design drawings 400kv overhead lines - planning … · application reference en020001 march 2017...

23
March 2017 Application Reference EN020001 Document Hinkley Point C Connection Project Design Drawings 400kV overhead lines 4.8.6A Regulation 5(2)(o) of the Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

Upload: hathuan

Post on 27-Aug-2018

239 views

Category:

Documents


2 download

TRANSCRIPT

  • March 2017Application Reference EN020001

    Do

    cum

    ent

    Hinkley Point C Connection Project

    Design Drawings400kV overhead lines

    4.8.6A

    Regulation 5(2)(o) of the Infrastructure Planning(Applications: Prescribed Forms and Procedure)Regulations 2009

  • 0

    10

    20

    30

    40

    50

    DRAIN ROAD DRAIN

    CONTINUESSECTION

    B3141ROAD

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    51.0

    5.2

    0.0

    0.0

    ARABLE

    40.0

    4.7

    324.7

    324.7

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLE ARABLEARABLE ARABLERIVER

    HUNTSPILL

    40.0

    4.7

    324.7

    41.1

    4.7

    374.7

    699.4

    40.9

    5.0

    718.6

    1043.3

    0.0

    324.7m 374.7m 344.0m

    LD2 - LD6

    1463.9m

    LD1 - LD2324.7m

    Y=143744.60

    X=334786.47

    35.9m

    T PYLON D

    LD4

    Y=143507.81

    X=334536.98

    36.4m

    T PYLON D

    LD3

    Y=143249.88

    X=334265.22

    35.3m

    T PYLON D30

    LD2

    Y=143028.33

    X=334028.97

    HUNTSPILL TEE

    45.8m

    L12 D55 STD

    LD1

    SAG 10.98mSAG 13.12mSAG 10.49m

    Y=143249.88

    X=334265.22

    35.3m

    T PYLON D30

    LD2

    0

    10

    20

    30

    40

    CONTINUESSECTION

    CONTINUESSECTION

    ROAD

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    42.0

    5.0

    1091.7

    1416.4

    40.0

    4.7

    1463.9

    1788.6

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    40.0

    4.7

    01788.6

    38.7

    4.8

    344.3

    2132.8

    ARABLE

    40.9

    5.0

    718.6

    1043.3

    372.1m 344.3m

    LD2 - LD6

    1463.9m

    LD6 - LD10

    1348.9m

    373.1m

    Y=144559.03

    X=335493.37

    33.9m

    T PYLON D

    LD7

    Y=144257.61

    X=335326.99

    35.3m

    T PYLON D30

    LD6

    Y=144001.43

    X=335057.07

    36.9m

    T PYLON D

    LD5

    Y=143744.60

    X=334786.47

    35.9m

    T PYLON D

    LD4

    SAG 11.64mSAG 13.05mSAG 12.90m

    DR

    AIN

    Y=144257.61

    X=335326.99

    35.3m

    T PYLON D30

    LD6

    0

    10

    20

    30

    40

    CONTINUESSECTION

    BRUERIVER

    ROADROAD

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE ARABLE

    38.8

    4.8

    672.2

    2460.8

    39.9

    4.9

    1023.1

    2811.7

    39.3

    5.0

    1348.8

    3137.4

    ARABLE

    38.7

    4.8

    344.3

    2132.8

    328.0m 350.9m

    LD6 - LD10

    1348.9m

    325.7m

    Y=145438.45

    X=335978.79

    34.3m

    T PYLON D30

    LD10

    Y=145153.33

    X=335821.41

    34.9m

    T PYLON D

    LD9

    Y=144846.15

    X=335651.85

    33.9m

    T PYLON D

    LD8

    Y=144559.03

    X=335493.37

    33.9m

    T PYLON D

    LD7

    SAG 10.43mSAG 11.84mSAG 10.35m

    DR

    AIN

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 1 OF 17 SHEET 1 OF 15

    A AUG '13 GC JB PB

    01_13205_84

    PYLONS LD1 - LD10

    ROUTE REFERENCE LD

    S.42/S.47 CONSULTATION

    MAY '14 CFK LD JB

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    EN020001

    PINS SHEET 41 OF 70

    BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN

    BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN

    BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN

    SHEET 41 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • 0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE ARABLE

    39.3

    5.0

    3137.3

    0.0

    40.6

    4.7

    3496.5

    39.2

    4.7

    3828.1

    37.9

    5.1

    4159.8

    359.2

    690.8

    1022.4

    359.2m 331.6m 316.9m

    LD10 - LD131022.4m

    Y=146172.08

    X=336690.94

    32.8m

    T Pylon D30

    LD13

    Y=145934.12

    X=336459.95

    34.4m

    T Pylon D

    LD12

    Y=145696.19

    X=336228.98

    35.9m

    T Pylon D

    LD11

    Y=145438.45

    X=335978.79

    34.3m

    T PYLON D30

    LD10

    SAG 10.75mSAG 10.44mSAG 12.45m

    DR

    AIN

    DRAIN ARABLEARABLE DRAINARABLE

    SAG 8.94m

    ROAD

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLE

    SAG 9.45m

    ARABLE

    0

    10

    20

    30

    40

    37.9

    5.1

    4159.8

    37.1

    5.2

    4451.2

    291.4

    39.9

    5.1

    4751.1

    591.3

    0.0

    291.4m

    LD13 - LD14

    591.3m

    300.0m

    Y=146745.49

    X=336835.49

    34.8m

    T Pylon D30

    LD15

    Y=146454.64

    X=336762.17

    31.9m

    T Pylon D

    LD14

    Y=146172.08

    X=336690.94

    32.8m

    T Pylon D30

    LD13

    ROADDRAIN

    0

    10

    20

    30

    40

    50

    ARABLE ROADARABLE ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    39.9

    5.1

    4751.1

    0.0

    41.9

    5.0

    5123.3

    42.0

    5.1

    5523.0

    372.1

    771.9

    399.8m372.1m

    LD16 - LD17771.9m

    Y=147490.40

    X=336633.15

    36.9m

    T Pylon D10 Flying Angle

    LD17

    Y=147104.60

    X=336737.94

    36.9m

    T Pylon D

    LD16

    Y=146745.49

    X=336835.49

    34.8m

    T Pylon D30

    LD15

    SAG 14.30mSAG 12.65m

    DR

    AIN

    DR

    AIN

    DR

    AIN

    DR

    AIN

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 2 OF 17 SHEET 2 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    PYLONS LD10 - LD17

    ROUTE REFERENCE LD

    01_13205_84

    MAY '14 CFK LD JB

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    PINS SHEET 42 OF 70

    EN020001

    BIRD FLIGHT DIVERTERS TO BE INSTALLED IN THIS SPAN

    SHEET 42 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • ROADBUILDING

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLEARABLE ROADDRAIN ARABLEARABLE ARABLE

    0

    10

    20

    30

    40

    50

    0

    10

    20

    30

    40

    50

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    42.0

    5.1

    5523.0

    0.0

    40.3

    5.4

    5873.0

    350.0

    40.3

    5.4

    5873.0

    0.0

    38.3

    5.4

    6138.1

    36.4

    5.2

    6430.6

    265.1

    557.6

    SAG 7.53m SAG 9.39m

    292.6m350.0m 265.1m

    LD17 - LD18350.0m

    LD18 - LD20557.6m

    Y=148393.96

    X=336595.75

    31.3m

    T Pylon D30

    LD20

    Y=148101.51

    X=336588.18

    32.9m

    T Pylon D

    LD19

    Y=147836.52

    X=336581.32

    34.9m

    T Pylon D10 Flying Angle

    LD18

    Y=147490.40

    X=336633.15

    36.9m

    T Pylon D10 Flying Angle

    LD17

    SAG 11.67m

    DRAIN

    TR

    AC

    K

    DRAIN

    AR

    AB

    LE

    DR

    AIN

    ARABLE

    Y=147836.52

    X=336581.32

    34.9m

    T Pylon D10 Flying Angle

    LD18

    0

    10

    20

    30

    40

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    36.4

    5.2

    6430.6

    0.0

    41.5

    5.0

    6758.2

    327.5

    41.5

    5.0

    6758.2

    0.0

    41.9

    5.0

    7125.6

    39.5

    5.2

    7493.0

    367.4

    734.8

    367.4m367.4m327.5m

    LD20 - LD21327.5m

    Y=149293.19

    X=337159.55

    34.3m

    T Pylon D30

    LD23

    Y=148987.63

    X=336955.53

    36.9m

    T Pylon D

    LD22

    Y=148682.08

    X=336751.51

    36.4m

    T Pylon D10 Flying Angle

    LD21

    Y=148393.96

    X=336595.75

    31.3m

    T Pylon D30

    LD20

    SAG 12.81mSAG 12.57mSAG 10.76m

    DRAINARABLEDRAIN ARABLE

    DR

    AIN

    DR

    AIN

    ARABLE

    TR

    AC

    K

    Y=148682.08

    X=336751.51

    36.4m

    T Pylon D10 Flying Angle

    LD21

    LD21 - LD23734.8m

    0

    10

    20

    30

    40

    CONTINUESSECTION

    TR

    AC

    K

    TRACK BRIDGE

    TR

    AC

    K

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLEARABLEARABLE ARABLE ARABLE

    39.5

    5.2

    7493.0

    0.0

    40.1

    5.1

    7841.3

    41.3

    5.3

    8215.1

    41.5

    5.0

    8595.9

    348.3

    722.1

    1102.9

    348.3m 373.8m 380.8m

    LD23 - LD281859.1m

    Y=150392.94

    X=337242.64

    36.4m

    T Pylon D

    LD26

    Y=150013.23

    X=337213.95

    35.9m

    T Pylon D

    LD25

    Y=149640.53

    X=337185.79

    34.9m

    T Pylon D

    LD24

    Y=149293.19

    X=337159.55

    34.3m

    T Pylon D30

    LD23

    SAG 13.34mSAG 12.87mSAG 11.49m

    DR

    AIN

    DR

    AIN

    DRAIN ARABLE

    DR

    AIN

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 3 OF 17 SHEET 3 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    PYLONS LD17 - LD26

    01_13205_84

    ROUTE REFERENCE LD

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 43 OF 70

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    SHEET 43 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • 0

    10

    20

    30

    40

    CONTINUESSECTION

    DRAIN TRACK ROAD

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE ARABLE

    CONTINUESSECTION

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    41.5

    5.0

    8595.9

    1102.9

    42.1

    5.2

    8977.8

    1484.8

    41.5

    5.2

    9352.0

    1859.1

    41.5

    5.2

    9352.0

    0.0

    41.1

    5.2

    9730.7

    378.7

    SAG 13.21mSAG 12.98mSAG 13.40m

    DRAINYEO

    MARK ARABLE DRAIN

    382.0m 374.2m

    LD23 - LD281859.1m

    LD28 - LD311133.5

    378.7m

    Y=151524.55

    X=337328.13

    35.9m

    T Pylon D

    LD29

    Y=151146.96

    X=337299.60

    36.3m

    T Pylon D30

    LD28

    Y=150773.81

    X=337271.41

    36.9m

    T Pylon D

    LD27

    Y=150392.94

    X=337242.64

    36.4m

    T Pylon D

    LD26

    Y=151146.96

    X=337299.60

    36.3m

    T Pylon D30

    LD28

    CONTINUESSECTION

    PARKCAR

    ARABLE ARABLE

    0

    10

    20

    30

    40

    CONTINUESSECTION

    TRACKBUILDING

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    41.1

    5.2

    9730.7

    378.7

    41.5

    5.6

    757.5

    41.7

    5.7

    1133.5

    10109.5

    10485.5

    41.7

    5.7

    10485.5

    0.0

    39.2

    5.8

    10821.7

    336.2

    378.8m

    Y=151524.55

    X=337328.13

    35.9m

    T Pylon D

    LD29

    SAG 10.82mSAG 12.94mSAG 13.11m

    TRACK DRAIN DRAIN ROAD TRACK

    375.9m

    LD283 - LD311133.5

    336.2m

    LD31 - LD341043.0m

    Y=152613.31

    X=337394.14

    33.4m

    T Pylon D

    LD32

    Y=152277.19

    X=337384.99

    35.9m

    T Pylon D10 Flying Angle

    LD31

    Y=151902.30

    X=337356.67

    35.9m

    T Pylon D

    LD30

    Y=152277.19

    X=337384.99

    35.9m

    T Pylon D10 Flying Angle

    LD31

    0

    10

    20

    30

    40

    CONTINUESSECTION

    CONTINUESSECTION

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE DRAINARABLE ARABLE

    39.2

    5.8

    10821.7

    336.2

    41.7

    5.7

    11165.8

    680.3

    40.6

    5.9

    11528.5

    1043.0

    40.6

    5.9

    11528.5

    0.0

    40.5

    6.6

    11872.1

    343.6

    343.6m

    LD31 - LD34

    1043.0m

    LD34 - LD37

    989.3m

    Y=153662.72

    X=337391.71

    33.9m

    T Pylon D

    LD35

    Y=153319.79

    X=337413.38

    34.8m

    T Pylon D30

    LD34

    SAG 11.61mSAG 12.68mSAG 11.30m

    DRAIN DRAINDRAIN

    Y=153319.79

    X=337413.38

    34.8m

    T Pylon D30

    LD34

    362.7m344.0m

    Y=152957.22

    X=337403.51

    35.9m

    T Pylon D

    LD33

    Y=152613.31

    X=337394.14

    33.4m

    T Pylon D

    LD32

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 4 OF 17 SHEET 4 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    ROUTE REFERENCE LD

    PYLONS LD26 - LD35

    MAY '14 CFK LD JB

    PINS SHEET 44 OF 70

    EN020001

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    SHEET 44 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • 0

    10

    20

    30

    40

    CONTINUESSECTION

    DRAIN

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLEARABLE

    40.5

    6.6

    11872.1

    343.6

    38.7

    5.8

    12198.7

    670.2

    38.7

    6.0

    12517.7

    989.3

    38.7

    6.0

    12517.7

    0.0

    22.5

    5.9

    12740.1

    222.4

    ARABLE

    SAG 6.03m

    222.4m

    LD34 - LD37

    989.3m

    LD37 - LD38

    222.4m

    319.0m326.6m

    Y=154527.28

    X=337320.03

    16.6m

    GOALPOST

    LD38A

    Y=154307.10

    X=337351.00

    32.8m

    T Pylon D30

    LD37

    Y=153988.70

    X=337371.12

    32.9m

    T Pylon D

    LD36

    Y=153662.72

    X=337391.71

    33.9m

    T Pylon D

    LD35

    SAG 10.04mSAG 10.37m

    Y=154307.10

    X=337351.00

    32.8m

    T Pylon D30

    LD37

    0

    10

    20

    30

    40

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    38.7

    6.0

    12517.7

    0.0

    22.5

    5.9

    12739.9

    222.2

    23.7

    7.1

    23.1

    0.0

    23.9

    7.3

    0.0

    0.0

    39.9

    5.6

    187.3

    187.3

    39.8

    5.6

    164.2

    187.3

    SAG 6.00m SAG 3.88m SAG 4.83m

    222.2m

    LD39B - LD40

    222.2m

    LD39B - LD40

    187.3m

    LD39A - LD40164.2m

    Y=160744.78

    X=341567.45

    34.3m

    T Pylon D30

    LD40

    Y=160557.92

    X=341554.71

    16.6m

    GOALPOST

    LD39B

    Y=160744.78

    X=341567.45

    34.3m

    T Pylon D30

    LD40

    Y=160583.24

    X=341597.02

    16.6m

    GOALPOST

    LD39A

    Y=154529.32

    X=337349.03

    16.6m

    GOALPOST

    LD38B

    Y=154307.10

    X=337351.00

    32.8m

    T Pylon D30

    LD37

    164.2m 187.3m

    SAG 9.92m

    ARABLE ARABLEROADARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    SAG 4.74m

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    39.9

    5.6

    187.3

    5.1

    182.6

    369.9

    40.0

    0.0

    5.1

    369.9

    40.0

    0.0

    4.8

    682.9

    37.7

    4.9

    997.2

    38.9

    313.0

    627.3

    SAG 9.87m

    182.6m

    LD40 - LD41182.6m

    Y=160744.78

    X=341567.45

    34.3m

    T Pylon D30

    LD40

    DRAIN

    314.3m313.0m

    LD41 - LD451252.5m

    Y=161532.21

    X=341749.97

    33.9m

    T Pylon D

    LD43

    Y=161223.88

    X=341689.26

    32.9m

    T Pylon D

    LD42

    Y=160916.78

    X=341628.78

    34.9m

    T Pylon D10 Flying Angle

    LD41

    CONTINUES

    SECTION

    Y=160916.78

    X=341628.78

    34.9m

    T Pylon D10 Flying Angle

    LD41

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 5 OF 17 SHEET 5 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    ROUTE REFERENCE LD

    PYLONS LD35 - LD43

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 45 OF 70

    SHEET 45 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • ARABLEARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    SAG 9.47m

    ARABLE

    4.9

    997.2

    38.9

    4.7

    1318.5

    37.7

    4.3

    1622.4

    36.5

    627.3

    948.6

    1252.5

    4.3

    1622.4

    36.5

    0.0

    4.4

    1962.3

    40.4

    339.9

    LD41 - LD451252.5m

    303.9m321.3m

    Y=161847.48

    X=341812.05

    32.9m

    T Pylon D

    LD44

    Y=161532.21

    X=341749.97

    33.9m

    T Pylon D

    LD43

    SAG 11.01mSAG 10.36m

    CONTINUES

    SECTION

    DRAIN DRAIN

    DR

    AIN

    DRAINARABLE

    339.9m

    LD45 - LD522523.6m

    Y=162484.98

    X=341850.09

    35.9m

    T Pylon D

    LD46

    Y=162145.67

    X=341870.77

    32.3m

    T Pylon D30

    LD45

    CONTINUES

    SECTION

    Y=162145.67

    X=341870.77

    32.3m

    T Pylon D30

    LD45

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    0

    10

    20

    30

    40

    ARABLE ARABLE

    4.4

    1962.3

    40.4

    4.6

    2340.9

    40.5

    4.4

    2710.1

    39.9

    4.5

    3066.5

    39.4

    718.5

    339.9

    1087.8

    1444.1

    SAG 11.87mSAG 12.73mSAG 13.38m

    DR

    AIN

    DR

    AIN

    ARABLE

    DR

    AIN

    ARABLE

    DR

    AIN

    LD45 - LD522523.6m

    356.3m369.2m378.6m

    Y=163587.07

    X=341782.93

    34.9m

    T Pylon D

    LD49

    Y=163231.41

    X=341804.60

    35.4m

    T Pylon D

    LD48

    Y=162862.86

    X=341827.06

    35.9m

    T Pylon D

    LD47

    Y=162484.98

    X=341850.09

    35.9m

    T Pylon D

    LD46

    CONTINUES

    SECTION

    CONTINUES

    SECTION

    ROAD

    TR

    AC

    K

    ARABLE ARABLEARABLE ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    4.5

    3066.5

    39.4

    1444.1

    40.8

    4.8

    1814.8

    3437.2

    40.9

    5.0

    2192.6

    3815.0

    38.5

    5.3

    2523.6

    4146.0

    LD45 - LD522523.6m

    331.0m377.8m370.7m

    Y=164664.56

    X=341717.26

    33.3m

    T Pylon D30

    LD52

    Y=164334.22

    X=341737.40

    35.9m

    T Pylon D

    LD51

    Y=163957.11

    X=341760.38

    35.9m

    T Pylon D

    LD50

    Y=163587.07

    X=341782.93

    34.9m

    T Pylon D

    LD49

    SAG 10.46mSAG 13.34mSAG 12.84m

    CONTINUES

    SECTION

    DR

    AIN

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 6 OF 17 SHEET 6 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD43 - LD52

    ROUTE REFERENCE LD

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 46 OF 70

    SHEET 46 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    RIVER

    CONTINUESSECTION

    RIVER

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLEARABLE

    SAG 7.15m

    RAIL

    WA

    Y

    ARABLE ARABLE

    38.5

    5.3

    4146.0

    0.0

    40.6

    5.7

    4423.1

    42.4

    5.5

    4783.2

    42.4

    5.5

    5052.9

    277.1

    637.3

    906.9

    SAG 7.76m

    269.6m360.2m277.1m

    LD52 - LD592251.6m

    Y=165530.71

    X=341448.41

    36.9m

    T Pylon D

    LD55

    Y=165273.19

    X=341528.35

    36.9m

    T Pylon D

    LD54

    Y=164929.21

    X=341635.12

    34.9m

    T Pylon D

    LD53

    Y=164664.56

    X=341717.26

    33.3m

    T Pylon D30

    LD52

    SAG 12.74m

    RIVER ARABLE ARABLE

    RO

    AD

    CONTINUESSECTION

    ARABLE ARABLEARABLE

    CONTINUESSECTION

    RIV

    ER

    ARABLEARABLE

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    42.4

    5.5

    5052.9

    906.9

    41.4

    5.5

    5424.1

    1278.2

    38.6

    5.6

    5763.7

    1617.7

    38.4

    5.5

    6083.6

    1937.7

    SAG 10.06mSAG 11.30mSAG 13.49m

    RIV

    ER

    RIV

    ER

    319.9m339.6m371.3m

    LD52 - LD592251.6m

    Y=166515.12

    X=341142.85

    32.9m

    T Pylon D

    LD58

    Y=166209.56

    X=341237.70

    32.9m

    T Pylon D

    LD57

    Y=165885.27

    X=341338.36

    35.9m

    T Pylon D

    LD56

    Y=165530.71

    X=341448.41

    36.9m

    T Pylon D

    LD55

    ROADARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    DRAIN ARABLE

    CONTINUESSECTION

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    38.4

    5.5

    6083.6

    1937.7

    38.3

    5.8

    6397.6

    2251.6

    38.3

    5.8

    6397.6

    0.0

    37.9

    5.7

    6650.5

    253.0

    37.9

    5.7

    6650.5

    0.0

    38.1

    5.9

    6952.2

    301.7

    SAG 9.73m SAG 7.44m SAG 9.45m

    LD52 - LD592251.6m

    253.0m

    LD59 - LD60253.0m

    LD60 - LD61301.7m

    301.7m

    Y=167347.84

    X=341106.70

    32.3m

    T Pylon D30

    LD61

    Y=167063.88

    X=341004.76

    32.3m

    T Pylon D30

    LD60

    Y=166814.95

    X=341049.79

    32.4m

    T Pylon D10 Flying angle

    LD59

    DR

    AIN

    Y=166814.95

    X=341049.79

    32.4m

    T Pylon D10 Flying angle

    LD59

    Y=167063.88

    X=341004.76

    32.3m

    T Pylon D30

    LD60

    313.8m

    Y=166515.12

    X=341142.85

    32.9m

    T Pylon D

    LD58

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 7 OF 17 SHEET 7 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD52 - LD61

    ROUTE REFERENCE LD

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 47 OF 70

    SHEET 47 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    BUILDING ROAD

    CONTINUESSECTION

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLEARABLE ARABLE

    38.1

    5.9

    6952.2

    37.7

    5.8

    7215.0

    262.8

    0.0

    37.7

    5.8

    7215.0

    0.0

    41.6

    5.7

    7553.1

    41.6

    5.6

    7925.4

    338.1

    710.4

    0

    10

    20

    30

    40

    SAG 7.90m

    262.8m

    LD61 - LD62262.8m

    LD62 - LD682191.0

    372.3m338.1m

    Y=167906.83

    X=341901.07

    35.9m

    T Pylon D

    LD64

    Y=167704.13

    X=341588.80

    35.9m

    T Pylon D

    LD63

    Y=167520.04

    X=341305.20

    31.9m

    T Pylon D10 Flying Angle

    LD62

    Y=167347.84

    X=341106.70

    32.3m

    T Pylon D30

    LD61

    SAG 12.91mSAG 10.73m

    Y=167520.04

    X=341305.20

    31.9m

    T Pylon D10 Flying Angle

    LD62

    CONTINUESSECTION CONTINUES

    SECTION

    ARABLEARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    41.6

    5.6

    7925.4

    710.4

    41.5

    5.5

    8300.2

    1085.2

    41.3

    5.4

    8678.7

    1463.7

    40.7

    4.7

    8059.1

    1844.1

    380.3m378.5m374.8m

    LD62 - LD682191.0

    Y=168524.07

    X=342851.95

    35.9m

    T Pylon D

    LD67

    Y=168316.99

    X=342532.93

    35.9m

    T Pylon D

    LD66

    Y=168110.90

    X=342215.44

    35.9m

    T Pylon D

    LD65

    Y=167906.83

    X=341901.07

    35.9m

    T Pylon D

    LD64

    SAG 13.44mSAG 13.31mSAG 13.06m

    DR

    AIN

    DRAIN ROAD ARABLEARABLE

    0

    10

    20

    30

    40

    CONTINUESSECTION

    TRACK ARABLEARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    CONTINUESSECTION

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    0

    10

    20

    30

    40

    40.7

    4.7

    8059.1

    1844.1

    37.3

    4.0

    9406.1

    2191.0

    37.3

    4.0

    9406.1

    0.0

    36.3

    4.4

    9722.8

    37.6

    4.1

    316.8

    619.9

    10026.0

    SAG 9.98m SAG 8.98mSAG 11.37m

    ARABLE RIVER ARABLE

    LD62 - LD682191.0

    347.0m 303.1m316.7m

    LD68 - LD731663.4m

    Y=169126.34

    X=343605.04

    33.4m

    T Pylon D

    LD70

    Y=168924.19

    X=343379.07

    31.9m

    T Pylon D

    LD69

    Y=168713.00

    X=343143.00

    33.3m

    T Pylon D30

    LD68

    Y=168524.07

    X=342851.95

    35.9m

    T Pylon D

    LD67

    Y=168713.00

    X=343143.00

    33.3m

    T Pylon D30

    LD68

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 8 OF 17 SHEET 8 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD61 - LD70

    ROUTE REFERENCE LD

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 48 OF 70

    SHEET 48 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    RO

    AD

    CONTINUESSECTION

    DRAINARABLE ARABLEARABLEKENNRIVER

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ROAD

    37.6

    4.1

    619.9

    10026.0

    39.4

    4.4

    957.2

    10363.3

    38.1

    4.2

    1306.5

    10712.5

    40.1

    4.1

    1663.4

    11069.5

    357.0m349.2m337.4m

    Y=169822.08

    X=344382.75

    35.9m

    T Pylon D10 Flying Angle

    LD73

    Y=169584.08

    X=344116.71

    33.9m

    T Pylon D

    LD72

    Y=169351.22

    X=343856.42

    34.9m

    T Pylon D

    LD71

    Y=169126.34

    X=343605.04

    33.4m

    T Pylon D

    LD70

    SAG 12.38mSAG 11.83mSAG 11.07m

    DR

    AIN

    DR

    AIN

    DRAINARABLEARABLE

    LD68 - LD731663.4m

    DRAIN

    CONTINUESSECTION

    ARABLEDRAIN ARABLEARABLE

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    40.1

    4.1

    11069.5

    0.0

    38.8

    4.1

    11421.2

    351.7

    38.8

    4.1

    11421.2

    0.0

    40.1

    4.1

    11768.1

    40.6

    4.2

    12122.8

    346.9

    701.6

    LD73 - LD74351.7m

    LD74 - LD802132.1m

    354.7m346.9m

    Y=170485.35

    X=345199.77

    36.4m

    T Pylon D

    LD76

    Y=170253.80

    X=344931.07

    35.9m

    T Pylon D

    LD75

    Y=170027.35

    X=344668.28

    34.8m

    T Pylon D30

    LD74

    Y=169822.08

    X=344382.75

    35.9m

    T Pylon D10 Flying Angle

    LD73

    SAG 11.84mSAG 11.47mSAG 11.66m

    DR

    AIN

    DR

    AIN

    TR

    AC

    K

    DR

    AIN

    ARABLE ARABLE ARABLE ARABLE DRAIN

    Y=170027.35

    X=344668.28

    34.8m

    T Pylon D30

    LD74

    351.7m

    CONTINUESECTION

    ARABLE ARABLE

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    DR

    AIN

    ARABLEARABLE

    CONTINUESSECTION

    40.6

    4.2

    12122.8

    701.6

    39.3

    4.4

    12495.2

    1074.0

    39.9

    4.5

    12842.0

    1420.8

    40.5

    4.5

    13214.9

    1793.7

    DR

    AIN

    DR

    AIN

    DR

    AIN

    DR

    AIN

    TR

    AC

    K

    DR

    AIN

    ARABLE ARABLE ARABLE

    RO

    AD

    DRAIN

    372.9m346.8m372.4m

    LD74 - LD802132.1m

    Y=171198.27

    X=346027.10

    35.9m

    T Pylon D

    LD79

    Y=170954.84

    X=345744.60

    35.4m

    T Pylon D

    LD78

    Y=170728.46

    X=345481.89

    34.9m

    T Pylon D

    LD77

    Y=170485.35

    X=345199.77

    36.4m

    T Pylon D

    LD76

    SAG 11.32m SAG 13.08mSAG 13.04m

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 9 OF 17 SHEET 9 OF 15

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD70 - LD79

    ROUTE REFERENCE LD

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 49 OF 70

    SHEET 49 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • ARABLE ARABLE

    0

    10

    20

    30

    40

    50

    60

    70

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    40.5

    4.5

    13214.9

    1793.7

    38.3

    5.1

    13553.3

    2132.1

    LD74 - LD802132.1m

    CONTINUESSECTION

    DR

    AIN

    ARABLE DRAIN

    338.4m

    Y=171419.18

    X=346283.46

    33.3m

    T Pylon D30

    LD80

    Y=171198.27

    X=346027.10

    35.9m

    T Pylon D

    LD79

    SAG 11.08m

    SAG 10.91m

    20

    30

    40

    50

    60

    70

    0

    10

    20

    30

    40

    50

    60

    ROADRIVER

    70

    331.7m302.2m 274.3m

    LD80 - LD82

    576.5m

    LD82 - LD83

    331.7m

    38.3

    5.1

    13553.3

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLEARABLE ARABLE

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    53.8

    21.3

    13855.5

    302.2

    59.8

    25.5

    14129.7

    576.5

    59.8

    25.5

    14129.7

    0.0

    69.7

    33.4

    14461.4

    331.7

    0

    SAG 9.74m SAG 8.07m

    Y=172182.23

    X=346721.07

    36.3m

    T Pylon D30

    LD83

    Y=171964.23

    X=346471.13

    34.3m

    T Pylon D30

    LD82

    Y=171704.92

    X=346381.84

    32.4m

    T Pylon D

    LD81

    Y=171419.18

    X=346283.46

    33.3m

    T Pylon D30

    LD80

    DR

    AIN

    ARABLE

    Y=171964.23

    X=346471.13

    34.3m

    T Pylon D30

    LD82

    50

    60

    70

    80

    90

    100

    110

    120

    130SAG 12.77m SAG 10.61m SAG 17.98m

    30

    40

    371.5m 441.6m341.5m

    LD83 - LD86

    1154.6m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE ARABLE

    69.7

    33.4

    14461.4

    0.0

    74.7

    39.8

    14832.9

    88.4

    52.4

    15174.4

    93.2

    15616.0

    371.5

    713.0

    124.5

    1154.6

    Y=172690.96

    X=347757.53

    31.3m

    T Pylon D30

    LD86

    Y=172496.39

    X=347361.13

    35.9m

    T Pylon D

    LD85

    Y=172345.91

    X=347054.54

    34.9m

    T Pylon D

    LD84

    Y=172182.23

    X=346721.07

    36.3m

    T Pylon D30

    LD83

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD79 - LD86

    ROUTE REFERENCE LD

    SHEET 10 OF 17 SHEET 10 OF 15

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 50 OF 70

    SHEET 50 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    B

    B FOR DCO SUBMISSION

  • 60

    70

    80

    90

    100

    110

    120

    130

    140

    150

    160

    CONTINUES

    SECTION

    SAG 11.96m SAG 14.09m

    40

    50

    310.1m 351.3m 377.6m

    LD87 - LD93

    1962.6m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLE ARABLE BIKE TRACK

    16789.9

    156.2

    124.2

    923.6

    17100.0

    138.1

    101.1

    1233.6

    17451.3

    115.2

    1585.0

    17829.0

    1962.6

    76.8

    41.9

    79.1

    SAG 9.35m

    Y=174670.30

    X=348740.30

    37.26m

    T Pylon D30

    LD93

    Y=174328.95

    X=348578.75

    38.4m

    T Pylon D

    LD92

    Y=174011.40

    X=348428.48

    36.9m

    T Pylon D

    LD91

    Y=173731.12

    X=348295.84

    31.9m

    T Pylon D

    LD90

    ARABLE

    110

    120

    130

    140

    150

    160

    ROAD

    SAG 16.85m

    CONTINUES

    SECTION

    ROAD

    120

    130

    140

    150

    160

    170

    100

    250.4m 417.4m 260.0m246.2m

    C-LD85 - C-LD91

    1962.6m

    LD86 - LD87

    250.4m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLET

    OP

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLE ARABLEARABLE ARABLE

    93.2

    15616.0

    124.5

    0.0

    15866.4

    161.1

    128.1

    250.4

    15866.4

    161.1

    128.1

    0.0

    16112.6

    163.9

    132.0

    16529.9

    164.9

    132.0

    16789.9

    156.2

    124.2

    246.2

    663.6

    923.6

    SAG 7.54m SAG 5.94m SAG 6.58m

    Y=173731.12

    X=348295.84

    31.9m

    T Pylon D

    LD90

    Y=173496.11

    X=348184.62

    32.9m

    T Pylon D

    LD89

    Y=173118.86

    X=348006.09

    31.9m

    T Pylon D

    LD88

    Y=172896.32

    X=347900.77

    32.9m

    T Pylon D10

    LD87

    Y=172690.96

    X=347757.53

    31.3m

    T Pylon D30

    LD86

    Y=172896.32

    X=347900.77

    32.9m

    T Pylon D10

    LD87

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    A AUG' 13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    PYLONS LD86 - LD93

    ROUTE REFERENCE LD

    SHEET 11 OF 17 SHEET 11 OF 15

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 51 OF 70

    SHEET 51 OF 70

    (REGULATION 5(2)(o))

    DETAILED DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    C

    B FOR DCO SUBMISSION

    C

    FEB '16 TO REFLECT ORDER AS MADE CFK

    FOR CONTINUATION OF ROUTE REFER TO SHEET 56 & 57

    NOTE: THERE IS NO SHEET 52

    LD JB

  • 0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    60

    BUIL

    DIN

    G

    BUILDING

    205.6m 290.0m 358.6m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    CONTINUES

    SECTION

    LD114 - LD115

    205.6m

    LD115 - LD118

    964.0m

    25437.7

    7.5

    58.8

    0.0

    25643.3

    7.2

    62.0

    205.6

    25643.3

    7.2

    62.0

    0.0

    25933.3

    7.7

    63.2

    26291.9

    7.7

    60.2

    290.0

    648.6

    SAG 5.43m SAG 8.53m SAG 12.52m

    Y=178582.15

    X=352402.74

    52.5m

    L12 D E6

    LD117

    Y=178653.91

    X=352051.44

    55.5m

    L12 D E9

    LD116

    Y=178709.87

    X=351767.78

    54.8m

    L12 D55 E9

    LD115

    ROAD INDUSTRIALINDUSTRIAL INDUSTRIALBUILDING

    BUIL

    DIN

    G

    INDUSTRIAL BUILDING INDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL

    Y=178585.98

    X=351604.87

    51.3m

    L12 D25 E6

    LD114

    Y=178709.87

    X=351767.78

    54.8m

    L12 D55 E9

    LD115

    RAIL

    WA

    Y

    0

    10

    20

    30

    40

    50

    60

    301.2m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    LD113 - LD114

    301.2m

    25136.5

    8.7

    63.5

    0.0

    25437.7

    7.5

    58.8

    301.2

    SAG 9.23m

    Y=178585.98

    X=351604.87

    51.3m

    L12 D25 E6

    LD114

    Y=178486.82

    X=351321.34

    54.8m

    L12 D55 E9

    LD113

    INDUSTRIAL

    AR

    AB

    LE

    AR

    AB

    LE

    TR

    AC

    K

    RO

    AD

    ARABLE ROAD INDUSTRIAL

    0

    10

    20

    30

    40

    50

    60

    10

    20

    30

    40

    50

    60

    273.8m 245.6m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    50

    60

    LD109 - LD111

    635.9m

    LD111 - LD112

    273.8m

    LD112 - LD113

    245.6m

    ARABLE

    23981.2

    8.9

    69.9

    24286.8

    9.2

    70.7

    305.6

    24617.1

    8.2

    68.5

    635.9

    0.0

    24617.1

    8.2

    68.5

    0.0

    24890.9

    8.6

    69.6

    273.8

    24890.9

    8.6

    69.6

    0.0

    25136.5

    8.7

    245.6

    SAG 9.36m SAG 10.82m SAG 8.13m SAG 7.07m

    Y=178486.82

    X=351321.34

    54.8m

    L12 D55 E9

    LD113

    Y=177846.44

    X=351646.01

    61.5m

    L12 D E15

    LD110

    ROAD

    RO

    AD

    BUILDINGINDUSTRIAL INDUSTRIAL INDUSTRIAL INDUSTRIAL

    Y=177646.82

    X=351873.78

    61m

    L12 D90 E12

    LD109

    Y=178060.71

    X=351394.61

    60.3m

    L12 D10 E15

    LD111

    Y=178060.71

    X=351394.61

    60.3m

    L12 D10 E15

    LD111

    Y=178267.4

    X=351219.24

    61m

    L12 D90 E12

    LD112

    Y=178267.4

    X=351219.24

    61m

    L12 D90 E12

    LD112

    63.5

    0

    70 70 70

    330.3m305.6m

    345.9m

    10

    20

    30

    40

    50

    60

    70

    80

    90

    RO

    AD

    RAIL

    WA

    Y

    RIVER ROAD BUILDING

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    LD106 - LD109

    1094.5m

    22886.6

    12.1

    0.0

    23232.5

    9.2

    85.7

    23657.7

    8.1

    84.6

    23981.2

    8.9

    69.9

    345.9

    771.1

    1094.5

    SAG 11.4m SAG 16.43m SAG 9.88m

    323.5m425.2m

    Y=177339.21

    X=351783.01

    76.5m

    L12 D E30

    LD108

    Y=176933.03

    X=351657.38

    76.5m

    L12 D E30

    LD107

    PARK

    CAR

    RO

    AD

    ARABLEPARK

    CAR

    PARK

    CAR INDUSTRIAL

    Y=177646.82

    X=351873.78

    61m

    L12 D90 E12

    LD109

    0

    Y=176604.10

    X=351553.70

    51.84m

    L12 D55 E6

    P-LD106

    63.8

    9

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    ROUTE REFERENCE LD

    SHEET 13 OF 17 SHEET 13 OF 15

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 53 OF 70

    SHEET 53 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    D

    B FOR DCO SUBMISSION

    C

    D

    CFK LD JBJUN '15 FOR CONSULTATION

    CONTINUED FROM SHEET 56

    PYLONS P-LD106 - LD117

    FEB '16 TO REFLECT ORDER AS MADE CFK LD JB

  • 0

    10

    20

    30

    40

    50

    60

    SAG 12.14m SAG 12.70m

    DR

    AIN

    ROAD

    358.7m 368.4m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0

    10

    20

    30

    40

    50

    60

    315.4mCONTINUES

    SECTION

    LD115 - LD118

    964.0m

    LD118 - LD120

    727.1m

    26291.9

    7.7

    60.2

    648.6

    26607.3

    6.5

    55.3

    964.0

    26607.3

    6.5

    55.3

    0.0

    26966.0

    6.3

    55.8

    27334.4

    6.4

    54.7

    358.7

    727.1

    SAG 9.97m

    Y=178672.44

    X=353035.98

    49.5m

    L12 D E3

    LD119

    Y=178521.15

    X=352711.52

    48.8m

    L12 D55 E3

    LD118

    Y=178521.15

    X=352711.52

    48.8m

    L12 D55 E3

    LD118

    Y=178582.15

    X=352402.74

    52.5m

    L12 D E6

    LD117

    ARABLE

    RO

    AD

    INDUSTRIAL BUILDINGS INDUSTRIAL ARABLE ARABLE

    TR

    AC

    K

    ARABLE

    Y=178830.02

    X=353368.97

    48.3m

    L12 D25 E3

    LD120

    0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    60

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    27334.4

    6.4

    54.7

    0.0

    27663.5

    6.3

    54.6

    329.1

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    27663.5

    6.3

    54.6

    0.0

    28022.7

    6.3

    54.6

    359.2

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    28022.7

    6.3

    54.6

    0.0

    28405.0

    6.5

    57.5

    382.3

    329.1m

    LD131 - LD132

    329.1m

    SAG 10.62m

    Y=178830.02

    X=353368.97

    48.3m

    L12 D25 E3

    LD120

    359.2m

    LD131 - LD132

    359.2m

    SAG 12.08m

    382.3m

    LD131 - LD132

    382.3m

    SAG 13.4m

    RIV

    ER

    ARABLE ARABLE

    TR

    AC

    K

    BUILDING ARABLE

    RO

    AD

    DR

    AIN

    ARABLEARABLE ARABLEPOND DRAIN

    Y=179295.71

    X=353865.97

    48.3m

    L12 D25 E3

    LD122

    Y=179016.10

    X=353640.43

    48.3m

    L12 D25 E3

    LD121

    Y=179016.10

    X=353640.43

    48.3m

    L12 D25 E3

    LD121

    Y=179295.71

    X=353865.97

    48.3m

    L12 D25 E3

    LD122

    Y=179624.42

    X=354061.09

    51.3m

    L12 D25 E6

    LD123

    0

    10

    20

    30

    40

    50

    60

    RAIL

    WA

    Y

    RIV

    ER

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLEARABLE

    LD123 - LD125

    627.9m

    28405.0

    6.5

    57.8

    0.0

    28738.4

    6.4

    60.4

    29032.9

    6.7

    58.0

    333.4

    627.9

    SAG 10.48m SAG 9.52m

    Y=179624.42

    X=354061.09

    51.3m

    L12 D25 E6

    LD123

    ROAD ARABLE ARABLE DRAIN ARABLE

    DR

    AIN

    ARABLE

    DR

    AIN

    ARABLE

    DR

    AIN

    AR

    AB

    LE

    AR

    AB

    LE

    RO

    AD

    TR

    AC

    K

    AR

    AB

    LE

    Y=180240.87

    X=354180.20

    51.3m

    L12 D10 E6

    LD125

    Y=179951.73

    X=354124.33

    54m

    L12 D E6

    LD124

    333.4m 294.5m

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    ROUTE REFERENCE LD

    SHEET 14 OF 17 SHEET 14 OF 15

    PYLONS LD117 - LD125

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 54 OF 70

    SHEET 54 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    C

    B FOR DCO SUBMISSION

    C

    FEB '16 TO REFLECT ORDER AS MADE CFK LD JB

  • 0

    10

    20

    30

    40

    50

    60

    365.3m 350.5m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    LD125 - LD127

    715.8m29032.9

    6.7

    58.0

    0.0

    29398.2

    7.2

    56.7

    29748.7

    6.5

    55.3

    365.3

    715.8

    SAG 12.56m SAG 11.75m

    Y=180923.48

    X=354392.46

    48.8m

    L12 D55 E3

    LD127

    Y=180589.41

    X=354289.59

    49.5m

    L12 D E3

    LD126

    ARABLE ARABLEDRAIN

    DR

    AIN

    Y=180240.87

    X=354180.20

    51.3m

    L12 D10 E6

    LD125

    0

    10

    20

    30

    40

    50

    60

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    29748.7

    6.5

    55.3

    0.0

    0

    10

    20

    30

    40

    50

    60

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0.0

    Y=180923.48

    X=354392.46

    48.8m

    L12 D55 E3

    LD127

    359.1m 334.1m

    LD127 - LD129

    693.2m

    SAG 12.43m SAG 10.80m

    Y=181205.75

    X=354172.1

    49.5m

    L12 D E3

    LD128

    LD129 - LD130

    200.0m

    200.0m

    SAG 5.26m

    Y=181468.6

    X=353967.17

    45.8m

    L12 D25 STD

    LD129

    Y=181665.92

    X=353993.93

    45.3m

    L12 D25 STD

    LD130

    ARABLE ARABLE ARABLE

    TR

    AC

    K

    DR

    AIN

    TR

    AC

    K

    ARABLE ARABLE

    DR

    AIN

    ARABLE ARABLE ARABLEROAD

    RO

    AD

    DR

    AIN

    DR

    AIN

    55.8

    6.3

    6.3

    52.1

    6.3

    52.1

    7.1

    52.4

    359.1

    30107.8

    30441.9

    693.2

    30441.9

    200

    30641.9

    Y=181468.6

    X=353967.17

    45.8m

    L12 D25 STD

    LD129

    0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    60

    53.9m 52.8m

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    LD132 - GANTRY

    53.9m

    LD132 - GANTRY

    52.8m

    31213.9

    9.6

    55.6

    0.0

    31213.9

    9.6

    55.6

    0.0

    31267.8

    6.8

    21.8

    53.9

    31266.7

    6.8

    21.8

    52.8

    SAG 4.08m SAG 4.08m

    Y=182181.24

    X=353669.75

    12.2m

    400kV Gantry

    Y=182148.78

    X=353711.42

    46.0m

    L12 DT (Mk3) M3

    LD132

    Y=182160.70

    X=353658.88

    12.2m

    400kV Gantry

    Y=182148.78

    X=353711.42

    46.0m

    L12 DT (Mk3) M3

    LD132

    0

    10

    20

    30

    40

    50

    60

    0

    10

    20

    30

    40

    50

    60

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0.0

    9.6

    TO

    P

    PY

    LO

    NG

    RO

    UN

    DS

    EC

    TIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    0.0

    269.6m

    LD130 - LD131

    269.6m

    SAG 8.05m

    302.4m

    LD131 - LD132

    302.4m

    SAG 9.53m

    Y=181922.94

    X=353912.47

    48.3m

    L12 D25 E3

    LD131

    Y=181665.92

    X=353993.93

    45.3m

    L12 D25 STD

    LD130

    ARABLE ARABLE

    RO

    AD

    ARABLE

    7.1

    52.4

    9.6

    57.9

    9.6

    57.9

    55.6

    30641.9

    269.6

    31213.9

    302.4

    Y=182148.78

    X=353711.42

    46.0m

    L12 DT (Mk3) M3

    LD132

    Y=181922.94

    X=353912.47

    48.3m

    L12 D25 E3

    LD131

    30911.5

    30911.5

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    A AUG '13 S.42/S.47 CONSULTATION GC JB PB

    01_13205_84

    ROUTE REFERENCE LD

    SHEET 15 OF 17 SHEET 15 OF 15

    PYLONS LD125 - LD132

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 55 OF 70

    SHEET 55 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    C

    B FOR DCO SUBMISSION

    C

    FEB '16 TO REFLECT ORDER AS MADE CFK LD JB

  • 0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    SAG 13.49 mSAG 11.18 m

    374.7m 336.9m337.4m

    P-LD97 - P-LD98336.9m

    RIV

    ER

    DRAIN ARABLE

    6.1

    41.0

    60.0

    6.0

    40.9

    3337.4

    6.5

    45.2

    6712.1

    19106.0

    6.5

    45.2

    619106.0

    0.0

    6.2

    45.1

    919442.9

    336.9

    Y=175229.36

    X=348662.75

    34.94m

    T Pylon D10 Flying Angle

    P-LD95

    Y=175546.84

    X=348548.50

    34.94m

    T PYLON D

    P-LD96

    Y=175899.38

    X=348421.64

    38.76m

    T PYLON D30

    P-LD97

    Y=176231.00

    X=348481.36

    38.94m

    T Pylon D10 Flying Angle

    P-LD98

    SAG 10.80m

    AR

    AB

    LE

    ARABLE ARABLE

    RO

    AD

    ARABLE ARABLE ARABLE TRACK ARABLE

    RO

    AD

    RAIL

    WA

    Y

    Y=175899.38

    X=348421.64

    38.76m

    T PYLON D30

    P-LD97

    18393.9

    18731.3

    P-LD95 - P-LD97712.1m

    ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    0

    10

    20

    30

    40

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    7.2

    349.6

    7.1

    288.4

    11.8

    318.0

    SAG 8.91 m

    288.4m 318.0m

    P-LD99 - P-LD100288.4m

    P-LD100 - P-LD101318.0m

    SAG 11.79 mSAG 10.26 m

    TRACK

    6.2

    45.1

    919442.9

    336.9

    40.8

    619792.5

    7.2

    40.8

    619792.5

    0.0

    42.8

    420080.9

    7.1

    42.8

    420080.9

    0.0

    47.0

    520398.9

    Y=176564.95

    X=348584.67

    33.67m

    T Pylon D30

    P-LD99

    Y=176761.87

    X=348795.38

    35.76m

    T Pylon D30

    P-LD100

    Y=176835.36

    X=349104.73

    35.26m

    T Pylon D30

    P-LD101

    Y=176564.95

    X=348584.67

    33.67m

    T Pylon D30

    P-LD99

    Y=176761.87

    X=348795.38

    35.76m

    T Pylon D30

    P-LD100

    349.6m

    P-LD98 - P-LD99349.6m

    Y=176231.00

    X=348481.36

    38.94m

    T Pylon D10 Flying Angle

    P-LD98

    Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    0

    10

    20

    30

    40

    50

    60

    70

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    41.9

    206.4m

    ARABLE

    0

    10

    20

    30

    40

    50

    60

    70

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    18.1

    6.1

    358.5

    LD93 - P-LD94206.4m

    80

    SAG 5.58 m

    P-LD94 - P-LD95358.5m

    0.0

    79.1

    2

    59.8

    4

    18.1

    206.4

    59.8

    4

    0.0

    41.0

    6

    Y=174670.30

    X=348740.30

    37.26

    T Pylon D30

    LD93

    ROADMOTORWAY

    3 LANEARABLE ARABLEARABLE ROAD ARABLE

    DR

    AIN

    17829.0

    18035.4

    18035.4

    18393.9

    SAG 12.21 m

    358.5m

    Y=174876.03

    X=348723.72

    41.76m

    T Pylon D30

    P-LD94

    Y=175229.36

    X=348662.75

    34.94m

    T Pylon D10 Flying Angle

    P-LD95

    Y=174876.03

    X=348723.72

    41.76m

    T Pylon D30

    P-LD94

    CAD

    A1

    1:200013/NG/0271

    20897

    400kV OHL SECTIONS

    SHEET 1 OF 2

    A AUG '13 GC JB PB

    01_13205_85

    ROUTE REFERENCE P-LD

    PYLONS LD93 - P-LD101

    S.42/S.47 CONSULTATION

    MAY '14 CFK LD JB

    EN020001

    PINS SHEET 56 OF 70

    NG INVESTMENT No. APPLICATION No.

    NG DRAWING No. DRAWING No. SCALE

    ISSUE

    TITLE:

    ISSUE DATE COMMENTS CHK'D APP'DDRAWN

    Notes

    Key

    SHEET 16 OF 17

    SHEET 56 OF 70

    (REGULATION 5(2)(o))

    DESIGN DRAWINGS

    NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER

    HINKLEY - SANDFORD - SEABANK

    C

    B FOR DCO SUBMISSION

    C

    CONTINUED FROM SHEET 51

    FEB '16 TO REFLECT ORDER AS MADE CFK LD JB

  • Y=143249.88X=334265.22

    34.3mT PYLON D30

    LD2

    SECTION LENGTH IS ALSO GIVENPYLON e.g. LD10 - LD13BROKEN DOWN BY 'SECTION' BETWEEN EACH ANGLE THIS DRAWING ILLUSTRATES A LINE PROFILE THAT IS

    SECTION LABELS:

    - RIGHTRT- LEFTLT

    - PYLON DEVIATION

    - PYLON POSITION

    - PYLON HEIGHT- PYLON TYPE- PYLON DESIGNATION

    PYLON LABELS:

    VEGETATION

    GROUND PROFILE

    8.1m GROUND CLEARANCE LINE

    TWIN REDWOOD PHASE CONDUCTOR

    OPGW EARTHWIRE

    8. ALL DIMENSIONS IN METRESAFFECTED' PLANS'TREES AND HEDGDES TO BE REMOVED OR FACILITATE CONSTRUCTION - PLEASE REFER TO REMOVED TO MAINTAIN CLEARANCE AND TO

    7. A NUMBER OF TREES WILL NEED TO BE THE DCOTHE LIMITS OF DEVIATION SPECIFIED WITHIN INDICATIVE AND SUBJECT TO CHANGE WITHIN

    6. LOCATION AND HEIGHT OF PYLONS ARE DATA

    5. GROUND LINE IS TAKEN FROM LIDAR SURVEY IS IN ACCORDANCE WITH ENATS 43-8

    4. CLEARANCE TO GROUND AND OTHER OBJECTS CLEARANCE TO GROUND

    3. ROUTE IS PROFILED FOR 8.1m MINIMUM 2. CONDUCTOR SAGGED FOR 90C OPERATION

    AAAC1. CONDUCTOR BUNDLE: 2 x REDWOOD 850mm

    0

    10

    20

    30

    40

    50

    ARABLE ARABLE

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    9.4

    9.4

    310.1

    686.7

    SAG 13.49 m

    376.6m

    SAG 9.40 m

    ROAD

    11.8

    47.0

    520398.9

    0.0

    45.8

    320709.0

    45.3

    421085.6

    Y=176779.56

    X=349409.79

    36.44m

    T Pylon D

    P-LD102A

    Y=176711.81

    X=349780.21

    35.94m

    T Pylon D10 Flying Angle

    P-LD102B

    CAR PARK DRAIN

    310.1m

    P-LD101 - P-LD102B686.7m

    Y=176835.36

    X=349104.73

    35.26m

    T Pylon D30

    P-LD101

    0

    10

    20

    30

    40

    CONTINUESSECTION

    TO

    PP

    YL

    ON

    GR

    OU

    ND

    SE

    CTIO

    NR

    OU

    TE

    LAND USE

    (m)

    CH

    AIN

    AG

    E

    (AO

    D)

    ELE

    VA

    TIO

    N

    ARABLE

    AR

    AB

    LE

    ARABLE

    9.9

    9.1

    8.8

    339.1

    692.1

    1063.4

    SAG 10.84 m SAG 11.73 m SAG 12.95 m

    339.1m

    P-LD102B - P-LD1051427.8m

    ROAD

    RO

    AD

    9.4

    45.3

    421085.6

    0.0

    46.8

    721424.7

    47.0

    921777.7

    47.2

    422149.0

    Y=176711.81

    X=349780.21

    35.94m

    T Pylon D10 Flying Angle

    P-LD102B

    CAR PARK CAR PARK CAR PARK CAR PARK

    353.0m 371.3m

    Y=176663.89

    X=350115.90

    36.94m

    T Pylon D

    P-LD102C