Design and execution of a comprehensive PCB

Management Plan for Kazakhstan

IPEN Global Assembly19 October 2010

Page 2: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

General information

• Implementing agency: UNDP-Kazakhstan

• Project duration: 5 years• Project implementation modality –

NEX - Ministry of Environmental Protection -

• Office location: Astana• GEF grant: USD 3,300,000

Page 3: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Project Management

Steering Committee

BeneficiaryMinistry of Environmental

Protection

BeneficiaryMinistry of Environmental

Protection

ChairmanNational Director

ChairmanNational Director

UNDPUNDP

Quality AssuranceUNDP

GEF National coordinator (MoEP)

Quality AssuranceUNDP

GEF National coordinator (MoEP)

National project manager

National project manager

Project team

Project AssistantExperts

Consultants

Project team

Project AssistantExperts

Consultants

Page 4: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Project financing

• Financial contribution :

• In-kind contribution : US$ 10,901,356- Government of Kazakhstan

• Total project budget: US$ 20,834,680

Source: US $

GEF 3,300,000

UNDP 15,000

International private sector 2,983,000

National private sector 3,635,324

Page 5: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Project Objective:

Ensure minimization of PCB releases and subsequent health and environmental impacts through systematic capacity development for sound PCB management in the country

Page 6: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Facts and figures

• Production of PCB capacitors until 1989• 4 PCB hotspots

– Ust-Kamenogorsk storage pond– Ust-Kamenogorsk capacitor plant– Ekibastuz power sub-station– Dariyal-U former military base

• 116 pure PCB transformers (~ 950 tons)• 56 000 PCB capacitors (~ 2,500 tons)• 225,000 tons of highly PCB contaminated

soil

Page 7: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

PCB equipment map of Kazakhstan

PCB capacitors PCB capacitor batteries PCB transformers

Page 8: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

• PCB Hotspots Map

Page 9: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Project Outcomes

Outcome 1 - Regulatory and administrative strengthening for sound PCB management

Outcome 2 - Capacity building for sound PCB management, identification of additional PCB sources

Outcome 3 - Disconnecting, dismantling and disposal of 850 tons of PCB transformers (in partnership with ArcelorMittal Temirtau)

Outcome 4: Regionally organized secure storages and disposal of PCB capacitors

Page 10: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Regulatory and administrative strengthening for sound PCB

management• Output 1.1: Environmental Code and other PCB related

legislation reviewed, changes developed. Environmental Code revised to include a chapter on PCB management and disposal.

• Output 1.2: Responsibili ties vis-a-vis International Chemicals´ Conven tions in the government re-aligned

• Output 1.3: Detailed PCB rules, guidelines, incentive sche mes developed

• Output 1.4: Capacity for implementing and knowledge of PCB regulations and guidance among public sector actors, including training of customs department in PCB identification, enhanced.

• Output 1.5: Awareness raising campaigns on PCB risks and regulatory requirements among authorities and wider public conducted.

Page 11: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

A. PCB Management Guidelines

A. PCB Management Guidelines

B. PCB Regulations- Rules of PCB inventory (2010)- Stocktaking and monitoring rules (2011)- Rules of PCB equipment phase-out (2011)-Technical requirements for temporary PCB/HW storage facilities (2011)-Rules of packaging, labeling and transportation of PCB (2011)

-Technical requirements for incineration of hazardous waste (2011-2012)- Others (?) – 2012-2015

B. PCB Regulations- Rules of PCB inventory (2010)- Stocktaking and monitoring rules (2011)- Rules of PCB equipment phase-out (2011)-Technical requirements for temporary PCB/HW storage facilities (2011)-Rules of packaging, labeling and transportation of PCB (2011)

-Technical requirements for incineration of hazardous waste (2011-2012)- Others (?) – 2012-2015

C. Action Plan 2011-2015- Objectives & Targets- Components/Outcomes (e.g. Inventory Plan)- Stakeholders/Partners- KPIs/deliverables

D. Budget Program 2011-2015

- National level (Government)- Regional level (local authorities)- Local level (PCB holders)

E. Monitoring and Evaluation Plan

2011-2015

National Chemical Safety Policy

National Chemical Safety Policy

Page 12: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Other key elements of PCB Management Plan

• Stakeholder Engagement Strategy• Communication Strategy• PCB Information Management Systems:

– Web site– Databases– GIS-based Information Management System.

2010 – 2011: design and development phase• 2010 – design (regulation)• 2011 – planning (management system)• + inventory (initial phase)

Page 13: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Capacity building for sound PCB management,

identification of additional PCB sources

• Output 2.1: Improved capacities of PCB holders for sound PCB management

• Output 2.2: PCB holder-wise management and replacement plans

• Output 2.3: PCB inventory expanded and updated• Output 2.4: Enhanced PCB analysis preparedness at State

Hydro-meteorological services and Ministry of Health laboratories

• Output 2.5: Risk based priority setting tools for PCBs management initiatives developed..

Page 14: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Key indicators

National Inventory Plan 2011-2015 Setting clear targets for closed and open systems Setting deadlines for large companies, small and medium

size companies, municipalities

PCB Management Plans for 20 companies - first 3 years

Accreditation of reference POPs laboratory Training and awareness raising plan 2011-2015

(PCB MP)

Page 15: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Replacement, setting-up safe dismantling of 850 tons of PCB transformers and their safe disposal

• Output 3.1: Phase-out and procurement of replacement transformers planned and scheduled

• Output 3.2: Transformers disconnected, drained, dismantled and cleaned, metals recycled

• Output 3.3: Disposal of oils and associated waste

Page 16: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Regionally organized secure storages and disposal of PCB

capacitors• Output 4.1: Secure, temporary PCB storage facilities

identified, constructed/upgraded• Output 4.2: Safe operation of storage sites secured• Output 4.3: PCB collection and disposal put in place

and implemented• Output 4.4: 15,000 PCB capacitors at Darial-U

capacitor site disconnected, packed and stored. • Output 4.5: Clean-up premises and pack all

potentially PCB contami nated wastes.• Output 4.6: Transportation and disposal of

approxima te ly 600 tons of PCBs and associated waste disposed.

Page 17: Design and execution of a comprehensive PCB Management Plan for Kazakhstan IPEN Global Assembly 19 October 2010

Key indicators

Disposal of Dariayl-U 6,000 capacitors (~200 t) Establishment of 3 storage facilities for PCB waste

(capacitors, transformers) 200 t of additional PCB waste collected and

disposed Design of transportation scheme (inside

Kazakhstan, transportation routes to EU region and from Central Asian countries) – PCB MP

Dariyal-U clean-up project developed Working area Freely accessible area

10 m 21, 32 m

14,4

m

2 x

20

m3

Temporary storage

Output

area

Input area

Scale

PC

B o

il ta

nk

Driveway

Storage for materials / tools

Personnel sluice

Material

sluice

Air outlet

Transformer draining area

Cap

acito

r dr

aini

ng a

rea

Transformer draining area

Cra neCra ne

10,1 m2

10,2 m2

12,1

m2

6,2 m2

5,1 m2

For

klift

3,1

m2

5, 2 m2

16,1 m2

8, 2 m2

Emergency exit

Entrance