictionKnowledge input for design & redesign
![Page 16: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/16.jpg)
Disadvantages of the ApproachDisadvantages of the Approach
Less ‘prescriptively’ simpleDepends upon domain knowledge of
cause & effect relationships (or requires development thereof)
Less ‘prescriptively’ simpleDepends upon domain knowledge of
cause & effect relationships (or requires development thereof)
![Page 17: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/17.jpg)
Different Classes of Action on the Cause System
Different Classes of Action on the Cause System
Control Feedback - PDCASimultaneous Deliberate Learning while
making changes aimed at Improvement - PDSA
Control Feedback - PDCASimultaneous Deliberate Learning while
making changes aimed at Improvement - PDSA
![Page 18: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/18.jpg)
How to Proceed with Control - PDCA
How to Proceed with Control - PDCA
Determinegoals and
targets
Determinemethods of
reaching goals
Engage ineducation
and training
Implementwork
Check theeffects of
implementation
Takeappropriate
action
Plan
DoCheck
Action
Control Circle
Iskikawa, K. , 1985 - What is Total Quality Control? The Japanese Way
![Page 19: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/19.jpg)
Knowledge is built on theory
Management is Prediction The theory of knowledge teaches us that a
statement, if it conveys knowledge predicts future outcome, with risk of being wrong, and that it fits without failure observations of the past.
Rational prediction requires theory and builds knowledge through systematic revision and extension of theory based on comparison of prediction with observation
Ch. 4, The New Economics
![Page 20: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/20.jpg)
Reaction to “that corruption...”
Plan a change ora test, aimed atimprovement.
Do - Carry out thechange or the test(preferably on asmall scale)
Act - Adopt thechange, or abandon
it, or run throughthe cycle again.
Study the results.What did we learn?What went wrong?
P
DS
A
A flow diagram for learning and for improvement of a product or of a process.Page 132, The New Economics, 2ed.
![Page 21: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/21.jpg)
A Clarification of PDSA?
Revise theory if required
Compare results with goal(s)
Compare results with prediction(s)
Aim (goal(s)) Changes for
improvement Rationale &
Assumptions Rational prediction(s) Method of observation
or measurement
Carry out the plan
P
DS
A
![Page 22: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/22.jpg)
Production Viewed as a SystemProduction Viewed as a System
Stage 0:Generationof Ideas
DesignandRedesignSuppliers of
materials andequipment Receipt
and test ofmaterials
Production, assembly, inspection
Tests of processes,machines, methods,costs
Consumerresearch
Consumers
A
B
C
D
![Page 23: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/23.jpg)
SummarySummary
For conformance quality, 0% or 100% inspection (k-p rules) for lowest cost
Importance of understanding the nature of variation over time
Systematic application of PDSA to build knowledge and simultaneously take action aimed at improvement
For conformance quality, 0% or 100% inspection (k-p rules) for lowest cost
Importance of understanding the nature of variation over time
Systematic application of PDSA to build knowledge and simultaneously take action aimed at improvement
![Page 24: Design and Control of Quality Ian Bradbury peaker services, inc](https://reader035.vdocument.in/reader035/viewer/2022062621/551c14ed5503469e4f8b55ac/html5/thumbnails/24.jpg)
Questions & CommentsQuestions & Comments
References:The New Economics, 2ed. - W. Edwards
DemingOut of the Crisis - W. Edwards DemingSome Theory of Sampling - W. Edwards
DemingKaizen: The Key to Japan’s Competitive
Success - Masaaki ImaiWhat is Total Quality Control? The Japanese
Way - Kaoru Ishikawa
References:The New Economics, 2ed. - W. Edwards
DemingOut of the Crisis - W. Edwards DemingSome Theory of Sampling - W. Edwards
DemingKaizen: The Key to Japan’s Competitive
Success - Masaaki ImaiWhat is Total Quality Control? The Japanese
Way - Kaoru Ishikawa