Developing the First Grid Connected Solar PV in Indonesia by Abraham Mose, CEO of PT Len Industri (Persero) BALI CLEAN ENERGY FORUM Nusa Dua, 11-12 February 2016

Upload: phammien

Post on 01-Jul-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

Developing the First Grid Connected Solar PV

in Indonesia

by Abraham Mose, CEO of PT Len Industri (Persero)

BALI CLEAN ENERGY FORUM

Nusa Dua, 11-12 February 2016

Page 2: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

1

Project Background

National Energy Policy

National Energy Mix 20251

To increase the use of renewable

energy by total 23% of national energy

in 2025, including the solar energy for

power plant

Decree of Ministry of Energy and Mineral Resources

No. 17 / 20132

Feed in tariff for solar power plant.

Maximum at USD 25 cents per kWh with

additional incentive USD 5 cents for

local solar module application

Decree of Director General of New and Renewable Energy

and Energy Conservation No. 979 K/29/DJE/20133

Capacity Quota for Solar Power Plant

80 Sites,140 MWp.

Kupang 5 MW was included in the 7 first

sites to be tendered

Page 3: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

2

Capacity Quota for PV Power Plant (2013)

80 LOCATIONS OF CAPACITY QUOTA FOR PV POWER PLANT

2013

Page 4: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

3

Why Len ?

Page 5: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

4

The First PPA in Solar Energy

1

2Electricity Price

USD 0.25/kWh during

20 years period

Page 6: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

5

Site Location

Location

Coordinate

Avg. ESH

Desa Oelpuah, Kupang Regency, East Nusa Tenggara

123o 44’55” E | 10o8’58” S

6.38, lowest at 5.52 (kWh/m2/day)

Summer Season Approximately 8 months / year

Area Above 75.000 m2

ESH : Equivalent Sun Hour

ENT : East Nusa Tenggara

Electrification Ratio of ENT 58.91%, the second lowest level in Indonesia

Page 7: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

6

Site Position to the Grid (nearest feeder point)

Page 8: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

7

Site Survey

Page 9: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

8

Feasibility Analysis

(5,000,000)

0

5,000,000

10,000,000

15,000,000

20,000,000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

8.58years

USD792.635

PBP NPV

18.40%

IRR

Accumulated Cashflow

Investment Cost USD 11.200.000

EPC

7% 3%

Other Expenses (Legal, Admin, Bank) Land

90%

Financial Source70%30%

Equity Loan

Page 10: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

9

Construction Schedule

DecNovOctSepAugJulJunMayAprMarFebJan

Financial Closing

Procurement & Logistics

Land Clearing & Civil Works

Concrete Works

Metal Support Inst.

Water & Drainage System

Control Room

Road Works

CCTV

Solar Module Installation

Combiner & Inverter

Monitoring & Weather Inst.

Transformer & Switch Gear

Commissioning Certificate

COD

civil

mechanical & electrical

2015

Page 11: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

10

General Block Diagram

Page 12: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

11

General PV Arrays Design

Page 14: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

13

Pictures from Kupang

Land Clearing & Civil Works

Concrete Works

Page 15: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

14

Pictures from Kupang

Metal Support Inst.

Water & Drainage System

Control Room

Road Works

Page 16: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

15

Pictures from Kupang

Solar Module Installation

Page 17: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

16

Pictures from Kupang

Combiner & Inverter

Monitoring & Weather Inst.

Transformer & Switch Gear

Page 18: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

17

Pictures from Kupang

Page 19: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

18

Pictures from Kupang

Page 20: Developing the First Grid Connected Solar PV in Indonesia · Developing the First Grid Connected Solar PV in Indonesia ... Capacity Quota for Solar Power Plant ... the second lowest

19

Pictures from Kupang