Updated 05/24/2018 Printed 01/17/2019 Page 1 of 4 Project No. 45665-EH DESIGN & CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER EMPIRE STATE PLAZA ALBANY, NY 12242 ADDENDUM NO. 1 TO PROJECT NO. 45665 ELECTICAL AND HVAC WORK REPLACE BOILER & HVAC SYSTEM STATE ARMORY AUBURN, NY 13021 January 17, 2019 NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual. Acknowledge receipt of this Addendum in the space provided on the Bid Form. REVISIONS TO TECHNICAL SPECIFICATIONS: 1. Specification Section 230700 Piping Insulation a. Paragraph 1.01 Related Work Specified Elsewhere, ADD C. Mechanical Painting: Section 099103.2. Specification Section 230719 Insulation a. ADD Paragraph 1.01 Related Work Specified Elsewhere and ADD A. Mechanical Painting: Section 099103.b. CLARIFICATION: Renumber all paragraphs under Part I General accordingly. 3. Specification Section 232000 HVAC Piping a. Paragraph 1.01 Related Work Specified Elsewhere, ADD “C. Mechanical Painting: Section 099103.b. Paragraph 1.01 Related Work Specified Elsewhere, ADD D. Piping Insulation: Section 230700.REVISIONS TO DRAWINGS: 1. Sheet H-101 Asbestos and Lead Abatement Notes a. ADD the following paragraph to the Lead Paint Notes, “In addition to the lead dust on the equipment being removed, Contractor shall be made aware that there are potentially high levels of lead/heavy metal dust on adjacent horizontal surfaces including but not limited to window sills, structural steel, cabinets, ceilings, and lockers.” 2. Sheet M-001 Legends, Abbreviations, and Notes a. CLARIFICATION: Added the abbreviation VRFand Variable Refrigerant Flow Systemto the HVAC Abbreviations table. 3. Sheet M-101 Basement Removal Floor Plan a. CLARIFICATION: There is an existing 1-1/2NG main which runs down the crawl space in the basement that is to remain intact as it serves the existing kitchen on the first floor. This was not shown or noted to remain in the Contract Documents.

Upload: others

Post on 22-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

Updated 05/24/2018

Printed 01/17/2019 Page 1 of 4 Project No. 45665-EH

DESIGN & CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER

EMPIRE STATE PLAZA ALBANY, NY 12242

ADDENDUM NO. 1 TO PROJECT NO. 45665

ELECTICAL AND HVAC WORKREPLACE BOILER & HVAC SYSTEM

STATE ARMORY AUBURN, NY 13021

January 17, 2019

NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.

Acknowledge receipt of this Addendum in the space provided on the Bid Form.

REVISIONS TO TECHNICAL SPECIFICATIONS:

1. Specification Section 230700 Piping Insulation

a. Paragraph 1.01 Related Work Specified Elsewhere, ADD “C. Mechanical Painting: Section

099103.”

2. Specification Section 230719 Insulation

a. ADD Paragraph 1.01 Related Work Specified Elsewhere and ADD “A. Mechanical Painting:

Section 099103.”

b. CLARIFICATION: Renumber all paragraphs under Part I General accordingly.

3. Specification Section 232000 HVAC Piping

a. Paragraph 1.01 Related Work Specified Elsewhere, ADD “C. Mechanical Painting: Section

099103.”

b. Paragraph 1.01 Related Work Specified Elsewhere, ADD “D. Piping Insulation: Section 230700.”

REVISIONS TO DRAWINGS:

1. Sheet H-101 Asbestos and Lead Abatement Notes

a. ADD the following paragraph to the Lead Paint Notes, “In addition to the lead dust on the

equipment being removed, Contractor shall be made aware that there are potentially high levels of

lead/heavy metal dust on adjacent horizontal surfaces including but not limited to window sills,

structural steel, cabinets, ceilings, and lockers.”

2. Sheet M-001 Legends, Abbreviations, and Notes

a. CLARIFICATION: Added the abbreviation “VRF” and “Variable Refrigerant Flow System” to

the HVAC Abbreviations table.

3. Sheet M-101 Basement Removal Floor Plan

a. CLARIFICATION: There is an existing 1-1/2” NG main which runs down the crawl space in the

basement that is to remain intact as it serves the existing kitchen on the first floor. This was not

shown or noted to remain in the Contract Documents.

Page 2: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019

Updated 05/24/2018

Printed 01/17/2019 Page 2 of 4 Project No. 45665-EH

4. Sheet M-102 First Floor Removal

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-102-A1.

1.) Existing steam and condensate piping has been added to drawing, and shown to be removed.

2.) Steam coil in existing ERU has been show.

3.) Note R2 has been updated.

4.) Existing drill hall controls for UV-1 and UV-2 have been shown on and plan and a notes has

been added to remove them, R6.

5.) The fin tube radiation that was shown to be removed at the east addition entrance has been

deleted from the sheet, as this fin tube is currently non-existent in the field.

5. Sheet M-103 Second Floor Removal

a. ADD to removal Note R2 the following sentences, “Modify existing wall opening as required to fit

new ductwork. Infill wall opening as required, match existing exterior wall finish.”

6. Sheet M-104 Basement Renovation

a. CLARIFICATION: There is an existing 1-1/2” NG main which runs down the crawl space in the

basement that is to remain intact as it serves the existing kitchen on the first floor. This was not

shown or noted to remain in the Contract Documents.

7. Sheet M-105 First Floor Renovation

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-105-A1.

1.) Temperature sensor and control symbolic wiring have been added back to plan, to coordinate

with control sequence.

2.) All 3/4ӯ HWS/ HWR piping has been up-sized to 1ӯ.

3.) Fin Tube Radiation has been added to plan in the corridor, next to the south exit.

4.) Natural Gas Riser that was in a sheet metal enclosure at the east addition entrance, R5, has been

re-routed to the exterior of the building, on the south side. Key note R5 has been removed.

8. Sheet M-106 Second Floor Renovation

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-106-A1.

1.) Natural Gas pipes sizes have been updated.

2.) Natural gas piping routing has been modified.

3.) VRF-IU-1 in battalion HQ has been removed.

4.) VRF-IU-4 has been added to battalion HQ. Refrigerant and condensate piping layout

modified.

5.) Keynote 8 has been added to all indoor wall mounted units.

6.) Keynote 7 has been added to VRF-IU-4.

9. Sheet M-107 Roof Plan

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-107-A1.

1.) Natural Gas pipe sizes and layout have been modified.

10. Sheet M-201 Enlarged Boiler Room Removal Plan

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-201-A1.

1.) Existing Domestic Water system plans have been updated.

2.) Domestic Water Removal Plans have been updated.

3.) Pneumatic control panel has been shown to be removed.

4.) Keynote R11 updated.

5.) Keynote R13 updated.

6.) Keynote R14 added.

7.) General Note 2 Updated.

8.) General Note 4 added.

Page 3: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019

Updated 05/24/2018

Printed 01/17/2019 Page 3 of 4 Project No. 45665-EH

11. Sheet M-203 Enlarged Boiler Room Renovation Plan

a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-203-A1.

1.) Existing Domestic Water system plans have been updated.

2.) Domestic Water renovation plans have been updated.

3.) 3/4ӯ CWS piping has been shown for hydronic system.

4.) Keynote 11 updated.

5.) General Notes 1 and 2 added.

12. Sheet M-502 Details

a. Detail 6/M-502: ADD a line size union downstream of the balancing valve.

b. Detail 7/M-502: ADD a line size union upstream of the balancing valve.

13. Sheet M-503 Details

a. Detail 2/M-503: CLARIFICATION: Concrete housekeeping pads shall be minimum 4” tall with

chamfered corners.

b. Detail 3/M-503: ADD a line size union downstream of the check valve.

c. Detail 7/M-503: ADD a line size union downstream of the balancing valve.

d. Detail 8/M-503: ADD line size union on the downstream side of the balancing valve and a line size

union upstream of the control valve.

14. Sheet M-601 Schedules

a. Gas Fired Rooftop Unit Schedule:

1) DELETE Note #7 from the schedule.

b. VRF Schedule:

1) CLARIFICATION: VRF-IU-1 unit location has been revised from “Battalion HQ/Conference

Rm” to “Conference Rm”

2) ADD VRF-1U4 to the schedule with the following design parameters:

a.) Unit Designation: Indoor

b.) Unit Location: Battalion HQ

c.) Type: 3’x3’ ductless ceiling flush mount 4-way VRF Cassette Unit

d.) Supply Air: 600 cfm

e.) Compressor (No./Type): Not Applicable

f.) Voltage / Phase / Hz: 208/1/60

g.) Cooling Total: 24,200 Btuh

h.) Heating Total: 27,300 Btuh

i.) Refrigerant Type: R-410A

j.) Manufacturer: LG

k.) Model Number: ARNU243TPC4

l.) Weight: 48 lbs

m.) Notes: 2, 4, 5, 6, 7, 8, 9, 13

c. Fin Tube Radiation Schedule:

1) Tag FTR-A

a.) DELETE closure height of 2’-0” and REPLACE with an enclosure height of 1’-8”.

b.) DELETE capacity of 1,350 Btuh/lf and REPLACE with a capacity of 1,190 Btuh/lf.

15. Sheet M-701 Boiler Room Schematic

a. ADD a line size union on the connection to the expansion tank ET-1.

b. ADD a line size union on the discharge size of boiler pumps P-2 and P-3.

c. ADD a total of two (2) thermometers and two (2) temperature sensors on the 4” primary heating

supply and return mains shown on 1/M-701. The temperature sensors shall be tied into the existing

Trane Tracer BMS.

Page 4: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019

Updated 05/24/2018

Printed 01/17/2019 Page 4 of 4 Project No. 45665-EH

16. Sheet M-702 Hydronic Riser Diagram

a. DELETE All line size references to 3/4" piping and REPLACE with 1” piping.

17. Sheet M-703 Hydronic Riser Diagram

a. DELETE All line size references to 3/4" piping and REPLACE with 1” piping.

18. Sheet E-102 Basement Renovation Plan

a. On 3/E-102, REMOVE one (1) 3-way light switch located at the north end of the Boiler Room by

the entrance door. The second 3-way switch shown in the Contract Documents shall be provided

as shown.

b. On 3/E-102, CHANGE the 3-way light switch at the south end of the Boiler Room closest to the

exterior door from “New” to “Existing”. REMOVE the conduit and wire shown in the Contract

Documents to the Type “A” light fixtures shown tying into this existing switch. The second 3-way

switch shown in the Contract Documents shall be provided as shown.

END OF ADDENDUM

Erik T. Deyoe, P.E.

Director, Division of Design

Design & Construction

Page 5: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

T

T

T T

T

TT T T T

T TT

TT

T

TT

T

T

T

T

T

T

T

D

MENS TOILETROOM

ORDINANCESTORAGE

STAIR

MEDICALSTORAGE

1ST SARGENT DR'S OFFICE

EXAM ROOM

STORAGE

CUSTODIANROOM

STAIR

ADDITIONENTRANCE

CO COO

COOCONCO

CLASSROOM

WOMENS TOILETROOM

DAYROOM

COORIDOR /LOBBY

UNIT STORAGE

DRILL HALL(LOWER PART)

GARAGE

KITCHEN

OFFICE

CLASSROOM

1 1/2" F & T.TRAP - STRAINER & GATE VALVES

1 1/2"

2 1/2"

1 1/4"

1 1/2"

2 1/2"

U.H.

U.H.

2 1/2"

1 1/4"

3"

1 1/2"

3"

EXPANSION LOOP

3"

1 1/2"

3"

U.H.

1 1/4"

2 1/2"

2 1/2" STEAM DROP

1" COND. DROP

1 1/

4"

1" COND. DROP

1 1/4"

EXIST DEHUMIDIFIER TO REMAIN

EXIST DEHUMIDIFIER TO REMAIN

1" DROP1"

1 1/

2"

48" x 12" UP TO U.V. #2

1 1/2" FROM U.V. #2

1 1/

2" S

LOP

E

1" COND. DROP

WF #1 ABOVE DOORWITH AUTO SHUTTER1000 CFM.

1# DROP TO B'MET AND DRIP

6" x

40"

x26

" C

ON

V.

1"85

1 1/

2" C

ON

D.

DR

OP

TO

BA

SE

ME

NT

4"

ST

EA

MS

UP

PLY

DR

ILL

HA

LL

CEILING SUSPC.I. RAD.

CONV.6" x 40" x 24"

CONV.6" x 40" x 24"

CONV.6" x 56" x 24"

1 1/2" VENT FROM COND. REC.

2"

3/4" 1 1/4" 3/4"

2 1/2" 2 1/2"

1" 1"1"

3/4" 1 1/4"

1"

CO

NV

.6"

x40"

x24"

CO

NV

.6"

x40"

x24"

2 1/

2"

1"

1"

2-4"x28"x32"-21-3 EACH CONV.

1"

1"

3'-0"

3"

3"

12B

22

CONV.6" x 40" x 24"

CONV.6" x 40" x 24"

CONV.6" x 56" x 24"

3/4"1 1/4"

3"

3/4"1"

3"

3/4"1"

4" LARGE SUPPLY RISER TO 1ST FLOOR CEILING BAR JOISTS

1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"6"x40"x26"CONV.

3"

3/4"1 1/4"

3"

3/4"1 1/4"3/4"

3"

1 1/4"3/4"

3"

1 1/4"

14"x14" DUCT RISER800 CFM TOEXHAUST SYSTEM INMENS TOILET ROOM 2ND FL.

3"

3/4"1"

6"x56"x26"CONV.

10x6REG

150 CFM

3"

3/4"1 1/4"

3'-0

"

1"

1"250 CFM12x12 REG

250 CFM12x12 REG

3"

3/4"1"

6"x28"x24"24 CONV.

6"x28"x24"CONV.

WF #2 WITH AUTO SHUTTER300 CFM

6"x48"x24"CONV.

6"x48"x24"CONV.

6"x64"x26"CONV.

1" DROP TO BASEMENT

1"3/4"1"

2 1/2"2 1/2"

1" 3/4"

1 1/4"

3/4"1 1/4"

1"2 1/2"

6"x40"x24"-45 CONV. 1"1"

6"x64"x24"-79.9 CONV.

3/4"1 1/4"

1 1/4"2 1/2"

1 1/2" COND. DROP

3/4"

1 1/4" 3/4"

3" RISER

7" COND. DROPTO CRAWL SPACE

1" STEAM DROP & DRIPEND OF MAIN IN CRAWL SPACE

48" & 12" DUCTUP TO U.V. #1

2"

2"

1" COND. DROP

1 1/2" COND.FROM U.V. #1

1" S

TE

AM

6"x4

8"x2

4"-4

5C

ON

V.

3/4" 10"x6" REG50 CFM

6"x36"x24"-33.3CONV.

NOTE - SEE 2ND FLOOR PLANFOR RADIATION

FOR ALL FINNED TUBERAD. IN DRILL HALL

R1

R2

EXIST ERU TO REMAIN R3

R3

R1

R1

R5

R5

20

"x20

"

20"x20"

12"x8" 12"x10"

12"x10"12"x8"

12

"x10

"1

4"x

12

"

12

"x12

"1

4"x

12

"

20"x20"

14

"x12

"1

2"x

12

"

12

"x10

"

12"x8" 12"x10"

12"x10"12"x8"

14

"x12

"

WEST ADDITION (NIC)

EAST ADDITION (NIC)

2

NG 1-1/2"Ø NG UP FROM BASEMENT

1 1/2"ø NG

1 1

/2"ø

NG

1-1/2"Ø NG DN TO KITCHEN APPLIANCES

R1

R4

R6

R6

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

FIRST FLOOR REMOVAL

M-102-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

NORTH

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

SCALE: 1/8" = 1'-0"M-102-A1

1 FIRST FLOOR REMOVAL PLAN

REMOVAL KEY NOTES

R1REMOVE LAY IN CEILING TILE AND METAL GRID TO ACCESS THE ENERGYRECOVERY UNIT AS REQUIRED. SAVE TILE AND GRID FOR RE-INSTALLATION

R2DISCONNECT AND REMOVE EXISTING STEAM / CONDENSATE COIL IN EXISTINGENERGY RECOVERY UNIT.

R3DISCONNECT AND REMOVE EXISTING SUPPLY AIR DUCTWORK TO THE POINT OFDISCONNECT SHOWN.

R4DISCONNECT AND REMOVE EXISTING STEAM SUPPLY AND RETURN PIPING,VALVES, FITTINGS, INSULATION AND ACCESSORIES TO THE EXISTING ENERGYRECOVERY UNIT.

R5EXISTING RETURN AIR DUCTWORK AND GRILLE FROM UNIT VENTILATOR ABOVETO REMAIN.

R6DISCONNECT AND REMOVE EXISTING CONTROLS ASSOCIATED WITH EXISTINGUNIT VENTILATOR.

R#

GENERAL NOTES

1DISCONNECT AND REMOVE ALL STEAM AND CONDENSATE EQUIPMENT, PIPING,VALVES, FITTINGS, ETC. IN ITS ENTIRETY, UNLESS OTHERWISE NOTED.

7

4

4

4

Page 6: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

MENS TOILETROOM

ORDINANCESTORAGE

STAIR A

MEDICALSTORAGE

1ST SARGEANT DR'S OFFICE

EXAM ROOM

STORAGE

CUSTODIANROOM

STAIR B CO COO

COOCONCOCLASSROOMWOMENS TOILETROOM

DAY ROOM

COORIDOR /LOBBY

UNIT STORAGE

DRILL HALL(LOWER PART)

GARAGE

KITCHEN

CLASSROOM

MESS HALL

CLOSET

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

8 FT

0.8 GPM

FTR-A

12 FT

1.1 GPM

FTR-A

4 FT

0.5 GPM

FTR-A

2 FT

0.5 GPM

FTR-A

8 FT

0.8 GPM

FTR-A

8 FT

0.8 GPM

FTR-A

12 FT

1.1 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

EXIST 48"x12" RETURN AIR GRILLE AT 10' AFF

EXIST 48"x12" RETURN AIR GRILLE AT 10' AFF

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

12 FT

1.0 GPM

FTR-B

12 FT

1.0 GPM

FTR-B

12 FT

1.0 GPM

FTR-B

12 FT

1.0 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

UH-1

5.6 GPM

84.4 MBH

UH-1

5.6 GPM

84.4 MBH

UH-2

1.3 GPM

18.7 MBH

ADDITIONENTRANCE

11

HC-1

152 MBH

10.2 GPM

UH-1

5.6 GPM

84.4 MBH

FTR-A

6 FT

0.6 GPM

FTR ON FIRST FLOOR MID-LEVEL LANDING

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

NOTE: ALL FINNED TUBE RADIATION TO BE UP 10'-0" ABOVE FLOOR EXCEPT HIGHER OVER DOOR

WEST ADDITION (NIC)

EAST ADDITION (NIC)

2B

S

2C

R

1

R

1

S

2A

R

2B

R

2A

S

2C

S

2D

S2

R

2

S

2E

S

2E

R

2D

R

3

S

3

R

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

FTR-B

7 FT

1.6 GPM

3/4"ø3/4"ø

1"ø

HW

R

1"ø

HW

S

1 1

/4"ø

HW

R

1 1

/4"ø

HW

S

1"ø1"ø

1"ø1"ø

1 1

/2"ø

HW

R

1 1

/2"ø

HW

S

1 1/4"ø1 1/4"ø

2"ø

2"ø

HW

S

1"ø HWR

1"ø

1"ø HWS

1"ø1"ø

2"ø

HW

R

2"Ø HWS/ HWR

1"ø HWS

1"ø

HW

S

1 1/4"ø HWS

1 1/4"ø HWS 1 1/4"ø HWS 1"ø HWS

1"ø

HW

S

1"ø HWS

1 1/4"ø HWR

2"ø HWR 2"ø HWR 1 1/4"ø HWR

1 1

/4"ø

HW

R

1 1/4"ø HWR

1 1

/4"ø

HW

R

1"ø

HW

R

1"ø HWR

1"ø

1"ø

1"ø

1"ø

1"ø

1"ø

1"ø1"ø

1"ø

1"ø

1"ø

2"ø

2"ø 1

1"ø

1"ø

1"ø1"ø1"ø

1"ø

12"x8" 12"x10"

12

"x10

"

12"x8"

14

"x12

"

20"x20"20"x20"

20"x20"

14

"x12

"1

2"x

12

"1

4"x

12

"1

2"x

12

"

12"x8"

12"x8"

12"x10"

12

"x10

"

12"x10"

12"x10"14"x12"

1"ø

1 1

/4"ø

2

4' - 0"

8' -

0"

16' - 0" 16' - 0"

3 34 4

2

16

' -

0"

16

' -

0"

3

4' -

0"

8' - 0"

3

4

4

T

T

T T TT T

T

TTST

T

T

TT

T

T

T

T

EXIST GARAGE STYLE DOOR

BMS CONTROL INTERFACE FOR RTUS

RTU TIMERS W/ OVERRIDES

7

M-503

6

7

1"ø

FTR-A

4 FT

0.5 GPM

TS

2"Ø NG RISER TO RTU-1, RTU-2

EXIST 3"Ø NG SERVICE TO BUILDING

1

NG

2

NG

1-1/2"Ø NG UP FROM BASEMENT

1 1

/2"ø

NG

1 1/2"ø NG

1-1/2"Ø NG DN TO KITCHEN APPLIANCES

1

EXIST ERU

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

FIRST FLOOR

RENOVATION

M-105-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

SCALE: 1/8" = 1'-0"M-105-A1

1 FIRST FLOOR RENOVATION PLAN

NORTH

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

RENOVATION KEY NOTES

1

PROVIDE DUCT CONNECTION TO EXISTING SUPPLY AIR DUCTS WHEREINDICATED. PROVIDE HOT WATER DUCT COIL AS SHOWN. PROVIDE CONTROLVALVE AND CONNECT TO ENERGY RECOVERY UNIT CONTROLS IN PLACE OFSTEAM REHEAT. REFER TO 6/M-502. CONTROL VALVE SHALL OPEN WHENEVERDISCHARGE AIR IS LESS THAN 60°F, EVEN IF FAN IN NOT RUNNING.

2PROVIDE HARD PIPE EXPANSION LOOP AS SHOWN TO COMPENSATE FORTHERMAL EXPANSION.

3 PROVIDE PIPING GUIDES WHERE INDICATED.

4 PROVIDE PIPING ANCHORS WHERE INDICATED.

5 NOT USED.

6 PROVIDE 14"Ø FLUE VENT FROM BOILERS IN BOILER ROOM BELOW.

7PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP THROUGHEXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT SAMETERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT.

#

GENERAL NOTES

1.REUSE EXISTING PIPE SUPPORT RODS AND STRAPS FOR NEW HYDRONIC PIPING INDRILL HALL.PIPING IN DRILL HALL SHALL BE EXPOSED EXCEPT AT MAIN RISERLOCATIONS.

10

4

4

4

Page 7: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

EXO

CO

CONFERENCEROOM

INSTRUCTOROFFICE

STAIR B

STAFF OFFICER OFFICER

BATTALIONHEADQUARTERS

OFFICE

DRILL HALL(UPPER PART)

DRYINGROOM

SHOWER ROOM DRYINGROOM

JANITORSCLOSET

LOCKER ROOM

STAIR A

TOILET ROOM

CORRIDOR

OFFICERSLOCKERROOM

OFFICERSTOILETROOM

LOCKER ROOM OFFICEMEN'S LOCKER

ROOMENTRANCE TO

ADDITION

2

VRF-IU-3 VRF-IU-1

VRF-BC-1

VRF-IU-3

VRF-IU-2

RTU-2

202 MBH

3,000 CFM

RTU-1

202 MBH

3,000 CFM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

3FT

0.5 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

6 FT

0.6 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

FTR-A

10 FT

0.9 GPM

EXISTING POWER VENT

EXISTING POWER VENT

THIS FINNED TUBE RADIATION TO BE 2'-0" ABOVE SECOND FLOOR

R

R

D

D

DRAIN TO TERMINATE 3" OUT EXTERIOR WALL

UP TO ROOFTOP VRF UNIT

REFER TO FIRST FLOOR RENOVATION PLAN, M-105, FOR DRILL HALL FTR PLAN

FTR-A

6 FT

0.6 GPM

FTR-A

6 FT

0.6 GPM

FTR ON MID STAIR LANDING, REFER TO M-105

WEST ADDITION (NIC)

2B

S

2C

R

2A

R

2B

R

2A

S

2C

S

2D

S

2E

S

2E

R

2D

R

DRAIN TO TERMINATE 3" OUT EXTERIOR WALL

1

NG

1 1

/2"ø

NG

TTS TS

TS

TS

T

T T

T

T

1 1/2"ø NG

34"x12" SA

34"x12" RA

34"x12" SA

34"x12" RA 13

3

5

ROOF ACCESSHATCH WITH LADDER

4

1

UP TO UPPER ROOF, REFER TO M-107, FOR CONTINUATION

T

TT

TT

T

TOA

OA

9

M-502

EAST ADDITION (NIC)

UP TO UPPER ROOF, REFER TO M-107 FOR CONTINUATION

7

M-503

6

666

7

9

10

11

11

EXIST EXHAUST AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL

EXIST FRESH AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL

2"Ø NG UP AND DN

VRF-IU-4

8

8

8

8

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

SECOND FLOOR

RENOVATION

M-106-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

SCALE: 1/8" = 1'-0"M-106-A1

1 SECOND FLOOR RENOVATION

NORTH

0'

SCALE: 1/8" = 1'-0"

2' 4' 16'8'

RENOVATION KEY NOTES

1PROVIDE HORIZONTAL GAS-FIRED ROOFTOP UNIT ON 24" ROOF CURB. PROVIDEGAS CONNECTION. PROVIDE RETURN PLENUM BENEATH UNIT. PROVIDE 4x4x3/8"ANGLE FRAME BETWEEN JOIST BENEATH ROOFTOP UNIT ROOF CURB.

2PROVIDE MODIFIED OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK.INFILL AND PATCH WALL TO MATCH EXISTING WALL, AS REQUIRED. PROVIDEWEATHERTIGHT SEAL.

3PROVIDE DUCT CONNECTION TO EXISTING 48"x12" RETURN AIR DUCT RISER ATTHE POINT OF CONNECTION SHOWN.

4

PROVIDE MODIFIED OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK.INFILL AND PATCH WALL TO MATCH EXISTING WALL, AS REQUIRED, AND TOMAINTAIN CLEARANCE AROUND ROOF ACCESS HATCH. PROVIDE WEATHERTIGHTSEAL.

5PROVIDE OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK. PROVIDEWEATHERTIGHT SEAL.

6TEMPERATURE SENSOR TO BMS PANEL FOR ROOM TEMPERATURE, STATUS ANDALARM.

7PROVIDE VRF INDOOR CEILING FLUSH MOUNTED UNIT WITH CONDENSATE DRAINPUMP.

8PROVIDE VRF INDOOR WALL MOUNTED UNIT WITH CONDENSATE DRAIN PUMP.REFER TO DETAIL 9/M-503.

9PROVIDE 14"Ø FLUE VENT FROM BOILERS IN BOILER ROOM BELOW. TERMINATEMINIMUM OF 3 FEET ABOVE TALLEST ROOF.

10

PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP THROUGHEXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT SAMETERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT, MINIMUM OF 3FEET ABOVE TALLEST ROOF.

11PROVIDE TRI-FLOW, MULTIDIRECTIONAL SUPPLY GRILLE WITH DOUBLEDEFLECTION DAMPERS.

#GENERAL NOTES

1.SUPPORT NATURAL GAS PIPING TIGHT TO EXTERIOR WALL WHERE PRACTICAL. WHEREIMPRACTICAL, PROVIDE ROOF PIPING HANGER SUPPORTS. REFER TO DETAIL 4/M-502.

2PROVIDE LINE HIDE ENLOSURE TO CONCEAL ALL EXPOSED VRF REFRIGERANT PIPINGIN BATALLION OFFICES.

11

4

4

4

Page 8: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

1

VRF-OU-1

RTU-2

202 MBH

3,000 CFM

RTU-1

202 MBH

3,000 CFM

LOWER ROOF(EAST ADDITION)

LOWER ROOF

DRILL HALL ROOF

UPPER ROOF

WEST ADDITION ROOF

14"Ø BOILER FLUE WITH EXIT CONE TERMINATION

EXIST 10"Ø DWH FLUE

EXIST EXHAUST AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL

EXIST FRESH AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL

EXIST EXHAUST AIR ROOF POWER VENT

EXIST EXHAUST AIR ROOF POWER VENT

1 1

/2"ø

NG

1 1

/2"ø

NG

1 1/2"ø NG1 1/2"ø NG

1 1/2"ø NG

34"x12" SA

34"x12" RA

REFER TO M-106, SECOND FLOOR RENOVATION, FOR NOTES REGUARDING RTU

REFER TO M-106, SECOND FLOOR RENOVATION, FOR NOTES REGUARDING RTU

34"x12" SA

34"x12" RA

2"Ø NG DN TO EXISTING GAS SERVICE, REFER TO M-104 FOR CONTINUATION

REFER TO M-106, SECOND FLOOR RENOVATION, FOR CONTINUATION

OA

OA

FOR PIPE FLASHING DETAIL, REFER TO 5/M-502

2"ø NG

2"ø NG1-1/2"Ø NG DN TO LOWER ROOF

1-1/2"Ø NG DN TO LOWER ROOF

1

NG

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

ROOF PLAN

M-107-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

SCALE: 1/8" = 1'-0"M-107-A1

1 ROOF RENOVATION PLAN

NORTH

RENOVATION KEY NOTES

1PROVIDE ROOF MOUNTED VRF HEAT PUMP UNIT ON 24" STRUCTURAL STAND.PROVIDE REFRIGERANT LINESET DOWN TO SECOND FLOOR VIA ROOF PITCHPOCKET.

#

GENERAL NOTES

1.SUPPORT NATURAL GAS PIPING TIGHT TO EXTERIOR WALL WHERE PRACTICAL. WHEREIMPRACTICAL, PROVIDE ROOF PIPING HANGER SUPPORTS. REFER TO DETAIL 4/M-502.

12

4

Page 9: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

M

3"Ø LPSLPC

LPC4"Ø LPS2"Ø HWR4"Ø LPS2"Ø HWS

1-1/2"Ø NG

DHWS

DCW

CWS

R1

R2

R1

R2

4"Ø LPS

4"Ø LPS

3"Ø LPS

4"Ø LPS

2"Ø HWS2"Ø HWR

R3

R3 R4

R5

20"Ø EA DUCT

10"Ø EA DUCT

14"Ø EA DUCT 14"Ø EA DUCT

2"Ø LPS

10"Ø EA DUCT

8"Ø LPS8"Ø LPS

3"Ø NG 3"Ø NG 3"Ø NG

2"Ø

NG2"

Ø N

G

2"Ø

NGLPC

LPC

2"Ø CWS1-1/4"Ø DHWS3/4"Ø DHWR

LPS

R2

AIR COMPRESSOR

AIR DRYER

2"Ø NG

STEAM BOILER STEAM BOILER

DWH

ET

LPC RECIEVER

PUMP

PUMP

HW STORAGE TANK

GAS BURNER GAS BURNER

NG TRAIN

SUMP PIT

LPS

NG VENTNG VENT

NG BYPASS

NG VENT NG VENT NG VENT

NG BYPASS

NG TRAIN

NG VENTNG VENT

NG VENT

NG

NG VENT

NG

6"Ø

LP

S

6"Ø

LP

S

NG

NG

3"Ø NG CWS

NG

R6

R6R6

LPC

LPC

LPC

LPC

R6

R6

R6 R6

R11

R6

R6

R6

R2

R7

R8

4'x3' WALL LOUVER W/ MOTORIZED CONTROL DAMPER

R6

R1

R10

R9

R12

FD

DHWS

DHWR

CWSDHWR

R13

R2

R4

R4

R4

R14

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

ENLARGED BOILER

ROOM REMOVAL PLAN

M-201-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

REMOVAL KEY NOTESR1 DISCONNECT AND REMOVE EXISTING NATURAL GAS (NG) PIPING, FITTINGS,

VALVES AND SUPPORT ACCESSORIES TO THE POINT OF DISCONNECT SHOWN.

R2 DISCONNECT AND REMOVE EXISTING COLD WATER SUPPLY (CWS) PIPING,FITTINGS, VALVES AND SUPPORT ACCESSORIES TO THE POINT OF DISCONNECTSHOWN.

R3 DISCONNECT AND REMOVE EXISTING HYDRONIC HOT WATER SUPPLY / HOTWATER RETURN (HWS/HWR) PIPING, FITTINGS, VALVES AND SUPPORTACCESSORIES TO THE POINT OF DISCONNECT SHOWN.

R4 DISCONNECT AND REMOVE EXISTING DOMESTIC HOT WATER SUPPLY / HOTWATER RETURN (DHWS/DHWR) PIPING, FITTINGS, VALVES AND SUPPORTACCESSORIES TO THE POINT OF DISCONNECT SHOWN.

R5 EXISTING 4'x3' WALL LOUVER TO REMAIN.

R6 DISCONNECT AND REMOVE EXISTING MECHANICAL EQUIPMENT AND ANYHOUSEKEEPING PAD OR STRUCTURAL SUPPORT.

R7 EXISTING SUMP PIT TO REMAIN.

R8 DISCONNECT AND REMOVE EXISTING BOILER EXHAUST DUCTWORK/ FLUEDUCTWORK IN ITS ENTIRETY.

R9 DISCONNECT AND REMOVE EXISTING FLUE VENT FROM EXISTING DOMESTICWATER HEATER TO THE POINT OF DISCONNECT SHOWN. EXISTING 10"Ø FLUEVENT RISER TO REMAIN.

R10 DISCONNECT AND REMOVE EXISTING 4'x3' MOTORIZED CONTROL DAMPER.

R11 DISCONNECT AND REMOVE EXISTING EXPANSION TANK AND STORE FORRELOCATION.

R12 DISCONNECT AND REMOVE EXISTING DOMESTIC HOT WATER RETURNCIRCULATING PUMP AND STORE FOR RELOCATION.

R13 EXISTING DOMESTIC THERMOSTATIC MIXING VALVE AND SUPPORT STRUCTURETO REMAIN.

R14 DISCONNECT AND REMOVE EXISTING HONEYWELL PNEUMATIC CONTROL PANELAND ASSOCIATED EXTERNAL CONTROLS.

SCALE: 1/2" = 1'-0"M-201-A1

1 ENLARGED BOILER ROOM REMOVAL FLOOR PLAN

NORTH

GENERAL NOTES1. FIELD VERIFY ALL PIPE LOCATIONS AND SIZES BEFORE BEGINNING WORK.

2. DISCONNECT AND REMOVE ALL HYDRONIC EQUIPMENT, PIPING, FITTINGS, VALVES ANDSUPPORT ACCESSORIES IN BOILER ROOM UNLESS OTHERWISE NOTED.

3 REFER TO M-101 FOR CONTINUATION OF PIPING.

4 ALL EXISTING BUILDING DOMESTIC WATER PIPING, FIXTURES, ACCESSORIES, ETC SHALLREMAIN, UNLESS OTHERWISE NOTED.

R#

0'

SCALE: 1/2" = 1'-0"

6" 1' 4'2'

13

4

4

Page 10: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space

1

B-2

1,860 MBH

B-1

1,860 MBH

P-3

99 GPM

P-2

99 GPM

P-1A

198 GPM

P-1B

198 GPM

ET-1

AS-1

14"ø OA8"ø OA 14"ø OA

14

"ø O

A

20"x32"

24"x24"

3"ø NG

2"ø

NG

2"ø

NG

4"ø

DWH-1

2

2

3

4

11

5

2"ø

HW

S

2"ø

HW

R

CWS

EXIST

AREAWAY

8"ø V

8"ø V

EAST

ADDITION

UH-3

0.8 GPM

5.7 MBH

E

R

E

S

2"ø HWS

2"ø HWR

4"ø

HW

R4

"ø H

WR

4"ø

HW

S

3/4"ø HWS

3/4

"ø H

WS

3"ø

4"ø 3"ø

3/4"ø HWR

3/4

"ø H

WR

1 1

/2"ø

HW

R

1 1

/2"ø

HW

R

3/4"ø HWS

3/4"ø HWR

610

6

EXIST

SUMP PIT

3"ø

NG

4"ø V

4"ø

V

4"ø V

14

"ø V

1 1

/2"ø

NG

1 1

/2"ø

NG

ET

EXIST 10"Ø FLUE

GAS VENT

6

10

6

8

9

11

T

COOLING DUTY

THERMOSTAT

1212

13

14

14

15

15

FD

7

CWS

CW

S

7

DHWSDHWR

DH

WS

DH

WR

CW

S

1-1

/2"Ø

NG

3/4"ø CWS 7

2"Ø

CW

S1-1

/4"Ø

DH

WS

3/4

"Ø D

HW

R

3"ø NG1 1/2"ø NG

DHWSDHWR

1 1

/2"ø

DH

WR

1 1

/2"ø

HW

S

1 1

/2"ø

DH

WS

1 1

/2"ø

DH

WR

2"ø

CW

S

2"ø CWS

2"ø

CW

S

DESIGN & CONSTRUCTION

36x24 PLOT

THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE

UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.

ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR

LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A

VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR

REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.

WARNING:

CLIENT:

CONTRACT:

TITLE:

LOCATION:

SHEET TITLE:

DESIGNED BY:

PROJECT

DRAWN BY:

DRAWING NUMBER:

CHECKED:

APPROVED:

MARK DATE DESCRIPTION

CONSULTANT

NUMBER:

Sheet of

DELTA PROJECT NUMBER:

1

30

EXISTING BUILDING

2005 ADDITION

2005 ADDITION

HVAC

45665

2 11/19/2018 100% SUBMISSION

I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY

KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE

INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS

BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS

OF THE NEW YORK STATE ENERGY CONSERVATION CODE.

-H

3 12/07/2018 IFB SUBMISSION

4 01/18/2019 ADDENDUM #1

ENLARGED BOILER

ROOM RENOVATION

PLAN

M-203-A1

REPLACE BOILER & HVAC SYSTEM

STATE ARMORY

174 SOUTH STREET AUBURN, NY

13021

DIVISION OF MILITARY AND NAVAL

AFFAIRS

60% SUBMISSION

DDW

DDW

FCA

FCA

2016.170.019

09/14/2018

SCALE: 1/2" = 1'-0"M-203-A1

1 ENLARGED BOILER ROOM RENOVATION PLAN

0'

SCALE: 1/2" = 1'-0"

6" 1' 4'2'

NORTH

RENOVATION KEY NOTES

1

PROVIDE CONNECTION TO EXISTING NATURAL GAS BRANCH WHERE

INDICATED. PROVIDE NATURAL GAS CONNECTION AT EXISTING SHUT-OFF

VALVE IF PRACTICAL.

2PROVIDE CONNECTION TO EXISTING 2"Ø HWS/ HWR MAIN TO EXISTING

BUILDING ADDITION WHERE INDICATED.

3

PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP

THROUGH EXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT

SAME TERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT.

4PROVIDE MOTORIZED CONTROL DAMPER AND DUCTWORK CONNECTION TO

EXISTING 4'x3' LOUVER, REFER TO DETAIL 1/M-501.

5

PROVIDE FLUE GAS VENT AS SHOWN. SLOPE DUCTWORK TOWARDS BOILER

UNIT AT 1/4" PER LINEAR FOOT OF DUCT. INSTALL PER MANUFACTURER'S

RECOMMENDATIONS.

6

PROVIDE 4" HIGH CONCRETE HOUSEKEEPING PAD THAT IS 6" LARGER THAN

MECHANICAL EQUIPMENT ON ALL SIDES. REFER TO HOUSEKEEPING PAD

DETAIL 2/M-503.

7PROVIDE CONNECTION TO EXISTING DOMESTIC WATER SYSTEM WHERE

INDICATED.

8RELOCATE AND INSTALL EXISTING DOMESTIC WATER SYSTEM EXPANSION

TANK. REFER TO DOMESTIC WATER HEATER SCHEMATIC 2/M-701.

9

RELOCATE AND INSTALL EXISTING DOMESTIC HOT WATER RETURN

CIRCULATION PUMP WHERE INDICATED. REFER TO DOMESTIC WATER

HEATER SCHEMATIC 2/M-701. EXTEND EXISTING ELECTRICAL CIRCUIT TO

PUMP IN NEW LOCATION.

10

PROVIDE 8" HIGH CONCRETE HOUSEKEEPING PAD THAT IS 6" LARGER THAN

MECHANICAL EQUIPMENT ON ALL SIDES. REFER TO HOUSEKEEPING PAD

DETAIL 2/M-503.

11PROVIDE CONNECTION TO EXISTING THERMOSTATIC MIXING VALVE AS

SHOWN.

12PROVIDE CONDENSING BOILER AND ALL REQUIRED PIPING AND VENTING

CONNECTIONS AS SHOWN. REFER TO BOILER SCHEMATIC, 1/M-701.

13

PROVIDE CONDENSING DOMESTIC WATER HEATER AND ALL REQUIRED

PIPING AND VENTING CONNECTIONS AS SHOWN. REFER TO BOILER

SCHEMATIC, 2/M-701.

14 PROVIDE INLINE HORIZONTAL BOILER PUMP. REFER TO DETAIL 3/M-503.

15PROVIDE BASE MOUNTED BUILDING HOT WATER DISTRIBUTION PUMP.

REFER TO DETAIL 1/M-503.

#

GENERAL NOTES1 FIELD VERIFY EXISTING DOMESTIC PIPE SIZING. SIZE TO MATCH EXISTING.

2 REFER TO M-701 FOR BOILER ROOM SCHEMATICS.

15

4

4