Development and Construction Planning

Lessons Learned from the Earthquake(s)

Mark Allan NZIS President

Page 2: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Learned Response

•  ChristchurchEarthquakeSequence•  KaikouraEarthquakeSequence•  AllianceModelsSCIRTNCTIR•  ChristchurchPropertyBoundariesandRelatedMatters

Act•  GeotechnicalEngineering•  CivilEngineering

Page 3: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Kaikoura

14November2016Magnitude7.8

Page 4: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1

February 22nd 2011 – Magnitude 6.3 June 13th 2011 – Magnitude 6.0

December 23rd 2011 – Magnitude 6.0 More than 18,000 aftershocks

Kaikoura Earthquake Sequence

November 14th 2016 – Magnitude 7.8 More than 18,000 aftershocks

Page 5: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Alliance Models

•  SCIRT-StrongerChristchurchInfrastructureRebuildTeam•  NCTIR-NorthCanterburyTransportInfrastucture

Recovery•  AlliancesformedbetweenOwnerParticipants,NonOwner

ParticipantsandSub-Contractors

Page 6: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Enable Networks | External Timesheets | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | ProjectCentre | SKM | Stronger Christchurch Team | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Enable Networks | External Timesheets | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | ProjectCentre | SKM | Stronger Christchurch Team | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Enable Networks | External Timesheets | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | ProjectCentre | SKM | Stronger Christchurch Team | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Enable Networks | External Timesheets | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | ProjectCentre | SKM | Stronger Christchurch Team | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Beca I Opus I URS I GHD I Enable Networks | External Timesheets | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | ProjectCentre | SKM | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Enable Networks | Harrison Grierson Consultants Limited | Lawson Consulting 2008 Ltd | MWH | Octa Associates Ltd | Orion | Powell Fenwick Consultants | SKM | Stronger Christchurch Team | Telstra | Test Co | Underground Overground Archaeology Ltd | Vodafone | Woods | WT Partnership | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Enable Networks | Harrison Grierson Consultants Limited I Beca I Opus I URS I GHD | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Cardno Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy| CPG New Zealand Ltd | Davie, Lovell-Smith Ltd |e2 Environmental Ltd |Eliot Sinclair & Partners Ltd |Cardno | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Bond Construction Management | Cardno | Chorus | Churchill LDS | City Care | Civil Solutionz | Clark Fortune McDonald & Associates - Surveyors | Contact Energy | CPG New Zealand Ltd | Davie, Lovell-Smith Ltd | e2 Environmental Ltd | Eliot Sinclair & Partners Ltd | Andersen & Associates Ltd | Aurecon | Eliot Sinclair & Partners Ltd | Bond Construction Management | Chorus | Churchill LDS | City Care | Civil Solutionz | CPG New Zealand Ltd | Eliot Sinclair & Partners

OwnerParticipants

Non-OwnerParticipants

Page 7: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About SCIRT

TheStrongerChristchurchInfrastructureRebuildTeam(SCIRT)wascreatedin2011bytheCanterburyEarthquakeRecoveryAuthoritytorebuildChristchurch’searthquakedamagedhorizontalinfrastructure.SCIRT’sjobwastoprovideacost-effectiveandefficientvehicletoquicklygetthecity'scivilinfrastructurebackonitsfeet.SCIRTisanalliancepartnershipbetween:OwnerParticipants-ChristchurchCityCouncil(CCC),CanterburyEarthquakeRecoveryAuthority(CERA),NewZealandTransportAgency(NZTA)andNonOwnerParticipants–contractors;CityCare,McConnellDowell,Downer,Fletcher,FultonHogan.

Page 8: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About SCIRT

SCIRTwasdefinedveryearlyasa5yearprogramme,transitioningfromemergencyrecoverytoamorebusinessasusualapproachasworksprogressed.SCIRTwasbasedonanallianceagreementbetweennationalandlocalgovernmentandfivecivilengineeringcontractors,butwasnotaconventionalalliance.Thecontractordeliveryteamscompetedforconstructionwork,whichwasallocatedaccordingtoperformanceinbothcostandnon-costKeyResultAreas(KRAs).Strongdriverswerecreatedforbothcompetitionandcollaboration.

Page 9: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About SCIRT

"Thosecompanieswhoperformedbetterwereallocatedmorework,"saidSCIRTExecutiveGeneralManagerIanCampbell."Deliveryteamswerepaidafeebasedonthetargetcostofworkdone.Poorperformancethereforemeantlessfeeearned;goodperformanceincreasedthefee."Thedifferencebetweentargetcost(budget)andactualcostforeachprojectwasaddedtoagainshare/painsharepot,ashareofwhich(nominally50%butvariabledependingonnon-costperformance)waspaidto(orpaidby)thecontractorsattheendoftheprogrammeaccordingtotheamountofworkeachhaddone.Thisencouragedcollaborationbecauseallcontractorsneededtoperformtoensureanoverall"gain"ratherthan"pain"result.

Page 10: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About SCIRT

Allcontractorsstartedoutbeingallocatedanequalamountofwork;however,eachcompany'ssharealteredoverthecourseoftheprogramme.Becauseallthecontractorssharedpainorgain,itwasinalltheirintereststohelpeachotherdeliverthebestpossibleoutcome.

Page 11: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About SCIRT

SCIRT’s$2.2billion,five-and-a-halfyearprogrammewasfundedbytheNewZealandGovernmentandChristchurchCityCouncil.Itinvolvedmorethan700individualprojectsacrossthecityrepairingandrebuildingundergroundsewage,stormwaterandfreshwaterpipes,rebuildingwastewaterpumpstationsaswellasroads,bridgesandretainingwalls.Multiplecontractorscollaboratedwithgovernmentagenciesforthegreatergoodofanearthquake-batteredcommunity.

Page 12: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About NCTIR

TheNorthCanterburyTransportInfrastructureRecovery(NCTIR)hasbeenset-upbythegovernmentundertheHurunui/KaikouraEarthquakesRecoveryAct2016torepairandgettheroadandrailnetworksre-openedbytheendof2017.TheNorthCanterburyTransportInfrastructureRecoveryisanalliancerepresentingtheNZTransportAgencyandKiwiRailonbehalfofgovernment,torepairbytheendof2017,theroadandrailnetworksbetweenPictonandChristchurchfollowingtheNovember2016Kaikouraearthquake.NCTIRisanalliancepartnershipbetween:OwnerParticipantstheNZTransportAgencyandKiwiRailandNonOwnerParticipants–contractors;FultonHogan,Downer,HEBConstructionandHiggins.

Page 13: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

About NCTIR

NCTIRwassetupasanemergencyresponsealliancewithanexpectedlifetimeof8monthstoreinstatealevelofserviceduetotheimpactofthemaintrunkrailwaylinebeingoutofservice.NCTIRhasjustrecentlyhadanimprovementspackageaddedontoit’sscopeofworkresultinginlikelyadditionof2years.TheNCTIRallianceissetupdifferentlytotheSCIRTallianceinthatthenon-ownerparticipantsarenotcompetingagainsteachotherforwork.

Page 14: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

14

Page 15: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

North Canterbury Transport Infrastructure Recovery

Page 16: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

MovemountainstoReconnectCommunities

1.  KeeptheLewisPassandInlandRoadroadsopen

2.  ReopentheMainNorthLine

3.  ReopenStateHighway1NorthandSouth

4.  OpentheKaikouraHarbour

Page 17: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Challenge

Page 18: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

18

Page 19: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Scale of the Damage

19

Page 20: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

20

Page 21: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

21

Page 22: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

22

Page 23: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

23

Page 24: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

24

Page 25: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

25

Page 26: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Thephases

1.  Cleanthetopsoftheslips

2.  Clearawaytheslipwithmachinery

3.  Keeptheslipsfromblockingtheroadandorrail

4.  Buildtherailandroad

5.  Maketheroadandrailresilient

Page 27: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

27

Page 28: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Engineering Resilience

Page 29: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Progress Report Asat1August2017

Projected Dates

2 June 17

14 June 17

1 Aug 17

27 April 17

22 May 17

10 June 17

9 July 17

Key:

Open for Work Trains and Track Repairs in Progress

Civil Works in Progress

Page 30: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Stabilising Slip Faces

BeforeSluicingandScaling

AfterSluicingandScaling

Page 31: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Benches

Slipmateriallandsand

accumulatesonthe

engineeredbenchratherthanthetransportcorridor

Page 32: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Relocate Road and Rail

Railandroadmovedaway

fromlandslides

SlipsDeconstructed

Rockarmouringtoprotect

railfromthesea

Bundsandcatchpitsbetweentheslipsandthetransportcorridor

Page 33: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Stabilising Slip Faces Using Mesh

Page 34: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Catch Bunds and Fences Catchareabehindbundtocollectlandslidematerial

Bundtocreatecatchareaandtoprotectrailway

Fencetocatchairbornerocks

(seenextslide)Rail&road

movedawayfrom

slip

Remotemonitoringsensorsonthefencetodetectslope

failures

Page 35: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Rockfall Trajectory Analysis

Rockfalltrajectoryanalysistohelpdesignthe:

-Heightofthefences-Strengthofthefences

Page 36: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Remote Monitoring Systems

Remotemonitoringsensorsonthefencetodetect

slopefailurestowarntrainsbeforetheyenterthearea.Weatheralsomonitored.

Page 37: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Rockfall Fences

Page 38: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Rockfall Fences August 2017 – slip material barriers near site 27

38

Page 39: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Rock Fall Shelters

RockfallRisk

Page 40: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Containers – Temporary Bunding

Page 41: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude
Page 42: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude
Page 43: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Main North Line Rail Network August 2017 – Final rail weld at site 4. MNL reconnected nine months after quake

43

Page 44: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude
Page 45: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

45

Page 46: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Data Capture

Groundtopo,scanner,mobilescanner,UAV,PointClouds,BigData,GIS

Page 47: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Where to Start?

Page 48: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

LiDAR and Aerial Photography •  Concept design able to start quickly •  Allows large surfaces to be modelled quickly •  Images allow comparison between Pre and Post Quake

Page 49: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

DetailedDesign=DetailedSurvey

Accuracy?

EndUser?

MethodsofCapture?

DeliverablesRequired?

Datums?

Page 50: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Capture/As-built

Design

Setout

ConstructionSurvey

ProjectLifeCycle

QualityofDesign,SetoutandConstructionareadirectresultofthequalityoftheoriginalsurvey

Page 51: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

NCTIRControlNetworkInstalled•  Frameworkthattheentireprojectisbasedon•  Allcontrolmarksintermsofeachother•  Marksintermsofprojectdatum•  Allowssurveystobestartedconfidently

Page 52: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

NCTIRSurveySpecificationCreated

•  Allconsultantsabletoprovideconsistentdeliverables•  7Consultantsbeingused•  Accuraciesspecified•  Datacapturemethodologyspecified•  Systemsetupforeasyflowofdatathroughdata

system(deliveryandQA)

Page 53: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Surveying - Equipment

53

GPS TotalStationScanning

Page 54: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Data Management -12d

54

•  12dModeland12dSynergyUtilized•  12dSynergy–Datamanagementwithtraceability•  12dModel–CivilEngineeringandSurveySoftware

•  Allowsthemaintenanceofalivedatabase•  Modelsharing•  120+Designers

•  NewSurveysanddataaddedeveryday•  Designjobsrefreshtoshownewdatacaptured

Page 55: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Surveying - Technology

55

UnmannedAerialVehicle(UAV)-Drone

•  GatherDataQuickly•  CreatesBothSurfacemodelsandAerialImage•  SurveyDangerousLocations•  Integrationwithothersurveymethods

Page 56: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

CentralEngineeringDatabase

SurveyGISLiDARAerialImage

MasterProject Designer

Project

Page 57: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

PrimaryDataDelivery;•  12d

Ø  3DSurfaceØ  Attributedlinestrings

•  LocalControlTiedintoNCTIRControlNetwork

Page 58: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

ViewersSketchFab-Geotechs

Page 59: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Recap-Designers

Page 60: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

IntegratedDesignandSurvey

Page 61: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude
Page 62: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Capture/As-built

Design

Setout

ConstructionSurvey

ProjectLifeCycle

Page 63: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

MobileLaserScanningforImprovementsPackage

•  GPSforLocation•  InternalIMUforaccuratesolution•  10mmAccuracy•  LargeareasSurveyedQuickly•  DigitalStringExtraction•  Essentialinlargeimprovementpackage•  ContinuousSitenotisolatedlocations

Page 64: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Christchurch Property Boundaries and Related Matters Act

29 August 2016

Note:TheprovisionsofthisactdonotapplytotheKaikouraEarthquakeSequence.

Surveyorsneedtotakeintoaccountearthquake-relatedlandmovementwhenlocatingpropertyboundariesinChristchurch.

Page 65: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Act

TheCanterburyPropertyBoundariesandRelatedMattersActcameintoforceon29August2016.ThepurposeoftheactistoprovidecertaintytosurveyingandtitlesingreaterChristchurchfollowingtheCanterburyearthquakes,tosupportrecoveryandtherebuildandtomaintainpublicconfidenceinthecadastre."GreaterChristchurch"isdefinedasthedistrictsoftheChristchurchCityCouncil,theSelwynDistrictCouncil,andtheWaimakaririDistrictCouncil,andincludesthecoastalmarineareaadjacenttothosedistricts.The"Canterburyearthquakes"aredefinedasanyearthquakeinCanterburybetween4September2010and13February2022andincludinganyaftershockinthatperiod.

Page 66: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Act

Thelegislationtakesapragmaticviewbysayingboundarieshavemovedwiththeland.Inmostinstances,thismeansthatboundarieswillbewherepropertyownersexpectthemtobe,asmarkedbyfeatureslikefences.Thislegislationwillreducethepotentialforfutureboundarydisputesandconflicts.TheSurveyorGeneralwillconsultwithsurveyorsonproposedrulestoimplementthenewlegislation.Thereisapossibilitythattherewillbeboundaryconflictsasaresultofearlierapprovedsurveysthatdidnottakelandmovementintoaccount.

Page 67: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Act

CoverageandimpactofthelegislationSections7and8ofthenewActsetrulesapplyingtoallboundariesthatdeterminethespatialextentofland.Section7(2)saystheboundariesaredeemedtohavemovedortomovewiththemovementoflandcausedbytheCanterburyearthquakes(whetherthemovementwashorizontalorvertical,orboth),unlessthemovementwasalandslip.Thisdoesnotaffectthevalidityofanestateorinterestinland,"andtheland(asmoved)continuestobethesameland,andaffectedbythesameinterests,asbeforethemovement".ItalsodoesnotaffecttheboundarieswithingreaterChristchurchdefinedbefore29August2016..

Page 68: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

The Act

Section8statesthatacadastralsurveywillcontinuetodeterminetheboundariesofanylandsurveyedwithingreaterChristchurchifitwasdoneingoodfaithandwithoutnegligencebetween4September2010and29August2016,anditscadastralsurveydatasetwasdeterminedtocomplywithsection9(a)oftheCadastralSurveyAct2002inthatperiod.Section10removesliabilityforcadastralsurveysorboundarydeterminationsbetween4September2010and29August2016iftheliabilitywouldnothavearisenifthesurveyordeterminationhadbeendoneontheoppositebasistothatused-ie,thattheboundariesdidordidnotmovewiththemovementoflandcausedbytheearthquakes.

Page 69: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Sector Leaders Group

Page 70: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Sector Leaders Group

Page 71: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

CanterburyandKaikouraearthquakesequencesresultedinintensegroundshakingLargeareasofsaturatedalluvialsoilsacrosstheeasternpartsofChristchurchliquifiedresultinginsignificantdamagetoland,buildingsandservicesManyareaswereaffectedbylateralspreadSignificantcliffcollapseandrockfallinthePortHillsandBanksPeninsulasurroundingChristchurch

Page 72: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Christchurch Sumner Road Rockfall

Page 73: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Christchurch – Whitewash Head

Page 74: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Christchurch – Deans Head

Page 75: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Christchurch - Redcliffs

Page 76: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

Page 77: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

SincetheCanterburyearthquakes,itisnowrecognisedthatspecialistsingeotechnicalengineeringisneededtoassessthegroundconditionsatasite.Geotechnicalengineersneedtoworkcloselyatanearlystagewiththesurveyors,civilandstructuralengineers,architects,planners,LocalAuthoritiesandtheowner/developerstodeterminethesiteconstraints,understandgeotechnicalrisks,andtoidentifydesignsolutions.

Page 78: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

TheMinistryforBuilding,InnovationandEmploymenthaveproducedanumberofguidancedocumentsthatoutlinevariousgeotechnicalandfoundationoptionsthatcanbeconsideredforresidentialdevelopmentandareconsideredtobeanacceptablesolution.Foundationoptionswillvaryandaretypicallycontrolledbytheliquefactionhazard,riskoflateralspreading,andthebearingcapacityoftheinsitugroundconditions.Guidanceisnowavailableonassessingandmitigatingtheriskofrockfall.

Page 79: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

‘TheNewZealandGeotechnicalDatabase’hasbeenestablishedtoprovideavaluableresourceforgeotechnicalengineerstoreviewexistinggeotechnicaldataofanareaandreviewtheearthquakeperformanceofland.Thedatabasealsocontainsrecordsofsurveys,peakgroundaccelerationsinthevariousearthquakes,groundwatermodels,floodhazardmodelling,geologicalmapping,activefaultmapping,aerialphotographytakenaftereachofthesignificantearthquakes,andmore.

Page 80: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Geotechnical Engineering

MethodsofdeepgroundinvestigationincludedeepboreholeswithSPTtesting,DMT,MASW,groundradar,andCPTtesting.TherearealsospecialistdeepgroundimprovementcontractorsoperatingintheCitythatcanprovidebespokegroundimprovement/densificationsolutionstomitigatethepresenceofsoftorliquefiablegroundconditions.

Page 81: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Civil Engineering

WehaveseenmanychangestoCivilEngineeringdesignspecificationsandconstructionstandardsMostaredirectlyrelatedtothegeotechnicalclassificationofthelandTC1,TC2andTC3orequivalentandthedesignedresilienceofthestructuresinaspecifiedSLS(StaticLimitState)andULS(UltimateLimitState)event.

Page 82: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Civil Engineering

ExamplesDrainage-useoftractiveforcesewerdesignusingminimumgradesandflowratestoprovideformoreshallowsewers<2.5mUsecollectorsewersandliftstationstocompensateformaximumdepthspecificationforsewersandpumpstationsConstructionofwrappedgravelraftstosupportinfrastructureincludingpipelinesandmanholestructuresWrappingofpipejointsProvisionofyieldjointconnectionstosolidinfrastructure,interruptionofconcretehaunchedyieldjointsandcorbelswithsoftjointUseofshortpipesandlongsocketsasyieldjointsUseofpressuresewersinsoftgroundUseofPEpipe-moreresilientthanuPVC

Page 83: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Civil Engineering

ExamplesRoadingIncreasedpavementdepthsReinforcedmetalcourseconstruction-geogridFlexiblepavements–polymerasphaltsolutionsEarthworksTC2–TC3Groundimprovement-deepcompaction-impactrollingGrounddensification–stonepiling–groutingandcementstabilisationBuildingFoundationsTC2–TC3RibraftPiling–timber,concete,screwpilesFootingsbackfilledwithhardfillCostAllmeasuresareaddingsignificantlytothecost

Page 84: Development and Construction Planning Lessons Learned from … · 2018-04-12 · Canterbury Earthquake Sequence September 4th 2010 – Magnitude 7.1 February 22nd 2011 – Magnitude

Thank you