Scope of Works
Detailed Engineering Analysis Existing Buildings
UTTARON TECHNOLOGIES
General Supply and Engineering Solutions
![Page 2: Detail Engineering Assessment for Existing Buildings](https://reader036.vdocument.in/reader036/viewer/2022073018/55cf968e550346d0338c4a58/html5/thumbnails/2.jpg)
UTTARON TECHNOLOGIES
General Supply and Engineering Solutions
Page 2 of 4
Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com
Terms and Conditions: Detail Engineering Assessment for Structural Safety 1. Deliverable: Report and As‐built Drawing in line with the codes and regulations.
2. Scope of Work: Limited to evaluation only not covers any retrofitting works.
A. Concrete & Reinforcement Configuration Tests :
I. In‐situ 4”/3” core cutting & testing from BUET lab by Universal testing machine (UTM) for determine
compressive strength of concrete. Core gives the actual compressive strength of particular concrete, but
it is advisable to collect minimum number of core from existing building. At least 4 Nos of core (per
building) may be sufficient. UPV and Rebound Hammer will be used on the same spot of coring and
determine compressive strength separately. The calibrated results of core test and UPV & Hammer shall
be used to determine a reliable value of concrete strength. Thus the compressive strength of concrete
for all key load caring structural members of the structure will be determined by UPV & Hammer.
II. Test of rebar for tensile strength.
III. Using the above mentioned correlation from core test and UPV with Hammer test regarding compressive
strength, UPV and hammer will be used at least 15 spot (/building) to determine the compressive
strength of key structural Elements.
IV. In‐Situ Scanning test – Using Ferro Scan (Existing Rebar detection) at least 15 nos. per building.
B. Soil Test:
Soil test at minimum four locations.
C. Foundation Explorations:
At least Three (If required more) Foundation (/Building) will be explored to verify its size with existing design drawings.
D. Structural Design for check existing structure:
I. Analysis of sub‐soil investigations report.
II. Develop computer simulated Finite element model (With Etabs/ Sap) by using concrete compressive
strength and rebar tensile test data.
III. Analysis will be performed as per Guideline of BNBC 2006.
IV. Checking of structural stability and safety.
V. Checking of lateral load resistance capacity of the Building
VI. Design check for soft story & Dynamic Load (For earthquake & Wind load)
VII. Checking of Special joint detail for earthquake or other lateral load.
![Page 3: Detail Engineering Assessment for Existing Buildings](https://reader036.vdocument.in/reader036/viewer/2022073018/55cf968e550346d0338c4a58/html5/thumbnails/3.jpg)
UTTARON TECHNOLOGIES
General Supply and Engineering Solutions
Page 3 of 4
Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com
E. Report & As built Drawing:
I. As Built architectural drawing.
II. As built structural drawing.
III. Detail Engineering Assessment reports.
3. Client’s Responsibility:
I. Any previous record on major incidents
II. Providing the concerned departmental personnel to ease the inspection
III. Procuring all sorts of permission and formalities from the authorities/bodies
IV. Ensuring the work environment to conduct the inspections
V. The machine / occupancy layout plan in CAD format if available
VI. Detailed load of each floor/equipment with signature
VII. Existing structural drawings, soil test report and test report and other relevant documents if available
VIII. Providing labor during test and foundation exploration
4. Contingency:
Deliverable may delayed due to following issues
I. Absent of proper information and desired documents
II. Natural disasters
III. Road Blockage
IV. Instability at factory level due to workers vexation
V. Any unwanted situation beyond control
5. Consultancy Fees: Project: Evaluation of Existing Building(s)
Sl No. Name of the Work Fees (BDT)
1 As built architectural drawing.
2 As built structural drawing.
3 In‐Situ per core cutting & testing (with scanning), Testing
at BUET lab.
4 Rebar test
5 In‐Situ Ultra Sonic Pulse Velocity Test and Hammer test
with report
6 Rebar Scanning test with report
7
Soil Test (60’‐100’ Boring)
Soil Exploration for confirmation of Foundation size and Depth. At least Three for each building. Owner will
engage man power for soil exploration.
8 Model based analysis (Using Finite Element software
ETABS/ SAP) For Existing Structure with report.
![Page 4: Detail Engineering Assessment for Existing Buildings](https://reader036.vdocument.in/reader036/viewer/2022073018/55cf968e550346d0338c4a58/html5/thumbnails/4.jpg)
UTTARON TECHNOLOGIES
General Supply and Engineering Solutions
Page 4 of 4
Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com
6. Payment Schedule: Fee will be payable by the client in installments as follows:
Item Service Phase Fee
1 Material test fee with work order 50% of Total fee
2 After Submission of Non Destructive test result with analysis
report and draft report. And As built drawings. 20% of Total fee
3 Submission of Analysis and Final Report result. 20% of Total fee
4 After Meeting with Accord appointed structural Engineer and
full fill all requirements. 10% of Total fee
†Note: Quoted amount will not include any type of government tax or vat. Quoted amount excluding the design of retrofit work.
Also the quoted amount may change with the additional works.
7. Time Schedule: 3 to 5 working weeks (from the date of payments, may vary depending on the availability of equipment).