design studies rob edgecock/ral. outline introduction – a reminder scope of wds current status...

11
Design Studies Design Studies Rob Edgecock/RAL Rob Edgecock/RAL

Post on 19-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

Design StudiesDesign Studies

Rob Edgecock/RALRob Edgecock/RAL

Page 2: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

OutlineOutline

• Introduction – a reminder

• Scope of WDS

• Current status

• Problems

• FP6 Design Study

• Status

• Plans

• Conclusions

Page 3: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

IntroductionIntroduction

• Last year:- time for a “3rd” Nufact design study- this time involving all 3 regions- World Design Study (WDS)

• Steering group created

US:US: Steve GeerSteve GeerBob PalmerBob PalmerMike ZismanMike Zisman

Japan:Japan: Yoshi KunoYoshi KunoYoshi MoriYoshi MoriKenzo NakamuraKenzo Nakamura

Europe:Europe: Alain BlondelAlain BlondelRob Edgecock (chair) Rob Edgecock (chair)

Helmut HaserothHelmut Haseroth

• Charged with:- define scope and charge- initiating

• NuFact’04 obvious target, but……..

• …….one or two problems have delayed start

• Much done, but more work required

• Still plan to start soon

• Comments very welcome!

Page 4: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

WDS ScopeWDS Scope

• Much discussion about this (still)!

• Concluded WDS must acknowledge current status

• In particular, existing international “sub-collaborations”

• Cannot subsumed into WDS (by us)

• Identified six possible sub-collaborations

• Either formed, forming or (perhaps) should be formed

Page 5: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

WDS ScopeWDS Scope

Sub-collaboration Summary of Task

1 Proton Driver Definition of critical parameters and R&D on components

2 Targetry R&D on solid and liquid targets to prove viability; R&D on pion collection

3 MICE Demonstration and study of ionisation cooling

4 FFAGs Study of FFAG acceleration, proof of principle and R&D on critical components

5 Design and engineering studies

Cost and performance optimised Neutrino Factory Design

6 Physics and detectors Define parameters for accelerator & detector, inc. detector cost

Mainly hardware R&D Mainly simulations and theory

Page 6: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

ScopeScope

• Overall coordination of all sub-collaborations required inlonger term

• Not by us – we are merely encouraging creation of some

• WDS: concentrate on simulations, theory, etc cost optimised NF layout, inc. detectors

• Aims:- continue studies of alternative options for machine

- integrate alternatives via end-to-end simulations - select “best” based on cost/performance optimisation - include detector(s) in cost optimisation

• Follows on directly from previous feasibility studies

• Will require close interaction with other sub-collaborations

• Possible duration: 4-5 years(?), hopefully starting soon

• Main deliverable: detailed design report

Page 7: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

WDS ChargeWDS Charge

The feasibility of a Neutrino Factory has been demonstrated by a number of studies performed in the US, Japan and Europe. The cost, however, as determined by the second study in the US, was higher than is desirable and since it was published work has been on-going to find cheaper alternatives to the most expensive parts of the machine, while maintaining the performance. What is required now is a “third” feasibility study which brings these studies to a close, does end-to-end simulations of the machine and develops an overall cost optimisation of the machine plus detectors. For the “best” layout, more detailed engineering should be performed and a detailed design report produced.

In detail, the charge is:

1) continue simulation studies of different elements of the accelerator complex

2) identify related R&D that needs to be done and initiate international collaborations to do it

3) once the studies of the different options in 1 are complete, do end-to-end simulations to demonstrate feasibility of at least one layout and perform cost optimisations with far detectors

4) if there is more one than layout, select the best based on cost and performance optimisations

5) write preliminary design report for selected option

6) perform detailed engineering studies of the selected option

7) at the end of the study, write a detailed design report

Page 8: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

Next Steps…….Next Steps…….

• Get endorsement and comments from three regions

• Plans have been presented to: - EMCOG - MUTAC

• Will need to be presented in Japan

• Some action required

• When WDS is endorsed in all three regions: - identify likely contributors - develop detailed plans in collaboration - setup management structure, WP, etc - identify host laboratory - etc!

Page 9: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

Design Study in EuropeDesign Study in Europe

• Funding difficulties in Europe

• Some improvement recently:- EC FP6 - UK- CERN management

• But mainly for R&D:- proton driver- target & TT2A- MICE- FFAGs

• Not part of current WDS

• Big hope: FP6 Design Study- up to 10MEUR- funds both simulation and R&D- 4 year duration

Page 10: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

FP6 Design StudyFP6 Design Study

• Three submission dates defined by EC:- March 2004- March 2005- March 2006

• Created a steering committee

• Defined 8 WPs

• Website: http://hepunx.rl.ac.uk/~edgecock/NufactDS

Director:Director: Ken PeachKen PeachCoordinator:Coordinator: Rob EdgecockRob Edgecock Japanese Japanese representative:representative: Yoshi MoriYoshi Mori US US representative:representative: Mike ZismanMike ZismanBENE representative:BENE representative: Vittorio PalladinoVittorio Palladino

Proton Driver:Proton Driver: Roland GarobyRoland GarobyChris PriorChris Prior Targetry:Targetry:

Roger BennettRoger BennettJean-Eric CampagneJean-Eric Campagne MICE:MICE:

Alain BlondelAlain BlondelJohn CobbJohn Cobb FFAGs:FFAGs: Francois Francois

MeotMeot ??Accelerator FS:Accelerator FS: Helmut HaserothHelmut Haseroth

Rob EdgecockRob Edgecock Physics & Physics & Detectors:Detectors: Mauro MezzettoMauro Mezzetto

Pilar HernandezPilar HernandezPaolo StrolinPaolo Strolin

WP Title Responsible Summary

1 Management Edgecock

Proton Driver Garoby Insufficient manpower

2 Targetry Bennett R&D on targets to prove viability; engineering of target station

3 Collection Campagne Viability of horn

4 MICE Blondel R&D on critical components

5 FFAGs Meot R&D on SC dipoles

6 Machine Haseroth Cost and performance optimised Neutrino Factory Design

7 Physics and detectors

Mezzetto Strolin

Define parameters for accelerator & detector, inc. detector cost

??????????

Page 11: Design Studies Rob Edgecock/RAL. Outline Introduction – a reminder Scope of WDS Current status Problems FP6 Design Study Status Plans Conclusions

Current StatusCurrent Status

• Waiting for Round 2 decision – September

• In the mean time:

– Start anyway!

– Try and increase participation

– Focus on specific projects to attract new people

– Talking to CERN bosses for small resource increase

– Investigating alternative FP6 actions

• In addition, APS studies in US

WDS not starting today!WDS not starting today!

Comments?