development control committee a 22 february 2017 item no....item no. 4 development control committee...
TRANSCRIPT
10/02/17 16:42 Committee report
Development Control Committee A – 22 February 2017
ITEM NO. 4
WARD:
Avonmouth & Lawrence Weston CONTACT OFFICER: Stuart Langer
SITE ADDRESS:
Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
APPLICATION NO:
16/05322/F
Full Planning
EXPIRY DATE: 18 January 2017
Construction of a temporary pre-cast concrete production facility and associated development including a concrete batching plant, cranes, offices, storage areas and parking, loading and unloading facilities (Major Application).
RECOMMENDATION:
Grant subject to Condition(s)
AGENT:
Ian Jewson Planning Ltd 1 Gas Ferry Road Bristol BS1 6UN
APPLICANT:
Costain Ltd c/o agent
The following plan is for illustrative purposes only, and cannot be guaranteed to be up to date. LOCATION PLAN:
DO NOT SCALE
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
1.0 SUMMARY
1.1 This application is being brought before the Bristol Development Control Committee due to its scale and importance to a nationally significant project, specifically the construction of the new Hinkley Point C nuclear power station.
1.2 The application has received an ‘advise against’ recommendation (objection) from The Health
and Safety Executive. However it is considered that draft conditions set out below will overcome the issues they have raised. Nonetheless, approval of the application is technically against their advice and as such it is felt that the committee should make the final decision to allow further scrutiny and discussion.
1.3 This report relates to an application for full planning permission for a concrete batching plant to
be constructed at ‘Land Adjoining Berth T and Graving Dock’, at Bristol Port in Avonmouth.
The batching plant will be used to make concrete segments that will form the water intake
tunnels for the new Hinkley Point C nuclear power station. The segments will be made and
stored at this facility, and then transported to the nuclear power station construction site,
mainly by road and very occasionally by boat. Due to the need to produce a large number of
segments the facility is intended to operate on a 24 hour basis. Once the nuclear power station
is complete the facility will no longer be required and as such the application is for a temporary
consent, for four years only. After this it is intended that the building will be dismantled and the
site returned to port related storage uses.
2.0 BACKGROUND TO THE PROJECT
2.1 A nationally significant development project to construct a new nuclear power station at Hinkley Point in North Somerset received consent from the Secretary of State on 19 March 2013. The project seeks to build a new nuclear power station called Hinkley Point C, which is next to Hinkley Point B which will be decommissioned.
2.2 In order to cool the new nuclear power station, water is required to be taken from the Severn
Estuary, and then released back once it has done this. In order to do this, three tunnels are required, two intake and one outlet. These will be laid approximately 20m beneath the sea bed. The intake tunnels will be 3.4 and 3.5km long and 6m in diameter. The outlet tunnel will be 1.8km long and 7m in diameter. At the point where the water is taken in / released there will be two ‘head’ units per tunnel (six total), which connect the tunnel to the marine environment.
2.3 The tunnels are to be pre-fabricated in concrete sections, which are taken to site and then
joined together in situ. The facility to which this application relates is the concrete batching plant that will make the tunnel segments. These will weigh either 4.8 or 4.2 tonnes each (depending on which tunnel it is for) and will be transported to the site from this facility by road.
2.4 The facility to which this application relates will be required to construct around 38,000
segments, this equates to 83,000m3 of concrete. At its peak, the facility will be producing 600 segments a week and will require 300m3 of concrete per day.
2.5 The facility will also make the six ‘head’ units, which are to be taken out to their location by
boat, due to their size / weight.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol 3.0 SITE DESCRIPTION AND WIDER CONTEXT
3.1 The site is located at Bristol Docks, specifically on land adjacent to T Berth. The site is split
into two sections, Site A and site B. Site A is brownfield land that was previously occupied with
a warehouse, which has since been dismantled. It is surfaced with a mixture of broken
hardstanding and loose gravel / mud. Site B is existing hardstanding that was previously used
as for car storage. The area surrounding the site is used for port related activities including
temporary storage and movement of goods.
3.2 The site is accessed by internal roads to the port, which in turn are accessed from King Road,
Victoria Road and St Andrews Road / Smoke Lane. The site can also be accessed by sea,
due to its location at Bristol Docks.
3.3 The nearest residential development is approximately 600m to the south-west of the site.
To the immediate north, west and south west is the Severn Estuary, which is protected by a
number of environmental designations including:
- Special Area of Conservation (SAC)
Severn Estuary European Marine Site (EMS)
- Special Protection Area (SPA)
- RAMSAR site
- Site of Nature Conservation Interest (SNCI)
- Special Scientific Interest (SSSI)
3.4 In addition part B of the site is actually in part of the Severn Estuary Site of Special Scientific
Interest (SSSI), although this has been used for car parking for a number of years.
3.5 The area surrounding the site is therefore very important for nature conservation and
protection.
3.6 The site is located in Flood Zones 2 and 3.
3.7 The site is within the inner consultation distances for a number of control of major accident
hazards (COMAH) zones.
3.8 The 1908 pumping station is a locally listed building, which is approximately 60m from the site,
across the graving dock. The nearest listed building is Grade II listed Royal Hotel at 24
Gloucester Road. This is approximately 840m from the site, and is outside of the port area.
The site is not a conservation area and does not have any other historic designations.
3.9 The site is also within the ‘Port operations’ Principle Industrial and Warehousing as set out in
the Bristol Local Plan allocations plan.
3.10 The site is not in a coal risk area.
3.11 The site is not within an air quality management area.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol 4.0 DESCRIPTION OF DEVELOPMENT
4.1 The development of the site is on two parts, Site A and Site B.
4.2 Site A will be the location of the segment manufacturing facility. Specifically, this will include:
- Concrete Batching Plant (this is the equipment that mixes the ingredients to make the
concrete)
- Aggregate Storage
- Facility to create the reinforced concrete segments
- Area outside for storage of the tunnel segments
- Storage for the offshore tunnel heads
- Laboratory
- Electrical substation
4.3 The submitted plans indicate that the concrete batching plant itself will be 20.6m in height.
The building to the north of this where the concrete segments are made will be up to 16.5m in
height and will be 36m wide by 200m long. This will have an industrial shed like appearance
and is to be built by steel frame clad in aluminium coloured to match nearby buildings. The
foundations are to be piled due to the wet ground conditions. The laboratory will have a foot
print of 9x12 m and be 5m tall. The ready mix storage bins will store material up to 20m in
height.
4.4 The segments will be transported to the outside storage area by overhead gantry crane, which
will be at most 12m tall.
4.5 The tunnel head sections, once they are made, will be approx. 35m long, 10m wide and 2.8m
tall.
4.6 Site A will be 44,868m2 in area.
4.7 Site B is a hardstanding area which has previously been used for car parking. The intention is
that this will be used to provide a 203 space car park for the facility, and that it will also be site
of welfare facilities for the site, including site offices, sanitary areas, cafeteria facilities and,
reception areas. These will be provided in a two storey building made in a temporary modular
design. This will have a footprint of 12m x 66m and be up to 8.5m tall.
4.8 Site B is 9,732m2 in area.
4.9 The site will operate 24 hours a day seven days a week. The average workforce on the site is
estimated to be around 150, with a peak of around 396 during the head construction and early
segment manufacturing works.
4.10 Aggregate will be delivered to the site by road. At most there are anticipated to be around 76
loaded HGV movements a day associated with the export of tunnel segments. Access to and
from the site will be via internal port roads and the main access roads between the Avonmouth
Dock entrance and Junction 18 of the M5 motorway.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
4.11 During the determination of the application the layout of the site was amended to provide for
more efficient operation. This new layout was consulted on in the second round of consultation
(see consultation section below).
5.0 ENVIRONMENTAL IMPACT ASSESSMENT
5.1 The development has been screened under the Town and Country Planning (Environmental
Impact Assessment) regulation 2011 (as amended) and has been determined not to be EIA
development.
6.0 EQUALITIES ASSESSMENT
6.1 During the determination of this application due regard has been given to the impact of this
scheme in relation to the Equalities Act 2010 in terms of its impact upon key equalities
protected characteristics. These characteristics are age, disability, gender reassignment,
marriage and civil partnership, pregnancy and maternity, race, religion or belief, sex and
sexual orientation. There is no indication or evidence (including from consultation with relevant
groups) that different groups have or would have different needs, experiences, issues and
priorities in relation this particular proposed development. Overall, it is considered that the
approval / refusal of this application would not have any significant adverse impact upon
different groups or implications for the Equalities Act 2010.
7.0 RELEVANT PLANNING HISTORY
7.1 Application 02/02621/CP – ‘Construction of plant of approximately 4000 sq m for the milling,
storage and packaging of mineral products imported by sea transport, (Certificate of Proposed
Use)’. CERTIFICATE ISSUED 28.02.2002.
8.0 PRE-APPLICATION COMMUNITY INVOLVEMENT
8.1 The application is supported by a statement of community involvement. This sets out that a
consultation leaflet outlining the proposals was distributed by post on 14th September 2016 to
the addresses of 622 households and businesses in the vicinity of the site. The leaflet invited
comments on the application proposals either by email or by post. A consultation box was also
left at the Avonmouth Community Centre.
8.2 The report states that three responses were received raising concern that about noise, dust,
traffic and proximity to residential development.
9.0 RESPONSE TO PUBLICITY
9.1 The application was publicised by site and press notice. These were printed / posted on
16.11.2016 with a target response date of 07.12. 2016. In addition a letter was sent to
neighbouring properties on 09.11.2016 with a target response date of 30.11.2016.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol 9.2 The application was amended during its determination period to amend the layout of the
proposals. in addition, a number of revisions were made to documentation following comments
from consultees. These materially amended the proposals and so a second round of public
consultation was undertaken, by letter which was from 03.01.2017 with a target response date
of 24.01.2017. The opportunity was taken at this point to widen the consultation area to
include residential properties nearest to the site.
9.3 In addition to the above consultation the proposals have been available to view and comment
upon online since approximately 19.10.2016 until present.
9.4 As a result of this consultation, no comments have been received from the general public to
date.
10.0 RESPONSE TO CONSULTATION
10.1 Due to the nature of the proposals a significant amount of consultees have been involved in
commenting and influencing the proposals. These are as follows:
Natural England
10.2 The first response from Natural England raised concern about the development proposals
which include noise disturbance from foundation piling and operational phases, which may
affect nesting birds, visual disturbance to nesting birds, noise disturbance to fish, the potential
for contamination from the site to affect designated sites (and therefore ecology). The
response also set out that the part of the application site that covers the SSSI has been in use
as a car park for approximately 17 years. As such, this is not considered to form part of the
‘site fabric’ of the SSSI.
10.3 In response to these comments the developer provided new information. Natural England was
re-consulted about this and their comments are summarised as follows:
- The change of layout is unlikely to result in significant effects on the Severn Estuary
designated site.
- In addition the amended noise assessment report proposes to adopt mitigation measures
recommended by Natural England in relation to suspending piling operations 2 hours before,
during and after high tide. Provided that this mitigation measure is adopted it is considered that
the works are unlikely to result in a significant effect to the Severn Estuary SPA features. A
visual barrier is proposed and this will reduce impacts on nesting birds to acceptable levels.
- Concerns remain about the level of contaminants likely to be present in surface water
discharge from the site.
- A pump is proposed to remove contaminated water from the site when piling foundations.
This will be assessed under the licence granted by the Environment Agency.
Natural England also agreed with the appropriate assessment provided by the Bristol City
Council Ecologist.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
The Environment Agency
10.4 The Environment Agency originally commented on the application objecting on the basis that
insufficient information had been provided about the potential for contaminants to be carried
into the surrounding area. They wrote again however to withdraw their objection subject to the
imposition of pre-commencement planning conditions to ensure appropriate remediation
occurred. The applicants provided an updated contamination risk assessment report and the
Environment Agency were again consulted. However, they held the position that pre-
commencement planning conditions are required.
10.5 In addition the Environment Agency commented that the site may flood from tidal surges, and
that measures should be put in place to mitigate against this.
10.6 As such the latest position is that the Environment Agency recommends pre-commencement
conditions to address the following:
- Provide a more accurate characterisation of the contamination on the site and a remediation
strategy to suitably ameliorate risks of contamination spreading
- Provide details of flood resilience measures and emergency action in case of flood
- a watching brief so that any identified contamination may be addressed if found.
Highways England
10.7 Highways England commented on the proposals and has offered no objection. Comments did
however seek clarity on some further transport matters, such as trip rates broken down into
different hours of the day.
Network Rail
10.8 Has responded setting out that they do not object in principle and recommend some advice
which is essentially to avoid impacts on the railway.
The Health and Safety Executive – Hazardous Substances
10.9 The application will result in an increase in personnel being present within the inner
consultation distance of several sites which have consent to store hazardous substances. As
such the HSE ‘advised against’ the application, which is essentially an objection. The HSE
have also advised that should the committee provide a resolution to grant, Bristol City Council
must give the HSE 21 days to call in the application before issuing the decision notice. The
HSE have further advised that if the hazardous substance consents were revoked then they
would reconsider their position.
The Health and Safety Executive – Explosives Directorate
10.10 The explosives directorate of the HSE has advised that the proposed development falls within
the consultation distances for a number of berths. This means that while the probability of a
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
major accident involving explosives is low the consequences to people at the development
could be serious. The relevant berths are:
- At Avonmouth Berths : O Shed, North Wall, West Wharf
- At Royal Portbury Dock: Rail Terminal, Portbury Pier
10.11 The comments go on to advise that there are a number of ways in which this could be
managed by Bristol Port Company should they wish to support the development; which are:
1) Abandoning the use of these berths for the duration of the project or,
2) Evacuating batching plant while vessels carrying explosives are in berth being
loaded/unloaded (evacuating other inhabited buildings will already be part of the terms of the
licence) or,
3) Establishing maximum quantities that can be handled at each berth to ensure the batching
plant remains outside the inhabited building distances. The berth schedules within the licence
already allow for lower quantities to be handled at the berth.
10.12 These options would not require any changes to the existing licence but would require careful
management by BPC and cooperation between BPC and Costain. Should options 1 or 2 be
adopted and those conditions not met it would constitute failure to comply with the terms of
their licence and render BPC liable to enforcement action.
Bristol City Council Ecology
10.13 The city council ecologist prepared an ‘Appropriate Assessment’ under The Conservation of
Habitats and Species Regulations 2010 and the Conservation of Habitats and Species
(Amendment) Regulations 2012. This sets out a number of conditions that are recommended
in order to reduce impacts to protected sites and species to acceptable levels. Specifically, this
includes details to ensure that no noise or visual disturbance of nesting sites occurs, to ensure
that contamination from the site does not affect nearby protected habitats or species and to
prevent the spread of invasive species such as Japanese knotweed, which has been identified
near the site.
Bristol City Council Air Quality
10.14 The air quality team advised that proposals do not have any significant implications with
regards to potential air quality impacts. They advised that the dust management measures
outlined in the CEMP should be conditioned to ensure generation of dust on site is effectively
managed.
Bristol City Council Contaminated Land
10.15 The Bristol City Council Contaminated Land team has reviewed the information submitted with
the application and has raised a number of concerns about the survey of the site and the
amount of information provided about it. Concern has also been raised about the proposed
remediation strategy which does not appear to be satisfactory to them.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
Bristol City Council Economic Development Service
10.16 The Bristol City Council economic development service has responded to the consultations
supporting the proposals, stating that the facility will create employment within the area and
bring significant economic benefit, from the large scale developments which it will serve, to
Bristol.
Bristol City Council Flood Risk Management
10.17 Bristol City Council flood risk management have commented on the proposals that the surface
water drainage strategy has been formed in accordance with consultation advice received from
the flood risk management team prior to the application being submitted. As such the response
set out no objection in principal to the proposals. However, further discussion with the team
revealed that they were keen to ensure that contamination risks were suitably ameliorated.
They also requested a planning condition requiring detailed drainage design prior to
commencement of development.
Bristol City Council Transport Development Management
10.18 The City Council transport development management team has commented on the application
but has not offered an objection to the application being permitted. They have however sought
further information including:
- A highway condition survey before and after construction
- Information about specific staff numbers on site at any time and shift patterns should be
provided [officer note this was provided relatively late in the assessment of this application and
the transport team have not yet had a chance to respond on this point].
- Measures to attempt to increase the level of sustainable travel to the site are welcomed, such
as cycle parking and minibus provision and should be conditioned in a travel plan
- Electric vehicle charging points are welcomed
- The construction traffic management plan is acceptable and should be conditioned
Bristol City Council Sustainable City Team
10.19 Regarding the application for the temporary concrete batching plant in Avonmouth for the
Hinkley C power-station and compliance with policy BCS14, it is acknowledged that a number
of details are still to be resolved.
10.20 With this in mind the BCC Sustainable City Team would be content for a condition to be
applied which allows the details of how this will be achieved to be deferred up to the point of
first use, to provide more time to complete discussions without delaying progress through the
planning system.
Bristol City Council City Design Group (Urban Design)
10.21 The Bristol City Design Group initially raised concern about the impact on views from
Kingsweston House. However after the proposals were revised verbally reported that they are
not specifically concerned about these impacts given the landscape context of the site.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
Bristol City Council Archaeology
10.22 The city council archaeologist verbally reported that no significant archaeology is anticipated
on the site, due to its history, however that an archaeological watching brief should be applied
during the construction.
Bristol City Council Pollution Control
10.23 The pollution control team initially raised concerns about the potential noise emissions from
the development. However on review of the noise assessment the pollution control officer
stated that the noise assessment demonstrated that noise impacts would be acceptable. The
comments also recommend various conditions to ensure that the development is undertaken
in accordance with the noise assessment and to ensure a scheme of noise monitoring is
undertaken during the operational phase of the development.
11.0 RELEVANT POLICIES 11.1 National Planning Policy Framework – March 2012
Bristol Local Plan Comprising Core Strategy (Adopted June 2011), Site Allocation and Development Management Policies (Adopted July 2014) and the Bristol Central Area Plan (Adopted March 2015) - In determining this application, the Local Planning Authority has had regard to all relevant policies of the Bristol Local Plan and relevant guidance.
12.0 KEY ISSUES
(A) IS THE PRINCIPLE OF DEVELOPMENT ACCEPTABLE?
12.1 The development seeks to provide a facility for the manufacture of concrete segments, which
will be stored on the site and then transported to their final destination beneath the Severn
estuary where they will be used in the construction of water intake and outlet tunnels. In
addition the proposals include office and welfare facilities for staff. The specific planning land
uses of the proposal are therefore B2 (General Industry) and B8 (Storage or Distribution) for
the segment manufacturing facility and its store, and B1(a) for the offices and welfare facilities.
12.2 The site is at Bristol Docks which is designated in the Allocations Map as a Principal Industrial
and Warehousing Area (PIWA) in accordance with Policy BCS8. Policy DM13 provides more
information on the types of development that are suited to these areas, specifically stating that
uses B1(b)-B8 are appropriate. It is considered that the uses applied for are appropriate.
Whilst there is an element of B1(a), this is related to the operation of the concrete segment
facility and is best located immediately adjacent to the concrete segment facility for operational
reasons. As such the element of B1(a) is considered ancillary and acceptable for the site.
12.3 Other planning considerations relating to the specific location and the proposals are discussed
in the key issues below.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
(B) ARE THERE ANY ECOLOGICAL, CONTAMINATED LAND AND DRAINAGE ISSUES
THAT CANNOT BE OVERCOME AND WARRANT REFUSAL OF THIS APPLICATION?
Ecology
12.4 The designations of the Estuary are set out above.
12.5 A part of the application site (Site B) crosses over into the SSSI. However Natural England has
confirmed that this site has been used as hard standing for a number of years and is no longer
considered to be ‘site fabric’. As such this is not considered to be a significant issue in itself.
12.6 However, the estuary is habitat for internationally significant population of birds and as such is
protected by international law. Where international designations will potentially be affected by
a proposed development, the local planning authority must consider the impacts on the
designated sites and produce an Appropriate Assessment in accordance with The
Conservation of Habitats and Species Regulations 2010 and the Conservation of Habitats and
Species (Amendment) Regulations 2012. The City Ecologist has produced an Appropriate
Assessment for this development and this has been agreed with Natural England. In addition,
policy BCS9 requires the protection of wildlife designations.
12.7 One of the key issues raised by Natural England and in the Appropriate Assessment is the
presence of overwintering birds. Particularly, when the tide is high and the birds are pushed
further toward the landward side of the shoreline (nearer to the development). In the winter of
2015/16, Natural England commissioned a High Tide Roost Study, on the Severn Estuary
SSSI/SPA. The study identified several specific high tide roosts, in the vicinity of the project,
which Natural England consider may be affected by the development. These include:
- 3D Redshank Roost
- 3E Cormorant/Oystercatcher/Herring Gull Roost
- 3F Redshank Roost
- 3G Mallard Roost
12.8 It is considered that birds at these sites are sensitive to either visual disturbance or noise
disturbance or both. As such, Natural England, and the city ecologist has recommended that
an acoustic barrier is erected in order to reduce the sound levels reaching the roosts. The
barrier will also act as a visual barrier and will therefore also prevent visual disturbance to the
roosts. The details of this will be controlled by recommended condition below and it is
considered will suitably mitigate potential impacts. In addition, a noise monitoring programme
is also required by condition and this will help to ensure that the predicted noise levels are
adhered to whilst the development is operational.
12.9 In addition to the provision of a barrier however, there are particular concerns about the
method of construction of the development and how this will result in noise emissions that will
not be mitigated by the acoustic barrier. In particular, to construct the development, it is
proposed to use piled foundations. This is due to the soft ground conditions. The potential
noise emissions of the piling operations have been monitored and have the potential to be
greater than 3dB above background levels, which means that they may affect bird populations.
In order to further control noise emissions, Natural England and the city ecologist has advised
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
that piling within 300m of the high tide roosts (3D, 3E, 3F and 3G) should not be undertaken
for a period ranging from 2 hours before, during and 2 hours after high tide. This is to be
controlled by condition recommended below. As such, it is considered that noise impacts on
the designated sites will not be overcome by the imposition of the planning conditions
recommended below.
Contamination and Drainage
12.10 In addition to noise impacts, it is important to note that due to the site history, which has
involved numerous industrial uses and the storage of hydrocarbon products, has resulted in a
site which is likely to be relatively highly contaminated. The developer has submitted
information about the level of contamination on the site and a remediation plan. However, the
Environment Agency has concerns that the survey work does not suitably quantify the amount
of existing contamination on the site. However, it is proposed that this will be controlled by
condition, in that the developer will need to submit a site survey and remediation plan which is
approved by the local planning authority before development commences. The city council
would consult with the Environment Agency when dealing with the information submitted under
this condition and this would ensure that the site would be prepared so as to be appropriate for
people to work on.
12.11 The contamination on the site is relevant to the concerns about ecological conservation as the
proposals have the potential to mobilise contaminants from the site into the surrounding areas,
most specifically the estuary. However the city council will be aware of this when dealing with
the afore mentioned conditions on land contamination assessment and remediation, and it is
considered this will ensure the estuary is suitably protected. These concerns also relate to the
surface water drainage strategy on the site and this would also have the potential to mobilise
contamination, potentially into ground water and into the estuary. However a draft condition is
set out below to ensure that the sustainable urban drainage scheme is approved by the local
planning authority before being implemented, and again at this time, the council would take
account of the potential for mobilisation of contaminants. The authority would also ensure the
system proposed would be adequate and take account of potential levels of rainfall.
12.12 It is therefore considered that through the imposition of the conditions recommended below the
risks from the development on sensitive ecological receptors will be mitigated to acceptable
levels.
12.13 In addition, evidence exists that Japanese knotweed is on an adjacent site. This is an invasive
species. A planning condition below requires a site management plan should the knotweed
spread to this location.
12.14 Overall there are there are no ecological, contaminated land or drainage issues that cannot be
overcome through the imposition of relevant conditions.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
(C) HAVE THE REPRESENTATIONS OF THE HEALTH AND SAFETY EXECUTIVE BEEN
ADDRESSED?
12.15 The Health and Safety Executive (HSE) has two separate departments, one dealing with
hazardous substances and the other dealing with explosive substances. These are discussed
below:
Hazardous substances
12.16 Bristol City Council is the Hazardous Substances Authority which determines hazardous
substance consent applications. However, the Health and Safety Executive (HSE) keep a
record of all consents and are a statutory consultee when a development falls within a
specified area (called a ‘consultation distance’) around a site which has consent to store
hazardous substances.
12.17 The application site falls within the ‘inner consultation distance’ of a number of sites
(specifically E, F, P, R and T sheds) which have consent to store hazardous substances. Due
to the number of people that will be working on the site, which will be over 100, the HSE
considers that the risks to people are too great, and have issued an ‘advise against’ comment,
which is essentially an objection, based on the Planning (Hazardous Substances) Regulations
2015 and Health and Safety at Work etc. Act 1974. Local Plan Policies BCS23 and DMDM33
also relate to the potential for pollution events. If the planning committee is minded to grant
consent then the local planning authority must provide the HSE with notice of this and give
them 21 days to call in that potential decision to the Secretary of State.
12.18 Having said this, it is important to note the actual situation on the ground regards the sites that
have consent to store hazardous licenses. The history of E, F, P, R and T sheds is as follows:
E - not stored hazardous substances since at least 2013
F - not stored hazardous substances since at least 2013
P - demolished in 2001
R - not stored hazardous substances since at least 2013
T - demolished in 2016
12.19 Therefore whilst all the above sites have consent to store hazardous substances, in reality this
has not occurred for some time. The sites are all owned by the Bristol Port Company, as is the
application site. The Port Company has communicated with the city council setting out that it
no longer wishes to utilise these hazardous substance consents.
12.20 This said, because the consents exist, hazardous substances could legally be stored on these
sites in future if there were a change in approach. In order to overcome this matter, the city
council, as the hazardous substances authority is in the process of revoking the licences for all
of these sites. In addition, a condition will be applied to any consent, that will prevent the
occupation of the proposed development until such time as the hazardous substances are
revoked. It is considered that this approach will suitably prevent any potential impacts. This
condition has not been applied to the construction phase of the development, however bearing
in mind the sites are not used for hazardous substance storage and the delay this would cause
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
to the project as a whole (with potential knock on issues for Hinkley Point C), this is considered
to be an acceptable, pragmatic, way forward based on the actual risk.
12.21 In summary therefore, approval of the application is technically against the advice of the
Health and Safety Executive (because the consents are still valid). If a resolution to grant is
made by the committee the council will still need to provide the HSE with a 21 day call in
period.
Explosive materials
12.22 The HSE are responsible for licensing sites where explosives may be transported or held.
They have commented that this application site lies within a distance where inhabited buildings
may be affected if there is an explosion. This occurs from sites which have licences to
transport / hold explosive licences including:
- At Avonmouth Berths : O Shed, North Wall, West Wharf
- At Royal Portbury Dock: Rail Terminal, Portbury Pier
12.23 However the HSE has advised that just because of this, the licenses should not be changed,
and that instead, the Port Company will need to change its practices of how it handles
explosive materials. This could include, either not using those berths for the four year duration
of the development, or making sure that the development is evacuated before transporting the
explosive substances.
12.24 As such, it is considered that issues relating to explosive materials will be suitably handled by
internal port operational management, as this is covered by legislation which is outside the
various planning acts.
(D) IS THE DESIGN OF THE PROPOSAL ACCEPTABLE AND WILL IT HAVE AN
ACCEPTABLE IMPACT ON SURROUNDING AMENITY?
12.25 The concrete batching plant will be operated 24 hours a day in order to meet the timescales
required for the construction of the nuclear power station. It is recognised that the operation of
the facility may result in noise impacts to the surrounding area, potentially including residential
areas in Avonmouth Village. The nearest residential is approximately 600m to the south of the
site. Policies BCS23 and DM35 set out that development will not be permitted unless it can be
demonstrated that noise impacts can be mitigated to acceptable levels. The applicant has
therefore submitted a noise impact assessment, which has been reviewed by the Bristol City
Council pollution control team.
12.26 In order to help reduce noise impacts to surrounding developed areas, the proposals include
an acoustic barrier on the south-eastern side of the site, between the development and the
residential area of Avonmouth Village. In addition, increased cladding to the concrete segment
making facility will be included in the design. The result of this is that noise levels are predicted
to be at most 45dB during the day and 42dB during the night. These are considered to be
acceptable. However, in order to further monitor noise impacts, a noise monitoring programme
will be put in place – the details of which are to be secured by condition.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
12.27 In terms of visual amenity, policies BCS21, DM26 and DM29 are relevant in that they require a
building to be sensitive to the character of the area in which they are located. The appearance
of the proposals will be of a large industrial ‘shed’ design, with open storage next to this on site
A and on site B, of a two storey modular building.
12.28 The maximum height of any structure on the site will be around 20m in height, this is the
concrete batching plant itself, and potentially aggregate stores when they are full. Given the
surrounding context of Bristol Docks, this height is considered to be acceptable - as just to the
southeast of the site are other buildings which are approximately 60m tall - this proposal will
not appear significantly out of place or overbearing. In addition the materials proposed are of
aluminium cladding which is considered likely to be appropriate for the context. The details of
this cladding and the external materials of the modular building will be controlled by condition
to ensure that they are appropriate. The city council historic environment conservation team
initially raised concern about the impact on views from Kingsweston House, which is a grade I
listed building which has views northwards over the Severn Estuary. However, this view
includes most of Avonmouth and the docks and as such this project is not considered to be
significantly detrimental in terms of impact here.
12.29 There is a locally listed building approximately 60m to the west of the site which is the 1908
Pump House. The development will not affect the fabric of this building however will be visible
in views of it. This said, the pumping station is surrounded by industrial development and this
application is considered likely to give rise to such significant harm so as to warrant refusal.
(E) WILL THE TRANSPORT IMPACTS OF THE PROPOSAL BE ACCEPTABLE?
12.30 The application is supported by a transport assessment. Policies BCS10 and DM23 set out
that developments should be suitably accessible by a range of transport types, including
primarily sustainable modes of travel. The development is located at Bristol Docks which is
accessible by train and bus, and well as walking and cycling. The developer has set out in their
transport assessment that they will include cycle parking and showers to help promote cycling
and also set out that a minibus will be provided to transport people from the nearest train and
bus stops. The details of these will be controlled by planning condition. Having said this, the
site is quite far within Bristol Docks and is not closely located to a large amount of housing. As
such it is considered realistic to accommodate the private car. The development features a car
park of approximately 200 spaces, which is likely to be sufficient given that on average 150
staff (and at most approximately 260 staff) will be on the site. Although the number of spaces
is large and would be over and above the council’s guidelines on car parking provision for the
average occupancy, the car park does already exist and it is considered that some additional
capacity is needed for those peak operational times. In addition the developers will provide a
travel plan (controlled by condition) to help promote sustainable travel. It is therefore not
considered appropriate to refuse the development on the level of car parking proposed.
12.31 The developers have also offered 6 electric vehicle parking spaces which will help to offer staff
alternative technologies to get to work. Whilst this is not fully policy compliant, it is considered
acceptable given the temporary nature of the development and other sustainability measures
which are proposed.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
12.32 The development in itself is likely to result in a high number of daily trips, approximately 145
(both ways). This is however approximately 2% of the average daily traffic on the road and
neither the Bristol City Council Transport Development Management nor Highways England
have objected. However, both did raise questions about how the transport would be managed
so as to avoid the peak periods and in order to control this a traffic management plan is to be
required as a condition. This will seek to ensure that the majority of movements from the site
avoid the peak congestion times. In addition, the routes for vehicles to access the site are
controlled by condition and during the construction phase, by the construction traffic
management plan which has been submitted and is acceptable.
12.33 In summary it is considered that the transport impacts of the development will be acceptable.
(F) HAS THE RISK OF FLOODING BEEN ACCEPTABLY MITIGATED?
12.34 The site is within flood zones 2 and 3, and this is due to its location so near to the estuary. The
flood risk assessment submitted with the application sets out that the site is defended by the
sea wall from most anticipated flooding impacts – flood zone mapping does not take account
of flood defences.
12.35 In any case, there is a risk that the defences could be overtopped and therefore risk of flooding
needs to be considered. Policy BCS16 sets out that development should be focussed to areas
of low flood risk whenever possible and should be designed so as to be resilient to flooding.
The National Planning Policy Framework and National Planning Practice Guidance also give
more details on how different uses should be determined depending on their flood
vulnerability. The guidance identifies that the proposed uses are ‘less vulnerable’ as the use is
‘general industry’, and therefore to be located in flood zone 3 (which this site is) the
development must demonstrate wider sustainability benefits to the community which outweigh
flood risk and be resilient.
12.36 In considering the wider benefits of the development being located at this site, it is considered
that due to the construction of the head units, which will be 35m in length, this facility needs to
be located at the docks in order to transport these to the nuclear power station site. As such it
is considered that the exception test is passed, as the development would not be able to serve
its purpose if not located here, and its purpose in constructing the new nuclear power station is
considered to outweigh the flooding risk.
12.37 In addition, the exception test, and policy BCS16 require development to be resilient in times
of flood. The flood risk assessment submitted with the development sets out that the floor slab
level of the buildings will be set at a certain level so as to mitigate flood risks. The specific level
is yet to be confirmed in the report so conditions recommended below will ensure that
resilience measures are provided – this includes how to fasten machinery and other materials
down and to ensure that the building is built to withstand a flood event. A flood emergency
evacuation plan is also conditioned.
12.38 It is relevant to this matter to also note that the Environment Agency has commented setting
out that because the development has a four year lifespan, that they have taken a pragmatic
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
view towards flood risk, however they did specifically request details of resilience measures
and as such, they will be consulted when the local planning authority assesses the resilience
plan submitted under the afore-mentioned planning condition.
(H) OTHER PLANNING MATTERS
12.39 In line with the advice from colleagues in the Sustainable City Team, an update on
sustainability will be provided at Committee.
12.40 A planning condition is recommended below to ensure that the storage of recycling and refuse
from the development occurs in a suitable location in a suitable receptacle. This detail has not
been submitted so far but given the size of the site, it is not considered that this will be a
significant matter.
12.41 In accordance with the comments from the Bristol City Council archaeologist, a watching brief
for archaeology will be undertaken as the development commences. It is important to note
however that significant archaeology is not expected to be discovered.
12.42 Air quality is also an important issue however in accordance with the air quality officer’s
comments, the potential issues relating to air quality will be suitably resolved by the measures
set out in the construction environmental management plan which was submitted in support of
the application.
13.0 COMMUNITY INFRASTRUCTURE LEVY (CIL)
13.1 The Bristol City Council Community Infrastructure Levy Charging Schedule (2013) sets out
that uses B1, B2 and B8 are liable at a rate of £0 CIL/ square metre. This development
includes only these uses and as such, no CIL payment will be required.
14.0 CONCLUSION
14.1 The development is to provide part of the infrastructure for the new Hinkley Point C nuclear
power station.
14.2 The site is near to a designated nature conservation site and as such there is the potential for
noise, visual and contamination impacts. However, mitigation for this has been developed and
conditions recommended will suitably control the impacts.
14.3 Although concerns have been raised by the Health and Safety Executive regarding the
potential risks from nearby sites with hazardous substance consents, it is considered that
these risks will be mitigated as in reality the sites are not used for hazardous substance
storage and the council is, in addition, in the process of revoking those consents.
14.4 The development is located in flood zone 3 but due to the nature of what is being provided, it
is considered that the location is suitable, and the development will be made resilient through
planning conditions.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol 14.5 The proposals will be acceptable in all other regards, subject to the imposition of the conditions
below.
RECOMMENDATION Grant subject to the following conditions:
1. Full Temporary Planning Permission
The development hereby permitted shall begin before the expiration of three years from the date of this permission. The applicant shall give notice to the LPA upon commencement of development, and the approved proposals are to be built and retained for no longer than four years from commencement, and subsequently dismantled at the end of this time period and the land returned to its former condition.
Reason: As required by Section 91 of the Town and Country Planning Act 1990, (as amended by Section 51 of the Planning and Compulsory Purchase Act 2004) and in order to avoid a permanent installation on the site due to the proposal only having been assessed as being in place for a temporary period.
Pre-commencement 2. Land affected by contamination - Site Characterisation
No development permitted by this consent shall take place until a site investigation and risk assessment, in addition to any assessment provided with the planning application, and has been completed in accordance with a scheme to assess the nature and extent of any contamination on the site, whether or not it originates on the site. The contents of the scheme should be submitted to and be approved in writing by the Local Planning Authority. The investigation and risk assessment must be undertaken by competent persons and a written report of the findings must be produced. The written report is subject to the approval in writing of the Local Planning Authority. The report of the findings must include:
(i) a physical survey of the site including testing of samples as well as a research-based report to identify the extent, scale and nature of contamination from all previous uses likely to have resulted in land contamination;
(ii) the creation of a conceptual model identifying sources, pathways and receptors to assess the potential risks to: * human health, * property (existing or proposed) including buildings, crops, livestock, pets, woodland and service lines and pipes, * adjoining land, * groundwaters and surface waters, * ecological systems, * archaeological sites and ancient monuments;
(iii) an appraisal of remedial options, and proposal of the preferred option(s).
This must be conducted in accordance with DEFRA and the Environment Agency's 'Model Procedures for the Management of Land Contamination, CLR 11'.
Reason: to ensure that risks from land contamination to the future users of the land and
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Government policy also states that planning policies and decisions should also ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121).
3. Land affected by contamination - Submission of Remediation Scheme
No development permitted by this consent shall take place until a detailed remediation scheme to bring the site to a condition suitable for the intended use by removing unacceptable risks to human health, buildings and other property and the natural and historical environment has been prepared, submitted to and been approved in writing by the Local Planning Authority. The scheme must include all works to be undertaken, proposed remediation objectives and remediation criteria, timetable of works and site management procedures. The scheme must ensure that the site will not qualify as contaminated land under Part 2A of the Environmental Protection Act 1990 in relation to the intended use of the land after remediation. The scheme must also demonstrate that piling or other ground penetrative methods will not result in unacceptable risk of contamination of ground water.
Reason: to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Government policy also states that planning policies and decisions should also ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121).
4. Land affected by contamination - Implementation of Approved Remediation Scheme
In the event that contamination is found, no development permitted by this consent other than that required to be carried out as part of an approved scheme of remediation shall take place until the approved remediation scheme has been carried out in accordance with its terms. The Local Planning Authority must be given two weeks written notification of commencement of the remediation scheme works.
Following completion of measures identified in the approved remediation scheme, a verification report that demonstrates the effectiveness of the remediation carried out must be produced, and be approved in writing of the Local Planning Authority.
Reason: to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Government policy also states that planning policies and decisions should also ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121).
5. Flood Risk
Prior to the commencement of the development hereby approved further details in relation to flood risk and mitigation shall be submitted to and approved in writing by the local planning authority: a) details of how the development will be constructed so as to be resilient in times of flood, specifically considering risks from mobilisation of buildings, plant and any other structures associated with the development hereby approved, and risk of contamination of nearby ecological designation by materials kept on site.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
b) a flood emergency plan setting out: - how staff and visitors working on the site will be protected in times of flood during both construction and operational phases of the development. - how mobile equipment will be protected or suitably fastened down in times of flood, during construction and operational phases of the development.
Reason: to ensure that persons and the environment are suitably protected from flooding risks including risks from flood waters and of debris carried by floodwaters.
6. Sound and visual impact mitigation
a) Prior to the commencement of the development hereby approved details of the combined noise / visual barriers to be erected on site will be submitted to and approved in writing by the local planning authority. The barriers will be designed so as to provide suitable noise and visual barrier between the site and areas identified as ‘high tide roosts 3D, 3F and 3G’ in Natural England’s letter to Bristol City Council of 25.11.2016. The details will include the size, location and materials of the barrier.
The barriers will be constructed in full accordance with the approved details prior to the commencement of the development and maintained for the lifetime of the development.
b) Prior to the commencement of the development hereby approved details of the noise barriers to be erected on site will be submitted to and approved in writing by the local planning authority. The barriers will be designed so as to provide suitable noise mitigation between the site and residential areas in Avonmouth Village, in accordance with the details set out in the noise impact assessment submitted in support of the application dated December 2016 (document reference: COS-OH2231-XX-000-REP 000107).
The barriers will be constructed in full accordance with the approved details prior to the commencement of the development and maintained for the lifetime of the development.
c) Prior to the commencement of the development details of site boundary control measures shall be submitted to and approved in writing by the local planning authority. The measures shall set out how persons visiting or working on the site shall be prevented from accessing the perimeter of the site where this may cause disturbance to the areas identified as ‘high tide roosts 3D, 3F and 3G’ in Natural England’s letter to Bristol City Council of 25.11.2016.
The approved measures shall be implemented as approved prior to commencement of the development.
Reason: To prevent undesirable ecological impacts on the habitats of wading and wildfowl species associated with the Severn Estuary European Marine Site and comply with the Conservation of Habitats and Species Regulations 2010 (as amended) and policy DM19 in the Bristol Local Plan - Site Allocations and Development Management Policies (adopted July 2014) and policies BCS9 and BCS15 in the Bristol Development Framework, Core Strategy (adopted 2011) and to comply with section 14(2) of the Wildlife and Countryside Act (1981) with respect to Japanese knotweed.
7. Control of invasive species
Prior to the commencement of development on the site a survey shall be undertaken to identify all Japanese Knotweed and other invasive species upon the site and adjacent to it. Following this, a report setting out measures to control invasive species to prevent them from spreading onto the
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
site shall be submitted to and approved in writing by the local planning authority. The report will include a timescale for undertaking the various measures. The approved measures shall be undertaken in accordance with the timescale as approved in the report. Reason: to prevent the spread of invasive species which have the potential to damage ecological systems and property, to comply with section 14(2) of the Wildlife and Countryside Act (1981).
8. Highway condition survey
Prior to the commencement of the development hereby approved a highway condition survey shall be undertaken and submitted to and approved in writing by the local planning authority. The survey shall include any routes as directed by the local planning authority. Reason: to help identify where damage may occur to the public highway as a result of development.
9. Waste Management Plan
Prior to the commencement of the development hereby approved a waste management plan shall be submitted to and approved in writing by the local planning authority. The plan shall include details of: - disposal of waste from site arising from site demolition and preparation. This will specifically provide details of actions for contaminated waste. - disposal of waste arising from the construction of the site, including activities relating to piling and any potentially contaminated materials that may be produced / exposed by this. The development shall be undertaken in accordance with the approved details during the construction and operational phases of the development. Reason: to suitably control waste from site.
Pre-occupation 10. Archaeological watching brief during development groundworks
The applicant/developer shall ensure that all groundworks, including geotechnical works, are monitored and recorded by an archaeologist or an archaeological organisation previously agreed in writing by the Local Planning Authority. Reason: To record remains of archaeological interest before destruction.
11. Sustainable Urban Drainage - details
Prior to the first commencement of the uses hereby approved, full details of a Sustainable Drainage System Strategy for the site to include potential pollution and erosion risks shall be submitted to, and approved in writing by the Local Planning Authority. This shall address whether water will discharge to the inter-tidal or sub-tidal zone, what potential pollutants are likely to be present and in what concentrations, how these compare to Environmental Quality Standards, evidence to support the effectiveness of the proposed petrol interceptor, estimated flow rates of surface runoff at the discharge point and a full assessment of Sustainable Drainage Systems
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
(SuDS). The approved plan shall be implemented prior to the use hereby approved commencing and adhered to thereafter for the lifetime of the development.
Reason: To prevent undesirable ecological impacts on the habitats of wading and wildfowl species associated with the Severn Estuary European Marine Site and comply with the Conservation of Habitats and Species Regulations 2010 (as amended) and policy DM19 in the Bristol Local Plan - Site Allocations and Development Management Policies (adopted July 2014) and policies BCS9 and BCS15 in the Bristol Development Framework, Core Strategy (adopted 2011).
12. Further details of external appearance
Prior to the commencement of the relevant element of the development, the following details will be submitted to and approved in writing by the local planning authority: a) colour and material of the external materials on the building where the precast concrete
segments will be made on the part of the site labelled ‘site A’ in the design and access
statement submitted in support of the application revision ‘d’ dated 16.12.2016 (document ref:
COS-OH2231-XX-000-REP-000106- AVONMOUTH DESIGN & ACCESS STATEMENT).
b) colour and material of the external materials for the welfare offices on the part of the site
known as ‘site B’ in the design and access statement submitted in support of the application
revision ‘d’ dated 16.12.2016 (document ref: COS-OH2231-XX-000-REP-000106-
AVONMOUTH DESIGN & ACCESS STATEMENT).
The approved details will be implemented prior to the occupation of the relevant building (as named above) and shall thereafter be maintained for the lifetime of the development. Reason: to ensure that the visual appearance of the buildings on the site is appropriate.
13. Construction Environmental Management Plan
During construction, operational and decommissioning phases the development hereby approved will be undertaken and operated in strict accordance with the construction environmental management plan submitted in support of the application prepared by Costain issue 3 dated December 2016 (unless variations to the contents are superseded by other details approved under separate conditions of this consent). Reason: To prevent undesirable ecological impacts on the habitats of wading and wildfowl species associated with the Severn Estuary European Marine Site and comply with the Conservation of Habitats and Species Regulations 2010 (as amended) and policy DM19 in the Bristol Local Plan - Site Allocations and Development Management Policies (adopted July 2014) and policies BCS9 and BCS15 in the Bristol Development Framework, Core Strategy (adopted 2011).
14. Construction Traffic Management Plan
During construction, operational and decommissioning phases the development hereby approved will be undertaken and operated in strict accordance with the construction traffic management plan submitted in support of the application prepared by Costain issue 2 dated 16 December 2016 document reference: COS-OH2231-XX-000-PLN-000037 (unless variations to the contents are superseded by other details approved under separate conditions of this consent). Reason: To prevent undesirable ecological impacts on the habitats of wading and wildfowl species associated with the Severn Estuary European Marine Site and comply with the Conservation of
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
Habitats and Species Regulations 2010 (as amended) and policy DM19 in the Bristol Local Plan - Site Allocations and Development Management Policies (adopted July 2014) and policies BCS9 and BCS15 in the Bristol Development Framework, Core Strategy (adopted 2011).
15. Noise mitigation
All the recommendations made in the acoustic report submitted with the application dated December 2016 (doc reference COS-OH2231-XX-000-REP 000107) with regards to noise mitigation measures for the construction and operational phases shall be implemented during the phase and timescale as set out in that report. Reason: in order to control noise emissions from the site in order to safeguard amenity.
16. Noise Monitoring Plan
No commencement of use of the development hereby approved shall take place until a site specific Noise Monitoring Plan has been submitted to and approved in writing by the Council. The plan must demonstrate how noise levels from the operation of the development will be in compliance with the noise levels predicted in the acoustic report submitted with the application at the commissioning part of the development and throughout the duration of the development. The monitoring will be undertaken in any area as so directed by the local planning authority. The plan will include methods and timescales for reporting of noise impacts. The approved measuring plan shall be implemented for the lifetime of the development. Reason: in order to monitor the effects of the development to ensure compliance with the documents submitted in support of the application.
17. Traffic management plan
Prior to the first use of the development hereby approved occurring a traffic management plan shall be submitted to and approved in writing by the local planning authority. The management plan will specifically set out the hours of vehicle movements associated with deliveries to the site and the transport of materials and products away from the site. The plan will also relate to shift working patterns in order to minimise the impact of the development on the highway network. Reason: To help ensure the expedient operation of the local highway network.
18. Travel plans
Prior to the first commencement of the land uses hereby approved occurring a travel plan shall be submitted to and approved in writing by the local planning authority. The plan shall include provision of a minibus to facilitate access to the site by more sustainable means as set out in the transport statement submitted in support of the application. The development will be managed in strict and full accordance with the approved travel plan details thereafter for the lifetime of the development. The Approved Travel Plan shall be monitored and reviewed in accordance with the agreed Travel Plan targets to the satisfaction of the Local Planning Authority. Reason: To support sustainable transport objectives including a reduction in single occupancy car journeys and the increased use of public transport, walking and cycling.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol 19. Electric Vehicle Charging
Prior to the first commencement of the land uses hereby approved occurring details of at least 6 electric vehicle charging spaces shall be submitted to and approved in writing by the local planning authority. This will include: a) the location of the parking spaces b) the technology associated with electric vehicle charging and how this will be accessed by users The development will be constructed in accordance with the approved details and will thereafter be maintained as such for the lifetime of the development. Reason: to ensure that alternative vehicle technologies are available to occupants of the building to help mitigate climate change
20. Further details of Refuse Storage and Recycling Facilities
Prior to the first commencement of the land uses hereby approved occurring details of the refuse store, and area/facilities allocated for storing of recyclable materials shall be submitted to and approved in writing by the local planning authority. The approved stores shall be constructed and completed prior to the first occupation of the development hereby approved. Thereafter, all refuse and recyclable materials associated with the development shall either be stored within the dedicated store/area, as shown on the approved plans, or internally within the building(s) that form part of the application site. No refuse or recycling material shall be stored or placed for collection on the public highway or pavement, except on the day of collection. Reason: To safeguard the amenity of the occupiers of adjoining premises, protect the general environment, and prevent obstruction to pedestrian movement, and to ensure that there are adequate facilities for the storage and recycling of recoverable materials.
21. Further details of Cycle Provision
No building or use hereby permitted shall be occupied or the use first commenced until details of the cycle parking provision for the development has been submitted to and approved in writing by the local planning authority. The approved cycle parking will be constructed prior to the first occupation of the development hereby permitted and shall be thereafter retained, kept free of obstruction and available for the parking of cycles only for the lifetime of the development. Reason: To ensure the provision and availability of adequate cycle parking.
22. Completion of Vehicular Routes - Shown on approved plans
No building or use hereby permitted shall be first occupied or the use first commenced until the routes for vehicular access have been constructed and completed in accordance with the approved plans and the said means of vehicular routes shall thereafter be retained for the duration of the development. Reason: In the interests of highway safety.
23. Completion and Maintenance of Car/Vehicle Parking - Shown on approved plans
No building or use hereby permitted shall be first occupied or the use first commenced until the car/vehicle parking area shown on the approved plans has been completed, and thereafter, the
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
area shall be kept free of obstruction and available for the parking of vehicles associated with the development for the lifetime of the development Reason: To ensure that there are adequate parking facilities to serve the development.
24. Completion of Pedestrians/Cyclists Access - Shown on approved plans
No building or use hereby permitted shall be first occupied or the use first commenced until the means of access for pedestrians and/or cyclists have been constructed in accordance with the approved plans and shall thereafter be retained for access purposes only for the lifetime of the development. Reason: In the interests of highway safety.
25. Details of noise mitigation for protected species and / or habitats
At least one of the provisions a), b) or c) below must be complied with at any one time: a) All percussive piling operations within 300m of roosts 3D or 3F, as set out in Natural England’s letter dated 25 November 2016, between 1 September and 16 July inclusive shall be suspended for two hours before, during and two hours after high tide, or alternatively; b) only screw auger piling and no percussive piling shall be used between 1 September and 16 July inclusive within 300m of roosts 3D or 3F, as set out in Natural England’s letter dated 25 November 2016, or alternatively; c) revised noise modelling and details of acoustic barriers shall be submitted to and approved in writing by the Local Planning Authority before the commencement of percussive piling. The noise modelling shall demonstrate that acoustic barrier(s) will reduce noise levels experienced at the noise sensitive ecological receptors [the redshank roosts identified as 3D or 3F in Natural England’s letter dated 25 November 2016], so that they shall not exceed 70 dB LAmax,f. The acoustic barrier shall be erected in accordance with the approved details prior to the commencement of piling operations and maintained for the duration of the construction of the project which involves piling operations. Reason: To prevent disturbance of wading and wildfowl species associated with the Severn Estuary European Marine Site and comply with the Conservation of Habitats and Species Regulations 2010 (as amended) and policy DM19 in the Bristol Local Plan - Site Allocations and Development Management Policies (adopted July 2014) and policies BCS9 and BCS15 in the Bristol Development Framework, Core Strategy (adopted 2011).
26. Occupation of uses and hazardous substance licences
No occupation of the buildings hereby permitted nor use of the land hereby permitted will occur until such time as hazardous substance licences for sheds E, F, P, R and T c/o The Bristol Port Company, Avonmouth Dock, Bristol, BS11 9DQ have been revoked. Reason: to ensure that the site suitable for use without unduly exposing workers to risks arising from storage of hazardous substances, in order to comply with the Health and Safety at Work etc. Act 1974.
27. Land affected by contamination - Reporting of Unexpected Contamination
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
In the event that contamination is found at any time when carrying out the approved development that was not previously identified it must be reported in writing immediately to the Local Planning Authority. An investigation and risk assessment must be undertaken in accordance with the requirements of Condition 5 and where remediation is necessary a remediation scheme must be prepared in accordance with the requirements of Condition 6, which is to be submitted to and be approved in writing by the Local Planning Authority. Following completion of measures identified in the approved remediation scheme a verification report must be prepared, which is subject to the approval in writing of the Local Planning Authority in accordance with condition 7. Reason: to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors.
Post occupation management 28. Highway condition survey
Following completion of the works necessary to allow the proposed use to commence, the developer shall submit a highway condition survey to the local planning authority. The highway condition survey shall re-survey the routes that were surveyed in the highway condition survey previously approved in writing by the local planning authority and any other additional routes if so directed in writing by the local planning authority. Reason: in order to ensure highways impacts are recorded.
29. Long term monitoring and maintenance – contaminated land
a) If a monitoring and maintenance scheme, to include monitoring the long-term effectiveness of the proposed remediation, is required as part of the approved remediation scheme then the monitoring and maintenance scheme will be submitted to and approved in writing by the local planning authority prior to the uses of the land hereby permitted first commencing. This will include a timescale for the monitoring and maintenance to take place and a timescale for reporting the effectiveness of this. b) Following completion of the measures identified in the approved monitoring and maintenance scheme and when the remediation objectives have been achieved, reports that demonstrate the effectiveness of the monitoring and maintenance carried out must be produced, and submitted to the Local Planning Authority for approval in accordance with the approved timescale. This must be conducted in accordance with current UK guidance including DEFRA and the Environment Agency’s ‘Model Procedures for the Management of Land Contamination, CLR 11’. Reason: to ensure that risks from land contamination to the future users of the land and neighbouring land are minimised, together with those to controlled waters, property and ecological systems, and to ensure that the development can be carried out safely without unacceptable risks to workers, neighbours and other offsite receptors. Government policy also states that planning policies and decisions should also ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121).
30. Vehicular access
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol
Vehicular access to the proposed facility will be through Bristol Port from Kings Road Avenue. The majority of traffic will use junction 18 of the M5 with some local traffic using the A4 Portway. No construction traffic will be permitted through Avonmouth village. Reason: to ensure that vehicles use appropriate routes to safeguard against amenity impacts and to ensure the expediency of the public highway.
31. Noise from plant & equipment
The specific noise level of any noise generated by any operational plant & equipment as part of the development shall not exceed the noise levels predicted in the acoustic report submitted with the application dated December 2016 (doc reference COS-OH2231-XX-000-REP 000107). Any noise measurements shall be made in accordance with BS4142: 2014 Methods for rating and assessing industrial and commercial sound. Reason: to safeguard amenity of the surrounding area.
32. Control of noise impacts
If at any time as reported by the noise monitoring approved under other conditions of this consent, or by noise monitoring carried out by officers of Bristol City Council, the noise emissions are above those predicted in the acoustic report submitted with the application dated December 2016 (doc reference COS-OH2231-XX-000-REP 000107), a scheme to reduce noise output to the levels set out in the acoustic report submitted with the application dated December 2016 (doc reference COS-OH2231-XX-000-REP 000107) shall be prepared, submitted to and approved in writing by the local planning authority. The approved scheme shall be put in place within 1 month of the approval of the local planning authority and the noise monitoring shall continue. Reason: in order to control noise emissions so as to safeguard surrounding amenity.
Listed of approved plans 33. To be presented at Committee. Informatives Network Rail Advice SAFETY No work should be carried out on the development site that may endanger the safe operation of the railway or the stability of Network Rail’s structures and adjoining land. Care must be taken to ensure that no debris or other materials can fall onto Network Rail land. In view of the close proximity of these proposed works to the railway boundary the developer should contact Richard Selwood at Network Rail on [email protected] before works begin. DRAINAGE Additional or increased flows of surface water should not be discharged onto Network Rail land or into Network Rail's culvert or drains. In the interest of the long-term stability of the railway, it is recommended that soakaways should not be constructed within 20 metres of Network Rail's boundary. Any surface water run-off from the site must drain away from the railway boundary and must NOT drain in the direction of the railway as this could import a risk of flooding and / or pollution onto Network Rail land.
Item no. 4 Development Control Committee A – 22 February 2017 Application No. 16/05322/F : Land Adjoining Berth T And Graving Dock Royal Edward Dock Bristol EXCAVATIONS/EARTHWORKS All excavations / earthworks carried out in the vicinity of Network Rail’s property / structures must be designed and executed such that no interference with the integrity of that property / structure can occur. If temporary compounds are to be located adjacent to the operational railway, these should be included in a method statement for approval by Network Rail. Prior to commencement of works, full details of excavations and earthworks to be carried out near the railway undertaker’s boundary fence should be submitted for approval of the Local Planning Authority acting in consultation with the railway undertaker and the works shall only be carried out in accordance with the approved details. Where development may affect the railway, consultation with the Asset Protection Engineer should be undertaken. PLANT, SCAFFOLDING AND CRANES Any scaffold which is to be constructed adjacent to the railway must be erected in such a manner that, at no time will any poles or cranes over-sail or fall onto the railway. All plant and scaffolding must be positioned, that in the event of failure, it will not fall on to Network Rail land. LIGHTING Any lighting associated with the development (including vehicle lights) must not interfere with the
sighting of signalling apparatus and/or train drivers vision on approaching trains. The location and
colour of lights must not give rise to the potential for confusion with the signalling arrangements on the
railway
Supporting Documents
4. Land adjoining Berth T and Graving Dock, Royal Edward Dock
1. Masterplan (Roof Plans) 2. Aggregate Bins plans & elevations 3. Laboratory plans & elevations 4. Segment factory plans & elevations 5. Site sections 1 & 2 6. Temporary office plans & elevations 7. Temporary office plans
4000
4000
2000
0
tel 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected]
Notes
Project No:
www.ramboll.co.uk
Scale (@ A1): Drawn:
Drawing No: Rev:
Rev Description DateByChk
App
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE MILLIMETRES U.N.O.
ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUMU.N.O.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
1.
2.
3.
4.
Date:
COPYRIGHT RAMBOLL UK LIMITED. ALL RIGHTS RESERVED. THIS DOCUMENT ISISSUED FOR THE PARTY WHO COMMISSIONED IT AND FOR THE SPECIFICPURPOSES CONNECTED WITH THE PROJECT ONLY. IT SHOULD NOT BE RELIEDUPON BY ANY OTHER PARTY OR USED FOR ANY OTHER PURPOSE. RAMBOLLACCEPTS NO RESPONSIBILITY OR LIABILITY WHICH MAY ARISE FROM RELIANCE ORUSE OF THIS DOCUMENT OR THE DATA CONTAINED HEREIN BY ANY OTHER PARTYOR FOR ANY OTHER PURPOSE.
CLIENT
KEY PLAN
KEY PLAN
1620000384
15/12/2016 19:22:57
1 : 100
PRELIMINARY
TEMPORARY PRECASTCONCRETE FACILITY,
AGGREGATE BINSPLANS & ELEVATIONS
RAM-OH2231-AV-ABA-DRW-A-000001 P01
12/15/16 PdS
AVONMOUTH DOCKS
1 : 100EAST ELEVATION
1 : 100SOUTH ELEVATION
1 : 100ROOF PLAN
P01 PRELIMINARY ISSUE 14/122016
SHPdSCC
AXONOMETRIC
tel 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected]
Notes
Project No:
www.ramboll.co.uk
Scale (@ A1): Drawn:
Drawing No: Rev:
Rev Description DateByChk
App
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE MILLIMETRES U.N.O.
ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUMU.N.O.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
1.
2.
3.
4.
Date:
COPYRIGHT RAMBOLL UK LIMITED. ALL RIGHTS RESERVED. THIS DOCUMENT ISISSUED FOR THE PARTY WHO COMMISSIONED IT AND FOR THE SPECIFICPURPOSES CONNECTED WITH THE PROJECT ONLY. IT SHOULD NOT BE RELIEDUPON BY ANY OTHER PARTY OR USED FOR ANY OTHER PURPOSE. RAMBOLLACCEPTS NO RESPONSIBILITY OR LIABILITY WHICH MAY ARISE FROM RELIANCE ORUSE OF THIS DOCUMENT OR THE DATA CONTAINED HEREIN BY ANY OTHER PARTYOR FOR ANY OTHER PURPOSE.
CLIENT
KEY PLAN
KEY PLAN
1620000384
15/12/2016 21:00:47
1 : 100
PRELIMINARY
TEMPORARY PRECASTCONCRETE FACILITY,
LABORATORYPLANS & ELEVATIONS
RAM-OH2231-AV-LAA-DRW-A-000001 P01
12/15/16 PdS
AVONMOUTH DOCKS
1 : 100EAST ELEVATION
1 : 100SOUTH ELEVATION
1 : 100NORTH ELEVATION
1 : 100WEST ELEVATION
1 : 100ROOF PLAN
P01 PRELIMINARY ISSUE 14/122016
SHPdSCC
AXONOMETRIC NE AXONOMETRIC SW
PV
36900
1650
0
1410
0
36900
1650
0
1410
0
201400
1410
0
1650
0
201400
1650
0
1410
0
EXTERNAL ENVELOPE
VEHICULAR DOOR
PERSONNEL DOOR
tel 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected]
Notes
Project No:
www.ramboll.co.uk
Scale (@ A1): Drawn:
Drawing No: Rev:
Rev Description DateByChk
App
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE MILLIMETRES U.N.O.
ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUMU.N.O.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
1.
2.
3.
4.
Date:
COPYRIGHT RAMBOLL UK LIMITED. ALL RIGHTS RESERVED. THIS DOCUMENT ISISSUED FOR THE PARTY WHO COMMISSIONED IT AND FOR THE SPECIFICPURPOSES CONNECTED WITH THE PROJECT ONLY. IT SHOULD NOT BE RELIEDUPON BY ANY OTHER PARTY OR USED FOR ANY OTHER PURPOSE. RAMBOLLACCEPTS NO RESPONSIBILITY OR LIABILITY WHICH MAY ARISE FROM RELIANCE ORUSE OF THIS DOCUMENT OR THE DATA CONTAINED HEREIN BY ANY OTHER PARTYOR FOR ANY OTHER PURPOSE.
CLIENT
KEY PLAN
KEY PLAN
1620000384
15/12/2016 20:42:54
Asindicated
PRELIMINARY
TEMPORARY PRECASTCONCRETE FACILITY,
SEGMENT FACTORYPLANS & ELEVATIONS
RAM-OH2231-AV-SFA-DRW-A-000010 P01
12/14/16 PdS
AVONMOUTH DOCKS
1 : 500ROOF PLAN
1 : 500EAST ELEVATION
1 : 500WEST ELEVATION
1 : 500SOUTH ELEVATION
1 : 500NORTH ELEVATION
P01 PRELIMINARY ISSUE 14/122016
SHPdSCC
AXONOMETIC VIEW
tel 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected]
Notes
Project No:
www.ramboll.co.uk
Scale (@ A1): Drawn:
Drawing No: Rev:
Rev Description DateByChk
App
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE MILLIMETRES U.N.O.
ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUMU.N.O.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
1.
2.
3.
4.
Date:
COPYRIGHT RAMBOLL UK LIMITED. ALL RIGHTS RESERVED. THIS DOCUMENT ISISSUED FOR THE PARTY WHO COMMISSIONED IT AND FOR THE SPECIFICPURPOSES CONNECTED WITH THE PROJECT ONLY. IT SHOULD NOT BE RELIEDUPON BY ANY OTHER PARTY OR USED FOR ANY OTHER PURPOSE. RAMBOLLACCEPTS NO RESPONSIBILITY OR LIABILITY WHICH MAY ARISE FROM RELIANCE ORUSE OF THIS DOCUMENT OR THE DATA CONTAINED HEREIN BY ANY OTHER PARTYOR FOR ANY OTHER PURPOSE.
CLIENT
KEY PLAN
KEY PLAN
1620000384
15/12/2016 15:23:51
1 : 125
PRELIMINARY
TEMPORARY PRECASTCONCRETE FACILITY,
TEMPORARY OFFICEPLANS & ELEVATIONS
RAM-OH2231-AV-TOA-DRW-A-000001 P01
12/15/16 PdS
AVONMOUTH DOCKS
1 : 125EAST ELEVATION
1 : 125SOUTH ELEVATION
1 : 125NORTH ELEVATION
1 : 125WEST ELEVATION
1 : 125ROOF PLAN
P01 PRELIMINARY ISSUE 14/122016
SHPdSCC
high level high level
926 2LFD30SFRVP
DC
STORE
CLEANERS
SINK
high level
60 NO WIRE MESH LOCKERS (supplied & fitter by others)
IRIS HD NON SLIP
VINYL FLOORING
S+V STACK
22MM
S
ZIP
NOTE:
zip water
boiler
CANTEEN
AREA
ZIP
NOTE:
zip water
boiler
1150MM
BELOW CEILING
51" FLAT
SCREEN
TV
1150MM
BELOW CEILING
51" FLAT
SCREEN
TV
UPVC SLIDING WINDOW
3OOO X 1200MM LINED APERTURE
KITCHEN
AREA
SEPARATE MAINS BOARD
FOR KITCHEN EQUIPMENT
KITCHEN
STORE
926 2L
FD30S
FRVP
DC
(VP TYPE) (VP TYPE)
(VP TYPE) (VP TYPE)
(VP TYPE) (VP TYPE)
(fit out by others)
MAINS
BOARD
1110
926 2LFD30S
DC
826 DC
FD30S
FRVP
826 DC
FD30S
FRVP
high level high levelhigh level high levelhigh level high level
926 2L
FD30S
FRVP
DC
926
FD30S
FRVP
DC
high level high level
826 LA
DC
high level high levelhigh levelhigh levelhigh level high level
926 LA
FD30S
DC
high level high levelhigh level high levelhigh level high levelhigh level high levelhigh level high level
1110
MALE CHANGING AREA
926 2L
FD30S
DC
high level
FIRST
AID
1110
1894VP
VP
926 2L
FD30S
DC
900x1000
SLIDING HATCH
900x1000
VISION PANELSECURITY
926 2L
FD30S
DC
FRVP
1150MM
BELOW CEILING
51" FLAT
SCREEN
TV
INDUCTION ROOM
high level
826 IB
(VP TYPE)
826 IB
ALARM
ALARM
PIR PIR PIR PIR
(VP TYPE)
(VP TYPE)
(VP TYPE)
DX200T
ROLLER SHUTTER
926 LA
FD30S
DC2400 S/S WASH TROUGH 2400 S/S WASH TROUGH
U/SINK U/SINK
2x 1800 S/S TROUGH URINAL (W
ATERLESS)
(ARIEL)
(ARIEL)
2x 1800 S/S TROUGH URINAL (W
ATERLESS)
2x 1800 S/S TROUGH URINAL (W
ATERLESS)
40 NO WIRE MESH LOCKERS (supplied & fitter by others)
1110
HD
HD HD HD
HD
HD
IRIS HD NON SLIP
VINYL FLOORINGIRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
15MMSTOP TAP
40MMWASTE OUTLET
110MMAVV DRAIN
22MMSTOP TAP 110MM STOP TAP
110MM
S+V STACK
22MM15MM
STOP TAP32MM
WASTE OUTLET
32MMWASTE OUTLET
15MMSTOP TAP
S S S S
S S
S
S
S
S
S
S S S
S
H
H
HH
S
S S S S S
RWP RWP RWP RWP RWP RWP
RWP RWPRWP RWP RWP RWP
10P
10P
10P
10P
WORKTOP WORKTOP
high level high level
926 LA
FD60S
FRVP
DC
2w
STOP TAP
S
RWP
DOUBLE
BOARDED
ALARM ALARM
PIR PIR
high level high level
HD
dyson
airblade
HD
dyson
airblade
110mm vent stack15mm MCW inlet
GARTEC
DDA PLATFORM LIFT
110mm vent stack15mm MCW inlet R
WP
RECEPTION AREA
PIR
RWP
VISITOR ROOM
VP
720
VP720
1070
VP
VP
1070
926 IB
926 IB
2600
250 250
338
3000 BAY 223000 BAY 01 3000 BAY 02 3000 BAY 03 3000 BAY 04 3000 BAY 05 3000 BAY 06 3000 BAY 07 3000 BAY 08 3000 BAY 09 3000 BAY 13 3000 BAY 14 3000 BAY 15 3000 BAY 16 3000 BAY 17 3000 BAY 18 3000 BAY 19 3000 BAY 20 3000 BAY 21
12000
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250250
434
250
327250
250 250
250 250 250559
523
3900
2000
2000
2000
550
550
2000
3805
3805
1395
5695
3050
2189
1500
1800
3880
3880
3880
600
2265
11610
66000
3000 BAY 10
250 250
1503 1503
2600
250 900x400 250900x400
2400x2400 Fully Glazed
324
2400x2400 Fully Glazed
300300
300
3000 BAY 11 3000 BAY 12
high level high level
high level
S+V STACK
22MM
UPVC SLIDING WINDOW
SEPARATE MAINS BOARD
FOR KITCHEN EQUIPMENT
1110
high level high levelhigh level high levelhigh level high level
high level high levelhigh level high levelhigh levelhigh levelhigh level high level
high level high levelhigh level high levelhigh level high levelhigh level high levelhigh level high level
1110
high level
1110
high level
1110
15MMSTOP TAP
40MMWASTE OUTLET
110MMAVV DRAIN
22MMSTOP TAP 110MM STOP TAP
110MM
S+V STACK
22MM15MM
STOP TAP32MM
WASTE OUTLET
32MMWASTE OUTLET
15MMSTOP TAP
RWP RWP RWP RWP RWP RWP
RWP RWPRWP RWP RWP RWP
10P
10P
10P
high level high level
STOP TAP
RWP high level high level
110mm vent stack15mm MCW inlet
110mm vent stack15mm MCW inlet R
WP
RWP
VP
720
VP720
1070
VP
VP
1070
250 250
338
3000 BAY 223000 BAY 01 3000 BAY 02 3000 BAY 03 3000 BAY 04 3000 BAY 05 3000 BAY 06 3000 BAY 07 3000 BAY 08 3000 BAY 09 3000 BAY 13 3000 BAY 14 3000 BAY 15 3000 BAY 16 3000 BAY 17 3000 BAY 18 3000 BAY 19 3000 BAY 20 3000 BAY 21
12000
250 250 250 250 250 250 250 250 250 250 250 250 250 250 250250
434
250
327250
250 250
250 250 250559
523
66000
3000 BAY 10
250 250
250 900x400 250900x400
2400x2400 Fully Glazed2400x2400 Fully Glazed
300300
300
3000 BAY 11 3000 BAY 12
826 IB
826 LA
high level high level
DC
FD30SFRVPDC
926 2L
FD30S
FRVP
DC
TC MEETING ROOM
space for
dish washer
space for
fridges
space for
fridges
ZIP
NOTE:
zip water
boiler
TC OFFICE AREA
IT IT IT(3 DSSO 3 DATA)
IT IT IT(3 DSSO 3 DATA)
IT IT IT(3 DSSO 3 DATA)
IT IT IT(3 DSSO 3 DATA)
IT (1 DSSO
1 DATA)
IT (1 DSSO
1 DATA)
IT (1 DSSO
1 DATA)
IT (1 DSSO
1 DATA)
IT (1 DSSO
1 DATA)
1110 VP
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT
IT
FLOOR
BOX
1110 VP
826 LA
DC
826 LA
DC
826 IB
high level high level
826 LA
DC
826 2LFD30S
SERVER
ROOM ITITIT
IT
IT
IT IT IT IT(3 DSSO 3 DATA)
IT IT IT(4 DSSO 4 DATA)
IT
IT
IT
IT
IT
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
IT
926 2L
FD30S
FRVP
DC
926 2L
FD30S
FRVP
DC
926 2L
FD30S
FRVP
DC
926 2L
FD30S
FRVP
DC
926 2L
FD30S
FRVP
DC
926 2LFD30SFRVPDC
VIEWING DECK C/W
CHECKER PLATE LANDING
AND HANDRAILS TO SUIT
MEETING
RM3
MEETING
RM1
MEETING
RM2 MEETING
RM
CLIENT
STORE
PPE
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(3 DSSO 3 DATA)
IT IT IT
(4 DSSO 4 DATA)
IT
IT(1 DSSO
1 DATA)
IT(1 DSSO
1 DATA)
IT(1 DSSO
1 DATA)
IT(1 DSSO
1 DATA)
IT(1 DSSO
1 DATA)
(1 DSSO
1 DATA)
IT
IT
IT IT
IT
IT
IT
IT
IT
IT
IT
51" FLAT
SCREEN
TV
1150MM
BELOW CEILING
MAINS
BOARD
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER
AIR CON
CONDENSER CONDENSER
AIR CON
CONDENSER
2DE
2DE
PIRPIR
PIRPIRPIRPIRPIR
2DE
2DE
1150MM
BELOW CEILING
51" FLAT
SCREEN
TV
12No hat&coat
hooks
(plumbing)
U/SINK
(ARIEL)
(ARIEL)
(VID LEAD/
TO FLOOR BOX)
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
CLARET
CARPET TILES
METAL
CARPET TILES
OCEAN
CARPET TILES
MOSS
CARPET TILES
TAN
CARPET TILES
CLARET
CARPET TILES
BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND BLIND
HD
HD
RWP RWP RWP RWP RWP RWP
110MM
S+V STACK
22MMSTOP TAP110MM
S+V STACK
22MMSTOP TAP
S S S
S
S
S
S
S
S
S
H
S S
S S
S
SSSS
S
RWP RWP RWPRWP RWP RWP
10P
10P
ALARM ALARM
PIR PIR
high level high level
HD
dyson
airblade
HD
dyson
airblade
110mm vent stack15mm MCW inlet
GARTEC
DDA PLATFORM LIFT
PROPOSED FIRST FLOOR NEW SECTIONS
PIR
RWP
RWP
926 2L
FD30S
FRVP
DC
ZIP
space for
dish washer
NOTE:
zip water
boiler
space for
fridge
RECEPTION AREA
IT
IT
FLOOR
BOX
IT(1 DSSO
1 DATA)
(MACE OFFICE)
AIR CON
CONDENSER
PIR
(plumbing)
U/SINK
IRIS HD NON SLIP
VINYL FLOORING
BLIND
BLIND BLIND
22MMSTOP TAP
H
926 LA
FD60S
FRVP
DC
2w
IT
IT
FLOOR
BOX
IRIS HD NON SLIP
VINYL FLOORING
IRIS HD NON SLIP
VINYL FLOORING
BLIND BLIND
HD
S
RWP
DOUBLE
BOARDED
926 IB
926 IB
66000
3000 BAY 23 3000 BAY 24 3000 BAY 25 3000 BAY 26 3000 BAY 27 3000 BAY 28 3000 BAY 29 3000 BAY 31 3000 BAY 35 3000 BAY 36 3000 BAY 37 3000 BAY 38 3000 BAY 39 3000 BAY 40 3000 BAY 41 3000 BAY 42 3000 BAY 43 3000 BAY 44
12000
3000
3000
250250 250 250 250 1050 250 250 250 250 250 250 250 250 250
250250
250 250 250 250 250 250
250
250 250 250250 250
6396
3838
4000
1715
1286
5795
1528
2163
1293
2200
4000
5800
5800
2405
1503 1503
2600
250 900x400 250900x400
2400x2400 Fully Glazed
300
2400x2400 Fully Glazed
300 300300
3000 BAY 30 3000 BAY 32
4000
1800
3000 BAY 33 3000 BAY 34
tel 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected] 0117 929 5200 [email protected]
Notes
Project No:
www.ramboll.co.uk
Scale (@ A1): Drawn:
Drawing No: Rev:
Rev Description DateByChk
App
DO NOT SCALE FROM THIS DRAWING
ALL DIMENSIONS ARE MILLIMETRES U.N.O.
ALL LEVELS ARE IN METRES ABOVE ORDNANCE DATUMU.N.O.
THIS DRAWING IS TO BE READ IN CONJUNCTION WITHALL RELEVANT ARCHITECTS AND ENGINEERS DRAWINGSAND SPECIFICATIONS.
1.
2.
3.
4.
Date:
COPYRIGHT RAMBOLL UK LIMITED. ALL RIGHTS RESERVED. THIS DOCUMENT ISISSUED FOR THE PARTY WHO COMMISSIONED IT AND FOR THE SPECIFICPURPOSES CONNECTED WITH THE PROJECT ONLY. IT SHOULD NOT BE RELIEDUPON BY ANY OTHER PARTY OR USED FOR ANY OTHER PURPOSE. RAMBOLLACCEPTS NO RESPONSIBILITY OR LIABILITY WHICH MAY ARISE FROM RELIANCE ORUSE OF THIS DOCUMENT OR THE DATA CONTAINED HEREIN BY ANY OTHER PARTYOR FOR ANY OTHER PURPOSE.
CLIENT
KEY PLAN
KEY PLAN
1620000384
16/12/2016 11:51:46
1 : 125
PRELIMINARY
TEMPORARY PRECASTCONCRETE FACILITY,
TEMPORARY OFFICEPLANS
RAM-OH2231-AV-TOA-DRW-A-000002 P01
12/16/16 PdS
AVONMOUTH DOCKS
1 : 125GROUND FLOOR
P01 PRELIMINARY ISSUE 14/122016
SHPdSCC
1 : 125FIRST FLOOR
3D VIEW