Detail Engineering Assessment (DEA) can reveal the weakness of a buiding structure.

TRANSCRIPT

Page 1: Detail Engineering Assessment for Existing Buildings

 

 

 

 

 

 

 

 

Scope of Works

Detailed Engineering Analysis Existing Buildings

UTTARON TECHNOLOGIES

General Supply and Engineering Solutions

 

Page 2: Detail Engineering Assessment for Existing Buildings

UTTARON TECHNOLOGIES

General Supply and Engineering Solutions

Page 2 of 4 

  Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com 

 

Terms and Conditions: Detail Engineering Assessment for Structural Safety  1. Deliverable: Report and As‐built Drawing in line with the codes and regulations.   

 2. Scope of Work: Limited to evaluation only not covers any retrofitting works.  

 A. Concrete & Reinforcement Configuration Tests : 

 I. In‐situ 4”/3”  core  cutting &  testing  from BUET  lab by Universal  testing machine  (UTM)  for determine 

compressive strength of concrete. Core gives the actual compressive strength of particular concrete, but 

it  is advisable  to  collect minimum number of  core  from existing building.   At  least 4 Nos of  core  (per 

building) may be  sufficient. UPV  and Rebound Hammer will be used on  the  same  spot of  coring  and 

determine compressive strength separately. The calibrated results of core test and UPV & Hammer shall 

be used to determine a reliable value of concrete strength. Thus the compressive strength of concrete 

for all key load caring structural members of the structure will be determined by UPV & Hammer.    

II. Test of rebar for tensile strength.  

III. Using the above mentioned correlation from core test and UPV with Hammer test regarding compressive 

strength,  UPV  and  hammer  will  be  used  at  least  15  spot  (/building)  to  determine  the  compressive 

strength of key structural Elements. 

IV. In‐Situ Scanning test – Using Ferro Scan (Existing Rebar detection) at least 15 nos. per building. 

 

B. Soil Test: 

Soil test at minimum four locations.  

C. Foundation Explorations: 

At  least Three  (If  required more) Foundation  (/Building) will be explored  to verify  its size with existing design drawings.  

D. Structural Design for check existing structure: 

I. Analysis of sub‐soil investigations report. 

II. Develop  computer  simulated  Finite  element model  (With  Etabs/  Sap)  by  using  concrete  compressive 

strength and rebar tensile test data.  

III. Analysis will be performed as per Guideline of BNBC 2006. 

IV. Checking of structural stability and safety. 

V. Checking of lateral load resistance capacity of the Building  

VI. Design check for soft story & Dynamic Load (For earthquake & Wind load) 

VII. Checking of Special joint detail for earthquake or other lateral load. 

     

 

Page 3: Detail Engineering Assessment for Existing Buildings

UTTARON TECHNOLOGIES

General Supply and Engineering Solutions

Page 3 of 4 

  Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com 

 

 E. Report & As built Drawing: 

I. As Built architectural drawing. 

II. As built structural drawing. 

III. Detail Engineering Assessment reports. 

 3. Client’s Responsibility:  

I. Any previous record on major incidents 

II. Providing the concerned departmental personnel to ease the inspection 

III. Procuring all sorts of permission and formalities from the authorities/bodies 

IV. Ensuring the work environment to conduct the inspections 

V. The machine / occupancy layout plan in CAD format if available  

VI. Detailed load of each floor/equipment with signature 

VII. Existing structural drawings, soil test report and test report and other relevant documents if available 

VIII. Providing labor during test and foundation exploration 

 4. Contingency:  

Deliverable may delayed due to following issues  

I.   Absent of proper information and desired documents 

II.   Natural disasters 

III.   Road Blockage 

IV.   Instability at factory level due to workers vexation 

V.   Any unwanted situation beyond control 

5. Consultancy Fees: Project: Evaluation of Existing Building(s) 

 

Sl No.  Name of the Work  Fees (BDT) 

1  As built architectural drawing.

 

2  As built structural drawing. 

3 In‐Situ per core cutting & testing (with scanning), Testing 

at BUET lab.

4  Rebar test 

5 In‐Situ Ultra Sonic Pulse Velocity Test and Hammer test 

with report

6  Rebar Scanning test with report 

Soil Test (60’‐100’ Boring) 

Soil Exploration for confirmation of Foundation size and Depth. At least Three for each building. Owner will 

engage man power for soil exploration. 

8 Model based analysis (Using Finite Element software 

ETABS/ SAP) For Existing Structure with report.

                   

 

Page 4: Detail Engineering Assessment for Existing Buildings

UTTARON TECHNOLOGIES

General Supply and Engineering Solutions

Page 4 of 4 

  Apartment 402, Configure Shadhona, 3E South KallyanpurDhaka‐ 1207, Bangladesh. Hotline‐ 0167 8631 636, 8802 809 1611 Email: info@uttaron‐technologies.com Web: www.uttaron.webs.com 

 

 

6. Payment Schedule: Fee will be payable by the client in installments as follows:  

Item  Service Phase  Fee 

1  Material test fee with work order  50% of Total fee 

2 After Submission of Non Destructive test result with analysis 

report and draft report. And As built drawings. 20% of Total fee 

3  Submission of Analysis and Final Report result.  20% of Total fee 

4 After Meeting with Accord appointed structural Engineer and 

full fill all requirements. 10% of Total fee 

†Note: Quoted amount will not include any type of government tax or vat. Quoted amount excluding the design of retrofit work. 

Also the quoted amount may change with the additional works. 

7. Time Schedule:  3 to 5 working weeks (from the date of payments, may vary depending on the availability of equipment).