designed by: symbol legend -elevations drawn by: …including without limitation the construction of...
TRANSCRIPT
SYMBOL LEGEND - ELEVATIONS
5:12
12
5
SLOPE TAG
0
EXTERIOR ELEVATION SYMBOL(RE: ELEV. # & SHEET #)
1
A101
SIM________ BUILDING SECTION SYMBOL
(RE: SECTION # & SHEET #)
BUILDING REFERENCE GRID
1
A101REFERENCE TAG
1. PROVIDE 1/2" MIN. SLOPE AWAY FROM WALL ON TOP SURFACE OF WALL PROJECTIONS.
2. MOUNT ALL EXTERIOR WALL LIGHT FIXTURES WHERE BOTTOM OF LIGHT FIXTURE IS AT 6'-8" A.F.F. WHERE THEY PROJECT MORE THAN 4" FROM FACE OF WALL.
3. RE: CIVIL AND STRUCTURAL DRAWINGS FOR F.F.E. AND SLAB BREAKS.4. FLASHING, WATERPROOF MEMBRANES, PROPER CAULKS AND SEALANTS (BACKER
RODS AS REQUIRED) SHALL BE INSTALLED AROUND ALL WINDOWS, DOORS, ROOF OPENINGS, HORIZONTAL AND VERTICAL JOINTS OF DISSIMILAR MATERIALS, MATERIAL TRANSITIONS, TRIM, BALCONIES AND OTHER WEATHER EXPOSED AREAS.
5. PROVIDE A WATER TIGHT BUILDING(S), ROOF AND EXTERIOR ENVELOPE THAT SHEDS WATER PROPERLY.
6. ALL PATIOS, PORCHES, BALCONIES, AND SIDEWALKS TO BE SLOPED 1/8" PER 1'-0" MIN. IN DIRECTION INDICATED ON PLANS AND AWAY FROM EXTERIOR WALLS.
7. GRADES AROUND ALL EXTERIOR WALLS OF THE BUILDING TO BE 8" MIN. BELOW THE FINISHED FLOOR AND IS TO BE SLOPED AWAY FROM THE BUILDING 5% MIN. FOR 10'-0" PER 2018 IBC SECTION 1804.4.
8. GRADE ELEVATIONS ARE APPROXIMATE. RE: CIVIL & HARDSCAPE DRAWINGS FOR FINE GRADING.
9. SIGNS ARE FOR REFERENCE ONLY. ALL SIGNS SHALL BE REVIEWED AND INSTALLED UNDER SEPARATE PERMIT.
10. ALL EXTERIOR COLORS, FINISHES, AND DECORATIVE TRIM BANDS TO TERMINATE AT AN INSIDE CORNER. (U.N.O.)
11. ALIGN ALL MECHANICAL VENTS BOTH HORIZONTALLY AND VERTICALLY.12. PITCHED ROOFS, CRICKETS, DORMERS, ETC. TO HAVE A MIN. ROOF PITCH OF 4:12.
REFER TO ROOF PLAN FOR ROOF PITCHES.
ELEVATION NOTES
MATERIAL LEGEND - ELEVATIONS
MANUFACTUREDSTONE VENEER
MORTAR COLOR FOR STONE: TBD
METAL AWNING / METAL RAILING / WINDOW FRAME: TBD
1 / A1.01
WALL SECTION SYMBOL(RE: SECTION # & SHEET #)
1 / A1.01
SIM.
XX
DOOR TAG SYMBOL(RE: SCHEDULE A2.01)
WINDOW TAG SYMBOL(RE: SCHEDULE A2.02)
X
F.F.E. 100'-0"
T.O.P. 100'-0"
XX FLOOR
T.O.D. 100'-0"
XX FLOOR
F.F. 100'-0"
XX FLOORFINISH FLOOR
TOP OF DECK
TOP OF PLATE
FINISH FLOOR ELEVATION(RE: CIVIL)
SLOPE TAG
FIBER CEMENTVERTICAL SIDING
METAL PANEL
NO PENETRATIONS AND PROVIDED NON-COMBUSTIBLE MATERIALS 4'-0" ON EITHER SIDE OF 2 HOUR FIREWALL
Drawn by:
Architect of Record:
The architectural works depicted herein are the sole property of Humphreys & Partners Architects, L.P. and may not be constructed or used without its express written permission. No permission to modify or reproduce any of the architectural works, including without limitation the construction of any building, is expressed or should be implied from delivery of preliminary drawings or unsealed construction drawings. Permission to construct the building depicted in sealed construction drawings is expressly conditioned on the full and timely payment of all fees otherwise due Humphreys & Partners Architects, L.P. and, in the absence of any written agreement to the contrary, is limited to a one-time use on the site indicated on these plans.
HU
MP
HR
EY
S &
PA
RTN
ER
S
5339
ALP
HA
RO
AD
• S
UIT
E 3
00 •
DA
LLA
S, T
X 7
5240
(972
) 70
1-96
36 •
(972
) 70
1-96
39 F
AX
DA
LLA
S •
CH
AR
LOT
TE
•C
HIC
AG
O •
DE
NV
ER
•N
EW
OR
LEA
NS
•N
EW
YO
RK
•N
EW
PO
RT
BE
AC
H •
OR
LAN
DO
•S
CO
TT
SD
ALE
•C
HE
NN
AI •
DU
BA
I •H
AN
OI •
LON
DO
N •
MO
ND
EV
IDE
O •
ME
XIC
O C
ITY
•w
ww
.hum
phre
ys.c
om
© 2018 by Humphreys & Partners Architects, L.P. All Rights Reserved
Issue for SD/DD:
Designed by:
Date Plotted:
SHEET CONTENTS
SHEET NO.
12-20-2018
Issue for 50% Construction Documents:
Issue for 80% Construction Documents:
AR
CH
ITE
CT
S,
L.P
.
SC
ALE
:D
AT
E /
TIM
E:
XX-XX-XXXX
XX-XX-XXXX
BF
4/24/2019 7:48:10 AM
As
indi
cate
d4/
24/2
019
7:48
:10
AM
A4.20
OVERALLELEVATION -
EAST & NORTH
LA
UN
CH
DE
VE
LO
PM
EN
T,
INC
.
EL
EV
AT
ION
JC
18443
VA
IL, C
O
Revisions
# DATE COMMENTS
1/8" = 1'-0"1
BUILDING I - EAST ELEVATION - OVERALL
1/8" = 1'-0"2
BUILDING I - NORTH ELEVATION - OVERALL
SYMBOL LEGEND - ELEVATIONS
5:12
12
5
SLOPE TAG
0
EXTERIOR ELEVATION SYMBOL(RE: ELEV. # & SHEET #)
1
A101
SIM________ BUILDING SECTION SYMBOL
(RE: SECTION # & SHEET #)
BUILDING REFERENCE GRID
1
A101REFERENCE TAG
1. PROVIDE 1/2" MIN. SLOPE AWAY FROM WALL ON TOP SURFACE OF WALL PROJECTIONS.
2. MOUNT ALL EXTERIOR WALL LIGHT FIXTURES WHERE BOTTOM OF LIGHT FIXTURE IS AT 6'-8" A.F.F. WHERE THEY PROJECT MORE THAN 4" FROM FACE OF WALL.
3. RE: CIVIL AND STRUCTURAL DRAWINGS FOR F.F.E. AND SLAB BREAKS.4. FLASHING, WATERPROOF MEMBRANES, PROPER CAULKS AND SEALANTS (BACKER
RODS AS REQUIRED) SHALL BE INSTALLED AROUND ALL WINDOWS, DOORS, ROOF OPENINGS, HORIZONTAL AND VERTICAL JOINTS OF DISSIMILAR MATERIALS, MATERIAL TRANSITIONS, TRIM, BALCONIES AND OTHER WEATHER EXPOSED AREAS.
5. PROVIDE A WATER TIGHT BUILDING(S), ROOF AND EXTERIOR ENVELOPE THAT SHEDS WATER PROPERLY.
6. ALL PATIOS, PORCHES, BALCONIES, AND SIDEWALKS TO BE SLOPED 1/8" PER 1'-0" MIN. IN DIRECTION INDICATED ON PLANS AND AWAY FROM EXTERIOR WALLS.
7. GRADES AROUND ALL EXTERIOR WALLS OF THE BUILDING TO BE 8" MIN. BELOW THE FINISHED FLOOR AND IS TO BE SLOPED AWAY FROM THE BUILDING 5% MIN. FOR 10'-0" PER 2018 IBC SECTION 1804.4.
8. GRADE ELEVATIONS ARE APPROXIMATE. RE: CIVIL & HARDSCAPE DRAWINGS FOR FINE GRADING.
9. SIGNS ARE FOR REFERENCE ONLY. ALL SIGNS SHALL BE REVIEWED AND INSTALLED UNDER SEPARATE PERMIT.
10. ALL EXTERIOR COLORS, FINISHES, AND DECORATIVE TRIM BANDS TO TERMINATE AT AN INSIDE CORNER. (U.N.O.)
11. ALIGN ALL MECHANICAL VENTS BOTH HORIZONTALLY AND VERTICALLY.12. PITCHED ROOFS, CRICKETS, DORMERS, ETC. TO HAVE A MIN. ROOF PITCH OF 4:12.
REFER TO ROOF PLAN FOR ROOF PITCHES.
ELEVATION NOTES
MATERIAL LEGEND - ELEVATIONS
MANUFACTUREDSTONE VENEER
MORTAR COLOR FOR STONE: TBD
METAL AWNING / METAL RAILING / WINDOW FRAME: TBD
1 / A1.01
WALL SECTION SYMBOL(RE: SECTION # & SHEET #)
1 / A1.01
SIM.
XX
DOOR TAG SYMBOL(RE: SCHEDULE A2.01)
WINDOW TAG SYMBOL(RE: SCHEDULE A2.02)
X
F.F.E. 100'-0"
T.O.P. 100'-0"
XX FLOOR
T.O.D. 100'-0"
XX FLOOR
F.F. 100'-0"
XX FLOORFINISH FLOOR
TOP OF DECK
TOP OF PLATE
FINISH FLOOR ELEVATION(RE: CIVIL)
SLOPE TAG
FIBER CEMENTVERTICAL SIDING
METAL PANEL
NO PENETRATIONS AND PROVIDED NON-COMBUSTIBLE MATERIALS 4'-0" ON EITHER SIDE OF 2 HOUR FIREWALL
Drawn by:
Architect of Record:
The architectural works depicted herein are the sole property of Humphreys & Partners Architects, L.P. and may not be constructed or used without its express written permission. No permission to modify or reproduce any of the architectural works, including without limitation the construction of any building, is expressed or should be implied from delivery of preliminary drawings or unsealed construction drawings. Permission to construct the building depicted in sealed construction drawings is expressly conditioned on the full and timely payment of all fees otherwise due Humphreys & Partners Architects, L.P. and, in the absence of any written agreement to the contrary, is limited to a one-time use on the site indicated on these plans.
HU
MP
HR
EY
S &
PA
RTN
ER
S
5339
ALP
HA
RO
AD
• S
UIT
E 3
00 •
DA
LLA
S, T
X 7
5240
(972
) 70
1-96
36 •
(972
) 70
1-96
39 F
AX
DA
LLA
S •
CH
AR
LOT
TE
•C
HIC
AG
O •
DE
NV
ER
•N
EW
OR
LEA
NS
•N
EW
YO
RK
•N
EW
PO
RT
BE
AC
H •
OR
LAN
DO
•S
CO
TT
SD
ALE
•C
HE
NN
AI •
DU
BA
I •H
AN
OI •
LON
DO
N •
MO
ND
EV
IDE
O •
ME
XIC
O C
ITY
•w
ww
.hum
phre
ys.c
om
© 2018 by Humphreys & Partners Architects, L.P. All Rights Reserved
Issue for SD/DD:
Designed by:
Date Plotted:
SHEET CONTENTS
SHEET NO.
12-20-2018
Issue for 50% Construction Documents:
Issue for 80% Construction Documents:
AR
CH
ITE
CT
S,
L.P
.
SC
ALE
:D
AT
E /
TIM
E:
XX-XX-XXXX
XX-XX-XXXX
BF
4/24/2019 7:48:21 AM
As
indi
cate
d4/
24/2
019
7:48
:21
AM
A4.21
OVERALLELEVATION -
WEST & SOUTH
LA
UN
CH
DE
VE
LO
PM
EN
T,
INC
.
EL
EV
AT
ION
JC
18443
VA
IL, C
O
Revisions
# DATE COMMENTS
1/8" = 1'-0"1
BUILDING I - SOUTH ELEVATION - OVERALL
1/8" = 1'-0"2
BUILDING I - WEST ELEVATION - OVERALL