detector systems update mico march 17, 2008. mice detector systems ckov u mississippi team @ ral ...

3
Detector Systems Update MICO March 17, 2008

Upload: abraham-adams

Post on 17-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Detector Systems Update MICO March 17, 2008. MICE Detector Systems  CKOV u Mississippi Team @ RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing

Detector Systems Update

MICO March 17, 2008

Page 2: Detector Systems Update MICO March 17, 2008. MICE Detector Systems  CKOV u Mississippi Team @ RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing

MICE Detector Systems

CKOV Mississippi Team @ RAL

TOF0/1 Hamamatsu PMT assemblies show an increasing rate of failures

(discharging tubes) under an heavy test cycle that includes cosmics for some days + laser pulses runs with signals ~MIP and rates up to 1 MHZ. This has implied changes to installed counters. Up to now 8 broken tubes (resent to Hamamatsu) + 10 discharging tubes (to be resent). No news from Hamamatsu about this problem.

Delivery schedule for TOF1/2 PMTs not matched by Hamamatsu. Tracker

Work continues on AFEII firmware Calorimeter

Tests and calibrations of KL are going on; The mech. table, previously used for the assembling of KL modules,

has been modified and reinforced to realize a provisional trolley to be placed temporarily at the tracker's place; it can support KL with his trigger counters and, if available, the SW prototype.

As soon as drawings of the second Virostek plate and, consequently, of the TOF2 shielding frame are available the construction of the final trolley for all downstream detectors can start.

Page 3: Detector Systems Update MICO March 17, 2008. MICE Detector Systems  CKOV u Mississippi Team @ RAL  TOF0/1 u Hamamatsu PMT assemblies show an increasing

Beam Monitors Beam Monitors and electronics at London Heathrow Fermilab Team arrives at RAL on 3/24 for installation and

commissioning