Design & Engineering Team Presentation on Developing Borough Infrastructure – Northwold Road 2013/14

Upload: sheena

Post on 06-Jan-2016

41 views

Category:

Documents


2 download

DESCRIPTION

Design & Engineering Team. Presentation on Developing Borough Infrastructure – Northwold Road 2013/14. Supported by Chris proctor- Team Manager Andrew Pillai – Senior Engineer. Presented By Ugo Ihesiene Principal Road Safety Engineer. Why are we doing this?. Awareness Staff engagement - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Design & Engineering Team

Design & Engineering Team

Presentation on Developing Borough Infrastructure – Northwold Road 2013/14

Page 2: Design & Engineering Team

Presented By

Ugo IhesienePrincipal Road Safety Engineer

Supported byChris proctor- Team Manager

Andrew Pillai – Senior Engineer

Page 3: Design & Engineering Team

Why are we doing this?

Awareness Staff engagement Sharing of ideas & experiences Developing a better scheme Collaborative/joined up working

Page 4: Design & Engineering Team

Coverage/Scope

Introduction Scheme Background Proposals Consultations/Approvals Implementation Questions & Discussion

Page 5: Design & Engineering Team

Introduction (Overview)

Northwold Road location/ward Amenities – schools, bus route, shops,

recreational park etc. Road collision data Current collision reduction measures

Page 6: Design & Engineering Team

Scheme Background

Why are we considering proposal in Northwold Road? To upgrade the public realm, traffic calm, assist in improving and regenerating the area

Funding – The scheme is a newly developed proposal. It was not included in the 2011 LIP and it is funded from Developing Borough Infrastructure

Delivery – 2013/14 financial year

Page 7: Design & Engineering Team

Proposals – Widening of pavements & Entry Treatments

Reighton Road Durlston Road Norcott Road

Page 8: Design & Engineering Team

Proposals – Entry Treatments

Narford Road Rossington Street Gelderston Road (2

sides) Alconbury Road Alkham Road

Page 9: Design & Engineering Team

Junction Tables

Kyverdale Road

Page 10: Design & Engineering Team

Miscellaneous

Maintenance: Review existing tactile

paving at crossing point O/S NW Primary school & re-align to approved standard

Review existing speed table O/S NW Primary school & amend ramp gradient to approved standard

Page 11: Design & Engineering Team

Miscellaneous (Cont.)

De-clutter Street Signs: On & opposite Alkham

road

Page 12: Design & Engineering Team

Miscellaneous (Cont.)

Other Safety improvements:

Adjust bus Stand east of Alkham Road in easterly direction to improve visibility.

SUDs – We have not yet considered – Needs Input from Adam

Page 13: Design & Engineering Team

Where do we go from here?

Senior Management/Lead Member Draft approval of proposals

Stakeholders Draft consultation Public Consultation Decision Audit approval Traffic Regulation Order Public Notification of works Implementation

Page 14: Design & Engineering Team

QUESTION TIME

?

Page 15: Design & Engineering Team

Your contributions are welcome:

Speak to Chris, Andrew, or me E-mail us if you prefer Show examples of any better ideas you may

have come across.

Page 16: Design & Engineering Team

FURTHER INFORMATION

Any questions or further information please e-mail to one of us at:

[email protected]

[email protected]

[email protected]