design and economics of commercial ground loop water ......ground loop portion turn key cost: $...

134
Design and Economics of Commercial Ground Loop Water Source Heat Pump Systems Presented by Alan Niles Western Region Commercial Sales Manager WaterFurnace International Presents

Upload: others

Post on 24-Mar-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Design and Economics ofCommercial Ground Loop Water Source Heat Pump Systems

Presented byAlan NilesWestern Region Commercial Sales ManagerWaterFurnace International

Presents

Page 2: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

ASHRAE is a Registered Provider with The American Institute of Architects Continuing Education Systems. Credit earned on completion of this

program will be reported to CES Records for AIA members. Certificates of Completion for non-AIA members are available on request.

This program is registered with the AIA/CES for continuing professional education. As such, it does not include content that may be deemed or

construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. Questions related to specific materials,

methods, and services will be addressed at the conclusion of this presentation.

1 LU by AIA Course number is NILES01.

Page 3: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

The GBCI CMP mark indicates

that this course will be monitored

by GBCI to ensure that it upholds

the quality, relevance, and rigor

necessary to contribute to

ongoing learning in knowledge

areas relevant to LEED

professionals.

GBCI cannot guarantee that course sessions will be

delivered to you as submitted to GBCI. However, any

course found to be in violation of the standards of the

program, or otherwise contrary to the mission of

GBCI, shall be removed. Your course evaluations will

help us uphold these standards. Please complete

them as requested by GBCI or the education provider.

Approval date:

Course ID: 0920010524

Alan Nilesby

09/12/2016

Approved for:

1General CE hours

1LEED-specific hours

Commercial Ground Loop Heat Pump Systems: Design & Economics

Page 4: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Complete the Distinguished Lecturer

Event Summary Critique

CTTC needs your feedback to continue to improve the

DL Program

Distribute the DL Evaluation Form to all attendees

Collect at the end of the meeting

Compile the attendee rating on the Event Summary

Critique

Send the completed Event Summary Critique to your

CTTC RVC and ASHRAE Headquarters

Forms are available at:

www.ashrae.org/distinguishedlecturers

This ASHRAE Distinguished Lecturer is brought to you by the Society Chapter Technology Transfer Committee

Page 5: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

BECOME A FUTURE LEADER IN ASHRAE –WRITE THE NEXT CHAPTER IN YOUR CAREER

YOU ARE NEEDED FOR:

Society Technical Committees

Society Standard Committees

Chapter Membership Promotion

Chapter Research Promotion

Chapter Student Activities

Chapter Technology Transfer

Find your Place in ASHRAE and volunteer

ASHRAE Members who are active at their chapter and society become

leaders and bring information and technology back to their job.

Page 6: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Commercial Ground Loop Heat Pump SystemsDesign & Economics

Learning Objectives:

1) Describe the components of a commercial GLHP system and the details of the installation and operation of the system

2) Learn the project specific data required by software used to design a commercial ground loop and understand the economic impact for changes in each of these project specific design variables

3) Apply hybrid design enhancements to achieve additional savings on initial cost with minimal increase to operating costs

4) Discuss and identify LEED points for Energy and Atmosphere Credit 1 "Optimize energy performance" and additional points for water efficiency and points for sustainable sites as GLHP Hybrid Systems are a clear path to a net zero energy building

Page 7: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Systems

GeothermalGround SourceGround CoupledGeoExchange

Vertical Bore Hole

Pump & Dump Pond Loop

Page 8: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Lower Operating Costs

Lower Life Cycle Costs

Lower Maintenance Costs

Simple Path to Net Zero Energy

Why a Ground Loop Heat Pump System

Page 9: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Lower Operating CostsNeed Building Loads and Ground Loop Design Software for Monthly Average Water Temperatures to Determine the Operating Efficiency of WSHP's

Why a Ground Loop Heat Pump System

Page 10: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Lower Life Cycle CostsNeed Estimated Ground Loop Installed Cost

Why a Ground Loop Heat Pump System

Page 11: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Lower Maintenance CostsGround Loop HDPE Pipe has a standard 50 year warrantyWSHP's have 24 Year Estimated Life - ASHRAE

“…the cost advantage of the ground-source systems over the other HVAC systems was 23.09 cents/ft2 with a standard deviation of 2.51 cents/ft2…

… with 99% confidence, the cost advantage is no less than 15.56 cents/ft2”

From ASHRAE Journal, 1998, V. 104Maintenance and Service Costs of Commercial Building Ground-Source Heat Pump Systems

Why a Ground Loop Heat Pump System

Page 12: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Simple Path to Net Zero Energy

Page 13: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Use the ground’s constant temperature as the sourceof heat in winter and as a high efficiency heat sink in summer

City Winter Design Ground Temperature Summer Design

Salt Lake City 6 F 50 - 56 F 96 F

Denver 4 F 50 – 57 F 91 F

Las Vegas 27 F 73 - 77 F 108 F

Minneapolis -16 F 44 - 47 F 91 F

Lower Operating Costs

Page 14: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

85 FSupplyWater

95 FReturn Water

10F Across the Cooling Tower

Lower Operating Costs

Page 15: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

95 F

90 FReturn Water

79 F

85 FSupplyWater

95 F87 F

Only 5F Across the Cooling Tower

One unit in each zone with individual local temperature control

Lower Operating Costs

Page 16: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

95 F84 F

Only 1.8F Across the Cooling Tower

Heat Recovery To OA AHUSnow MeltDomestic Hot Water Pre-Heat130 F or 160 F Hot Water

Water-to-Water Unit

Lower Operating Costs

Page 17: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

95 F84 F

Water-to-Water Unit

Boiler/Cooling Tower 20% to 25% of Total HVAC Operating Cost

Lower Operating Costs

Page 18: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

95 F

86.8 FReturn Water

79 F

85 FSupplyWater

Heat Recovery To OA AHU:125 F Hot Water

Water-to-Water Unit

Supply Water approaches Ground Temperature

Lower Operating Costs

Page 19: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical Water Source Heat Pump Cooling Performance

Lower Operating Costs

Page 20: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical Water Source Heat Pump Cooling Performance

33% Increase

Lower Operating Costs

Page 21: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical Water Source Heat Pump Cooling Performance

33% IncreaseIMPORTANTGround Loops approach ground temperature when the Building is not at Peak Loads

80% - 90% of the time, building loads are at 50% of the Peak Load or Less

Lower Operating Costs

Page 22: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Installation Costs

GLHP Design Basics

Page 23: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

NEED TO KNOW:

From the Ground: Thermal Conductivity and Average Ground Temperature

From the Building: Monthly/Daily Loads

From the Equipment: GLHP Efficiency of Each Specific Heat Pump

GLHP Design Basics

Page 24: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

The Ground

GLHP Design Basics

Page 25: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

20 10 Tm 10 20

4

8

12

16

20

24

28

Dep

th i

n F

ee

t

WET SOIL(0.96 sq. ft./day) or

(0.40 sq. ft./hr)

AVERAGE SOIL(0.6 sq. ft./day) or(0.025 sq. ft./hr)

LIGHT DRY SOIL(0.26 sq. ft./day) or

(0.011 sq. ft./hr)

GLHP Design Basics

Page 26: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Thermal

Conductivity Diffusivity

Material (Btu/hr-ft-F) (ft2/day)

Dense Rock 2.00 1.2

Average Rock 1.40 0.96

Heavy Soil, saturated 1.40 0.84

Heavy Soil, damp 0.75 0.60

Heavy Soil, dry 0.50 0.48

Light Soil, damp 0.50 0.48

Light Soil, dry 0.20 0.26

GLHP Design Basics

Page 27: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

GLHP Design Basics

Page 28: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

GLHP Design Basics

Page 29: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

GLHP Design Basics

Page 30: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Required Test Duration – A minimum test duration of 36 hours is recommended, with a preference toward 48 hours.

TC Test: $12,000 to $17,000

GLHP Design Basics

Page 31: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 32: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 33: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 34: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 35: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Drillers Need to Know

to bid competitively

Thermal Conductivity Test

Page 36: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 37: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity Test

Page 38: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Conductivity (k) =

3.412 (BTU/Whr) * W(watts)4p x L(ft of loop) x Slope(F)

Thermal Conductivity Test

Page 39: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Thermal Diffusivity (a) =

k /rcp

r = average density of the soil

cp = specific heat of the soil

Usually measured in ft2/day but sometimes reported as ft2/hour

Thermal Conductivity Test

Page 40: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Site Layouts

Page 41: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Old Fashion Ground Loop Site Layout

Page 42: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Valve Vault

Page 43: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Valve Vault

Page 44: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Reverse Return Piping for Ground Loop

Each Bore hole has identical pressure dropSo no balancing valves required under ground

GLHP Design

Page 45: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Reverse Return Piping for Ground Loop

Save Pipe with separate supply & return trenches

GLHP Design

Page 46: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

GLHP Design - Deeper is Cheaper

10 bore holes at 200 foot deep180 foot overall

5 bore holes at 400 foot deep120 foot overall

20’

30 ‘

Page 47: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

5 Rows of 10 Bore Holes – each row on Reverse Return

Supply/Return From Building

GLHP Design

Page 48: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Same Number of Bore Holes in Same Location Only 5 Bore holes on reverse return - Lower Water Pressure Drop, Lower Installed Cost

Supply/Return From Building

GLHP Design

Page 49: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Same Number of Bore Holes in Same Location Smaller Diameter Supply & Return Header Piping

Supply from Building Return to Building

GLHP Design

Page 50: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

400 Foot Bore Hole Layout

Ground Loop Site Layout

Page 51: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

High School – Row of Vertical Loops

Page 52: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

High School – Rows Returned

Page 53: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

High School – Headers In Mechanical Room

Page 54: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

High School – Headers In Mechanical Room

Page 55: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Mechanical Room

Page 56: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Installing Pipe

Page 57: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical vertical bore detail

Vertical Loop Cross Section

Page 58: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical vertical bore detail

Vertical Loop Pipe with U-Bend

Page 59: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Vertical Loop Pipe with U-Bend

Page 60: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

PE 3408 HDPE (High Density Polyethylene Pipe)

1” IPS SDR-111.25” IPS SDR-112” IPS SDR-113” IPS SDR-15.54” IPS SDR-15.56” IPS SDR-15.5 8” IPS SDR-15.5

Standard Dimension Ratio (SDR) is the Side Wall Thickness to the Pipe Diameter Ratio

GLHP Design

Page 61: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical vertical bore detail

PE Pipe Cell Classification PE 355434C

PE: Polyethylene3: Density (0.941 - 0.955 g/cm3)5: Melt Index (ASTM D-1693, 10.1.4)

Molecular Weight5: Flexural Modulus4: Tensile Strength at Yield3: Environmental Stress Crack Resistance4: Hydrostatic Design Basis at 23CC: Color and UV Stabilizer

GLHP Design

Page 62: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Selecting Pipe Size for the Bore Hole

GLHP Design

Page 63: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Selecting Pipe Size for the Bore Hole Design Goal: 15 Ft H2O pressure dropfor entire ground loop

GLHP Design

Page 64: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Vertical bore without backfill

GLHP Design

Page 65: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Bentonite

Grout backfill

Geothermal pipe

GLHP Design

Page 66: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

• Built in 1996

• 1600 Students

• 239,000 square feet

• 140 units (average size 3 tons )

• 414 total tons

• 240 bore holes at 330 ft deep

Middle School, Ohio

Page 67: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

• Mechanical HVAC System was installed for $ 10 per square ft

($ 2.4 million)

Ground Loop Portion Turn Key Cost: $ 500,000

$ 6.30 per foot of bore hole

• System projected to operate at 25 cents per square ft.

System actually operating at 18 cents per square ft.

Poor energy modeling added 38% to the estimated operating cost!

Middle School, Ohio

Page 68: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

New Public School built in 2006

Loop Field Layout

Construction Cost Comparison

1st Year Operating Cost Comparison

High School, Utah

Page 69: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

316 – 300’ boreholes Under North Parking Lot

High School, Utah

Page 70: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

High School, Utah

Page 71: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

• Conventional System Bid: $19.00 / sq ft

• Ground Source System Bid:

Mechanical/Plumbing bid: $3,065,161

Loop Field bid: $930,784

Total: $3,995,945

Mechanical Cost: $14.95 /sq ft

HVAC Construction Cost Savings: = $1,082,387

• Savings by reducing the “tilt up” wall height saved an additional $ 600,000.00

High School: GLHP System with Lower 1st Cost

Page 72: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Pond Loops

Page 73: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Spacer

Pond Loops

Page 74: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Pond Loops

Page 75: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Pond Loops

Page 76: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Great River Medical Center – Burlington, Iowa2002 ASHRAE Technology Award1500 Tons in a 15 Acre Man-made Lake

Pond Loops

Page 77: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

SOFTWARE VENDOR

GLD2014 Gaia Geothermal

GLHEPRO 4.0 IGSHPA

ECA ELITE SOFTWARE, INC. BRYAN, TX

Geo CALC FERRIS STATE UNIVERSITY, BIG RAPIDS, MI

GchpCalc ENERGY INFORMATION SERVICES, Tuscaloosa, AL

GL-SOURCE KANSAS ELECTRIC UTILITY, TOPEKA, KS

G L Design GBT, Inc., Maple Plain, MN

GS2000 Buildings Group, Natural Resources Canada

LUND Programs University of Lund, Sweden

Wright-Loop Wrightsoft, Lexington, MA

Page 78: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

75.5 Connected Tons of GLHP’s97/77 F Summer; 28 F Winter

Ground Loop Software

Page 79: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 80: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 81: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

1.19 Thermal Conductivity

74.6 F Ground Temperature

Ground Loop Software

Page 82: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Impact of system efficiency and waste heat to a ground loop

Basis of Design Ground Loop:

60 bore holes x 305 ft per hole x $10/ft

Total: $ 183,000.00

Add for Alt #1:

60 bore holes X 5 ft per hole = 300 bore ft

Plus 8 holes X 310 ft = 2,480 bore ft

Total: 2,780 bore ft X $10/ft = $ 27,800.00 15% add

Add for Alt # 2:

16 holes X 305 ft = 4,880 bore ft

Total: 4,880 bore ft X $10/ft = $ 48,800.00 27% add

Add for Alt # 3:

60 holes X 10 ft per hole = 600 bore ft

Plus 16 holes X 315 ft = 5,040 bore ft

Total: 5,640 bore ft X $10/ft = $ 56,400.00 31% add

75.5 Connected Tons of GLHP’s

Cost of Heat Pumps with Accessories

$ 75,000.00

Ground Loop Software

Page 83: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Upgrade to High Efficiency WSHP’s

• Standard efficiency 12 EER means for every 1 watt of electricity consumed, 3.52 watts

of energy is removed from the conditioned space resulting in 4.52 watts of waste heat

delivered to the net energy water loop

• High efficiency 21.6 EER reduces the electricity consumed from 1 watt to only 0.56

watts to remove the same amount of energy from the zone and reduces the waste

heat delivered to the net energy water loop from 4.52 watts to 4.08 watts

Ground Loop Software

Page 84: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Building and Heat PumpInformation

Ground and LoopInformation

Ground Loop Software

Page 85: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loads Imported Directly from Trace 700 .GT File

Ground Loop Software

Page 86: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 87: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 88: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Peak Water Temperature Design

Ground Loop Software

Page 89: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Building and Heat PumpInformation

Ground and LoopInformation

Ground Loop Software

Page 90: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 91: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 92: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 93: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 94: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 95: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Peak Water Temperature Design

Ground Loop Software

Page 96: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

If Guessing at 1.0 Thermal Conductivity

Ground Loop Software

Page 97: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Using correct 1.44 Thermal Conductivity Saved 26 bore holes and 9,708 feet of drilling = 18% smaller loop

Ground Loop Software

Page 98: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loop Designed for the Cooling Peak Loop Temperature And the Heating Peak Loop Temperature

Ground Loop Software

Page 99: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

150 bore holes @ 308 ft deep 246 tons of Block Load Cooling116 bore holes @ 400 ft deep 287 tons of Connected Cooling

Ground Loop Software

Page 100: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Peak Water Temperatures Are only for brief periods of time

Ground Loop Software

Page 101: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Page 102: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ground Loop Software

Maximum Peak Loop Temperature in 30 years during the cooling mode

Page 103: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loop Design Using Original Peak Loop Temperatures and the resulting WSHP Efficiencies

Ground Loop Software

Page 104: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Modify the Peak Loop Temperatures resulting in new WSHP Efficiencies (19.4 EER versus 16.9 EER) at the system’s maximum peak.

Ground Loop Software

Page 105: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Maximum Average Loop temperature during the cooling mode is even lower than 80F

Ground Loop Software

Page 106: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical Water Source Heat Pump Cooling Performance

33% Increase

I told you this was

IMPORTANT

Ground Loop Software

Page 107: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid GLHP Systems

• Cooling Load is out of balance with the Heating Load

• Property Area is insufficient

• Install only as much ground loop as meets the client’s desired economics – just like PV panels

Page 108: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Cooling Load is out of balance with the Heating Load

• Clark County School District (Las Vegas)

60% ground loop plus fluid cooler allows for winter, spring and fall operation on ground loop but runs a fluid cooler at peak loads.

• Lincoln Public Schools (Nebraska)

Boiler hybrid to eliminate anti-freeze and the 30% pumping penalty from anti-freeze.

Hybrid GLHP Systems

Page 109: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid GLHP Systems

Take Advantage of Part Load Operation

Bin Weather Data: 8760 Hours/Year

205 Hours or 2.3%

Page 110: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Cooling Load is out of balance with the Heating LoadLincoln Public Schools

Hybrid GLHP Systems

Page 111: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Take Advantage of Part Load Operation

Lincoln Public Schools

50% of the hours In the year

27% Flow

80% of the hoursIn the year

54% Flow

552 GPM System (2.8 GPM/ton) with VFD Pumping

Hybrid GLHP Systems

Page 112: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Take Advantage of Part Load Operation

Hybrid GLHP Systems

Page 113: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Project name: Motor Speedway

Description: Media Center64,000 Sq. ft.Vertical Loop w/ Cooling Tower

Ground Temperature: 73.5 – 77.5ºF

Cooling load: 4,500,000 BTUH (375 tons)EFLH (cooling): 1325 - 1000

Heating load: 2,640,000 BTUH (220 tons)EFLH (heating): 400

Hybrid GLHP Systems

Page 114: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loop Details (375 tons)

Full Geo

Number of bores: 563

Depth of bores: 400 feet

Bore hole spacing: 25 feet

Loop field installed costs: $ 2.1 million

Building energy consumption/yr: $ 92,700

Maintenance costs / yr: $ 8,250

Hybrid GLHP Systems

Page 115: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loop Details (375 tons)

Hybrid Full Geo

Number of bores: 150 563

Depth of bores: 400 feet 400 feet

Bore hole spacing: 25 feet 25 feet

Loop field installed costs: $ 780,000 $ 2.1 million

Building energy consumption/yr: $ 98,000 $ 92,700

Maintenance costs / yr: $ 11,856 $ 8,250

Summary

Hybrid Loop installed costs reduced by $ 1,320,000

Operating costs increased by $ 5,300 / yr.

Maintenance increase $ 3,606 / yr.

Hybrid GLHP Systems

Page 116: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Loop Details Hybrid Full Geo

Number of bores: 150 563

Depth of bores: 400 feet 400 feet

Bore hole spacing: 25 feet 25 feet

Loop field installed costs: $ 780,000 $ 2.1 million

Building energy consumption/yr: $ 98,000 $ 92,700

Maintenance costs / yr: $ 11,856 $ 8,250

Summary

Hybrid Loop installed costs reduced by $ 1,320,000

Operating costs increased by $ 5,300 / yr.

Maintenance increase $ 3,606 / yr.

Hybrid GLHP Systems

Turn Key Cost about $13 per ft of bore hole

Page 117: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Full Size Ground Loop – Unbalanced Loads

Hybrid GLHP Systems

Page 118: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Full Size Ground Loop – Unbalanced Loads

Hybrid GLHP Systems

Page 119: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Boiler Hybrid Sizing

Hybrid GLHP Systems

Page 120: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid with 20% Boiler Saved 34 bore holes and 10,384 feet of drilling = 22% smaller loop

Hybrid GLHP Systems

Page 121: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid with 26% Tower (10 ton) Saved 9 bore holes and 3,191 feet of drilling

Hybrid GLHP Systems

Page 122: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Integrate non-HVAC equipment:

ice making machines, freezer cases, refrigeration cases, snow melt, ice

rinks, process water, black water waste, grey water, sprinkler water

Hybrid GLHP Systems

Page 123: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Ice Making Machines, Freezer Cases, Refrigeration Cases,

Walk-in Freezers

AHRI Certified EER improves 20% using water cooled Ice

Making Machines as compared to air cooled machines.• Units are quieter

• Units do not add a heat load to the zone

• Units require less maintenance

Freezer and Refrigeration Cases are free sources of energy for

the Ground Loop and selecting "water cooled" improves

efficiency, reduces refrigerant charge, and improves comfort by

reducing sound levels

Hybrid GLHP Systems

Page 124: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

The GLHP system in this Minnesota gas

station heats and cools the building: provides

hot water, food refrigeration, and ice making;

and melts snow to and from the carwash.

5 HP Cooler Case downsized to 3 HP

3 HP Freezer Case downsized to 1 HP

Integrating Hybrid Ground Loop, Snow Melt, DHW, Freezer Cases,

and Refrigeration Cases

Hybrid GLHP Systems

Page 125: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid GLHP Systems

Page 126: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid GLHP Systems

Page 127: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Hybrid GLHP Systems

Page 128: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

LEED Version 4

Energy and Atmosphere Credit 1: Optimize Energy Performance

Points are awarded for exceeding the base line energy performance for the entire building

New Construction

Major Renovation

Core and Shell

Points (except Schools, Healthcare)

Points Healthcare

Points Schools

6% 4% 3% 1 3 1

8% 6% 5% 2 4 2

10% 8% 7% 3 5 3

12% 10% 9% 4 6 4

14% 12% 11% 5 7 5

16% 14% 13% 6 8 6

18% 16% 15% 7 9 7

20% 18% 17% 8 10 8

22% 20% 19% 9 11 9

24% 22% 21% 10 12 10

26% 24% 23% 11 13 11

29% 27% 26% 12 14 12

32% 30% 29% 13 15 13

35% 33% 32% 14 16 14

38% 36% 35% 15 17 15

42% 40% 39% 16 18 16

46% 44% 43% 17 19 -

50% 48% 47% 18 20 -

Page 129: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

LEED Version 4

Energy and Atmosphere Credit 1: Optimize Energy Performance

New Construction

Major Renovation

Core and Shell

Points (except Schools, Healthcare)

Points Healthcare

Points Schools

6% 4% 3% 1 3 1

8% 6% 5% 2 4 2

10% 8% 7% 3 5 3

12% 10% 9% 4 6 4

14% 12% 11% 5 7 5

16% 14% 13% 6 8 6

18% 16% 15% 7 9 7

20% 18% 17% 8 10 8

22% 20% 19% 9 11 9

24% 22% 21% 10 12 10

26% 24% 23% 11 13 11

29% 27% 26% 12 14 12

32% 30% 29% 13 15 13

35% 33% 32% 14 16 14

38% 36% 35% 15 17 15

42% 40% 39% 16 18 16

46% 44% 43% 17 19 -

50% 48% 47% 18 20 -

Baseline ASHRAE 90.1 for GLHP: 13.4 EER

Most GLHP’s at AHRI Rating:

17.0 EER to 30.0 EER

20 EER = 49% Increase

Page 130: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Lower Operating Costs

Lower Life Cycle Costs

Lower Maintenance Costs

Simple Path to Net Zero Energy

Why a Ground Loop Heat Pump System

Page 131: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

NEED TO KNOW:

From the Ground: Thermal Conductivity and Average Ground Temperature

From the Building: Monthly/Daily Loads

From the Equipment: GLHP Efficiency of Each Specific Heat Pump

GLHP Design Basics

Page 132: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Typical Water Source Heat Pump Cooling Performance

33% IncreaseIMPORTANT

Page 133: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Use Hybrid Design

Use Grey Water/Black Water/Process Water

Integrate non-HVAC Equipment

Page 134: Design and Economics of Commercial Ground Loop Water ......Ground Loop Portion Turn Key Cost: $ 500,000 $ 6.30 per foot of bore hole • System projected to operate at 25 cents per

Commercial Ground Loop Heat Pump Systems:Design & Economics

by Alan Niles

Questions & Answers