design of steel piles for integral abutment bridges using...

12
Design of steel piles for integral abutment bridges using Eurocodes Hans Pétursson ABSTRACT Integral Abutment Bridges are becoming more popular in Europe, but the traditions differ from country to country. This leads to different technical solutions for the same problem in each country. In this paper some of the different solutions that are used in Europe are presented. The Eurocodes are set of technical rules for the structural design of construction works. Since 2010 the Eurocodes are mandatory for specification of public works and are intended to be the standard used in all the EU zone for the design of construction works. There are no special rules for bridges with integral abutments in the Eurocodes for integral abutment bridges. It is up to the designer to come up with a design that complies with the rules in the Eurocodes that are common with other type of bridges. In this paper some of the aspects of designing piles according to Eurocodes are described. _______________ Hans Pétursson, Steel Bridges Specialist, Swedish Transport Administration, Röda vägen 1,SE-781 89 Borlänge, Sweden 180

Upload: others

Post on 23-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Design of steel piles for integral abutment bridges using Eurocodes

Hans Pétursson

ABSTRACT

Integral Abutment Bridges are becoming more popular in Europe, but the traditions differ from country to country. This leads to different technical solutions for the same problem in each country.

In this paper some of the different solutions that are used in Europe are presented. The Eurocodes are set of technical rules for the structural design of construction works. Since 2010 the

Eurocodes are mandatory for specification of public works and are intended to be the standard used in all the EU zone for the design of construction works. There are no special rules for bridges with integral abutments in the Eurocodes for integral abutment bridges. It is up to the designer to come up with a design that complies with the rules in the Eurocodes that are common with other type of bridges. In this paper some of the aspects of designing piles according to Eurocodes are described.

_______________ Hans Pétursson, Steel Bridges Specialist, Swedish Transport Administration, Röda vägen 1,SE-781 89 Borlänge, Sweden

180

Page 2: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

INTR

Pile t

Estatestowar

TWork(Collworkfurthe

Dapprothat ththe fu

Itcountthe st

Pto marow (into atheir Kingdbridgprobl

Fig

Dtheir piles.bridgdesigthe so

Tof pilabutmimpac

RODUCTIO

types used i

European exps in USA, burds making I

To broaden kshop on Inin et. al. 200

kshop. The ger the unders

During the woach to the dheir designsuture. t should be tries. There atarting point

Pile foundatioany USA age(Maruri et. aand out of thvery naturedom, howev

ge and the alems related

gure1. Exampl

Despite the suFIAB. The E In most Eu

ge must be vgners typicalloil supportin

The design phle. Some coment translatct of the pil

ON

in Europe

perience withut what expeIAB a largerthe knowle

ntegral Abut06). Designegoal of the wstanding of t

workshop, itdesign of IABs were succe

pointed ouare few stant from whichons are not aency require

al. 2005) on the soil while e, restrain thver, spread foapproach pato the restra

le of an Integr

uccess in theEuropean Suuropean cou

verified by caly create a co

ng the pile alhilosophy vaountries strivtion and rotales on the o

h integral aberience has br percentageedge base tment Bridgers and reseaworkshop wthe design, ct became clB. In spite ofessful and sta

ut that integndards yet. Th engineers ialways requiements. Manthe belief thaalso permitt

he rotation footings are tavement wiained abutm

ral Abutment

e UK, most Eurvey indicauntries, empalculations. omputer finilong its lengaries betweeve to make ation while

overall struct

butment bridbeen gainede of all newlyfor IAB de

ges was heldarchers from was to share constructionear that eacf the differenated that the

gral abutmenhe experiencin Europe apired in Euro

ny US agencat the single tting rotationof the abut

the preferredill settle equent rotations

on Spread Foo

European coates that desiirical designAlthough thite element m

gth, as well aen different c

the piles stothers chooture. For ex

dges (IAB) isd has been poy constructeesign and cd in Stockhoeight differethe experie

n, and maintech country rnt viewpointey would be

nts are still ces from othpply the conpe for FIAB

cies require trow permits

n of the abuttment stem d foundationually. Theres.

oting Used in

ountries use igners accoun is not permhere are no rmodel usingas the fillingcountries andtiff to resist ose slender pxample, Eng

s significantositive. As a

ed bridges acconstructionolm, Swedeent countriences of the enance of IArepresented ts, each repreconstructing

quite new her bridge foncept of integB. This is in dthe piles to bs the abutmetment stem. (see Figure

n for FIAB oe have not

the United K

a pile suppount for the bemitted, and requirementsg theoretical g behind the bd that is reflethe stresses

piles in an atgland, Irelan

tly less than ia result, the cross Europen, the Internen in May os participateparticipants

AB. a slightly desentative ing additional

in most Euoundations tygral abutmendirect contra

be placed in ent stem to trSpread footie 1). In the on the belief been any r

Kingdom (Iles 2

orted foundaending forcethe functions for the prosprings to reback wall. ected in theirs induced frttempt to lesd, and Swed

in some trend is e. national of 2006 ed in the s and to

different ndicated l IAB in

uropean ypes are nts. adiction a single ranslate ings, by United

f that the reported

2005)

ation for es in the n of the ocedure, epresent

r choice rom the ssen the den use

181

Page 3: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

sleevsuperalongsoil toaccom

TXC

The Xstressfuture

HH

wheremajorwith t

SS

diamewhen

LL

type uyearspipe pft. (1.Figurthe be

es around thrstructure trag a greater leo prevent themmodate the

The followinX-piles Cross-shapedX-shaped pises. This pilee.

H-pilesH-piles are ne more thanrity of their ithe strong ax

Small Diamemall diameteter pipe pil

n precise loca

Figu

Large DiameLarge diametused in Euros (Kerokoskipiles. These .2 m) in diamre 4. In this ceam ends, an

he piles to panslation. Thength of the pe buckling oe unsupporteg is a listing

d steel piles, iles are drive type is bein

not commonn 70% of Staintegral abuxis perpendieter Pipe Piter pipe pileles may be ation is imp

ure 2. Swedish

eter Steel Pter steel pipope. In Finlai 2006), andsteel pipe p

meter. If the case, the desnd the beam

prevent soil his theoreticapile, thereby

of the pile, thed length. g of the vario

also called ven verticallng discontin

nly used in Eate agencies utments. Wheicular to the iles es are not codrilled or drortant.

h Integral Abu

Pipe Piles pe piles filledand, more thad a large perciles are typicdistance to tsign usually

m’s mid-span

from restraally distributy reducing thhis method o

ous pile type

X-piles, havly and rotat

nued by the m

Europe. Thisreported (Men they use pbridge expa

ommonly usriven. In roc

utment Detail

d with reinfan 1,000 joincentage of thcally 2.25 ftthe bedrock

y assumes thn moments d

aining the frtes any longhe moment i

of constructio

es that are us

ve been usedted 45° in omanufacture

s practice is Maruri et. al.

piles, Englanansion.

ed for FIABcky soil, it i

l with Small D

forced concrntless bridgehem rest on. (700 mm) iis short, pip

hat the large decrease whi

ree bending itudinal traninduced in thon may requ

sed with FIA

d in integral order to miner, thus it wil

quite differ2005) using

nd and Irelan

B in Europe is best to pr

Diameter Steel

rete are the es have beenreinforced c

in diameter bpe piles can bdiameter pilile the end m

of the pilesnslation and rhe pile. Withuire stronger

AB in Europ

bridges in Snimize the bll not be use

rent from thg steel H-pilnd use steel

or the USAre-drill for th

l Pipe Piles

most commn built in theconcrete fillbut can be ube used as shles provide f

moments inc

s during rotation hout the piles to

pe:

Sweden. bending ed in the

he USA, les for a H-piles

A. Smallhe piles

mon pile last ten ed steel

up to 4.0 hown in fixity at rease.

182

Page 4: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

CC

diamemomThe d

P

Figure

Cast-In-PlacCast-in-placeeter cast-in-

ments. An exadesired cons

FPrecast and

3. Finnish Br

ce Reinforcee concrete p-place piles ample can betraint could

igure 5. SketcPrestressed

ridge with Lar

Figure 4. S

ed Concretepiles are usare used to e seen in Figalso be obta

ch of German d Concrete P

rge Diameter S

hort pipe piles

e Piles sed in some

constrain egure 9. Theseained by usin

bridge with rePiles

Steel Pipe Pile

s on rock, Sw

e European end rotation e piles typicang wide spre

einforced cast

es During Con

weden

countries. Iand lower t

ally have a dead footings

t in-situ concre

nstruction

In Germanythe mid-spadiameter of 9s.

ete piles.

y, large an beam 900 mm.

183

Page 5: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Precast (PC) and prestressed (PS) concrete piles are not commonly used in Europe, with the exception of Sweden. In Sweden, PC/PS concrete piles are common in all bridge types, including short FIAB, due to their low cost and ready availability. In the USA, these pile types are typically only used for shorter span FIAB.

Steel Core Piles Although not common, steel core pipe piles have been used for FIAB in Europe. The pile

system consists of a cover pipe, injected concrete and a core steel pile. Drilling is performed down to the bedrock. The cover pipe is drilled 300-500 mm into the rock. When the cover pipe is placed in the hole the interior is rinsed and then injected with concrete. The steel core is then installed. After inspection and driving pile to refusal the pile is cut to the right length. A pressure distribution plate is then fit to the top of the pile. In this way the very slender steel pile can be used and the concrete stabilizes the pile from buckling. A few FIAB have been built in Sweden with steel core piles.

Figure 6. Sketch of steel core pile.

The Eurocodes

The Eurocodes are set of technical rules for the structural design of construction works. Since 2010 the Eurocodes are mandatory for specification of public works and are intended to be the standard used in all the EU zone for the design of construction works. The Eurocodes are published separate European Standards each section having a number e.g. EN 1990 Basis of structural design, EN 1991 Actions on structures, 1992 Design of Concrete Structures and EN 1993 Design of Steel Structures. There are 10 sections published and each section consists of several parts.

There are no specific parts of the Eurocodes that deals with integral abutments nor are there any specific rules in the different parts. It is up to the designer to come up with a design that complies with the rules in the Eurocodes that are common with other type of bridges. The parts of the Eurocodes that the designer needs to look into when designing piles for integral abutment bridges are: EN 1990 Basis of structural design EN 1991-2Actions on structures - Part 2: Traffic loads on bridges

184

Page 6: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

EN 1991-5 Actions on structures - Part 1-5: General actions - Thermal actions EN 1993-2 Steel bridges EN 1993-5 Design of steel structures - Part 5: Piling EN 1997-1 Geotechnical design - Part 1: General rules

Design of piles

Philosophies

Integral abutment bridges may be generally designed based on two different concepts. 1. Low flexural stiffness of piles / low degree of restraint

If the integral abutment is supported by one row of flexible piles the superstructure can beanalyzed as a beam with simple hinged supports. 2. High flexural stiffness of piles / high degree of restraint

If the integral abutment is supported on stiffer piles or spread footing the rotation of thesuperstructure and to some extent the displacement will be restraint and a large support moment will be distributed to the superstructure. This means that the connection between the abutment and the superstructure needs to be stronger and more robust but the field moment of the superstructure is somewhat shifted to the support and a more slender superstructure can be constructed. If the piles are relatively short and stiff enough the structure act like a frame and the soil-bridge interaction is not as vital as in bridges with more slender piles. This type is not discussed further in this paper.

Loading

Bridge loading is the same for integral abutment bridges as other bridges. The difference is that some loads cause forced displacement and rotations at the top of the piles and this gives unwanted strains in the piles. The stiffness behind the abutment reliefs these strains to some extent depending on confinement, water content and friction.

Thermal loads

Two types of temperature loads needs to be considered. First, a uniform temperature change which means that the abutment is displaced horizontally. The magnitude of the bridge movement depends on the mean temperature of the structure when the superstructure is locked to the abutments. Also uneven temperature distribution in the superstructure cause movements of the piles as the beam end rotates. The mean bridge temperature is dependent on the ambient air temperature, wind effect and solar radiation. Temperature gradients through the depth of the bridge beams generate secondary bending moments due to the fact that the centroid of the temperature distribution curve and the centroid of the cross-section of the bridge beams may not coincide. The maximum temperature differentials (with positive gradient) occurs when the concrete deck slab is exposed to sun radiation during the summer and winter, resulting in a concrete deck slab that is warmer than the steel beams. The minimum temperature differential (with negative gradient) occurs when the concrete deck slab is suddenly drenched with cold rain or snow, thus cooling the concrete deck slab at a faster rate than the steel beams. The rotation will also cause a horizontal displacement of the pile top if there is a vertical distance between the centre of gravity of the composite cross-section and lower edge of the abutment wall where the pile is clamped.

185

Page 7: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Thampligivesand wconstdaily valuaestimalso. the m

F

Brfor thcool fType maximtemperange

TbeingTe,maxbecom52 yeconse

he temperatuitude, but a

s 120 stress cwill induce tant and the wtemperature

able to havemation is mos

In Eurocodemaximum an

Figure 7. Corre

ridge decks ahe purpose ofrom lighter 1: Steel decmum/and meratures for e of the unifo

The shade airg exceeded ox=36 ° C (Tmes 75° C. Aears is 56.6ervative.

ure of the brsmall numbcycles of ann365×120 =width of anne cycles. It

e models to stly based one EN 1991-1d minimum

elation betwee

are groupedf differentia

r bridge deckck, Type 2: C

minimum bridtype 2 whileorm bridge t

r temperaturof 0,02 or o

TRVFS ) anAs can be se

6° C (Mobe

ridge varies ber of cyclesnual tempera

= 43 800 strnual temperais not commestimate th

n the shade a1-5 (CEN 20uniform bri

en minimum/m

d in three diffating betweenks that are mComposite ddge temperae the range itemperature

TN =

re used for donce in 50 ynd Te,min =-2een in Tablerg et. al. 20

continuousl. A bridge liature variatioress cycles. ature cycles mon to meae bridge temair temperatu003) a diagraidge tempera

maximum sha

fferent groupn massive br

more rapidly deck and typatures are 5°is larger for T:

=Te,max –Te,m

design is a tyears. As an 29 ° C and e 4 the maxim002) and th

ly. The seasoifetime is esons. The daiThe width are (of cour

asure the brimperature frure but theream like in Fature compo

ade air temper

ps in Eurocoridge deck thheated and c

pe 3: Concret° C above thType 1 and

min

temperature example vathe range o

mum annualhe design va

onal variatiostimated to bily variationof temperat

rse) larger thidge temperrom ambiene are more soFigure 1 is pronents Te,min

ature and mea

ode EN 1991hat take longcooled. The te deck. As s

he corresponsmaller for T

with the analue for Stoof the bridgl temperaturalues can th

ons have thebe 120 yearsns are more fture cycles han the widtrature and itnt temperatuophisticated resented to eand Te,max.

an bridge temp

1-1-5 (CEN 2ger time to hthree group

seen in Figunding shade aType 3. The

nnual probabckholm, Sw

ge temperature width for thus be rega

e largest s, which frequent are not

th of the t is thus ure. The

models estimate

perature.

2003) heat and ps are ure 1 the air

e overall

(1)

bility of weden is ure thus the past

arded as

186

Page 8: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

MaxMin.Mean

Media

Inon daMeascomp

Traff

Inpedesthe mtwo aroads

Load

Llane a

Para

Aresistand sreact

1Calcu2Calcu

TABLE

Tmax

. 35.4. -22.1n 10.5an 10.0

n Eurocode Eaily temperasurements inposite bridge

ffic loads

n this paper ostrian bridge

most severe tradjustment fas. Only one l

d model 1

Load model 1according. E

meters of so

According ttance of a losupported bytion

ulated from maulated from dai

E Ⅰ. TEMPER

x T4 221 -25 40 4

EN 1991-1-5ature ranges n the UK (e as most we

only road bres are also coraffic expect

factors α andload model i

1 consist of tEach lane is

T

oil surroun

to the Eurung slender py a deforma

aximum and mily mean estim

RATURE MEA(M

Daily temp

min T2.4 25.5 -2

4.1 74.0 6

5 (CEN 200of 10° C wh

(Emerson 19ere about 25

ridges are coovered. For ted in practi

d β to adjust tis described

two axle loa3 m wide an

TABLE Ⅱ. L

ding the pil

ucodes (EC pile may be cable medium

minimum readinmations.

ASUREMENTMOBERG ET.peraturers

Tmean Δ28.3 223.9 7.1 6.9

03) the maximhich is 13% 977) showe% of the ann

onsidered, inroad bridges

ice on the mathe loads to here as it th

ads, Qik, and nd the distan

LOAD VALUE

les

1997-1 7.carried out um characteri

ngs.

TS IN STOCKH AL. 2002).

ΔTdaily Δ20.4 0.3 6.3 5.9

mum and miof the maxi

ed that the dnual.

n the Eurocos there are twain routes ofdifferences b

he only one t

a distributednce between

ES FOR THE T

7.3) “The using the theised by a ho

HOLM 1961-0

ΔTmean

14 0

1.7 1.3

inimum temimal annual daily tempe

odes railway wo load modf European cbetween couthat is used f

d load qik wiaxles is 1.20

TRAFFIC

calculation eory of a beaorizontal mo

01-01-2012-12

Annual tempechanges.

ΔT1 56.6 32

45.8 46.2

mperatures artemperature

erature widt

loads and lodels that repcountries. Thuntries and dfor pile desig

ith values in0 m.

of the traam loaded atodulus of su

2-31

erature .

T2

46.6 23.5 36.1 36.1

re based e width. ths in a

oads for presents here are

different gn.

n each

ansverse t the top ubgrade

187

Page 9: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Soil with cohesion (clay)

If the soil surrounding the soil is considered to be an elastic continuum with Young´s modulus E and Poisson´s ratio of 0.5 the lateral soil modulus, ku, can be derived e.g. according to Baguelin (1997). If the Young´s modulus is supposed to be E=50cu, where cu is the cohesion the lateral soil modulus can be written:

ku =k0cu/b, 157≤k0≤242 (2)

For long term loading the creep effect must be considered. This done approximately by reducing the lateral soil stiffness:

ku =50cu/b (3)

The pressure against the pile is described by the expression:

p=kuu (4)

Where u is the lateral displacement of the pile. The pressure p is limited to a value py that for drained conditions can be calculated by:

py=Nccu (5)

Where Nc is a constant that varies between 8-12 for deep soil layers (<3b) and decreases to 2 for layers closer to the surface. For short time loading Nc=9can be used and for long time loading the creep is considered by a lower value of Nc=6.

Cohesion-less soil (friction soil)

For cohesion-less soils there are no unambiguous expression that describes the relation between the lateral soil modulus and the strength parameter �´. The relationship between lateral displacement and soil pressure against the pile is therefor based on suggested empirical “p-y” curves based on experimental data. There are numerous suggestions on different “p-y” curves among them are Reese (1994). The “p-y” curves are un-linear and a soil model with linear curve based the initial slope of the “p-y” curve suggested by Reese et. al.(1994) is used here. The lateral soil modulus is half of the initial modulus according to Reese et. al.(1994) and is expressed as follows:

Ku=1/2ksz (6)

where ksis given in Table Ⅲ.

TABLE Ⅲ. VALUES FORTHE CONSTANT KsFOR LATERAL SOIL MODULUS ACCORDING TO REESE ET. AL. (2007) Water[MN/m3] Sand above water table [MN/m3]

Loose sand 5 7 Medium dense sand 16 24 Dense sand 34 61

188

Page 10: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

For u

where

Mode

Tconnefull-sinelasload cnot pwith someand dpile.

Mode

Indisplais at tlateraThe pthe picross

Figu

Torder

un-drained co

e σ´vis the v

elling the pi

The connectection. Expescale modelsstic deformacycles. This

permissible useveral hun

ewhere betwdesign the pi

elling the pi

n the suggacements takthe upper paal soil modupile will behile capacity -section acc

ure 8. Three s

The procedurr effects is a

onditions the

vertical soil p

ile abutmen

tion betweeneriments at s of clampedations unders indicates thunder most cndred meter

ween rigidly file with norm

ile soil inter

gested analyke place neaart of the pileulus will behhave elastic u

is reached. cording to EN

stages for th

re to calculaiterative pro

e limit value

py=N�σ´v

pressure and

nt connectio

n the pile anLulea Univ

d piles demor strains six hat by permicurrent desirs of bridgfixed and pinmal force, d

raction

ytical modelar the pile heae. As soon ahave plastic until a plastTo reach th

N 1993-1-1.

he pile analyand la

ate the momeocess that is

e is calculate

v

d N� = 3Kp. Cr

on

nd the abutmversity of Tonstrated thatimes greateitting pile strgn codes), ie length. Cnned it is pradisplacement

l to design ad and thus t

as the limit vat further d

tic hinge is fhis state the p

ysis, low loadarge load at t

ents and shepreferable d

ed by:

reep is not con

ment can beTechnology at a steel piper than the yrains in exceintegral abut

Considering actical to cont and an ext

the pile itthe largest so

value, py, of tdisplacementformed sompile must be

d at the left, the right.

ear forces alodone with co

nsidered for fric

e modelled (Pétursson pe pile can ayield strain fess of the yitment bridgethat the fix

nsider the coternal mome

t is assumeoil pressure the soil prest of the pile ewhere alone ductile and

intermediat

ong the pile omputer prog

ction soils.

as fixed or et. al. 2013accommodafor several hield strain (wes could be xity of the onnection asent at the top

ed that the against the psure is obtaitop (see Fig

ng the pile ad belong to

t load in the

consideringgrams.

(7)

pinned 3) usingate large hundred which is erected pile is

s pinned p of the

largest pile also ined the gure 9).

and then Class 1

middle

g second

189

Page 11: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Initial imperfections and second order moments

When designing piles second order effects are taken into consideration. This is done by enlarging moment along the pile and is depending on the initial imperfections of the pile. The initial imperfection of the pile can be assumed according to Table 5.1 in EN 1993-1-1 and is:1/200

e0/lc=1/200 (8)

for steel pipe piles that are cold formed. For piles with H-profile the value is 1/300 for strong axis bending and 1/250 for weak axis bending.

Concluding remarks

This paper describes some of issues that have to be dealt with when designing steel piles for integral abutment bridges, but is far from complete. For a more comprehensive material about designing integral abutments according to Eurocodes the reader can look into the design guide from the INTAB project Feldman et. al 2010.

REFERENCES

Baugelin F, Frank R, Said Y. H., 1977, Theoretical study of lateral reaction mechanics of piles, Geotechnique, Vol. 3, pp. 405-434

Collin P., Veljkovic M., Petursson H., 2006, “International Workshop on Bridges with Integral Abutments”, Lulea University of Technology, ISSN: 1402-1536, ISRN: LTU-TR06/14-SE

EN 1990 // Eurocode - Basis of structural design. - Brussels : European Committee forStandardization (CEN), 2002.

EN 1990/A1 Eurocode - Basis of structural design, Annex A2: Application of brigdes(normative). - Brussels : European Committee for Standardization (CEN), 2006.

EN 1991-1-5 // Eurocode 1: Actions on structures - Part 1-5: General actions – Thermalactions. - Brussels : European Committee for Standardization (CEN), 2003.

EN 1991-2 // Eurocode 1: Actions on structures - Part 2: Traffic loads on bridges. -Brussels : European Committee for Standardization (CEN), 2003.

EN 1992-1-1 // Eurocode 2: Design of concrete structures - Part 1-1: General rules and rulesfor buildings. - Brussels : European Committee for Standardization (CEN), 2004.

EN 1992-2 // Eurocode 2 - Design of concrete structures - Concrete bridges - Design anddetailing rules. - Brussels : European Committee for Standardization (CEN), 2005.

EN 1993-1-1 // Eurocode 3: Design of steel structures - Part 1-1: General rules and rules forbuildings. - Brussels : European Committee for Standardization (CEN), 2005.

EN 1993-1-5 // Eurocode 3 - Design of steel structures - Part 1-5: Plated structuralelements. - Brussels : European Committee for Standardization (CEN), 2006.

EN 1993-1-9 // Eurocode 3: Design of steel structures - Part 1-9: Fatigue. - Brussels :European Committee for Standardization (CEN), 2005.

EN 1993-2 // Eurocode 3 - Design of steel structures - Part 2: Steel Bridges. - Brussels :European Committee for Standardization (CEN), 2006.

EN 1993-5 // Eurocode 3 - Design of steel structures - Part 5: Piling. - Brussels : EuropeanCommittee for Standardization (CEN), 2007.

EN 1994-2 // Eurocode 4 - Design of composite steen and concrete structures - Part 2:General rules and rules for bridges. - Brussels : European Committee for Standardization(CEN), 2005.

EN 1997-1 // Eurocode 7: Geotechnical design - Part 1: General rules. - Brussels : EuropeanCommittee for Standardization (CEN), 2005.

Feldmann, M., Naumes, J., Pak, D., Veljkovic, M., Eriksen, J., Hechler, O., et al.,2010, Design Guide. Aachen: RWTH AachenUniversity, Institut für Stahlbau, http://www.bridgedesign.de

190

Page 12: Design of steel piles for integral abutment bridges using ...ch.jointlessbridges.fzu.edu.cn/attach/2017/02/20/255271.pdf · 2/20/2017  · The Eurocodes are set of technical rules

Emerson, M. (1977). Temperature differences in bridges: basis ofdesign requirements, TRRL Laboratory Report 765, Transport and Road Research Laboratory, Crowthorne, Berkshire, pp. 39.

Iles D., 2005, “Integral Steel Bridges: A Summary of Current Practice in Design and Construction”, SCI PublicationP340, p. 8

Kerokoski O., 2006, Soil Structure Interaction of Long Jointless Bridges with Integral Abutments, Tampere University of Technology, p.16

Maruri R., Petro S., 2005, Integral Abutments and Jointless Bridges (IAJB) 2004 Survey Summary, Federal Highway Administration (FHWA)/Constructed Facilities Center (CFC) at West Virginia University

Pétursson H., Möller M., Collin P., 2013, Structural Engineering International, Vol. 23 , Number 3 ,pp. 278-284 Reese L. C., Cox W. R., Koop F. D., 1974, Analysis of Laterally Loaded Piles in Sand, Offshore Technology

Conference, Houston, Paper. No. OTC 2080

191