![Page 1: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/1.jpg)
Updated 05/24/2018
Printed 01/17/2019 Page 1 of 4 Project No. 45665-EH
DESIGN & CONSTRUCTION GROUP THE GOVERNOR NELSON A. ROCKEFELLER
EMPIRE STATE PLAZA ALBANY, NY 12242
ADDENDUM NO. 1 TO PROJECT NO. 45665
ELECTICAL AND HVAC WORKREPLACE BOILER & HVAC SYSTEM
STATE ARMORY AUBURN, NY 13021
January 17, 2019
NOTE: This Addendum forms a part of the Contract Documents. Insert it in the Project Manual.
Acknowledge receipt of this Addendum in the space provided on the Bid Form.
REVISIONS TO TECHNICAL SPECIFICATIONS:
1. Specification Section 230700 Piping Insulation
a. Paragraph 1.01 Related Work Specified Elsewhere, ADD “C. Mechanical Painting: Section
099103.”
2. Specification Section 230719 Insulation
a. ADD Paragraph 1.01 Related Work Specified Elsewhere and ADD “A. Mechanical Painting:
Section 099103.”
b. CLARIFICATION: Renumber all paragraphs under Part I General accordingly.
3. Specification Section 232000 HVAC Piping
a. Paragraph 1.01 Related Work Specified Elsewhere, ADD “C. Mechanical Painting: Section
099103.”
b. Paragraph 1.01 Related Work Specified Elsewhere, ADD “D. Piping Insulation: Section 230700.”
REVISIONS TO DRAWINGS:
1. Sheet H-101 Asbestos and Lead Abatement Notes
a. ADD the following paragraph to the Lead Paint Notes, “In addition to the lead dust on the
equipment being removed, Contractor shall be made aware that there are potentially high levels of
lead/heavy metal dust on adjacent horizontal surfaces including but not limited to window sills,
structural steel, cabinets, ceilings, and lockers.”
2. Sheet M-001 Legends, Abbreviations, and Notes
a. CLARIFICATION: Added the abbreviation “VRF” and “Variable Refrigerant Flow System” to
the HVAC Abbreviations table.
3. Sheet M-101 Basement Removal Floor Plan
a. CLARIFICATION: There is an existing 1-1/2” NG main which runs down the crawl space in the
basement that is to remain intact as it serves the existing kitchen on the first floor. This was not
shown or noted to remain in the Contract Documents.
![Page 2: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/2.jpg)
ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019
Updated 05/24/2018
Printed 01/17/2019 Page 2 of 4 Project No. 45665-EH
4. Sheet M-102 First Floor Removal
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-102-A1.
1.) Existing steam and condensate piping has been added to drawing, and shown to be removed.
2.) Steam coil in existing ERU has been show.
3.) Note R2 has been updated.
4.) Existing drill hall controls for UV-1 and UV-2 have been shown on and plan and a notes has
been added to remove them, R6.
5.) The fin tube radiation that was shown to be removed at the east addition entrance has been
deleted from the sheet, as this fin tube is currently non-existent in the field.
5. Sheet M-103 Second Floor Removal
a. ADD to removal Note R2 the following sentences, “Modify existing wall opening as required to fit
new ductwork. Infill wall opening as required, match existing exterior wall finish.”
6. Sheet M-104 Basement Renovation
a. CLARIFICATION: There is an existing 1-1/2” NG main which runs down the crawl space in the
basement that is to remain intact as it serves the existing kitchen on the first floor. This was not
shown or noted to remain in the Contract Documents.
7. Sheet M-105 First Floor Renovation
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-105-A1.
1.) Temperature sensor and control symbolic wiring have been added back to plan, to coordinate
with control sequence.
2.) All 3/4ӯ HWS/ HWR piping has been up-sized to 1ӯ.
3.) Fin Tube Radiation has been added to plan in the corridor, next to the south exit.
4.) Natural Gas Riser that was in a sheet metal enclosure at the east addition entrance, R5, has been
re-routed to the exterior of the building, on the south side. Key note R5 has been removed.
8. Sheet M-106 Second Floor Renovation
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-106-A1.
1.) Natural Gas pipes sizes have been updated.
2.) Natural gas piping routing has been modified.
3.) VRF-IU-1 in battalion HQ has been removed.
4.) VRF-IU-4 has been added to battalion HQ. Refrigerant and condensate piping layout
modified.
5.) Keynote 8 has been added to all indoor wall mounted units.
6.) Keynote 7 has been added to VRF-IU-4.
9. Sheet M-107 Roof Plan
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-107-A1.
1.) Natural Gas pipe sizes and layout have been modified.
10. Sheet M-201 Enlarged Boiler Room Removal Plan
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-201-A1.
1.) Existing Domestic Water system plans have been updated.
2.) Domestic Water Removal Plans have been updated.
3.) Pneumatic control panel has been shown to be removed.
4.) Keynote R11 updated.
5.) Keynote R13 updated.
6.) Keynote R14 added.
7.) General Note 2 Updated.
8.) General Note 4 added.
![Page 3: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/3.jpg)
ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019
Updated 05/24/2018
Printed 01/17/2019 Page 3 of 4 Project No. 45665-EH
11. Sheet M-203 Enlarged Boiler Room Renovation Plan
a. DELETE the sheet from the Contract Documents in its entirety and REPLACE with M-203-A1.
1.) Existing Domestic Water system plans have been updated.
2.) Domestic Water renovation plans have been updated.
3.) 3/4ӯ CWS piping has been shown for hydronic system.
4.) Keynote 11 updated.
5.) General Notes 1 and 2 added.
12. Sheet M-502 Details
a. Detail 6/M-502: ADD a line size union downstream of the balancing valve.
b. Detail 7/M-502: ADD a line size union upstream of the balancing valve.
13. Sheet M-503 Details
a. Detail 2/M-503: CLARIFICATION: Concrete housekeeping pads shall be minimum 4” tall with
chamfered corners.
b. Detail 3/M-503: ADD a line size union downstream of the check valve.
c. Detail 7/M-503: ADD a line size union downstream of the balancing valve.
d. Detail 8/M-503: ADD line size union on the downstream side of the balancing valve and a line size
union upstream of the control valve.
14. Sheet M-601 Schedules
a. Gas Fired Rooftop Unit Schedule:
1) DELETE Note #7 from the schedule.
b. VRF Schedule:
1) CLARIFICATION: VRF-IU-1 unit location has been revised from “Battalion HQ/Conference
Rm” to “Conference Rm”
2) ADD VRF-1U4 to the schedule with the following design parameters:
a.) Unit Designation: Indoor
b.) Unit Location: Battalion HQ
c.) Type: 3’x3’ ductless ceiling flush mount 4-way VRF Cassette Unit
d.) Supply Air: 600 cfm
e.) Compressor (No./Type): Not Applicable
f.) Voltage / Phase / Hz: 208/1/60
g.) Cooling Total: 24,200 Btuh
h.) Heating Total: 27,300 Btuh
i.) Refrigerant Type: R-410A
j.) Manufacturer: LG
k.) Model Number: ARNU243TPC4
l.) Weight: 48 lbs
m.) Notes: 2, 4, 5, 6, 7, 8, 9, 13
c. Fin Tube Radiation Schedule:
1) Tag FTR-A
a.) DELETE closure height of 2’-0” and REPLACE with an enclosure height of 1’-8”.
b.) DELETE capacity of 1,350 Btuh/lf and REPLACE with a capacity of 1,190 Btuh/lf.
15. Sheet M-701 Boiler Room Schematic
a. ADD a line size union on the connection to the expansion tank ET-1.
b. ADD a line size union on the discharge size of boiler pumps P-2 and P-3.
c. ADD a total of two (2) thermometers and two (2) temperature sensors on the 4” primary heating
supply and return mains shown on 1/M-701. The temperature sensors shall be tied into the existing
Trane Tracer BMS.
![Page 4: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/4.jpg)
ADDENDUM NO. 1 TO PROJECT NO. 45665 January 17, 2019
Updated 05/24/2018
Printed 01/17/2019 Page 4 of 4 Project No. 45665-EH
16. Sheet M-702 Hydronic Riser Diagram
a. DELETE All line size references to 3/4" piping and REPLACE with 1” piping.
17. Sheet M-703 Hydronic Riser Diagram
a. DELETE All line size references to 3/4" piping and REPLACE with 1” piping.
18. Sheet E-102 Basement Renovation Plan
a. On 3/E-102, REMOVE one (1) 3-way light switch located at the north end of the Boiler Room by
the entrance door. The second 3-way switch shown in the Contract Documents shall be provided
as shown.
b. On 3/E-102, CHANGE the 3-way light switch at the south end of the Boiler Room closest to the
exterior door from “New” to “Existing”. REMOVE the conduit and wire shown in the Contract
Documents to the Type “A” light fixtures shown tying into this existing switch. The second 3-way
switch shown in the Contract Documents shall be provided as shown.
END OF ADDENDUM
Erik T. Deyoe, P.E.
Director, Division of Design
Design & Construction
![Page 5: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/5.jpg)
T
T
T T
T
TT T T T
T TT
TT
T
TT
T
T
T
T
T
T
T
D
MENS TOILETROOM
ORDINANCESTORAGE
STAIR
MEDICALSTORAGE
1ST SARGENT DR'S OFFICE
EXAM ROOM
STORAGE
CUSTODIANROOM
STAIR
ADDITIONENTRANCE
CO COO
COOCONCO
CLASSROOM
WOMENS TOILETROOM
DAYROOM
COORIDOR /LOBBY
UNIT STORAGE
DRILL HALL(LOWER PART)
GARAGE
KITCHEN
OFFICE
CLASSROOM
1 1/2" F & T.TRAP - STRAINER & GATE VALVES
1 1/2"
2 1/2"
1 1/4"
1 1/2"
2 1/2"
U.H.
U.H.
2 1/2"
1 1/4"
3"
1 1/2"
3"
EXPANSION LOOP
3"
1 1/2"
3"
U.H.
1 1/4"
2 1/2"
2 1/2" STEAM DROP
1" COND. DROP
1 1/
4"
1" COND. DROP
1 1/4"
EXIST DEHUMIDIFIER TO REMAIN
EXIST DEHUMIDIFIER TO REMAIN
1" DROP1"
1 1/
2"
48" x 12" UP TO U.V. #2
1 1/2" FROM U.V. #2
1 1/
2" S
LOP
E
1" COND. DROP
WF #1 ABOVE DOORWITH AUTO SHUTTER1000 CFM.
1# DROP TO B'MET AND DRIP
6" x
40"
x26
" C
ON
V.
1"85
1 1/
2" C
ON
D.
DR
OP
TO
BA
SE
ME
NT
4"
ST
EA
MS
UP
PLY
DR
ILL
HA
LL
CEILING SUSPC.I. RAD.
CONV.6" x 40" x 24"
CONV.6" x 40" x 24"
CONV.6" x 56" x 24"
1 1/2" VENT FROM COND. REC.
2"
3/4" 1 1/4" 3/4"
2 1/2" 2 1/2"
1" 1"1"
3/4" 1 1/4"
1"
CO
NV
.6"
x40"
x24"
CO
NV
.6"
x40"
x24"
2 1/
2"
1"
1"
2-4"x28"x32"-21-3 EACH CONV.
1"
1"
3'-0"
3"
3"
12B
22
CONV.6" x 40" x 24"
CONV.6" x 40" x 24"
CONV.6" x 56" x 24"
3/4"1 1/4"
3"
3/4"1"
3"
3/4"1"
4" LARGE SUPPLY RISER TO 1ST FLOOR CEILING BAR JOISTS
1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"1.HI. F.T. 4"x12'-0"6"x40"x26"CONV.
3"
3/4"1 1/4"
3"
3/4"1 1/4"3/4"
3"
1 1/4"3/4"
3"
1 1/4"
14"x14" DUCT RISER800 CFM TOEXHAUST SYSTEM INMENS TOILET ROOM 2ND FL.
3"
3/4"1"
6"x56"x26"CONV.
10x6REG
150 CFM
3"
3/4"1 1/4"
3'-0
"
1"
1"250 CFM12x12 REG
250 CFM12x12 REG
3"
3/4"1"
6"x28"x24"24 CONV.
6"x28"x24"CONV.
WF #2 WITH AUTO SHUTTER300 CFM
6"x48"x24"CONV.
6"x48"x24"CONV.
6"x64"x26"CONV.
1" DROP TO BASEMENT
1"3/4"1"
2 1/2"2 1/2"
1" 3/4"
1 1/4"
3/4"1 1/4"
1"2 1/2"
6"x40"x24"-45 CONV. 1"1"
6"x64"x24"-79.9 CONV.
3/4"1 1/4"
1 1/4"2 1/2"
1 1/2" COND. DROP
3/4"
1 1/4" 3/4"
3" RISER
7" COND. DROPTO CRAWL SPACE
1" STEAM DROP & DRIPEND OF MAIN IN CRAWL SPACE
48" & 12" DUCTUP TO U.V. #1
2"
2"
1" COND. DROP
1 1/2" COND.FROM U.V. #1
1" S
TE
AM
6"x4
8"x2
4"-4
5C
ON
V.
3/4" 10"x6" REG50 CFM
6"x36"x24"-33.3CONV.
NOTE - SEE 2ND FLOOR PLANFOR RADIATION
FOR ALL FINNED TUBERAD. IN DRILL HALL
R1
R2
EXIST ERU TO REMAIN R3
R3
R1
R1
R5
R5
20
"x20
"
20"x20"
12"x8" 12"x10"
12"x10"12"x8"
12
"x10
"1
4"x
12
"
12
"x12
"1
4"x
12
"
20"x20"
14
"x12
"1
2"x
12
"
12
"x10
"
12"x8" 12"x10"
12"x10"12"x8"
14
"x12
"
WEST ADDITION (NIC)
EAST ADDITION (NIC)
2
NG 1-1/2"Ø NG UP FROM BASEMENT
1 1/2"ø NG
1 1
/2"ø
NG
1-1/2"Ø NG DN TO KITCHEN APPLIANCES
R1
R4
R6
R6
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
FIRST FLOOR REMOVAL
M-102-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
NORTH
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
SCALE: 1/8" = 1'-0"M-102-A1
1 FIRST FLOOR REMOVAL PLAN
REMOVAL KEY NOTES
R1REMOVE LAY IN CEILING TILE AND METAL GRID TO ACCESS THE ENERGYRECOVERY UNIT AS REQUIRED. SAVE TILE AND GRID FOR RE-INSTALLATION
R2DISCONNECT AND REMOVE EXISTING STEAM / CONDENSATE COIL IN EXISTINGENERGY RECOVERY UNIT.
R3DISCONNECT AND REMOVE EXISTING SUPPLY AIR DUCTWORK TO THE POINT OFDISCONNECT SHOWN.
R4DISCONNECT AND REMOVE EXISTING STEAM SUPPLY AND RETURN PIPING,VALVES, FITTINGS, INSULATION AND ACCESSORIES TO THE EXISTING ENERGYRECOVERY UNIT.
R5EXISTING RETURN AIR DUCTWORK AND GRILLE FROM UNIT VENTILATOR ABOVETO REMAIN.
R6DISCONNECT AND REMOVE EXISTING CONTROLS ASSOCIATED WITH EXISTINGUNIT VENTILATOR.
R#
GENERAL NOTES
1DISCONNECT AND REMOVE ALL STEAM AND CONDENSATE EQUIPMENT, PIPING,VALVES, FITTINGS, ETC. IN ITS ENTIRETY, UNLESS OTHERWISE NOTED.
7
4
4
4
![Page 6: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/6.jpg)
MENS TOILETROOM
ORDINANCESTORAGE
STAIR A
MEDICALSTORAGE
1ST SARGEANT DR'S OFFICE
EXAM ROOM
STORAGE
CUSTODIANROOM
STAIR B CO COO
COOCONCOCLASSROOMWOMENS TOILETROOM
DAY ROOM
COORIDOR /LOBBY
UNIT STORAGE
DRILL HALL(LOWER PART)
GARAGE
KITCHEN
CLASSROOM
MESS HALL
CLOSET
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
8 FT
0.8 GPM
FTR-A
12 FT
1.1 GPM
FTR-A
4 FT
0.5 GPM
FTR-A
2 FT
0.5 GPM
FTR-A
8 FT
0.8 GPM
FTR-A
8 FT
0.8 GPM
FTR-A
12 FT
1.1 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
EXIST 48"x12" RETURN AIR GRILLE AT 10' AFF
EXIST 48"x12" RETURN AIR GRILLE AT 10' AFF
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
12 FT
1.0 GPM
FTR-B
12 FT
1.0 GPM
FTR-B
12 FT
1.0 GPM
FTR-B
12 FT
1.0 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
UH-1
5.6 GPM
84.4 MBH
UH-1
5.6 GPM
84.4 MBH
UH-2
1.3 GPM
18.7 MBH
ADDITIONENTRANCE
11
HC-1
152 MBH
10.2 GPM
UH-1
5.6 GPM
84.4 MBH
FTR-A
6 FT
0.6 GPM
FTR ON FIRST FLOOR MID-LEVEL LANDING
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
NOTE: ALL FINNED TUBE RADIATION TO BE UP 10'-0" ABOVE FLOOR EXCEPT HIGHER OVER DOOR
WEST ADDITION (NIC)
EAST ADDITION (NIC)
2B
S
2C
R
1
R
1
S
2A
R
2B
R
2A
S
2C
S
2D
S2
R
2
S
2E
S
2E
R
2D
R
3
S
3
R
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
FTR-B
7 FT
1.6 GPM
3/4"ø3/4"ø
1"ø
HW
R
1"ø
HW
S
1 1
/4"ø
HW
R
1 1
/4"ø
HW
S
1"ø1"ø
1"ø1"ø
1 1
/2"ø
HW
R
1 1
/2"ø
HW
S
1 1/4"ø1 1/4"ø
2"ø
2"ø
HW
S
1"ø HWR
1"ø
1"ø HWS
1"ø1"ø
2"ø
HW
R
2"Ø HWS/ HWR
1"ø HWS
1"ø
HW
S
1 1/4"ø HWS
1 1/4"ø HWS 1 1/4"ø HWS 1"ø HWS
1"ø
HW
S
1"ø HWS
1 1/4"ø HWR
2"ø HWR 2"ø HWR 1 1/4"ø HWR
1 1
/4"ø
HW
R
1 1/4"ø HWR
1 1
/4"ø
HW
R
1"ø
HW
R
1"ø HWR
1"ø
1"ø
1"ø
1"ø
1"ø
1"ø
1"ø1"ø
1"ø
1"ø
1"ø
2"ø
2"ø 1
"ø
1"ø
1"ø
1"ø1"ø1"ø
1"ø
12"x8" 12"x10"
12
"x10
"
12"x8"
14
"x12
"
20"x20"20"x20"
20"x20"
14
"x12
"1
2"x
12
"1
4"x
12
"1
2"x
12
"
12"x8"
12"x8"
12"x10"
12
"x10
"
12"x10"
12"x10"14"x12"
1"ø
1 1
/4"ø
2
4' - 0"
8' -
0"
16' - 0" 16' - 0"
3 34 4
2
16
' -
0"
16
' -
0"
3
4' -
0"
8' - 0"
3
4
4
T
T
T T TT T
T
TTST
T
T
TT
T
T
T
T
EXIST GARAGE STYLE DOOR
BMS CONTROL INTERFACE FOR RTUS
RTU TIMERS W/ OVERRIDES
7
M-503
6
7
1"ø
FTR-A
4 FT
0.5 GPM
TS
2"Ø NG RISER TO RTU-1, RTU-2
EXIST 3"Ø NG SERVICE TO BUILDING
1
NG
2
NG
1-1/2"Ø NG UP FROM BASEMENT
1 1
/2"ø
NG
1 1/2"ø NG
1-1/2"Ø NG DN TO KITCHEN APPLIANCES
1
EXIST ERU
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
FIRST FLOOR
RENOVATION
M-105-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
SCALE: 1/8" = 1'-0"M-105-A1
1 FIRST FLOOR RENOVATION PLAN
NORTH
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
RENOVATION KEY NOTES
1
PROVIDE DUCT CONNECTION TO EXISTING SUPPLY AIR DUCTS WHEREINDICATED. PROVIDE HOT WATER DUCT COIL AS SHOWN. PROVIDE CONTROLVALVE AND CONNECT TO ENERGY RECOVERY UNIT CONTROLS IN PLACE OFSTEAM REHEAT. REFER TO 6/M-502. CONTROL VALVE SHALL OPEN WHENEVERDISCHARGE AIR IS LESS THAN 60°F, EVEN IF FAN IN NOT RUNNING.
2PROVIDE HARD PIPE EXPANSION LOOP AS SHOWN TO COMPENSATE FORTHERMAL EXPANSION.
3 PROVIDE PIPING GUIDES WHERE INDICATED.
4 PROVIDE PIPING ANCHORS WHERE INDICATED.
5 NOT USED.
6 PROVIDE 14"Ø FLUE VENT FROM BOILERS IN BOILER ROOM BELOW.
7PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP THROUGHEXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT SAMETERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT.
#
GENERAL NOTES
1.REUSE EXISTING PIPE SUPPORT RODS AND STRAPS FOR NEW HYDRONIC PIPING INDRILL HALL.PIPING IN DRILL HALL SHALL BE EXPOSED EXCEPT AT MAIN RISERLOCATIONS.
10
4
4
4
![Page 7: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/7.jpg)
EXO
CO
CONFERENCEROOM
INSTRUCTOROFFICE
STAIR B
STAFF OFFICER OFFICER
BATTALIONHEADQUARTERS
OFFICE
DRILL HALL(UPPER PART)
DRYINGROOM
SHOWER ROOM DRYINGROOM
JANITORSCLOSET
LOCKER ROOM
STAIR A
TOILET ROOM
CORRIDOR
OFFICERSLOCKERROOM
OFFICERSTOILETROOM
LOCKER ROOM OFFICEMEN'S LOCKER
ROOMENTRANCE TO
ADDITION
2
VRF-IU-3 VRF-IU-1
VRF-BC-1
VRF-IU-3
VRF-IU-2
RTU-2
202 MBH
3,000 CFM
RTU-1
202 MBH
3,000 CFM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
3FT
0.5 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
6 FT
0.6 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
FTR-A
10 FT
0.9 GPM
EXISTING POWER VENT
EXISTING POWER VENT
THIS FINNED TUBE RADIATION TO BE 2'-0" ABOVE SECOND FLOOR
R
R
D
D
DRAIN TO TERMINATE 3" OUT EXTERIOR WALL
UP TO ROOFTOP VRF UNIT
REFER TO FIRST FLOOR RENOVATION PLAN, M-105, FOR DRILL HALL FTR PLAN
FTR-A
6 FT
0.6 GPM
FTR-A
6 FT
0.6 GPM
FTR ON MID STAIR LANDING, REFER TO M-105
WEST ADDITION (NIC)
2B
S
2C
R
2A
R
2B
R
2A
S
2C
S
2D
S
2E
S
2E
R
2D
R
DRAIN TO TERMINATE 3" OUT EXTERIOR WALL
1
NG
1 1
/2"ø
NG
TTS TS
TS
TS
T
T T
T
T
1 1/2"ø NG
34"x12" SA
34"x12" RA
34"x12" SA
34"x12" RA 13
3
5
ROOF ACCESSHATCH WITH LADDER
4
1
UP TO UPPER ROOF, REFER TO M-107, FOR CONTINUATION
T
TT
TT
T
TOA
OA
9
M-502
EAST ADDITION (NIC)
UP TO UPPER ROOF, REFER TO M-107 FOR CONTINUATION
7
M-503
6
666
7
9
10
11
11
EXIST EXHAUST AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL
EXIST FRESH AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL
2"Ø NG UP AND DN
VRF-IU-4
8
8
8
8
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
SECOND FLOOR
RENOVATION
M-106-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
SCALE: 1/8" = 1'-0"M-106-A1
1 SECOND FLOOR RENOVATION
NORTH
0'
SCALE: 1/8" = 1'-0"
2' 4' 16'8'
RENOVATION KEY NOTES
1PROVIDE HORIZONTAL GAS-FIRED ROOFTOP UNIT ON 24" ROOF CURB. PROVIDEGAS CONNECTION. PROVIDE RETURN PLENUM BENEATH UNIT. PROVIDE 4x4x3/8"ANGLE FRAME BETWEEN JOIST BENEATH ROOFTOP UNIT ROOF CURB.
2PROVIDE MODIFIED OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK.INFILL AND PATCH WALL TO MATCH EXISTING WALL, AS REQUIRED. PROVIDEWEATHERTIGHT SEAL.
3PROVIDE DUCT CONNECTION TO EXISTING 48"x12" RETURN AIR DUCT RISER ATTHE POINT OF CONNECTION SHOWN.
4
PROVIDE MODIFIED OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK.INFILL AND PATCH WALL TO MATCH EXISTING WALL, AS REQUIRED, AND TOMAINTAIN CLEARANCE AROUND ROOF ACCESS HATCH. PROVIDE WEATHERTIGHTSEAL.
5PROVIDE OPENING IN EXTERIOR WALL TO ACCOMODATE DUCTWORK. PROVIDEWEATHERTIGHT SEAL.
6TEMPERATURE SENSOR TO BMS PANEL FOR ROOM TEMPERATURE, STATUS ANDALARM.
7PROVIDE VRF INDOOR CEILING FLUSH MOUNTED UNIT WITH CONDENSATE DRAINPUMP.
8PROVIDE VRF INDOOR WALL MOUNTED UNIT WITH CONDENSATE DRAIN PUMP.REFER TO DETAIL 9/M-503.
9PROVIDE 14"Ø FLUE VENT FROM BOILERS IN BOILER ROOM BELOW. TERMINATEMINIMUM OF 3 FEET ABOVE TALLEST ROOF.
10
PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP THROUGHEXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT SAMETERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT, MINIMUM OF 3FEET ABOVE TALLEST ROOF.
11PROVIDE TRI-FLOW, MULTIDIRECTIONAL SUPPLY GRILLE WITH DOUBLEDEFLECTION DAMPERS.
#GENERAL NOTES
1.SUPPORT NATURAL GAS PIPING TIGHT TO EXTERIOR WALL WHERE PRACTICAL. WHEREIMPRACTICAL, PROVIDE ROOF PIPING HANGER SUPPORTS. REFER TO DETAIL 4/M-502.
2PROVIDE LINE HIDE ENLOSURE TO CONCEAL ALL EXPOSED VRF REFRIGERANT PIPINGIN BATALLION OFFICES.
11
4
4
4
![Page 8: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/8.jpg)
1
VRF-OU-1
RTU-2
202 MBH
3,000 CFM
RTU-1
202 MBH
3,000 CFM
LOWER ROOF(EAST ADDITION)
LOWER ROOF
DRILL HALL ROOF
UPPER ROOF
WEST ADDITION ROOF
14"Ø BOILER FLUE WITH EXIT CONE TERMINATION
EXIST 10"Ø DWH FLUE
EXIST EXHAUST AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL
EXIST FRESH AIR ROOF PENETRATION FOR ERV-1, SERVING MESS HALL
EXIST EXHAUST AIR ROOF POWER VENT
EXIST EXHAUST AIR ROOF POWER VENT
1 1
/2"ø
NG
1 1
/2"ø
NG
1 1/2"ø NG1 1/2"ø NG
1 1/2"ø NG
34"x12" SA
34"x12" RA
REFER TO M-106, SECOND FLOOR RENOVATION, FOR NOTES REGUARDING RTU
REFER TO M-106, SECOND FLOOR RENOVATION, FOR NOTES REGUARDING RTU
34"x12" SA
34"x12" RA
2"Ø NG DN TO EXISTING GAS SERVICE, REFER TO M-104 FOR CONTINUATION
REFER TO M-106, SECOND FLOOR RENOVATION, FOR CONTINUATION
OA
OA
FOR PIPE FLASHING DETAIL, REFER TO 5/M-502
2"ø NG
2"ø NG1-1/2"Ø NG DN TO LOWER ROOF
1-1/2"Ø NG DN TO LOWER ROOF
1
NG
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
ROOF PLAN
M-107-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
SCALE: 1/8" = 1'-0"M-107-A1
1 ROOF RENOVATION PLAN
NORTH
RENOVATION KEY NOTES
1PROVIDE ROOF MOUNTED VRF HEAT PUMP UNIT ON 24" STRUCTURAL STAND.PROVIDE REFRIGERANT LINESET DOWN TO SECOND FLOOR VIA ROOF PITCHPOCKET.
#
GENERAL NOTES
1.SUPPORT NATURAL GAS PIPING TIGHT TO EXTERIOR WALL WHERE PRACTICAL. WHEREIMPRACTICAL, PROVIDE ROOF PIPING HANGER SUPPORTS. REFER TO DETAIL 4/M-502.
12
4
![Page 9: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/9.jpg)
M
3"Ø LPSLPC
LPC4"Ø LPS2"Ø HWR4"Ø LPS2"Ø HWS
1-1/2"Ø NG
DHWS
DCW
CWS
R1
R2
R1
R2
4"Ø LPS
4"Ø LPS
3"Ø LPS
4"Ø LPS
2"Ø HWS2"Ø HWR
R3
R3 R4
R5
20"Ø EA DUCT
10"Ø EA DUCT
14"Ø EA DUCT 14"Ø EA DUCT
2"Ø LPS
10"Ø EA DUCT
8"Ø LPS8"Ø LPS
3"Ø NG 3"Ø NG 3"Ø NG
2"Ø
NG2"
Ø N
G
2"Ø
NGLPC
LPC
2"Ø CWS1-1/4"Ø DHWS3/4"Ø DHWR
LPS
R2
AIR COMPRESSOR
AIR DRYER
2"Ø NG
STEAM BOILER STEAM BOILER
DWH
ET
LPC RECIEVER
PUMP
PUMP
HW STORAGE TANK
GAS BURNER GAS BURNER
NG TRAIN
SUMP PIT
LPS
NG VENTNG VENT
NG BYPASS
NG VENT NG VENT NG VENT
NG BYPASS
NG TRAIN
NG VENTNG VENT
NG VENT
NG
NG VENT
NG
6"Ø
LP
S
6"Ø
LP
S
NG
NG
3"Ø NG CWS
NG
R6
R6R6
LPC
LPC
LPC
LPC
R6
R6
R6 R6
R11
R6
R6
R6
R2
R7
R8
4'x3' WALL LOUVER W/ MOTORIZED CONTROL DAMPER
R6
R1
R10
R9
R12
FD
DHWS
DHWR
CWSDHWR
R13
R2
R4
R4
R4
R14
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
ENLARGED BOILER
ROOM REMOVAL PLAN
M-201-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
REMOVAL KEY NOTESR1 DISCONNECT AND REMOVE EXISTING NATURAL GAS (NG) PIPING, FITTINGS,
VALVES AND SUPPORT ACCESSORIES TO THE POINT OF DISCONNECT SHOWN.
R2 DISCONNECT AND REMOVE EXISTING COLD WATER SUPPLY (CWS) PIPING,FITTINGS, VALVES AND SUPPORT ACCESSORIES TO THE POINT OF DISCONNECTSHOWN.
R3 DISCONNECT AND REMOVE EXISTING HYDRONIC HOT WATER SUPPLY / HOTWATER RETURN (HWS/HWR) PIPING, FITTINGS, VALVES AND SUPPORTACCESSORIES TO THE POINT OF DISCONNECT SHOWN.
R4 DISCONNECT AND REMOVE EXISTING DOMESTIC HOT WATER SUPPLY / HOTWATER RETURN (DHWS/DHWR) PIPING, FITTINGS, VALVES AND SUPPORTACCESSORIES TO THE POINT OF DISCONNECT SHOWN.
R5 EXISTING 4'x3' WALL LOUVER TO REMAIN.
R6 DISCONNECT AND REMOVE EXISTING MECHANICAL EQUIPMENT AND ANYHOUSEKEEPING PAD OR STRUCTURAL SUPPORT.
R7 EXISTING SUMP PIT TO REMAIN.
R8 DISCONNECT AND REMOVE EXISTING BOILER EXHAUST DUCTWORK/ FLUEDUCTWORK IN ITS ENTIRETY.
R9 DISCONNECT AND REMOVE EXISTING FLUE VENT FROM EXISTING DOMESTICWATER HEATER TO THE POINT OF DISCONNECT SHOWN. EXISTING 10"Ø FLUEVENT RISER TO REMAIN.
R10 DISCONNECT AND REMOVE EXISTING 4'x3' MOTORIZED CONTROL DAMPER.
R11 DISCONNECT AND REMOVE EXISTING EXPANSION TANK AND STORE FORRELOCATION.
R12 DISCONNECT AND REMOVE EXISTING DOMESTIC HOT WATER RETURNCIRCULATING PUMP AND STORE FOR RELOCATION.
R13 EXISTING DOMESTIC THERMOSTATIC MIXING VALVE AND SUPPORT STRUCTURETO REMAIN.
R14 DISCONNECT AND REMOVE EXISTING HONEYWELL PNEUMATIC CONTROL PANELAND ASSOCIATED EXTERNAL CONTROLS.
SCALE: 1/2" = 1'-0"M-201-A1
1 ENLARGED BOILER ROOM REMOVAL FLOOR PLAN
NORTH
GENERAL NOTES1. FIELD VERIFY ALL PIPE LOCATIONS AND SIZES BEFORE BEGINNING WORK.
2. DISCONNECT AND REMOVE ALL HYDRONIC EQUIPMENT, PIPING, FITTINGS, VALVES ANDSUPPORT ACCESSORIES IN BOILER ROOM UNLESS OTHERWISE NOTED.
3 REFER TO M-101 FOR CONTINUATION OF PIPING.
4 ALL EXISTING BUILDING DOMESTIC WATER PIPING, FIXTURES, ACCESSORIES, ETC SHALLREMAIN, UNLESS OTHERWISE NOTED.
R#
0'
SCALE: 1/2" = 1'-0"
6" 1' 4'2'
13
4
4
![Page 10: DESIGN CONSTRUCTION GROUP THE GOVERNOR NELSON A ... 01 EH.pdf6.Sheet M-104 Basement Renovation a.CLARIFICATION: There is an exis ting 1 -1/2” NG main which runs down the crawl space](https://reader035.vdocument.in/reader035/viewer/2022071014/5fcd2074ae6f08391e32023d/html5/thumbnails/10.jpg)
1
B-2
1,860 MBH
B-1
1,860 MBH
P-3
99 GPM
P-2
99 GPM
P-1A
198 GPM
P-1B
198 GPM
ET-1
AS-1
14"ø OA8"ø OA 14"ø OA
14
"ø O
A
20"x32"
24"x24"
3"ø NG
2"ø
NG
2"ø
NG
4"ø
DWH-1
2
2
3
4
11
5
2"ø
HW
S
2"ø
HW
R
CWS
EXIST
AREAWAY
8"ø V
8"ø V
EAST
ADDITION
UH-3
0.8 GPM
5.7 MBH
E
R
E
S
2"ø HWS
2"ø HWR
4"ø
HW
R4
"ø H
WR
4"ø
HW
S
3/4"ø HWS
3/4
"ø H
WS
3"ø
4"ø 3"ø
3/4"ø HWR
3/4
"ø H
WR
1 1
/2"ø
HW
R
1 1
/2"ø
HW
R
3/4"ø HWS
3/4"ø HWR
610
6
EXIST
SUMP PIT
3"ø
NG
4"ø V
4"ø
V
4"ø V
14
"ø V
1 1
/2"ø
NG
1 1
/2"ø
NG
ET
EXIST 10"Ø FLUE
GAS VENT
6
10
6
8
9
11
T
COOLING DUTY
THERMOSTAT
1212
13
14
14
15
15
FD
7
CWS
CW
S
7
DHWSDHWR
DH
WS
DH
WR
CW
S
1-1
/2"Ø
NG
3/4"ø CWS 7
2"Ø
CW
S1-1
/4"Ø
DH
WS
3/4
"Ø D
HW
R
3"ø NG1 1/2"ø NG
DHWSDHWR
1 1
/2"ø
DH
WR
1 1
/2"ø
HW
S
1 1
/2"ø
DH
WS
1 1
/2"ø
DH
WR
2"ø
CW
S
2"ø CWS
2"ø
CW
S
DESIGN & CONSTRUCTION
36x24 PLOT
THE ALTERATION OF THIS MATERIAL IN ANY WAY, UNLESS DONE
UNDER THE DIRECTION OF A COMPARABLE PROFESSIONAL, I.E.
ARCHITECT FOR AN ARCHITECT, ENGINEER FOR AN ENGINEER OR
LANDSCAPE ARCHITECT FOR A LANDSCAPE ARCHITECT, IS A
VIOLATION OF THE NEW YORK STATE EDUCATION LAW AND/OR
REGULATIONS AND IS A CLASS 'A' MISDEMEANOR.
WARNING:
CLIENT:
CONTRACT:
TITLE:
LOCATION:
SHEET TITLE:
DESIGNED BY:
PROJECT
DRAWN BY:
DRAWING NUMBER:
CHECKED:
APPROVED:
MARK DATE DESCRIPTION
CONSULTANT
NUMBER:
Sheet of
DELTA PROJECT NUMBER:
1
30
EXISTING BUILDING
2005 ADDITION
2005 ADDITION
HVAC
45665
2 11/19/2018 100% SUBMISSION
I, THE UNDERSIGNED, DO HEREBY CERTIFY THAT TO THE BEST OF MY
KNOWLEDGE, BELIEF AND PROFESSIONAL JUDGEMENT, THE
INFORMATION SHOWN ON THESE DRAWINGS AND SPECIFICATIONS
BEARING MY SEAL, COMPLIES WITH THE APPLICABLE REQUIREMENTS
OF THE NEW YORK STATE ENERGY CONSERVATION CODE.
-H
3 12/07/2018 IFB SUBMISSION
4 01/18/2019 ADDENDUM #1
ENLARGED BOILER
ROOM RENOVATION
PLAN
M-203-A1
REPLACE BOILER & HVAC SYSTEM
STATE ARMORY
174 SOUTH STREET AUBURN, NY
13021
DIVISION OF MILITARY AND NAVAL
AFFAIRS
60% SUBMISSION
DDW
DDW
FCA
FCA
2016.170.019
09/14/2018
SCALE: 1/2" = 1'-0"M-203-A1
1 ENLARGED BOILER ROOM RENOVATION PLAN
0'
SCALE: 1/2" = 1'-0"
6" 1' 4'2'
NORTH
RENOVATION KEY NOTES
1
PROVIDE CONNECTION TO EXISTING NATURAL GAS BRANCH WHERE
INDICATED. PROVIDE NATURAL GAS CONNECTION AT EXISTING SHUT-OFF
VALVE IF PRACTICAL.
2PROVIDE CONNECTION TO EXISTING 2"Ø HWS/ HWR MAIN TO EXISTING
BUILDING ADDITION WHERE INDICATED.
3
PROVIDE 4"Ø FLUE GAS VENT FROM DOMESTIC WATER HEATER UP
THROUGH EXISTING 10"Ø FLUE VENT AS SHOWN. PROVIDE TERMINATION AT
SAME TERMINATION ELEVATION AS THE EXISTING 10"Ø FLUE GAS VENT.
4PROVIDE MOTORIZED CONTROL DAMPER AND DUCTWORK CONNECTION TO
EXISTING 4'x3' LOUVER, REFER TO DETAIL 1/M-501.
5
PROVIDE FLUE GAS VENT AS SHOWN. SLOPE DUCTWORK TOWARDS BOILER
UNIT AT 1/4" PER LINEAR FOOT OF DUCT. INSTALL PER MANUFACTURER'S
RECOMMENDATIONS.
6
PROVIDE 4" HIGH CONCRETE HOUSEKEEPING PAD THAT IS 6" LARGER THAN
MECHANICAL EQUIPMENT ON ALL SIDES. REFER TO HOUSEKEEPING PAD
DETAIL 2/M-503.
7PROVIDE CONNECTION TO EXISTING DOMESTIC WATER SYSTEM WHERE
INDICATED.
8RELOCATE AND INSTALL EXISTING DOMESTIC WATER SYSTEM EXPANSION
TANK. REFER TO DOMESTIC WATER HEATER SCHEMATIC 2/M-701.
9
RELOCATE AND INSTALL EXISTING DOMESTIC HOT WATER RETURN
CIRCULATION PUMP WHERE INDICATED. REFER TO DOMESTIC WATER
HEATER SCHEMATIC 2/M-701. EXTEND EXISTING ELECTRICAL CIRCUIT TO
PUMP IN NEW LOCATION.
10
PROVIDE 8" HIGH CONCRETE HOUSEKEEPING PAD THAT IS 6" LARGER THAN
MECHANICAL EQUIPMENT ON ALL SIDES. REFER TO HOUSEKEEPING PAD
DETAIL 2/M-503.
11PROVIDE CONNECTION TO EXISTING THERMOSTATIC MIXING VALVE AS
SHOWN.
12PROVIDE CONDENSING BOILER AND ALL REQUIRED PIPING AND VENTING
CONNECTIONS AS SHOWN. REFER TO BOILER SCHEMATIC, 1/M-701.
13
PROVIDE CONDENSING DOMESTIC WATER HEATER AND ALL REQUIRED
PIPING AND VENTING CONNECTIONS AS SHOWN. REFER TO BOILER
SCHEMATIC, 2/M-701.
14 PROVIDE INLINE HORIZONTAL BOILER PUMP. REFER TO DETAIL 3/M-503.
15PROVIDE BASE MOUNTED BUILDING HOT WATER DISTRIBUTION PUMP.
REFER TO DETAIL 1/M-503.
#
GENERAL NOTES1 FIELD VERIFY EXISTING DOMESTIC PIPE SIZING. SIZE TO MATCH EXISTING.
2 REFER TO M-701 FOR BOILER ROOM SCHEMATICS.
15
4
4