DRAWING INDEX
SAFETY
PERSONAL PROTECTIVE EQUIPMENT SHALL BE WORN AS REQUIRED IN ALL APPLICABLE AREAS.
LIMIT ACCESS BY UNAPPROVED PERSONNEL TO APPLICABLEAREAS
IF WORK IS BEING DONE IN AN AREA WHERE PEDESTRIANS MAY WALK THROUGH, MAKE SURE THE AREA IS BARRICADED OR CONED OFF APPROPRIATELY.
IF WORKING NEAR DOORS OF OFFICE SUITES MAKE SURE SIGNS ARE PLACED ON OTHER SIDE OF DOOR INDICATING WORKERS NEAR DOORWAY
PERMITS MUST BE OBTAINED FROM THE AHJ FOR ENERGIZED ELECTRICAL, HOT WORK, CONFINED SPACE ENTRY AS WELL AS LIFE SAFETY WORK ARE OBTAINED PRIORTO BEGINNING WORK.
ALL EMPLOYEES WORKING ON “LOCKED OUT “EQUIPMENT SHALL HAVE THEIR LOCK AND TAG ON THE SOURCE OF ENERGY.
FOLLOW ALL OTHER APPLICABLE FEDERAL, STATE AND LOCAL ENVIRONMENTAL HEALTH AND SAFETY REGULATIONS.
PROJECT MANAGERS, CONTRACTORS, EHS SHOULD CONFIRM THAT ASBESTOS/HAZARDOUS MATERIALS HAVE BEEN IDENTIFIED, TESTED AND ABATED PRIOR TO ALLWORK.
REDLINESCONTRACTOR SHALL SUBMIT PROJECT REDLINES MERGED TO ONE CLEAN SET OF DRAWINGS. DRAWINGS WILL BE MARKED: CHANGE - RED PENCIL / REMOVAL - RED PENCIL HATCH /
NOTE TO DESIGNER - GRAY PENCIL.
SUBMITTALS
SCOPE OF WORK
US-3 IS TO BE REPLACED FIRST WITH LOADS TEMPORARIES OFF OF US-2.
US-2 WILL THEN BE REPLACED WITH TEMPORARIES OFF OF US-3.
1U01:RECAP US-2 & US-3
THIS PROJECT CONTAINS ASBESTOS, ABATEMENT REQUIRED.
THIS PROJECT CONTAINS HAZARDOUS MATERIALS, SPECIAL PRECAUTIONS REQUIRED.
YES NO
GENERAL INFORMATION1 G-001 COVER (INDEX) SHEET
2 G-002 GENERAL INFORMATION
CIVIL
ARCHITECTURAL
STRUCTURAL
MECHANICAL
PLUMBING
FIRE PROTECTION
ELECTRICAL3 E-001 ELECTRICAL NOTES, SYMBOLS, AND LEGEND
4 E-101 ELECTRICAL DEMOLITION PLAN - LOWER B & G BLOCK
5 E-102 ELECTRICAL DEMOLITION PLAN - LOWER C BLOCK
6 E-103 ELECTRICAL DEMOLITION PLAN - UPPER C BLOCK
7 E-201 ELECTRICAL NEW WORK PLAN - LOWER B & G BLOCK
8 E-202 ELECTRICAL NEW WORK PLAN - LOWER C BLOCK
9 E-203 ELECTRICAL NEW WORK PLAN - UPPER C BLOCK
10 E-501 US-2 ELECTRICAL DETAILS
11 E-502 US-3 ELECTRICAL DETAILS
12 E-601 ELECTRICAL PANEL SCHEDULES
13 E-602 ELECTRICAL PANEL SCHEDULES
14 E-603 ELECTRICAL PANEL SCHEDULES
15 E-604 ELECTRICAL PANEL SCHEDULES
16 E-701 US-2 ONE-LINE DIAGRAM - DEMOLITION PLAN
17 E-702 US-2 FEEDER TABLES
18 E-703 US-2 ONE-LINE DIAGRAM - NEW WORK PLAN
19 E-704 US-3 ONE-LINE DIAGRAM - DEMOLITION PLAN
20 E-705 US-3 FEEDER TABLES
21 E-706 US-3 ONE-LINE DIAGRAM - NEW WORK PLAN
TELECOMMUNICATIONS
AV / SECURITY
G-001
COVER(INDEX)SHEET
x
x
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
GENERAL NOTES
ELEVATIONNUMBER
PLATE ON WHICHELEVATION ISSHOWN
CLOUDAROUNDREVISEDITEM ORAREA
SHADED AREAINDICATESELEVATIONSHOWN
SURROUNDINGLETTERSINDICATEELEVATION
COLUMN LINES
DRAWING TITLE
REVISIONNUMBER
REVISION
DESIGNATESWHICH DOOR
D INDICATES DOORW INDICATES WINDOWL INDICATES LOUVER
INDICATES ROOM NUMBER
ASSIGNEDROOMNUMBER
DOORS, WINDOWS AND LOUVERS
SECTION REFERENCE
ELEVATION MARKERS
ROOM TAG
1
A601
A
B
C
D
INTERIOR ELEVATION
ABBREVIATIONS SYMBOLS
PLATE ON WHICHDETAIL IS SHOWN
DETAIL NUMBER
PLATE ON WHICHELEVATION ISSHOWN
ELEVATION NUMBER
REFERENCE
DETAIL REFERENCE
ELEVATION REFERENCE
PLATE ON WHICHSECTION IS SHOWN
SECTION NUMBER
VENT THRU ROOFVTR
NORTHN
DIM DIMENSION
DOWN
DISPENSER
DRAWING
DRAWER
DEPRESSION
DOWNSPOUT
DOOR
DOOR OPENING
ELEVATION
EACH
EAST
ENCLOSURE
EMERGENCY
ELEVATOR
ELECTRICAL
EXPANSION JOINT
ELECTRICAL PANELBOARD
EQUAL
EQUIPMENT
EXPANSION
EXISTING
EXPOSED
EXTERIOR
FIRE ALARM
FIRE ALARM CONTROL PANEL
FOUNDATION
FINISH
EXTINGUISHER
FLOOR DRAIN
FLOOR CLEAN OUT
FULL HEIGHT
FINISH FACE OF WALL
FIRE HOSE CABINET
FLOOR
FLASHING
FIREPROOF
FURRING
FOOTING
FACE OF FINISH
FLUORESCENT
FACE OF CONCRETE
FACE OF STUDS
FULL SIZE, FLOOR SINK
GALVANIZED
GRAB BAR
GAUGE
FUTURE
GLASS
GRADE
GROUND
GOVERNMENT FURNISHEDGFE
GND
GL
GR
FUT
GALV
GB
GA
FPRF
FOS
FTG
FS
FURR
FL
FOF
FOC
FLASH
FLUOR
EQ (EQL)
FES
FHC
FH
FFOW
FD
FDN
FCO
FEC
FE (FEXT)
EXT
FACP
FA
EXPO
EQPT
EWC
EXP
EXIST
ELEC
ELEV
EP
EMER
ENCL
EL
EA
E
DR
DEP
DWG
DS
DWR
DN
DISP
DO
RWL
RF
RO
RM
RGTR
RWD
REINF
REC
RBP
RESIL
RAIN WATER LEADER
ROUGH OPENING
REGISTER
REDWOOD
RADIO FREQUENCY
ROOM
RECESSED
REQUIRED
REINFORCED
RESILIENT
W/O
WNSCT
RATG
RD
REF
RAD
REFR
PVC
R
QT
PTR
PTD
PTN
PTD/R
PT
PM
PRCST
PR
POP
PLYWD
RATING
RADIUS
ROOF DRAIN
REFERENCE
REFRIGERATOR
QUARRY TILE
POLYVINYL CHLORIDE
RISER
PRESSED METAL FRAMES
PAPER TOWEL DISPENSER
PAINTED
PARTITION
& WASTE RECEPTACLE
POINT
PRE-CAST
PLYWOOD
POINT OF PRESENCE
PAIR
OD
PD
PLAS
PLAM
PL
OPNG
OPP
OPS
OD
OC
OA
OBS (OB)
NO/#
NIC
NOM
NTS
OVERFLOW DRAIN
PIT DRAIN
PLASTER
PLASTIC LAMINATE
PLATE
OPPOSITE
OPERATIONS
OPENING
WR
WT
OVERALL
OBSCURE
ON CENTER
OUTSIDE DIMENSION
NOMINAL
NUMBER
NOT TO SCALE
NOT IN CONTRACT
WC
WD
WP
WH
W
W/
WAINSCOT
WATER RESISTANT
WEIGHT
WATERPROOF
WATER CLOSET
WATER HOSE,
WOOD
WEST (WIDTH)
WITH
WITHOUT
DIRECT APPLIED EXTERIOR
AREA DRAIN
ACOUSTICAL TILE CEILING
AT
AND
ALUMINUM
AGGREGATE
ADJUSTABLE
ASPHALT
BOARD
BITUMINOUS
APPROXIMATE
ABOVE FINISH FLOOR
ARCHITECTURAL
BLOCK
BLOCKING
BUILDING
BEAM
BOTTOM
CABINET
CENTER LINE
BOTTOM OF STEEL
CAST IRON
CERAMIC
CEMENT
CLEAR
CEILING
CAULKING
CLOSET
CATCH BASIN
CONTRACTOR INSTALLED
CONCRETE MASONRY UNIT
COUNTER
COLUMN
CONCRETE
CORRIDOR
CONNECTION
COMMUNICATION
CONSTRUCTION
CONTINUOUS
CONFERENCE
DOUBLE
DETAIL
DIAMETER
COUNTERSUNK
DRINKING FOUNTAIN
DRY FILM THICKNESS
DEPARTMENT
CENTERCTR
DEPT
DF
DFT
DIA
CTSK
DBL
DEFS
CONF
CONT
CONN
CORR
CONSTR
CNTR
COL
COMMO
CONC
CLKG
CLG
CLO
CLR
CMU
CB
CEM
CER
CI
CI
CAB
CL
BM
BLDG
BLK
BOS
BMS
BITUM
ASPH
BD
BLKG
ARCH
AFF
ADJ
APPROX
AGGR
ATC
AD
@
&
SPEC
SSK (SS)
SST
STD
STOR
SUSP
T & G
SYST
TBD
TOC
THK
TOS
TRD (T)
TPD
UON
UPS
UNF
VERT
VCT
VEST
VSC
MIN
MTD
MULM
mm
MISC
MIR
MO
MK
MEMB
MH
MGR
MATL
MAX
MECH
MC
MINIMUM OR MINUTES
MOUNTED
MULLION
METER (METRIC)
MILLIMETER (METRIC)
MIRROR
MISCELLANEOUS
MASONRY OPENING
MARK
UR
MEMBRANE
MANUFACTURER
MANHOLE
MANAGER
METAL
MAXIMUM
MATERIAL
MECHANICAL
MEDICINE CABINET
TV
TW
TYP
TP
LVR (L)
LT
MAINT
MACH
LAB
LAM
LP
LKR
LAV
JT
JAN
KIT
INSUL
ID
INT (INTR)
LOUVER
MACHINE
MAINTENANCE
LIGHT
LABORATORY
LAMINATE
LOCKER
LOW POINT
LAVATORY
TB
TC
TER
TEL
JANITOR
KITCHEN
JOINT
INSIDE DIAMETER
INSULATION
INTERIOR
INTERMEDIATE
STA
STL
SQ
SP
UNFINISHED
UNLESS OTHERWISE
VINYL COMP. TILE
VERTICAL SLIDE CLIP
UNINTERRUPTIBLE
VERTICAL
VESTIBULE
URINAL
TOP OF CONCRETE
TOP OF PAVEMENT
TOP OF STEEL
TOP OF WALL
TOILET PAPER
TREAD
TYPICAL
TELEVISION
THICK
SUSPENDED
SYMMETRICAL
TONGUE AND GROOVE
TELEPHONE
TO BE DETERMINED
TOWEL BAR
TOP OF CURB
TERRAZZO
SYSTEM
SPECIFICATION
STAINLESS STEEL
SERVICE SINK
STRUCTURAL
STANDARD
STATION
STORAGE
STEEL
SQUARE
SPACE
SCD
SCHED
SEC
SCN
SECT
SHT
SHR
SND
SNR
HORIZ
HR
HP
HDWD
HC
HM
HMI
HDW (HW)
GYP
GYP BD
HB
HOLLOW METAL INSULATED
HORIZONTAL
HEIGHT
HIGH POINT
HOUR
HOLLOW CORE
HARDWOOD
HARDWARE
HOLLOW METAL
SIM
SD
SH
GYPSUM
HOSE BIBB
GYPSUM WALLBOARD
S
SC
SECRETARIES
SOAP DISPENSER,
SANITARY NAPKIN
SANITARY NAPKIN
SIMILAR
SHEET
SHOWER
SCREEN
SHELF
SECTION
SOLID CORE
SOUTH
SCHEDULE
ARCHITECTURAL SYMBOLS
NEW WORK
WALL TYPE
FURNITURE / EQUIPMENT
DEMOLITION
DOOR
REVISION TRIANGLE
ARCHITECTURAL TAGS:
T.O. TOP OF
SATC
PTI PROPERTY TURN IN
AREA OFWORK
WORK AREA
FRONTFR
MOUNTED
FINISH SYSTEM
(OUTSIDE DIAMETER)
WALL HYDRANT
EQUIPMENT
POWER SUPPLY
NOTED
DISPENSER
(PROJECT MANAGER)
DISPENSER
RECEPTACLE
STORM DRAIN
TILE CEILING
G-002
GENERALINFORMATION
A
1
1
SCALE: REF.
PLAN/DETAIL TITLE1A-101 AX-YYY
AX-YYY
1. THIS PROJECT SHALL COMPLY WITH LATEST EDITION OF THEFOLLOWING CODES: UNIFIED FACILITIES CRITERIA, UFC 1-200-01, GENERAL BUILDING
REQUIREMENTS UNIFIED FACILITIES CRITERIA, UFC 3-600-01, FIRE PROTECTION ENGINEERING
FOR FACILITIES UNIFIED FACILITIES CRITERIA, UFC 3-301-01, STRUCTURAL ENGINEERING UNIFIED FACILITIES CRITERIA, UFC 3-310-04; SEISMIC DESIGN OF BUILDINGS INTERNATIONAL BUILDING CODE, IBC, EXCEPT AS MODIFIED BY UFC 1-200-01 NFPA 1, FIRE CODE IN LIEU OF INTERNATIONAL FIRE CODE NFPA 101 LIFE SAFETY CODE AS SPECIFIED IN UFC 3-600-01 ABA ACCESSIBILITY STANDARD FOR DEPARTMENT OF DEFENSE ELECTRICAL: IBC, CHAPTER 27 ELECTRICAL: NFPA 70, NATIONAL ELECTRIC CODE, NEC ELECTRICAL: UFC 3-501-01, ELECTRICAL ENGINEERING ELECTRICAL: UFC 3-520-01, INTERIOR ELECTRICAL SYSTEMS ELECTRICAL: UFC 3-530-01, DESIGN: INTERIOR AND EXTERIOR LIGHTING AND
CONTROLS ELECTRICAL: UFC 3-550-01, EXTERIOR ELECTRICAL POWER DISTRIBUTION ELECTRICAL: UFC 3-560-01, ELECTRICAL SAFETY, OPERATIONS AND
MAINTENANCE ELECTRICAL: UFC 3-580-01, TELECOMMUNICATIONS, BUILDING CABLING
SYSTEMS PLANNING AND DESIGN FIRE PROTECTION: NFPA 13, STANDARD FOR THE INSTALLATION OF
SPRINKLER SYSTEMS FIRE PROTECTION: NFPA 72, NATIONAL FIRE ALARM AND SIGNALING CODE MECHANICAL: UFC 410-01FA, HEATING, VENTILATING AND AIR CONDITIONING
IN LIEU OF IBC MECHANICAL: NFPA 90A, INSTALLATION OF AIR-CONDITIONING AND
VENTILATING SYSTEMS IN LIEU OF THE INTERNATIONAL MECHANICAL CODE MECHANICAL: UFC 3-400-02, DESIGN: ENGINEERING WEATHER DATA, TO
ACCESS CLIMATOLOGICAL DATA FOR DESIGN OF MECHANICAL SYSTEMS PLUMBING: IBC CHAPTER 29 PLUMBING: UFC 3-420-01, PLUMBING SYSTEMS PLUMBING: INTERNATIONAL PLUMBING CODE NFPA 75 STANDARD FOR THE PROTECTION OF INFORMATION TECHNOLOGY
EQUIPMENT EIA/TIA 568 COMMERCIAL BUILDINGS COMMUNICATIONS WIRING STANDARDS EIA/TIA 569 COMMUNICATIONS PATHWAYS AND SPACES EIA/TIA 607 COMMUNICATIONS GROUNDING AND BONDING ANSI/EIA/ETI 758 CONSUMER OWNED OUTSIDE PLANT TELECOMMUNICATIONS
STANDARDS EIA/TIA 492/455 OPTICAL FIBER SPECIFICATIONS AND TESTING BICSI TELECOMMUNICATIONS DISTRIBUTION METHODS SPECIFICATIONS ALL ELECTRICAL FITTINGS SHALL BE STEEL.
2. SHOULD PROJECT CIRCUMSTANCES REQUIRE CLARIFICATION, SENDRFIs TO SITE PROJECT MANAGER FOR RESOLUTION.
3. UNLESS OTHERWISE NOTED, PLAN DIMENSIONS AT NEW WORK ARE TOFACE OF EXISTING FINISH WALL AND TO THE CENTER OF NEWPARTITIONS.
4. CONTRACTOR SHALL PROVIDE BARRIERS TO PREVENT SPREAD OFCONSTRUCTION DUST. REFER TO SPECIFICATION SECTION 01 50 00,TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS AND SECTION01 74 19, CONSTRUCTION DEMOLITION AND WASTE MANAGEMENT.
5. VERIFY ALL ROUGH-IN DIMENSIONS FOR EQUIPMENT PROVIDED IN THISCONTRACT, OR BY OTHERS.
6. ENGINEERING DRAWINGS SUPPLEMENT THE ARCHITECTURALDRAWINGS. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO CHECKWITH THE ARCHITECTURAL DRAWINGS BEFORE THE INSTALLATION OFOTHER WORK. BRING DISCREPANCIES TO THE SITE PROJECT MANAGER'SATTENTION FOR CLARIFICATION PRIOR TO INSTALLATION OF SAID WORK.ANY WORK INSTALLED IN CONFLICT WITH THE ARCHITECTURALDRAWINGS SHALL BE CORRECTED BY THE CONTRACTOR AT HISEXPENSE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.
8. DO NOT SCALE DRAWINGS. VERIFY IN FIELD ALL DIMENSIONS, GRADES,CONDITIONS AT SITE PRIOR TO COMMENCING THE WORK, AND REPORTANY DISCREPANCIES TO FSB DESIGN PROJECT MANAGER IN WRITING.DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES SHOWN ONDRAWINGS. CONTRACTOR SHALL NOTIFY FSB WHERE DISCREPANCIESOCCUR BETWEEN DRAWINGS, GENERAL NOTES. THE CONTRACTORSHALL BE RESPONSIBLE FOR THE ACCURATE PLACEMENT OF THEWALLS.
9. ALL SYMBOLS AND ABBREVIATIONS USED ON THE DRAWINGS ARECONSIDERED TO BE STANDARDS. IF THE CONTRACTOR HAS ANYQUESTIONS REGARDING SAME, OR OTHER EXACT MEANING, FSB SHALLBE NOTIFIED FOR CLARIFICATION.
10. CONTRACTOR SHALL PROVIDE TEMPORARY EXIT SIGNS TO ASSURE AMEANS OF EGRESS DURING CONSTRUCTION.
11. GENERAL CONTRACTOR SHALL COORDINATE SITE PLUMBING,DRAINAGE, ELECTRICAL, TELEPHONE WORK AND EXISTING UTILITIES TOPROVIDE A COMPLETE OPERATING SYSTEM.
12. CONTRACTOR SHALL VERIFY ALL CONCRETE AND MASONRY OPENINGSIN THE FIELD PRIOR TO FABRICATION OF DOORS, WINDOWS, LOUVERSAND FRAMES.
13. CONTRACTOR SHALL VERIFY SIZES AND LOCATION OF MECHANICALEQUIPMENT PADS AND BASES AS WELL AS POWER AND WATER ORDRAIN INSTALLATION WITH EQUIPMENT MANUFACTURERS BEFOREPROCEEDING WITH THE WORK. CHANGES TO ACCOMMODATE FIELDCONDITIONS OR SUBSTITUTIONS SHALL BE MADE WITHOUTADDITIONAL COST TO THE GOVERNMENT.
14. CONTRACTOR SHALL REVIEW THE LOCATION OF ALL FIRE LIFE SAFETYDEVICES WITH FSB FOR ON SITE APPROVAL PRIOR TO INSTALLATION.
15. OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACESWILL BE FLUSH.
16. INSTALL ALL METAL CORNER BEADS TO ALL EXPOSED WALL BOARDEDGES. INSTALL CASING BEAD WHEREVER WALLBOARD, PLASTER, ETC.ABUTS A DISSIMILAR FINISH MATERIAL AND PROVIDE SEALANT ASREQUIRED.
17. CONTRACTOR SHALL PROVIDE AND INSTALL ALL STIFFENERS,BRACING, BLOCKING, HANGERS, BACK-UP PLATES AND SUPPORTINGBRACKETS REQUIRED FOR THE INSTALLATION OF ALL CASEWORK,FIXTURES AND PARTITIONS AND ALL WALL MOUNTED OR SUSPENDEDMECHANICAL, ELECTRICAL, OR MISCELLANEOUS EQUIPMENT ANDFURNISHINGS.
18. AN ACOUSTICAL SEAL SHALL BE PROVIDED BETWEEN ALL DUCTS,PIPING, AND PARTITIONS.
19. ALL DOOR SIZES SHOWN ON DOOR SCHEDULE ARE OPENING SIZES.FRAMES SHALL BE REINFORCED WHERE REQUIRED FOR CLOSURES,STOPS AND HARDWARE.
20. IN CASES WHERE MATERIALS AND PRODUCTS DIFFER BETWEEN THEDRAWINGS AND SPECIFICATIONS THE DRAWINGS SHALL PREVAIL.
21. "ALIGN" - INDICATES THAT WHERE NEW CONSTRUCTION ABUTSEXISTING CONSTRUCTION WALL FINISHES ARE TO ALIGN. TAPE,SPACKLE AND PAINT TO PROVIDE AN EVEN SURFACE OF UNIFORMCOLOR AND APPEARANCE.
22. FIELD VERIFY EXISTING DIMENSIONS AND CONDITIONS PRIOR TOFABRICATION OR INSTALLATION OF ANY ITEM. SHOULD CONDITIONSVARY FROM DRAWINGS, PLEASE CONTACT FSB.
24. DOOR LOCATIONS NOT DIMENSIONED ARE:A. JAMB FACE 6" (152mm) FROM FACE OF WALL.B. CENTER LINE OF DOOR ON CENTER LINE OF ROOM OR CORRIDOR.
SPECIFICATIONS
1. ALL PROJECTS ARE SUBJECT TO THE REQUIREMENTS OF THE SITE GUIDESPECIFICATION, AS ADAPTED FOR THIS SPECIFIC PROJECT. THE SITE GUIDESPECIFICATION IS BASED UPON THE UNIFIED FACILITIES GUIDESPECIFICATION (UFGS) ARMY VERSION, CURRENT EDITION.
2. CONTRACTOR WORKFORCE SHALL ALWAYS ADHERE TO THEREQUIREMENTS OF SECTION 01 45 00.10 50, QUALITY CONTROL FORMINOR PROJECTS, AND THE QUALITY ASSURANCE PARAGRAPH OF EACHINDIVIDUAL SPECIFICATION SECTION USED ON THE PROJECT.
3. DIVISION 01, GENERAL CONDITIONS OF THE CONTRACT, ARE ALWAYS INEFFECT FOR ALL PROJECTS.
4. THE CONTRACTOR WORKFORCE SHOULD CONTACT THE CFOAM PM,SHOULD ANY OF THE PROVISIONS OF THE SPECIFICATION REQUIRECLARIFICATION.
5. FOLLOW THE PROJECT QUALITY CONTROL PLANNING CHECKLIST.
6. PRODUCTS USED ON THE PROJECT SHALL COMPLY WITH THE STANDARDSLISTED IN THE REFERENCES PARAGRAPH OF THE APPLICABLESPECIFICATION SECTION.
7. PROVIDE SUBMITTALS AS CALLED FOR IN THE SUBMITTALS PARAGRAPH OFEACH SPECIFICATION SECTION. IN THE CASE WHERE STATION STANDARDPRODUCTS ARE BEING ORDERED, PROVIDE CONFIRMATION OF SUCH TOTHE DESIGNER OF RECORD.
8. ALL PRODUCTS USED ON THIS PROJECT SHALL CONFORM TO THEREQUIREMENTS OF THE PRODUCTS PORTION OF THE APPLICABLESPECIFICATION SECTION.
9. INSTALLATION OF MATERIALS SHALL CONFORM TO THE REQUIREMENTS OFTHE EXECUTION PORTION OF THE APPLICABLE SPECIFICATION SECTION. INALL CASES, FOLLOW THE MANUFACTURERS' WRITTEN INSTRUCTIONS.
10. THE QUALITY ASSURANCE PARAGRAPH OF EACH PROJECT SPECIFICATIONSECTION WILL PROVIDE A LISTING OF DEFINABLE FEATURES OF WORK,WHICH ARE THE BASIS FOR INSPECTIONS OF INSTALLED WORK.
11. CONTRACTOR IS REQUIRED TO CORRECT ALL NON-COMPLIANT WORKFOLLOWING THE ISSUANCE OF A FINDING OF NON-COMPLIANCE.
12. THE FOLLOWING SPECIFICATION SECTIONS ARE HEREBY INCORPORATEDINTO THE PROJECT CONTRACT DOCUMENTS:
A. DIVISION 01 - GENERAL REQUIREMENTS, COMPLETE
B. DIVISION 26 - ELECTRICAL
26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
DEMOLITION NOTES1. REFER TO MECHANICAL, ELECTRICAL, PLUMBING &
FIRE PROTECTION DEMOLITION DRAWINGS FORWORK NOT SHOWN ON ARCHITECTURAL DEMOLITIONDRAWINGS.
2. CONTRACTOR SHALL INVESTIGATE PROJECT EXISTINGCONDITIONS. BRING ANY CONFLICTS AND/ORDISCREPANCIES BETWEEN DRAWINGS,SPECIFICATIONS, AND SITE CONDITIONS AND ANYUNUSUAL OR SPECIAL CONDITIONS TO THEATTENTION OF SITE PROJECT MANAGER.
3. CONTRACTOR SHALL PROVIDE ALL TEMPORARYFACILITIES REQUIRED FOR A SAFE CONSTRUCTIONOPERATION. CARE SHALL BE TAKEN TO PROTECTEXISTING CONSTRUCTION, EQUIPMENT, FURNITUREAND PERSONNEL IN THE AREA OF CONSTRUCTION.
4. CONTRACTOR SHALL PATCH AND REPAIR ALLDAMAGE RESULTING FROM PROJECT WORK TOMATCH EXISTING ADJACENT SURFACES OR NEWWORK AS NOTED.
5. PROVIDE MATERIALS AND WORKMANSHIP WHENPATCHING/REPAIRING TO ACCURATELY MATCHSURROUNDING EXISTING AND/OR NEW WORK.
6. UPON COMPLETION OF WORK, REMOVE TOOLS,EQUIPMENT AND MATERIALS FROM THE SITE.REMOVE PROTECTIONS NO LONGER NEEDED ANDLEAVE INTERIOR AREAS BROOM CLEAN.
7. CEASE OPERATIONS AND NOTIFY THE PROJECTMANAGER IMMEDIATELY IF SAFETY OF STRUCTUREOR WORK AREA APPEARS TO BE ENDANGERED. TAKEPRECAUTIONS TO SUPPORT STRUCTURE AND SECUREAREA UNTIL DETERMINATION IS MADE FORCONTINUING OPERATIONS.
8. DRAWINGS OF AREAS NOT WITHIN THE PROJECTAREA OF WORK ARE NOT PART OF PROJECT SCOPEAND MAY NOT ACCURATELY REFLECT EXISTINGCONDITIONS.
9. CONTRACTOR SHALL KEEP THE PREMISES CLEANAND FREE FROM AN ACCUMULATION OF WASTEMATERIAL AND RUBBISH. AT THE END OF EACH WORKDAY, LEAVE THE AREA OF WORK IN A BROOM CLEANCONDITION. CONTRACTOR SHALL SUPPLY OWNTRASH BINS.
10. CONTRACTOR SHALL PROVIDE ADEQUATESUPERVISION FOR ALL PROJECT OPERATIONS. THESUPERVISOR SHALL HAVE THE NECESSARYKNOWLEDGE, EXPERIENCE AND AUTHORITY TOCONDUCT THE REQUIRED ACTIVITIES IN COMPLIANCEWITH THESE NOTES.
11. THE FACILITY IS TO REMAIN OPEN AND OPERATIONALDURING CONSTRUCTION. THE CONTRACTOR SHALLCOORDINATE WITH AND GET THE APPROVAL OF SITEPROJECT MANAGER IN ESTABLISHING THE HOURS OFOPERATION.
12. THE CONTRACTOR SHALL MAINTAIN THE REQUIREDTEMPORARY EXITS AND PATHS OF TRAVEL FROMBUILDING AREAS THAT DO NOT FALL WITHIN THESCOPE OF THIS CONTRACT.
MATERIAL SYMBOLS
NEW WALL/ PARTITION
WOOD, FRAMING
METAL STUD WALL
WOOD BLOCKING
INSULATION, RIGID
INSULATION, BATT
ACOUSTICAL TILE
GYPSUM BOARD
METAL
WALL/ PARTITIONTO BE DEMOLISHED
EXISTING WALL/ PARTITION
2C02C
NEW WORK
2C02C
DEMOLITION:
2G03
EXISTING
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
EXISTING ROOM NUMBER
EXISTING RAISED ACCESS FLOOR
EXISTING SUSPENDED CEILING
PARTITION TYPE
NEW DOOR
NEW ROOM NUMBER
NEW RAISED ACCESS FLOOR
NEW 2'x2' SUSPENDED CEILING
EXISTING WALL TO BE REMOVED
EXISTING DOOR TO BE REMOVED
EXISTING ROOM NUMBER TO BE REMOVED
EXISTING SUSPENDED CEILING TO BEREMOVED
EXISTING RAISED ACCESS FLOOR TO BEREMOVED
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
EQUIPMENT RECEPTACLE WALL MTD 6" BELOW SUSPENDED CEILING.
EQUIPMENT RECEPTACLE WALL MTD 12" AFF (UON)
EQUIPMENT RECEPTACLE MTD BELOW RAISED FLOOR
CONDUIT EMBEDDED IN OR BELOW CONCRETE SLAB OR UNDERGROUND
LOCAL CONTROL STATION, TYPE AS INDICATED ON DRAWINGS
EXISTING ELECTRICAL DUCT BANK/GROUND CONDUCTOR AS INDICATED
SV = SOLENOID VALVE, TS = TEMPERATURE SWITCH/TIME SWITCH
MOTOR OPERATED VALVE
TRANSFORMER
MAGNETIC MOTOR STARTER, MH AS INDICATED ON PLANS
HOMERUN TO SOURCE, SOURCE AND CIRCUIT NO.(S) SHOWN
FLUORESCENT LIGHT FIXTURE, STRIP OR INDUSTRIAL TYPE
COMBINATION MOTOR STARTER & CKT BKR, AS INDICATED ON PLANS
FLUORESCENT LIGHT FIXTURE, STRIP OR INDUSTRIAL TYPE,
INCANDESCENT OR HID LIGHT FIXTURE, UNSWITCHED ON EMERG/NL CKT
PANELBOARD, 208Y/120V, SURFACE MOUNTED
GROUND WIRE SYSTEM (DASHED=EXPOSED), WIRE SIZE SHOWN.
FLEXIBLE CONNECTION, SIZE AS INDICATED ON PLANS
MANUAL MOTOR SWITCH, WITH THERMAL OVERLOAD, MH + 4'-0" AFF UON
PANELBOARD, 480/277V, SURFACE MOUNTED
CONDUIT RUN, EXPOSED
CONDUIT RUN, CONCEALED
MECHANICAL UNIT IDENTIFICATION (TYPICAL). UH/4 INDICATES UNIT HEATER #4
2' x 4' FLUORESCENT LIGHT FIXTURE
UNSWITCHED ON EMERG/NL CKT (UON)
JUNCTION BOX, CEILING MOUNTED (SIZE PER 2005 NEC REQUIREMENTS)
PULL BOX OR ENCLOSURE.
J
PLAN SYMBOLSPANELBOARD, 208/120V FLUSH MOUNTED
PANELBOARD, 480/277V, FLUSH MOUNTED
TRACK LIGHTING CEILING MTD, NUMBER OF FIXTURES AS INDICATED
2' x 2' FLUORESCENT LIGHT FIXTURE
1' x 4' FLUORESCENT LIGHT FIXTURE
DASH AND BOLD MARK INDICATES ITEMS TO BE REMOVED
JUNCTION BOX, WALL MOUNTED, MH AS INDICATED ON PLAN DWGS
DEMOLITION NOTES
ONE-LINE SYMBOLS
CONDUIT TURNING UP
CONDUIT TURNING DOWN
UNDERFLOOR BOX FOR UTILITY POWER. POINT OF DISTRIBUTION.
UNDERFLOOR BOX FOR TECHNICAL POWERPOINT OF DISTRIBUTION.
MH + 6'-0"AFF TOHIGHEST BREAKER
CONDUIT HASH MARKS INDICATE NO. OF #12 IN CODE SIZE CONDUIT,3/4"C MIN. LONG MARK INDICATES NEUTRAL CONDUCTOR; GREENGROUND CONDUCTOR IS NOT SHOWN BUT SHALL BE PROVIDED.
JUNCTION BOX, MOUNTED ON SLAB UNDERFLOOR (SIZE PER 2005 NEC REQUIREMENTS)J
J JUNCTION BOX, MOUNTED ON SLAB UNDERFLOOR
TYPE 5-20R.
OVERLOAD ELEMENTS, NO. INDICATED, MOTOR CONTROLLER
SELECTOR SWITCH (SPDT), THREE POSITION
SOLENOID OPERATED VALVE COIL
SELECTOR SWITCH (SPST), TWO POSITION
TOGGLE SWITCH (SPST)
ONE-LINE SYMBOLS
AS = AMMETER SWITCH, VS = VOLTMETER SWITCH
MOTOR WITH HORSEPOWER INDICATED
CIRCUIT BREAKER, 3P, FRAME & TRIP RATING AS INDICATED
TS=CKT BKR TEST SWITCH, CS=CKT BKR CONTROL SWITCH
120 VAC SHUNT TRIP, SOLID IS NEW, DASHED IS FUTURE
CONTROL TRANSFORMER, 1Ø, WINDING VOLTAGES AS INDICATED
CONDUCTORS CONNECTED
CONDUCTORS NOT CONNECTED
A= AMMETER V= VOLTMETER
INTERLOCK CIRCUIT
INDICATES FEEDER No.
KEY INTERLOCK
AUTOMATIC TRANSFER SWITCH
EMERGENCY/STANDBY GENERATOR SET
GROUND CONNECTION
BATTERY, DC VOLTAGE AS INDICATED
HIGH VOLTAGE LOAD INTERRUPTER SWITCH, NON-FUSED
POWER TRANSFORMER, RATINGS AS PER SINGLE LINE
POWER TRANSFORMER WITH ELECTROSTATIC SHIELD
GROUNDING RESISTOR, RESISTANCE AS INDICATED
LOW VOLTAGE DRAWOUT CIRCUIT BREAKER
FUSE, TYPE AS INDICATED
DRAW-OUT STAB CONNECTOR
E.O. = ELECTRICALLY OPERATED
S
HARDWIRE CONNECTION TO EQUIPMENT AS INDICATED ON DRAWINGS.
PLUG STRIP
SERVICE OUTLET BOX, (1) SINGLE 5-20R ON TECHNICAL POWERAND (1) DUPLEX 5-20R ON UTILITY POWER.
VIDEO INTERFACE BOXV
FLASHING LIGHT
OCCUPANCY SENSOR, PASSIVE DUAL TECHNOLOGY, WIDE VIEW, WALL MTD,MH 8'-6"AFF. INFRARED/MICROPHONIC TECHNOLOGIES, a = SWITCHCONTROLLING LIGHTING FIXTURES WITH DESIGNATIONS SHADED PORTIONS OFSYMBOL INDICATE SENSOR INSTALLATION DIRECTION FOR MAXIMUM AREACOVERAGE, 6-DESIGNATES CONTROLLED CIRCUIT (OPEN OFFICE AREAS).
HEAVY LINE IS NEW WORK BY THE CONTRACTOR UON.
LIGHT LINE IS EXISTING WORK AND IS SHOWN FOR REFERENCE ONLY UON.
CONDUIT HASH MARKS INDICATE NO. OF #12 IN CODE SIZECONDUIT, 3/4"C MIN. LIGHT HASH MARKS INDICATE EXISTING 2WIRES; BOLD HASH MARKS INDICATE NEW WIRES, SIZE ASINDICATED.
ACCESS CONTROL REMOTE RELEASE BUTTON
LIGHTNING PROTECTION AIR TERMINAL
EMERGENCY POWER SWITCH ("EPO" BUTTON) ANNUCIATOR PANEL.
EQUIPMENT DISCONNECT SWITCH.
PUBLIC ANNOUNCER SYSTEM SPEAKER
M
M5
1. SOME SYMBOLS SHOWN ON THIS DRAWING ARE NOT BEING USED.
2. ENSURE POWER OUTAGE AUTHORIZATION IS APPROVED PRIOR TOSHUTTING ANY POWER SOURCE. COORDINATE ALL POWEROUTAGES WITH CFOAM PM AT LEAST ONE WEEK IN ADVANCE.
3. THE CONDUIT SYSTEM SHALL NOT BE USED AS EQUIPMENTGROUNDING. FOR SYSTEMS 600 VOLTS AND BELOW, ALL POWER ANDCONTROL/INSTRUMENTATION FEEDERS SHALL HAVE A GREENGROUND CONDUCTOR. ALL NON-CURRENT CARRYING PARTS OFSUCH EQUIPMENT, LIGHTING FIXTURES, RECEPTACLES, ETC SHALLBE GROUNDED BY MEANS OF A GREEN INSULATED GROUNDCONDUCTOR RUN IN THE RACEWAY WITH PHASE CONDUCTORSSIZED PER 2017 NEC (OR MOST CURRENT VERSION) UNLESSOTHERWISE INDICATED ON THE DRAWING.
4. ALL "SPARE" CONDUITS AND "CONDUIT ONLY" SHALL BE PROVIDEDWITH A 200 POUND NYLON PULLCORD.
5. ALL NOTES ON DRAWINGS WITHOUT OR ARE GENERALNOTES.
6. ALL CONDUIT ABOVE CEILING SPACE SHALL BE INSTALLED ABOVEMECHANICAL PIPING/DUCT WORK.
7. OCCUPANCY SENSORS SHALL BE OF THE TWO-WAY TYPE, WHICHDETECT CHANGES IN LOW INTENSITY, INAUDIBLE SOUND WAVES.SENSORS SHALL HAVE ADJUSTABLE SENSITIVITY AND TIME DELAY (15SEC. TO 30 MINUTES), AND MANUAL OVERRIDE SWITCH. SET SENSORTIME DELAY AT 10 MINUTES. ADJUST SENSITIVITY AS REQUIRED.SENSORS SHALL HAVE MULTIPLE FREQUENCIES TO ENABLESEPARATE CONTROL OF ADJACENT AREAS. THREE AREAS WHEREOCCUPANCY SENSORS SHALL BE PROVIDED ARE: OPEN OFFICESPACES, RESTROOMS, AND CORRIDORS. OCCUPANCY SENSORSSHALL BE CAPABLE OF OPERATION IN OPEN OFFICE SPACE WITHMODULAR OFFICE WALLS AT 84 INCHES HIGH.
8. FOR ALL TRANSFORMERS, THE SECONDARY NEUTRAL CONDUCTORSHALL BE GROUNDED IN ACCORDANCE WITH THE 2017 NEC (ORMOST CURRENT VERSION).
9. ALL CONTROL/POWER WIRING REQUIRED BUT NOT SHOWN FORTHERMOSTATS, CONTROLLERS, VARIABLE FREQUENCY DRIVECONTROL, MANUFACTURE EQUIPMENT CONTROL PANEL, DAMPERMOTORS, VARIABLE VOLUME CONTROLS, MOTORS, SMOKE DAMPERS,SENSING DEVICES SUCH AS TEMPERATURE, PRESSURE, HUMIDITY,LEVEL, FLOW, AND VOLUME ETC. SHALL BE PROVIDED BYCONTRACTOR AS PART OF INSTALLATION PACKAGE.
10. CONTRACTOR SHALL MAKE FINAL CONNECTION TO FLOOR BOXESAND LAN FDF RACKS FOR A COMPLETE FUNCTIONAL SYSTEM.
11. FIELD VERIFY AND UPDATE ALL POWER PANEL SCHEDULES.
12. ALL WORK SHALL BE IN ACCORDANCE TO THE LATEST VERSION OFUFGS SPECIFICATIONS.
13. CONTRACTOR SHALL NOT USE METAL CLAD CABLE UNLESS NOTEDON DRAWINGS.
14. ALL CONDUIT RUNS SHOWN ARE FOR ILLUSTRATION ONLY.CONTRACTOR SHALL FIELD VERIFY FOR EXACT CONDUIT ROUTINGPATHS. PROJECT MANAGER SHALL BE NOTIFIED IMMEDIATELY OFANY DEVIATIONS FROM THE DRAWINGS.
15. AREA SHALL BE CLEAN AND LEFT IN SAFE WORKING CONDITIONS PEROSHA REQUIREMENTS UPON COMPLETION OF PROJECT.
16. EACH NEW RECEPTACLE FEEDING A SERVER RACK IN DATA CENTERSHALL BE FED FROM A DEDICATED CIRCUIT. MULTIPLERECEPTACLES FED FROM THE SAME CIRCUIT SHALL NOT BEPERMITTED.
1. THE CONTRACTOR SHALL VERIFY ALL EXISTING EQUIPMENT SHOWNON THE DEMOLITION DRAWINGS TO BE REMOVED/RELOCATEDDURING THE JOB WALK.
2. WHERE EXISTING CIRCUITS FEED DEVICES TO BE REMOVED AND TOBE RELOCATED, CONTRACTOR SHALL MAINTAIN EXISTING CIRCUITCONTINUITY TO THE PORTION OF THE CIRCUIT REQUIRED TOREMAIN IN SERVICE.
3. CONTRACTOR SHALL REMOVE ALL DEMOLISHED ELECTRICALEQUIPMENT FROM THE SITE UNLESS OTHERWISE NOTED. WORKAREAS SHALL BE CLEAR PRIOR TO STARTING NEW ELECTRICALWORK.
4. ALL HOLES AND DAMAGE CAUSED BY ELECTRICAL DEMOLITION ANDMODIFICATIONS SHALL BE REPAIRED AND PAINTED TO MATCHADJACENT AREA AND EXISTING CONDITIONS.
5. THE CONTRACTOR SHALL COORDINATE ANY ELECTRICALDEMOLITION WITH THE GOVERNMENT BEFORE STARTING ANYWORK.
6. THE CONTRACTOR SHALL RETURN TO THE GOVERNMENT, ORPROVIDE THE GOVERNMENT WITH COMPENSATION FOR ANYTHINGSALVAGED.
7. PRIOR TO DE-ENERGIZING POWER SOURCE OF ANY EXISTINGRECEPTACLE IN A DATA CENTER, CONTRACTOR SHALL FIELD VERIFYTO ENSURE THE DEMOLISHED RECEPTACLE HAS NO POWER CORDPLUGGED INTO IT. IF A POWER CORD IS STILL PLUGGED IN THERECEPTACLE TO BE DEMOLISHED, CONTRACTOR SHALL NOTIFYPROJECT MANAGER IMMEDIATELY. ONLY END USER ISAUTHORIZED TO UNPLUG THE POWER CORD.
8. UNLESS OTHERWISE NOTED, WHEN MULTIPLE CIRCUITS RUN IN THESAME RACEWAY TO FEED MULTIPLE RECEPTACLES AND ONE OFTHOSE RECEPTACLES IS NOT IN USE. THE UNUSED RECEPTACLESHALL NOT BE DEMOLISHED AND IT SHALL REMAIN IN PLACE. LABEL CIRCUIT FEEDING THE UNUSED RECEPTACLE AS “U/F SPAREREC @ XXYY.” XXYY IS THE ACTUAL GRID LOCATION.
MEDIUM VOLTAGE DRAW-OUT VACUUM CIRCUIT BREAKER,SIZE AND CAPACITY AS INDICATED
ELECTRICAL CONNECTION
WINDOW TYPE CURRENT TRANSFORMER. 1-INDICATESNUMBER OF CT'S AND 50/5-INDICATES TURN RATIO
CURRENT TRANSFORMER. 3-INDICATES NUMBER OF CT'S AND2000/5-INDICATES CURRENT RATIO
COMBINATION STARTER FULL VOLTAGE NONREVERSING; 1 = NEMA STARTER SIZE
COMBINATION CONTACTOR, 1 = NEMA CONTACTOR SIZE
CONTACTOR, 1 = NEMA CONTACTOR SIZE
LIGHTING FIXTURE TYPE, SEE LIGHTING FIXTURE SCHEDULE MOUNTINGHEIGHT AFF IS AS INDICATED. FIXTURE IS SURFACE OR RECESSED MOUNTEDWHEN MOUNTING HEIGHT IS OMITTED.
FLUORESCENT LIGHT FIXTURE, LETTER a INDICATES ONE HALF ON NORMALPOWER SWITCHED LEG AND THE OTHER HALF UNSWITCHED ON EMERG/NLCIRCUIT. ABSENCE OF CONTROL SW LETTER INDICATES ENTIRE FIXTURE ISUNSWITCHED ON EMERG/NL CKT.
INCANDESCENT, COMPACT FLUORESCENT OR HID LIGHT FIXTURE, CEILING MOUNTED,UON
EXIT LIGHT, CEILING MTD, SINGLE OR DOUBLE FACE AS INDICATED BY THE NUMBER OFDIRECTIONAL ARROWS SHOWN. SHADED AREA INDICATES FACE OF THE EXIT SIGN.
INCANDESCENT OR HID LTG FIXTURE WALL MTD UON, MOUNTINGHEIGHT AS NOTED ON LIGHTING PLAN
EXIT LIGHT, BACK WALL MOUNTED, WITH OR WITHOUT DIRECTIONALARROW AS INDICATED. SHADED AREA INDICATES FACE OF THE EXITSIGN.
LIGHT SWITCH, WALL MTD 42" AFF., LETTERS AND NUMBERS INDICATE: a = SWITCHCONTROLLING LTG FIXTURES W/DESIGNATION; 3 = THREE WAY SWITCH; 2 =DOUBLE POLE, SINGLE THROW; D = DIMMER (20A, 120-277VAC)
OCCUPANCY SENSOR, PASSIVE DUAL TECHNOLOGY, WIDE VIEW, WALL MTD, MH42"AFF. INFRARED/MICROPHONIC TECHNOLOGIES, a = SWITCH CONTROLLINGLIGHTING FIXTURES WITH DESIGNATIONS SHADED PORTIONS OF SYMBOL INDICATESENSOR INSTALLATION DIRECTION FOR MAXIMUM AREA COVERAGE. (PRIVATEOFFICES). PROVIDE IVORY COLORED DECORATOR STYLE AND FIT INTO A SINGLEGANG SWITCH BOX.
OCCUPANCY SENSOR (INFRARED TECHNOLOGY), WIDE VIEW, WALL MTD, MH 6"BELOW CEILING, a = SWITCH CONTROLLING LIGHTING FIXTURES WITHDESIGNATION, SHADED PORTIONS OF SYMBOL INDICATE SENSOR INSTALLATIONDIRECTION FOR MAXIMUM AREA COVERAGE (CORRIDORS).
20A, 120V, 1 PHASE POWER-PACK: a = IDENTIFIES CONTROLLINGOCCUPANCY SENSOR(S). CIRCUIT NUMBER ON THE LIGHTING FIXTURESALSO FEEDS THE POWER PACK NEAREST TO THE FIXTURE.
EMERGENCY POWER OFF "EPO" BUTTON MOUNTED 42" AFF. BUTTON SHALL BE REDMUSHROOM TYPE, SPRING ACTION MOMENTARY CONTACT, AND 40MM CLEARHINGED LOCKOUT LIP.
QUADRUPLEX RECEPTACLE, (2)20A, 125V, 2P-3W, NEMA 5-20R, 18"AFF (UON).MOUNTED IN DOUBLE GANG UTILITY BOX
FLOOR UTILITY ACCESS BOX WITH NEMA TYPE RECEPTACLES AS INDICATED ONDRAWINGS.
DUPLEX CONVENIENCE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, 18"AFF (UON).GFCI INDICATES GROUND FAULT CURRENT INTERRUPTER.
SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, 54" AFF (UON).
DUPLEX CONVENIENCE RECEPTACLE ON EMERGENCY CIRCUIT, 20A, 125V, 2P-3W,NEMA 5-20R, 18" AFF (UON). RECEPTACLES SHOWN ON SYSTEMS FURNITUREPARTITION PANELS ARE LOCATED IN BASE OF PANELS. GFCI INDICATES GROUNDFAULT CURRENT INTERRUPTER
DUPLEX CONVENIENCE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, MOUNTEDAT CEILING.
DUPLEX CONVENIENCE RECEPTACLE, 15A, 125V, 2P-3W, NEMA 5-15R, MOUNTEDUNDER RAISED FLOOR
SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA 5-20R, MOUNTED UNDERRAISED FLOOR
TWIST LOCK RECEPTACLE, AMPACITY AND VOLTAGE AS INDICATED ONRENOVATION PACKAGE.
TWIST LOCK SINGLE RECEPTACLE, 20A, 125V, 2P-3W, NEMA L5-20R, MOUNTEDUNDER RAISED FLOOR
TWIST LOCK SINGLE RECEPTACLE, 30A, 125V, 1P-3W, NEMA L5-30R, MOUNTEDUNDER RAISED FLOOR
TWIST LOCK SINGLE RECEPTACLE, 30A, 250V, 2P-3W, NEMA L6-30R, MOUNTEDUNDER RAISED FLOOR
TWIST LOCK SINGLE RECEPTACLE, 20A, 208/120V, 3P-5W, NEMA L21-20R,MOUNTED UNDER RAISED FLOOR
TWIST LOCK SINGLE RECEPTACLE, 20A, 250V, 2P-3W, NEMA L6-20R, MOUNTEDUNDER RAISED FLOOR
TWIST LOCK SINGLE RECEPTACLE, 30A, 120/208V, 3Ø, 3P-5W, NEMA L21-30R,MOUNTED UNDER RAISED FLOOR
SYSTEMS FURNITURE PARTITION POWER ENTRY (UTILITYPOWER)
CLOCK OUTLET, WALLMOUNTED
POWER DISTRIBUTION UNIT. K RATEDISOLATION TRANSFORMER WITH THREESECTION, 126 POLE PANELBOARD.
EMERGENCY POWER OFF (EPO) SWITCH FOROPERATION OF SHUNT TRIP BREAKER.
WALL OR CEILING MOUNTED EMERGENCYLIGHTING UNITS MAINTENANCE FREE WITHLEAD-CALCIUM BATTERIES
STREET LIGHT, 277AC, ON 25' (VON) POLE AND METAL HALIDE SOURCE.
AREA/WALKWAY LIGHT, 277AC, ON 10' (VON) AND METAL HALIDE SOURCE.
DIRECT BURIED PULL BOX FOR ELECTRICAL POWER FEEDS. (MANHOLE)
ELECTRICAL MOTOR. SIZE, CONDUIT, ANDCONDUCTORS AS INDICATED ON ONE-LINE DIAGRAM
COMBINATION HIGH VOLTAGE SELECTOR AND LOADINTERRUPTER WITH MECHANICAL INTERLOCK
POTENTIAL OR CONTROL POWER TRANSFORMER WITHFUSES QUANTITY AND WINDING VOLTAGES AS INDICATED
SURGE ARRESTER, VOLTAGE RATING AND QUANTITY ASINDICATED
MAGNETIC ONLY CIRCUIT BREAKER WITH MOTOR CIRCUITPROTECTOR
LOW VOLTAGE DISCONNECT SWITCH NON FUSED, 30A/3P UON
LOW VOLTAGE FUSED DISCONNECT SWITCH, 3 POLE SIZE ASSHOWN 60A INDICATES SWITCH SIZE (50A) INDICATES FUSESIZE
COIL, R=RELAY, D=DAMPER MTR, M=MOTOR STARTER COIL,TC=TRIP COIL, TS=TIME SWITCH
STARTER RELAY CONTACT, NORMALLY OPEN, R-1=DEVICECONTACT NO.1CIRCUIT BREAKER AUXILIARY CONTACT, b = NORMALLYCLOSED.
TEMPERATURE SWITCH, NORMALLY OPEN, CLOSES ON INCREASINGTEMP
TEMPERATURE SWITCH, NORMALLY CLOSED, OPENS ON INCREASINGTEMPTIMER CONTACT, NORMALLY OPEN, TIME DELAY CLOSE ATENERGIZING
TIMER CONTACT, NORMALLY CLOSED, TIME DELAY OPEN ATENERGIZINGINSTANTANEOUS CLOSE WHEN RELAY IS ENERGIZED. TIMEDELAY OPEN WHEN RELAY IS DEENERGIZED.
INSTANTANEOUS OPEN WHEN RELAY IS ENERGIZED. TIMEDELAY CLOSE WHEN RELAY IS DEENERGIZED.
PILOT LIGHT, A-AMBER, B-BLUE, G-GREEN, R-RED, W-WHITE,Y-YELLOW
GENERAL NOTES
CEILING MOUNTED BEACON LIGHTR: REDB: BLUEY: YELLOW
E-001
ELECTRICAL NOTES,SYMBOLS AND
LEGEND
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
T
L1AUE
L1
ATA
L1ATBE L1ATBF L1ATBC
L1AUBB
L1ATE
L1ATBB
L1AUBD
L1
AU
G
L1ATBA
E-101
ELECTRICALDEMOLITION
PLANLOWER B&G BLOCK
INSTALL TEMPORARY CABLING FROM P1HUA TO THE JUNCTIONBOX SHOWN. THIS TEMPORARY WILL ALLOW FOR THEUNLOADING OF P1GUA TO MAKE ROOM FOR THE NEWEQUIPMENT. (SEE SHEET E-201 FOR NEW WORK IN THIS AREA)
REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-3. MCC-40 IS TOREMAIN AND BE REFED.
REMOVE HP1GUA, 112.5 KVA TRANSFORMER, P1GUA AND ALLASSOCIATED CONDUIT, CABLING AND JUNCTION BOXES BACKTO US-2.
REMOVE P1BUA AND THE THREE SUB PANEL FEEDS SHOWN.REMOVE EXISTING FEEDER FROM CONDUIT IN SLAB BACK TOPULL BOX IN LOWER C-BLOCK.
REMOVE SURFACE MOUNT PANELBOARD L1BUC AND ALLASSOCIATED FEEDERS.
DEMOLITION KEY NOTES:
1
LOWER B & G BLOCK - ELECTRICAL DEMOLITION PLAN 1E-101
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
SEE SHEET E-102 FOR CONTINUATION
2
3
4
2
3
1
1
4
EXISTINGIN SLAB
TO REMAIN
5
5
5
T
T T
L1CXB
DP1CXA
T
T
T
SUB US-2
SUB US-3
VF
D
T
T
T
T
T
ATS
T
UP
UP
UP
DN
UP
E-102
ELECTRICALDEMOLITION
PLANLOWER C BLOCK
EXISTING FEEDER TO REMAIN FOR REUSE. NO TEMPORARYNEEDED.
EXISTING FEEDER TO REMAIN FOR REUSE. INSTALLTEMPORARIES ACCORDING TO THE EXISTING FEEDERTABLES ON SHEETS E-702 & E-705.
EQUIPMENT AND ASSOCIATED FEEDER TO BE REMOVED BYOTHERS.
REMOVE 225KVA TRANSFORMER, SWITCH AND ASSOCIATEDCONDUIT AND CABLING FOR P1BUA.
REMOVE FEEDER AND ALL ASSOCIATED CONDUIT AND PULLBOXES. INSTALL TEMPORARIES ACCORDING TO THEEXISTING FEEDER TABLES ON SHEETS E-702 & E-705.
REMOVE EQUIPMENT, FEEDER AND ALL ASSOCIATEDCONDUIT AND PULL BOXES AFTER RELOCATING LOADSONTO NEW EQUIPMENT.
REMOVE EQUIPMENT AND FEEDER FROM CONDUIT IN SLABAFTER RELOCATING LOADS ONTO NEW EQUIPMENT.
REMOVE EXISTING SWITCHES, TRANSFORMERS AND 480VSWITCHGEAR. 5KV FEEDERS ARE TO REMAIN FOR REUSEUNLESS OTHERWISE NOTED.
REMOVE 5KV FEEDER CABLE BACK TO BUILDING 2802.
REMOVE SURFACE MOUNT PANELBOARD.
DEMOLITION KEY NOTES:
1
LOWER C BLOCK - ELECTRICAL DEMOLITION PLAN 1E-102
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
SEE SHEET E-101 FOR CONTINUATION
2
3
4
5
6
7
8
9
1
3
5 55
9
5
2
1 1
6
77
6
58
2
4
3
EXISTINGIN SLAB
TO REMAIN
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
8
10
10
L2
CTS
TS
1A
L2
CTS
TS
1B
T
E-103
ELECTRICALDEMOLITION
PLANUPPER C BLOCK
REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-3. MCC-21 IS TOREMAIN AND BE REFED.
REMOVE 480V 3-WIRE FEEDER CABLE AND ALL ASSOCIATEDCONDUIT AND PULLBOXES BACK TO US-2. MCC-20 IS TOREMAIN AND BE REFED.
REMOVE EQUIPMENT, FEEDER AND ALL ASSOCIATEDCONDUIT AND PULL BOXES AFTER RELOCATING LOADSONTO NEW EQUIPMENT.
REMOVE SURFACE MOUNT PANELBOARD.
DEMOLITION KEY NOTES:
1
UPPER C BLOCK - ELECTRICAL DEMOLITION PLAN 1E-103
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
2
3
1
2
3
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
4
4
5-4" CONDUITS
3-4" CONDUITS
2" CONDUIT
T
L1AUE
L1
ATA
L1ATBE L1ATBF L1ATBC
L1AUBB
L1ATE
L1ATBB
L1AUBD
L1
AU
G
L1ATBA
E-201
ELECTRICALNEW WORK
PLANLOWER B&G BLOCK
REFEED PANELS L1AUE, L1BUC, AND L1BUG FROML1CUMDP1 IN LOWER C-BLOCK.
INSTALL NEW 480V 3-WIRE FEEDER TO MCC-40 FROM US-3.
INSTALL NEW EQUIPMENT AND FEEDER FROM US-2.PROVIDE NEW HOUSEKEEPING PADS AS NECESSARY.
REFEED EXISTING HP1GUA AND P1GUA LOADS FROM NEWH1GUMDP1 AND L1GUMDP1 RESPECTIVELY.
INSTALL NEW SURFACE MOUNT PANELBOARD.
1
LOWER B & G BLOCK - ELECTRICAL NEW WORK PLAN 1E-201
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
SEE SHEET E-202 FOR CONTINUATION
NEW WORK KEY NOTES:
2
3
4
1
3 4
2
3
3
1
1
4
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
EXISTINGIN SLAB
TO REMAIN
5
5
5
1
T T
L1CXB
DP1CXA
T
T
T
SUB US-2
SUB US-3
VF
D
T
T
T
T
ATS
T
T
UP
UP
UP
DN
UP
E-202
ELECTRICALNEW WORK
PLANLOWER C BLOCK
INSTALL NEW BREAKERS IN L1CUMDP1 AND REFEED PANELSL1AUE, L1BUC, AND L1BUG.
INSTALL NEW FEEDER TO NEW H1GUMDP1 IN ROOM 1G14.
INSTALL NEW 480V 3-WIRE FEEDER TO MCC-40 IN ROOM1G14 FROM US-3.
RECONNECT EXISTING FEEDER CABLE TO NEW UNITSUBSTATION.
INSTALL NEW 480V 4-WIRE FEEDER TO EXISTING 3-WIREMCC-20 & 21. CAP OFF AND SECURE NEUTRALCONDUCTORS ON BOTH ENDS FOR FUTURE USE.
INSTALL PULL BOX NEAR THE MCC TO ACCOMMODATEFUTURE REPLACEMENT OF THE EQUIPMENT.
INSTALL NEW EQUIPMENT AND FEEDER FROM US-3.
REFEED EXISTING HP1CUA AND P1CUA LOADS FROM NEWH1CUMDP2 AND L1CUMDP2 RESPECTIVELY.
INSTALL NEW FEEDER TO NEW H2CUMDP1 IN ROOM 2U01.
EXTEND EXISTING HOUSKEEPING PAD APPROXIMATELY 12"TO SUPPORT NEW SWITCHGEAR.
INSTALL NEW CLOSE COUPLED SWITCHES, TRANSFORMERSAND 480V SWITCHGEAR PER SPECIFICATIONS. ALLEQUIPMENT TO BE FITTED WITH IR WINDOWS TO ALLOW FORINFRARED SCANNING OF ALL CRITICAL BUS AND CABLECONNECTIONS WHILE ENERGIZED.
INSTALL NEW 5KV FEEDER FROM BLDG. 2802.
INSTALL NEW SURFACE MOUNT PANELBOARD.
1
LOWER C BLOCK - ELECTRICAL NEW WORK PLAN 1E-202
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
SEE SHEET E-201 FOR CONTINUATION
NEW WORK KEY NOTES:
2
3
4
5
6
7
8
9
4
7 8
7 8 7
5
65
5
6 4
9
1
4
5
3
2
4 4
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
10
11
12
1010
1111
EXISTINGIN SLABTO REMAIN
13
13
12
L2
CTS
TS
1A
L2
CTS
TS
1B
T
E-203
ELECTRICALNEW WORK
PLANUPPER C BLOCK
INSTALL NEW 480V 4-WIRE FEEDER TO EXISTING 3-WIREMCC. CAP OFF AND SECURE NEUTRAL CONDUCTORS ONBOTH ENDS FOR FUTURE USE.
INSTALL PULL BOX NEAR THE MCC TO ACCOMMODATEFUTURE REPLACEMENT OF THE EQUIPMENT.
INSTALL NEW EQUIPMENT AND FEEDER FROM US-2.
REFEED EXISTING HP2CUA AND P2CUA LOADS FROM NEWH2CUMDP1 AND L2CUMDP1 RESPECTIVELY.
INSTALL NEW SURFACE MOUNT PANELBOARD.
1
UPPER C BLOCK - ELECTRICAL NEW WORK PLAN 1E-203
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
3/32"= 1'-0"
NEW WORK KEY NOTES:
2
3
4
3 443 3
21
1
2
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH THEFSB PROJECT MANAGER.
5. SEE E-600 SERIES FOR PANEL SCHEDULES.
6. SEE E-700 SERIES FOR PARTIAL ONE-LINE DIAGRAMS ANDFEEDER TABLES.
GENERAL NOTES:
5
5
E-501
US-2ELECTRICAL
DETAILS
US-2 - ELECTRICAL SWITCH DETAIL 1E-501
KIRK KEY INTERLOCKS TO BE COORDINATEDBETWEEN SWITCH AND DISTRIBUTIONMANUFACTURERS.
1
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
NEW WORK KEY NOTES:1
E-502
US-3ELECTRICAL
DETAILS
US-3 - ELECTRICAL SWITCH DETAIL 1E-502
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
KIRK KEY INTERLOCKS TO BE COORDINATEDBETWEEN SWITCH AND DISTRIBUTIONMANUFACTURERS.
1
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
NEW WORK KEY NOTES:1
E-601
ELECTRICALPANEL
SCHEDULES
GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR
CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
REPLACE SURFACE MOUNT PANELBOARD.1
NEW WORK KEY NOTES:
1
1 1
1
E-602
ELECTRICALPANEL
SCHEDULES
GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR
CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
REPLACE SURFACE MOUNT PANELBOARD.1
NEW WORK KEY NOTES:
1
1
1
1
E-603
ELECTRICALPANEL
SCHEDULES
GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR
CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
REPLACE SURFACE MOUNT PANELBOARD.1
NEW WORK KEY NOTES:
1 1
1 1
E-604
ELECTRICALPANEL
SCHEDULES
GENERAL NOTES:1. PANEL SCHEDULES ON THIS SHEET ARE FOR
CONSTRUCTION PURPOSES. UPON COMPLETION OFTHIS PROJECT A REDLINED COPY OF THE PANELSCHEDULE IN THE FIELD WILL BE PROVIDED TO FSBFOR THE PURPOSE OF UPDATING THE PANELSCHEDULE DATABASE. FSB WILL UPDATE THEDATABASE AND PROVIDE A NEW "AS-BUILT"HARDCOPY TO REPLACE THE "REDLINE" IN THE FIELD.
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
REPLACE SURFACE MOUNT PANELBOARD.1
NEW WORK KEY NOTES:
1 1
11
E-701
US-2ONE-LINE DIAGRAMDEMOLITION PLAN
US-2 - ONE-LINE DIAGRAM - DEMOLITION PLAN 1E-701
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
E-702
US-2FEEDER TABLES
US-2 - EXISTING FEEDER TABLE 1E-702
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
US-2 - NEW FEEDER TABLE2E-702
E-703
US-2ONE-LINE DIAGRAMNEW WORK PLAN
US-2 - ONE-LINE DIAGRAM - NEW WORK PLAN 1E-703
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL CONDUIT AND CABLE ROUTING SHOWN IS APPROXIMATE,FIELD VERIFY PRIOR TO INSTALLATION.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONSPRIOR TO STARTING DEMOLITION. NOTIFY FSB PROJECTMANAGER IN WRITING WHERE DISCREPANCIES OCCUR.
4. SEE E-600 SERIES FOR PARTIAL ONE-LINE DIAGRAM ANDPANEL SCHEDULES.
5. ALL 480 VOLT CONDUITS AND CONDUCTORS WITHIN SCOPE
OF WORK ARE 3.5" EMT WITH (3) 600 KCMIL AND 1 3/0 GROUND
UNLESS NOTED.
6. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
E-704
US-3ONE-LINE DIAGRAMDEMOLITION PLAN
US-3 - ONE-LINE DIAGRAM - DEMOLITION PLAN 1E-704
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OFUFGS.
2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
E-705
US-3FEEDER TABLES
US-3 - EXISTING FEEDER TABLE 1E-705
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.
US-3 - NEW FEEDER TABLE2E-705
E-706
US-3ONE-LINE DIAGRAMNEW WORK PLAN
US-3 - ONE-LINE DIAGRAM - NEW WORK PLAN 1E-706
1. UNLESS OTHERWISE NOTED, ALL WORK SHALL BE INACCORDANCE TO NEC 2017 AND LATEST VERSION OF UFGS.
2. ALL DEMOLITION TO BE COORDINATED WITH THE PROJECTMANAGER.
GENERAL NOTES:
STATUS:
DESIGNER:
PROJECT INFORMATION
DESCRIPTION
REVISIONS:
REV.
SHEET TITLE
PROJECT #:
DATE
DRAWN BY:ENGINEERED BY:
CHECKED BY:
EntCadStd-v2.1 3/10/15
WORK # :
DRAWING NUMBER
CONSTRUCTION
KEY PLAN:
PROJ MGR:
LOCATION:
APPROVALS:
DESIGN MGR:
90% SUBMITTAL
NOT FOR
1U01:RECAP US-2 & US-3
01/09/19
80086086
4020847
EMG
STEVE K.
STEVE K.
DAVE K.
ERROL B.