Development of the building materials industry and prospective of investment cooperation JSC “UZBUILDINGMATERIALS”

Upload: others

Post on 28-Mar-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

Development of the building

materials industry and

prospective of investment

cooperation

JSC “UZBUILDINGMATERIALS”

Page 2: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

“UZBUILDMATERIALS”

2

MEMBERS - 120

Foreign & JV - 28 Uzbek - 92

Attracted Investment (last 10 years) – more $350 mln.

FDI - $ 115,0 mln. Foreign/bank credits -

$242.0 mln

EMPLOYIES – 19 000

Page 3: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

BUILDINGING MATERIALS PRODUCTION

BY JSC “UZBUILDMATERIALS

Ceramic tiles

– 8,5 mln.m2 Gypsum board sheets –

40 mln.m2

Cement (15 types) –

8,0 mln.ton

Glass – 7,5 mln.m2 and glass

product – 200 mln.item

Sanitary ware ceramics –

75 thousand sets

Dry Mix –

420 thousand tonn

Page 4: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

Geography of Export

Page 5: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

SUCCESSFUL PROJECTS

9

“Production of white and green cement”

Cost of project – 120 mln. USD

Location – Djizak region

Beginning of production – in 2014.

“Production of ceramic tiles ” Cost of project – 20.0 mln. USD Project capacity – 6.0 mln.sq.m

“Production of sanitary ware ceramics”

Location – Tashkent region

Beginning of production – in 2014.

Page 6: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

COOPERATION

6

Page 7: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

SUCCESSFUL PROJECTS

7

“Organization of production Dry Mix”

Cost of project – 1.5 mln. USD

Project capacity - 48000 tons

Beginning of production – in 2010.

“Organization of production gypsum board” Cost of project – 51.5 mln. USD Project capacity – 20 mln.sq.m Beginning of production – in 2011.

Location – Bukhara region

Foreign investor – “KNAUF” (Germany)

Page 8: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

www.themegallery.com

PRIVATIZATION

“KVARTZ” JSC

75 %

“QIZILKUMCEMENT

” 35.9 %

“SAMARQAND

MARMAR» JSC

6.9 %

“OHANGARON

SHIFER» JSC

54 %

Page 9: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

Proposed

cooperation areas with

Bulgarian partners

9

Page 10: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

“PRODUCTION OF WALLPAPERS ”

10

Annual capacity - 8.0 mln.m

Cost of project – 2,2 mln. USD

Location – SIZ “Jizzakh”, SIZ “Angren”

Payback period – 4 years

Target markets – Uzbekistan,

Central Asian countries and Afghanistan

Page 11: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

“PRODUCTION OF GLASS KRYSTAL STONE ”

Annual capacity - 100.0 ths m2 per a year

Cost of project – 9,0 mln. USD

Location – SIZ “Angren”

Payback period – 4-5 years

Target markets – Uzbekistan,

Central Asian countries

and Afghanistan

Page 12: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

FORMS OF COOPERATION

IN CREATION OF NEW FOREIGN COMPANY IN

UZBEKISTAN, INCLUDING THE TERRITORIES OF

THE SIZ “DJIZAK”, SIZ “ANGREN”, (GREENFIELD

INVESTMENTS)

IN CREATION OF JOINT VENTURE WITH UZBEK

PARTNER II

WE ARE READY TO PROVIDE ASSISTANCE TO FOREIGN COMPANIES IN THE

FOLLOWING DIRECTIONS IN UZBEKISTAN:

Page 13: Development of the building materials industry ... - bcci.bgŸрезентация... · “Organization of production Dry Mix” Cost of project – 1.5 mln. USD Project capacity

13

Thanks for attention!

JSC “Uzbuildingmaterials”

Contacts: www.uzsm.uz

[email protected] [email protected]

Теl: +99871 2522063/65 Fax: +99871 2557707