Designing with Data: How to realise the benefits of offsite constructionConstructing Excellence Oct 2019
Digital Building Components offsite saves 10–20% on overall cost and improves installation efficiency by 20-30%
Offsite manufacturing is 50% faster than traditional methods
Modular construction can reduce the energy used in the
construction process by 67% and waste produced onsite by
between 70% and 90% in comparison with traditional
construction methods
Using more technology we could cut energy use, create highly-skilled jobs and build a new export market
Science & Ops
Aircraft hangar
Wharf
Accommodation
Site Infrastructure
STR
Kit of Partsaspiration
MEP
Complex site constraints with varied demands
Facades
GEO
CIV
Sustainability
Station Operation
Programme risk
Supply chain setup
Flexibility
Key Drivers
Suitable for:
• Specific buildings
• Development plots
• Masterplan phases
• Standardised product/platforms
▪ In situ concrete - flat slab▪ Post Tensioned concrete▪ Precast concrete floors & walls▪ Steel frame▪ Light gauge steel▪ ASB beams with precast floors▪ Volumetric steel with concrete core▪ Volumetric steel with steel core ▪ Light gauge modules within steel frame▪ Corner loaded steel modules▪ Hybrid modular - concrete floor▪ Cross Laminated Timber▪ CLT with concrete core▪ CLT/Timber modular▪ Glulam beams with CLT floors▪ Concrete core, glulam perimeter▪ Steel frame with CLT floors
Technical Constraints
Decision Drivers
Long List Short List
Optimisation for maximum number of standardised modules
Hybrid looking for least wastage and standardised modules
Modular arrangement to best fit current building design
PRECAST RC
PT RCIN SITU RC
VOLUMETRIC STEEL
Metric 1
Metric 2
Metric 3
Metric 4
Metric 5
Metric 6
Metric 7
…
In
-Sit
u
Po
st
Ten
sio
ned
Precast
CLT
Mo
du
lar
Offsite Technical & Supplier Database
Project Specific Analysis
Standardisation Offsite Manufacture
Digitalisation
01
CollaborationValue led designStandardarisation
Embedded supply chainIntegrated programme
Product development
RiskContractsShared incentives
0203