Design and Techniques for Safety in High Rise Design and Techniques for Safety in High Rise Buildings Buildings- Focus on Temp. Structures Focus on Temp. Structures-Formwork Formwork 1 Dr. Kumar Neeraj Jha Department of Civil Engineering Department of Civil Engineering Indian Institute of Technology Delhi Indian Institute of Technology Delhi Email: Email: [email protected] [email protected] [email protected] [email protected]

Upload: trinhminh

Post on 01-Feb-2018

232 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

Design and Techniques for Safety in High Rise Design and Techniques for Safety in High Rise

BuildingsBuildings-- Focus on Temp. StructuresFocus on Temp. Structures--Formwork Formwork

1

Dr. Kumar Neeraj Jha

Department of Civil EngineeringDepartment of Civil Engineering

Indian Institute of Technology DelhiIndian Institute of Technology Delhi

Email: Email: [email protected]@civil.iitd.ac.in

[email protected]@rediffmail.com

Page 2: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Contents of my presentation

� Why ‘Temporary structures’ do not deserve ‘temporary’ treatment? The status of formwork in the country and failures in temporary structures

� Solutions available in context of high rise buildings

Climbing formwork for wall

2

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Climbing formwork for wall

� Slab formwork- Mivan, Doka, and PERI

� Flying formwork such as: Table Formwork, Tunnel Formwork, Column Mounted Shoring System, and Gang Form

� Avoiding failures in multistoreyed building construction

Page 3: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

• ‘Temporary’ gives a feeling as if it is something not that important

Why ‘Temporary Structures’ do not deserve ‘temporary’ treatment?

3

something not that important

• But is it the case-

• In RCC Construction, Temporary structures say formwork

• Quality, Economy, Safety

• Consumes about 40-50% of the total cost and about 60-70% of the time

• Major investment required

Thus ‘TEMPORARY’ is really not ‘Temporary’

Page 4: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Common defects due to poor formwork quality

1. Honey comb

Quality

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Formwork needs to be designed & built accurately so that the desired size, shape position, correct location, quality and finish of acceptable quality of

the cast concrete are attained.

Page 5: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Common defects due to poor formwork quality

2. Poor Construction Joint /Offsets in Concrete Joint

Quality

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 6: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Common defects due to poor formwork quality

3. Plywood Grains Stuck on the Concrete Surface

Quality

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 7: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� In Building Construction�60% Failure due to Formwork Collapse, Shoring Collapse, Inadequate Shoring & Lateral Bracing�8% due to premature removal of shore.�18% Failure is due to faulty materials.

Safety7

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

�18% Failure is due to faulty materials.

Thus Formwork needs to be built adequately so that it is capable of supporting all dead & live loads without danger to workmen and to the

concrete surface.

Page 8: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Collapse of one floor leading to another

8

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 9: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

View of the bent shoring (due to excess load)

9

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 10: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

View of the portion of the slab which failed due to concrete overloading

10

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 11: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Another view of the portion of the slab which failed due to concrete overloading (note the buckled props)

11

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 12: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Another view of the portion of the slab which failed due to concrete overloading

12

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 13: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

View of portion of slab and beam formwork which collapsed

13

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 14: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Another view of portion of slab and beam formwork which collapsed

14

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 15: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Wall Formwork

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Fig__Traveling Climbing Formwork System

Page 16: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Fig__L&T-Doka Wall Formwork with Traveling Climbing System in Use for the Construction of LNG Tank for M/s Punj Lloyd Ltd. Site ate Dabhol (Diameter of the Tank 80 m, Shutter Panel Size 4m x 3.8m, Height of Tank = 40m.

Page 17: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Fig_____L&T WALL FORMWORK WITH TRAVELING CLIMBING

SYSTEM IN USE FOR THE CONSTRUCTION OF LNG TANK

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

FOR M/S. PUNJ LLOYD LTD., SITE AT DABHOL. (DIAMETER OF THE

TANK 80M, SHUTTER PANEL SIZE 4M x 3.8M HEIGHT OF TANK 40M)

Page 18: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

CB 240 and CB 160 System18

In CB 240 system, the formwork is mounted on a carriage and can be moved

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

can be moved around 750 mm. In CB 160 system, the formwork is simply tilted backward when striking.

Page 19: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

CB System being transported through crane19

In both the systems, the formwork is moved to the next

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

moved to the next pour together with the scaffold in one crane lift

Page 20: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

RCS formwork20

formwork is supported on a mobile carriage which can be retracted up to a distance of 900 mm. system can be climbed either with the crane or lifted by means of mobile

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

or lifted by means of mobile hydraulic climbing devices. In this system a component called climbing shoe guides the climbing rail to the next casting segment. The climbing pawl engages automatic and secures the complete unit after lifting for 500 mm.

Page 21: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

ACS R21

The system is useful in all the regular climbing applications.

This system has climbing mechanism

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

climbing mechanism with a lifting power of 100 kN, which raises the climbing unit to the next pour without the need for intermediate anchors.

Page 22: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Slab and Beam by L&T formwork22

�Modular, easy to erect and dismantle.� Durable, faster construction.� Better site and store-yard management� L&T ‘Doka flex’ for casting waffle slab

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

‘Doka Flex’ for Waffle slab at Bangalore‘L&T Doka’ at RCC slab castingSource: L&T

Page 23: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Gridflex Aluminum Grid Slab by PERI 23

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Detail view of Skydeck panel slab formworkSkydeck aluminum panelsSource: PERI

Page 24: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Multiflex Girder Slab by PERI24

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Detail view of Multiflex girder formworkMultiflex girder slab Source: PERI

Page 25: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Beam & Slab system by MIVAN25

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� MIVAN formwork is the lightweight panel made of extruded aluminum rail

section and welded to aluminum sheet.� Good stiffness to weight ratio and ensures minimal deflection.

Page 26: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� The system is simple, flexible and cost – effective.� Factory made, highly précised aluminum sections� Possible reuse could be even up to 250.� Delivers total quality work increases concrete durability.� 4 to 5 day cycle for floor-to-floor construction- Profitable.

Beam & Slab system by MIVAN26

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� 4 to 5 day cycle for floor-to-floor construction- Profitable.

Details of formwork junctionMIVAN wall junction

Page 27: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Construction steps for MIVAN

� Step 1 : Setting out and

survey; adjustment if any and Timber stay fixing along the setting out line

27

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 2: Vertical rebar fixing

and first stage mechanical and electrical works.

Page 28: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 3: Wall, column, and

beam formwork erection

Construction steps for MIVAN

Wall form >

28

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Beam soffit >

< Door opening

Page 29: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 4: Deck / soffit formwork erection

Construction steps for MIVAN29

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Details of deck erectionTop of deck

Page 30: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 5: Slab rebar and 2nd phase of M&E works

Construction steps for MIVAN30

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 31: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 6: Sunken portion formwork fixing, spacer and

vertical soldier fixing

The formwork for sunken portion is fixed besides fixing of spacer and vertical soldier. The vertical soldier is used to maintain the verticality of beam side by using tie rod and wing

Construction steps for MIVAN31

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

maintain the verticality of beam side by using tie rod and wing nuts. Spacing of the vertical soldier is approximately 1000 mm. The same slot can be used for fixing walkway brackets.

� Step 7: Vertical and horizontal alignment and Checking

The vertical and horizontal alignments are checked.

Page 32: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 8: Concrete pouring

and compaction

Construction steps for MIVAN32

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 9: Striking of wall

formwork

Page 33: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Flying formwork

� The flying form is a system of formwork which is assembled into form units usually at ground and is located to form concrete elements at the site location. The form units are further relocated at new location with virtually no disassembly of parts to form concrete elements.

33

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

of parts to form concrete elements.

� The flying forms are more common in high rise buildings for rapid cycle construction where in large repetitions are possible and thus justifying their relatively high initial cost of fabrication.

Page 34: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Flying formwork

� In case of flying formwork all the members are assembled together to allow lifting of the whole system in one piece which is in contrast of hand set forms.

� A typical flying formwork consists of sheathing member

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� A typical flying formwork consists of sheathing member (mostly plywood), trusses or shores, wooden beams as stringers and joists.

�Joists are timber or aluminium beams connected in most cases to deep trusses.

Page 35: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-1

• Forms are preassembled at ground level• Entire assembly is lifted and placed on existing floor or at desired level by crane and hoist line.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 36: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-2

• Form assembly Is then moved and placed into exact position by movable dollies.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 37: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-3

• Form assembly is adjusted to correct height and attached firmly with other modules.• Reinforcement steel is fixed and electrical, mechanical and plumbing work is done.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

plumbing work is done.

Page 38: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-4

• Form assembly support systems are lowered to bring the form down.• This process is done by the hydraulic jacks places under the formwork.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

formwork.

Page 39: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-5

• Then the form assembly is moved to the edge of the support system by dollies.• Special attention on its movement has to be given.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 40: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step-6

• Form assembly tilts when about half of assembly is out of the floor slab.• Again the formwork is hoisted to the upper level fot the next cast.

Flying Formwork Cycle

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

next cast.

Page 41: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table Forms

� Another variant of flying form.

� Capable of providing very high speed of construction.

Used primarily for multi- storey building (such as

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Used primarily for multi- storey building (such as residential flats, hotels, hostels, offices and commercial buildings) construction works with regular plan layouts and long repetitive structures.

Page 42: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table formwork being flown42

Table formwork being flown to its new location

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 43: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table formwork43

Table formwork being positioned

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 44: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Transportation arrangement44

Transportation arrangement for table formwork

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 45: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table form in practice45

Extensive use of Table form at OberoiMall Project Site Mumbai (Courtesy

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

(Courtesy L&T)

Page 46: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table module being shifted46

Table module being shifted to new location (Note the props in folded

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

folded position)

Page 47: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table module being transported using crane47

Table module being transported using crane (note the lifting fork)

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

lifting fork)

Page 48: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table form being shifted on trolley48

Table form being shifted on trolley to the desired location

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 49: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

PERI Table Formwork49

� Peri offers modular tables which are pre assembled for immediate use.

� The modules are available in four standard sizes which allow optimal adjustment to the building. The

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

which allow optimal adjustment to the building. The sizes are:

� Table Module VT 200/215 x 400

� Table Module VT 250/265 x 400

� Table Module VT 200/215 x 500

� Table Module VT 250/265 x 500

Page 50: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Peri Uniportal Table form50

PERI UniportalTable form

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 51: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Table swivel head51

Table swivel head used in props

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 52: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Skytable form -PERI52

Skytable form (see the trusses)

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 53: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Tunnel form

� Fixed bracing.� Need to dismantle into smaller modules before reuse.

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 54: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Tunnel form

� Wall and ceilings are cast together.

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 55: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Tunnel formwork system55

Tunnel formwork system

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 56: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Construction steps-Tunnel form56

Construction of starter wall for the tunnel formwork system

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 57: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Construction steps-Tunnel form…contd.57

Placement of tunnel form in progress

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 58: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Construction steps-Tunnel form…contd.58

Tunnel form (window)

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 59: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Construction steps-Tunnel form…contd.59

Heating equipment in position for the tunnel form work

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 60: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Column Mounted Shoring System60

Column mounted shoring system (Courtesy Formwork–Shoreall

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Shoreallavailable at http://www.formwork-exchange.com)

Page 61: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Column Mounted Shoring System61

Column mounted shoring system (Courtesy Formwork–Shoreall

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Shoreallavailable at http://www.formwork-exchange.com)

Page 62: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Column Mounted Shoring System62

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 63: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Issues in Multistoreyed Building Construction Shoring explained

63

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 64: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Shoring and reshoring explained64

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 65: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Preshoring explained65

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Page 66: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Backshores

� Backshores are shores placed snugly under a stripped concrete slab or structural member after the original forms and shores have been removed from a small area without allowing the slab to deflect or support its own weight or

66

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

slab to deflect or support its own weight or existing construction loads from above.

Page 67: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Assumptions made in the simplified analysis

� Shores and reshores are infinitely stiff relative to the slabs.

� Slabs interconnected by shores therefore all deflect equally when a new load is added, and carry a share of the added load in proportion

67

Computation of loads on slabs and shores

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

carry a share of the added load in proportion to their relative stiffnesses.

� Slabs have equal stiffness and added loads are shared equally by the interconnected slabs.

� Ground level floor or other base support is rigid.

Page 68: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Two levels of shores and one level of reshore- Summary

68

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

live load, and self weight of formwork, shores, and reshores considered

Page 69: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Computation of strength of concrete slab at a given point of time

69

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Modification factor

Page 70: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Strength Calculation 1

Where,

is compressive strength at time t ( days elapsed) after casting

( ) ckct ftba

tf

+=

ctf

Source: ACI209R-92

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

is compressive strength at time t ( days elapsed) after casting

is 28-day characteristic compressive strength of concrete

ctf

ckfba , are constants depending on the type of cement and curing method

Type of Curing

Type of Cement

a b

Moist Curing Type I 4.0 0.85

Type III 2.3 0.92

Steam Curing

Type I 1.0 0.95

Type III 0.7 0.98

Page 71: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Solution steps

� Step 1: Load distribution for two levels of shores and one level of reshores

� Step 2: Allowable loads on the slabs

� Step 3: Comparison between the values obtained

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� Step 3: Comparison between the values obtained in step 1 and step 2

71

Page 72: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Comparing allowable v estimated load

� The allowable load is compared with the expected load coming on the slabs for a particular construction method and it should be made sure that the latter is always less than the former.

72

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

� In case the allowable load is exceeded, suitable adjustments can be made. For example, changes can be made in the following parameters:

� the construction cycle,

� the period for shore and reshore removal,

� number of levels of shores and reshores etc.

Page 73: Design and Techniques for Safety in High Rise · PDF fileBuildingsBuildings--Focus on Temp. Structures Focus on Temp. Structures--Formwork Formwork 1 Dr. Kumar NeerajJha ... the cast

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Other books by the author

Thank you

K N

JHA D

epartment of Civil En

gineering

IIT D

elhi

Thank you