development of the azipod system - abb grouppresentation.pdf · development of the azipod ......

40
® Development of the Azipod ® system – Modular construction: – Standard sizes – Standardised auxiliaries – New installation method – Operating Experience – New concepts: – Contra rotating Azipod concept

Upload: trinhkhanh

Post on 05-Jul-2018

295 views

Category:

Documents


8 download

TRANSCRIPT

®Development of the Azipod® system

– Modular construction: – Standard sizes– Standardised auxiliaries

– New installation method– Operating Experience– New concepts:

– Contra rotating Azipod concept

®Modularity

Main deliveries:• Slipring and aircooling unit• Steering mechanics andhydraulics• The mounting block• The Azipod unit• Generators• Electrical distribution system• Propulsion drive system• Automation systems

®Standard sizes up to 38 MW

®Steering unit Cooling unit (AZICOOL)

Pod and PropellerAZIPOD® MAIN COMPONENTS

Slipring unit

Mounting block

Hydraulic steering pump pack

®

Installation of the Mounting block, the Steering unitand the Slipring unit

®

Installation of the Mounting block, the Steering unitand the Slipring unit

®

Installation of theAZICOOL unit

®

®Installation of theHydraulic steering pump pack

®

®Azipod®

installation

The Azipod unit is connectedto the steering unit with a flange

®

Azipod®

ready for operation

®

®

From design...

®

…to reality

®

0

100000

200000

300000

400000

500000

600000

700000

800000

900000

91 92 93 94 95 96 97 98 99

2000

2001

2002

2003

2004

Ope

ratin

g ho

urs

132 000 HOURS

SEPT. 1999

Operating Experience

Experience from varying operational profiles:– Service vessels– Cruise vessels– Offshore vessels– Tankers– Icebreakers

®Seili (1,5 MW)

®Seili (1,5 MW)

®Uikku and Lunni (11,4 MW)

®Uikku and Lunni (11,4 MW)

®Röthelstein (2 x 560 kW)

®Röthelstein (2 x 560 kW)

®Elation and Paradise (2 x 14 MW)

®Elation and Paradise (2 x 14 MW)

®MSV Botnica (2 x 5 MW)

®MSV Botnica (2 x 5 MW)

®MSV Botnica (2 x 5 MW)

®Arcticaborg (2 x 1,62 MW)

®Arcticaborg (2 x 1,62 MW)

®

®M/S Europa (2 x 6,65 MW)

®M/S Europa (2 x 6,65 MW)

®Voyager of the Seas (3 x 14 MW)

®Voyager of the Seas (3 x 14 MW)

®Radiance of the Seas (2 x 19,5 MW)

®Costa Atlantica (2 x 17,6 MW)

®Shipyard Experience

Projects with 5 different shipyards:– Different installation methods– Different construction schedules– Different scopes of delivery

The common goal of shipyards?– Standardized solutions– Minimized installation time

The challenge: Develop standardized solutionsflexible enough to fit the variableneeds and capabilities of shipyards.

®29 units delivered - 16 on order

®Integrated Systems Deliveries

Bridge OperatorStations

Integrated Control and Monitoring SystemDynamic Positioning

Information ManagementSimulationRemote Diagnostics

Thrusters

Propulsion

Propulsion Drives

Power GenerationPower Distribution

Local Engine Control

Fieldbus Network

Control Network

Plant Network

®The CRP Azipod concept

Benefits:• Redundancy compared to singlepropeller vessels• Improved maneuverability• Hydrodynamic efficiencyimproved by 10…15%• Uses existing auxiliarypower plant

� � ��